HomeMy WebLinkAboutStormwater Narrative - Correspondence - 122 MILLPOND 2/7/2023 21 High Street, Suite 207 North Andover, MA 01845 C IVIL D ESIGN G ROUP, LLC Tel 978.794.5400 ENGINEERING. LAND USE. PLANNING. PERMITTING. www.cdgengineering.com February 7, 2023 Town of North Andover Planning Board 120 Main Street North Andover, MA 01845 Re:Proposed Residential Development 122 Millpond North Andover, MA 01845 Site and Stormwater Narrative Dear Planning Board Members: The proposed project is a single parcel totaling 0.81± acres and is located at 122 Millpond at the intersection of Harkaway Road and Stevens Street. The site lies in the Residence 4 zoning district and is currently comprised of two maintenance buildings and an existing driveway on Harkaway Road with two tennis courts. The proposed development includes the removal of the two tennis courts and the construction of two duplex residential structures and associated driveways with utility connections. Theparcel is proposed to be subdivided into two Approval Not Required (ANR) parcels, whereby the westerly parcel will include the existing maintenance structures to remain and a proposed duplex building and the easterly parcel will include one proposed duplex building. The site is bounded to the west by the Millpond development, to the north by a single family residence to the south by Harkaway Road and to the east by Stevens Street. According to FEMA flood insurance rate maps community panel number 250098C0228F, effective date 07/03/2012, the sitedoes not lie within a floodplain. The site also does not lie within a buffer/resource area or within an aquifer protection area. The site does not lie within an area mapped for rare and endangered species or certified vernal pools as mapped by the State of Massachusetts’ Natural Heritage and Endangered Species Program (NHESP) or within an Area of Critical Environmental Concern (ACEC). Based on the field survey,the entire parcel drains in a southerly direction via overland flow to the intersection of Harkaway Road and Stevens Street, where it is collected via the Town’s drainage system. As such, the stormwater study presents acomparative analysis of the pre- development and post-development hydrologic characteristics tothe site at the intersection. Northeast Regional Climate Center (Cornell Rates) was utilized to source the precipitation values andTechnical Release 55 (TR-55) methodology was utilized to determine weighted curve numbers (CNs) for each pre and post-development subcatchment area. Weighted CNs are based on ground cover type and hydrologic soil groups (HSGs). The times of concentration (Tc's) for each of the existing and proposed watersheds have been calculated. The areas that do not show a Tc travel path resulted in travel times of less than 6 minutes. CN and Tc values were then utilized to generate hydrographs using HydroCad 10.0, an industry standard software package commercial retail residential mixed use subdivisions industrial municipal 21 High Street, Suite 207 North Andover, MA 01845 C IVIL D ESIGN G ROUP, LLC Tel 978.794.5400 ENGINEERING. LAND USE. PLANNING. PERMITTING. www.cdgengineering.com that develops a hydrologic model based on the SCS method and computes peak discharges from rainfall runoff for urban and rural watersheds. The project results in a net reduction of impervious area totaling 6,500± square feet, therefore, this site is considered a redevelopment. Therefore, peak flow rates will be reduced as groundwater recharge will increase as compared to the existing condition. Additionally, a small rain garden is proposed in betweenthe proposed duplex buildings and is designed to take the first flush (1”) of rooftop runoff from each of thenew buildings. The overflow is a 10’ wide earthern berm spillway behind the edge of pavement to controlthe runoff from larger storms. Peak flow rates for the pre-development and post-development conditions are illustrated below: TABLE 2: PEAK FLOW RATE COMPARISON POINT 2-YEAR STORM 10-YEAR STORM 100-YEAR STORM OF EVENTEVENTEVENT (3.15”/24-HR)(4.83”/24-HR)(8.94”/24-HR) ANALYIS PRE (CFS)POST (CFS)PRE (CFS)POST (CFS)PRE (CFS)POST (CFS) 1.252.194.76 POA-10.901.774.29 Sincerely, C IVIL D ESIGN G ROUP, LLC Philip R. Henry, P.E. Principal cc. Mr. Thomas Zahoruiko, Applicant commercial retail residential mixed use subdivisions industrial municipal NRCC 24-hr D 2-Year Rainfall=3.15" NRCC 24-hr D 2-Year Rainfall=3.15" NRCC 24-hr D 2-Year Rainfall=3.15" NRCC 24-hr D 10-Year Rainfall=4.83" NRCC 24-hr D 10-Year Rainfall=4.83" NRCC 24-hr D 10-Year Rainfall=4.83" NRCC 24-hr D 100-Year Rainfall=8.94" NRCC 24-hr D 100-Year Rainfall=8.94" NRCC 24-hr D 100-Year Rainfall=8.94" NRCC 24-hr D 2-Year Rainfall=3.15" NRCC 24-hr D 2-Year Rainfall=3.15" NRCC 24-hr D 2-Year Rainfall=3.15" NRCC 24-hr D 10-Year Rainfall=4.83" NRCC 24-hr D 10-Year Rainfall=4.83" NRCC 24-hr D 10-Year Rainfall=4.83" NRCC 24-hr D 100-Year Rainfall=8.94" NRCC 24-hr D 100-Year Rainfall=8.94" NRCC 24-hr D 100-Year Rainfall=8.94"