Loading...
HomeMy WebLinkAbout2015-09-01 Wellington Woods Monitg BASBANESVVETLANO CONSULTING 3S Hardy St. Dunstab|e' yNA 01827 (978) 049-3839 SITE VISIT REPORT Date: 1-13-17 Project: Wellington Woods DEP#: 242 - 1655 Location: Boxfond St, N. Andover Date of Issuance: 8/1O/2015 Owner: Bob Messina Pursuant tothe Order mf Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order ofConditions not in compliance with the Order ofConditions / Minor sediment breach on Lot 2 but this has been cleaned and reinforced with extra hay bales. Lot 4 final site grading has been completed, but the exposed soil have some minor rill marks and should be mulched with straw orsomething similar. | spoke with Bob M. and he said this will ba done asap. Work on site is only the construction of houses and associated grading. All of this work is out of the 1O0' buffer zone. The roadway is clean, the site is stable, basins look great, and erosion control overall is in good shape. � � ` / 1/17/2017 1-13-17wwl.JPG x r https:Hm ai l.google.com/mai I/ca/u/0/#`nbox/1599907b82b73695?proj ector=l 1/1 1/17/2017 1-13-17 ww2.JPG At gm r t p d t a t' S ,r w x https:Hm ai I.googl e.com/m ai I/ca/u/0/#i nbox/1599907b82b73695?proj ector=1 1/1 1/17/2017 1-13-17 ww3.JPG Y w. a. A � F S, " Iow a x https:Hmai l.google.com/m ai I/ca/u/0/#i nbox/1599907b82b73695?projector=1 1/1 . . BASBANESVVETLAND CONSULTING 3S Hardy St. Dunatab|e. MA 01827 (878) 049-3839 SITE VISIT REPORT 0atm: 12-12-1G Project: Wellington Woods 0EP #: 242 - 1055 Location: Boxford St, N. Andover Date mf Issuance: 0/1O/2O15 Owner: Bob Messina Pursuant tm the Order mf Conditions bvthe North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order ofConditions not in compliance with the Order ofConditions Post rain/snow event-the site is in very good condition. Roadway is clean. The basins worked perfectly. There is some sediment build up in the silt fence between lots 1 &2. This will be addressed asap. Work on site is only the construction of houses and associated grading, All of this work is out of the 10U' buffer zone. The roadway is clean, the site is stable, basins look great, and erosion control overall is in good shape. 12/13/2016 silt 2.JPG -, Vv- K r �t a r x u f ww f https:Hm ai I.google.com/mai I/ca/u/0/#i nbox/158fa5a262b28fd6?projector=l 1/1 12/13!2016 12-12-16 ww3.JPG A r a a. �r i https:Hmail.google.com/mail/ca/u/O/#`nbox/158fa5a262b28fd6?projector=1 1/1 12/1312016 12-12-16 ww2.JPG I � fix a https://m ai I.googl e.com/m ai I/ca/u/0/Mti nbox/158fa5a262b28fd6?projector=1 1/1 12/13,12016 12-12-16 ww1.J PG Ar- 2 " v { +A https://m ai I.googl e.com/m ai I/ca/u/0/#i nbox/l 58fa5a262b28fd6?proj ector=1 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 11-1-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order of Conditions Post rain event-the site held up very well with the amount of rain received. The basins worked perfectly. No erosion issues on site. Some minor erosion of some of the lots but it was all contained on the lots. The front area near Boxford Rd has been finished. The grass is coming up well. Work on site is only the construction of houses and associated grading. All of this work is out of the 100' buffer zone. The roadway is clean, the site is stable, and erosion control is in good shape. 11.'2/2016 ww 2.JPG if f r https:Hmai I.google.com/mai I/ca/u/0/#i nbox/l5825076aal6d7fd?projector=1 1/1 11,`2/2016 ww UPG u d ` M n Iwo 77 ,< z� Ac- 7777���l,,�r-'-��,�' ',-.,,��",� �"-,-- -", �-�,�-� hftps:flmai I.google.com/m ai I/ca/u/O/#i nbox/l5825076aa16d7fd?projector=1 1/1 ' BASBANES WETLAND CONSULTING 39 Hardy St. OUOstah|8. K8A 01827 (978) 849-3839 SITE VISIT REPORT Date: 10-4-16 Project: Wellington Woods DEP #: 242 - 1055 Location: Boxford G[, N. Andover Date ofIssuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order ofConditions by the North Andover Conservation Commission for the above referenced project, we have performed m site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order ofConditions not in compliance with the Order ofConditions The front area near BOxhJrd Rd has been |O8nnnd and seeded. It has just started to germinate. [}8Spit8 the drought, the g[8SS is Qn]Vving well and stabilizing the soils. Work OO site is only the SOnStrUCLiOD Of hOUSeS and aaG0Ci8iGd grading. All of this work is out Of the 100' buffer zone. There are 4 lots that are SU|| not build yet. The rO8dxvny is clean, the Site is Si8b|8. and erosion control is in good shape. 10/7/2016 2016-10-04 13.44.05.jpg 1-6 � 4 A +� �f t be u 9 r: t" a_ 4' tip m.. ,,.tax. ., • .: � - Fr - nI s �� _"-•^,�+-dt- � ,-,�+ ?fit ' 4€ "` �Ga� * �� d w a}k d https://mail.goNle.com/mai I/ca/u/O/#`nbox/1579flfdecd8d93c?projector=1 1/1 10/7/2016 ww1.JPG i q kr r u 2 z } a e� { rt... s, Kt https://m ail.google.com/m ai I/ca/u/O/M nbox/1579fl fdecd8d93c?projector=1 1/1 10/7/2016 ww2.J PG �+ jj t �lv p. Al } r r ri `�",�, F `} a uti ` 5 �f t , 3 p a 3 ., x r 4 https://mai l.google.com/mai l/ca/u/0/#i nbox/1579flfdecd8d93c?projector=l 1/1 10/7/2016 ww3.JPG �r ,�'°�' a.�_; t ��' �"� ,3 � ��'2�r z.�. a ➢t b4��4 '� 1 M. � �&�� .,,/r .;.; �, ��.n, s � �s ,•� n � n� s 2 h n` � 4 y a 4E i. r 1 .n a "Svyy W. https:Hmail.google.com/m ai I/ca/u/O/M`nbox/1579flfdecd8d93c?projector=1 1/1 10/7/2016 ww4.JPG a d n � y� v 5 v r,r t i e, i st � sik 4 y u n, N 3 r MF � i tb+a fi5 iA ���d ry 14 d a� r"� �" '�' ,�3 ��.', :,. '� �,'•v '� f> c+� � � � ;.�;��n�"'�" �`�'� �e�`��,`'rare'-,�` ,is ; e v ''to „� t � ,,� _.,�.�t � .r�.a •,"�,� a�,F� sa;'�> .' �,,,.„ ��� r � ` �",Win, a"ti;�s.a � e,v �a <���� "x � � �� �., , .zs.., .Y _ a* aa ..Z 6' .. ti` i,.,.. ,. .�. 7 "t- 'a� a4' t s _ , z�... tn.....K �,'` .z. =•,� ,,. .e `?'a, a : ",.., a wo-+„ ti. s .taa...,� x a 1 ra�r ,.' ,s ', a �,...-^r + ;' ' , N X ,' `ai.. t ,.' „~ ,, ah.: a, �^,,. � .e.� rs�a:'. ,< s n� " ,ik , >. <„ 2f a".,�•*, ��" ,.� n, Y �,� ,wee.Cw ri�%��a r �,�� ,, 'rev, e M w ;u,- �.. '^, 4. ,1�.., vj „ ,,r '. x '.., S .:, t �' H e � ,f9� ��x ,.,� �. ��:-, �� a s,.- "3 ,,, �" A}�"v a� �i�t s --WIN .�,. , , 'w � , 'r ..° �;R :,e z.. t :'fie•,. �,. w;4 ,�F',..a ,r ,.._ ;., .� , uf��5 ,' t ,� s. ,, , }t ,a _:" �� ,,gy�pp A,a.: ,��z > ,.y:•. ,v ,,.. ,:, t L. ...� . .'d a H '. �.0 f? Pill `Z;:, n= --------- . _� _.a �. a �. �_ hffps://mail.googl e.com/m ai I/ca/u/0/ffi`nbox/1579fl fdecd8d93c?projector=1 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 9-3-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order of Conditions Site looks good overall though it is still very dry. The grassed areas look ok and still stabilizing the soil. Work on site is only the construction of houses and associated grading. All of this work is out of the 100' buffer zone. The roadway is clean, the site is stable, and erosion control is in good shape. 9/6/2016 9-3-16 ww 1.J PG n e y � v x 4zi i r +Z a„ L https://m ai l.google.com/mai I/ca/u/0/M`nbox/1570140634bO650b?projector=l 1/1 9/6/2016 9-3-16 ww2.J PG 46 � � t AW � "4Y s T y *y � f n 4 � I w _ z i'a' � o a ,; a a= i-n,..4,�?Stw,¢•^r F � S�"�*;,yd iS ,..x;'��,�`*,� t 'n h i:'a,�` `�'� IS xk., IN ire ^',;_;�d � �„°• '' �r� r "s.v�s. r 'w t k 3x Y to k.Pk2 4 � + P K w� a � .n ax t t t s r J a https://mail.google.com/mai I/ca/u/0/#`nbox/1570140634bO650b?projector=l 1/1 9/6/2016 9-3-16 ww3.JPG Y� u https://m ai l.google.com/mai I/ca/u/0/#i nbox/1570140634bD650b?projector=1 1/1 6/b 6=jo}oefojd690S909K90ti60L94/xoqu.W/0/n/eo/I!ew/woo•a!6006•1!ew//:sdA4 �t d, c c %S d- as ,w a t s�j . „I v"', V •�ke C�. 49 }}•y,f e 'tfl,: tf "'•)4 'fit{ 3,,= »,t "'�` 4 gt '. ''v" rv%.. ?e.. .;. r P 1 �" s .t � h, kn .�. xw�"'� j��a„�,� "�` ,'b 3 "g, � E �'x r � M p.. p• t ' 4 q s a N x 4 i i y r a w r r RFC Jdf 17mm 94-£-6 960Z/9/6 -jojoafoadZgo99ogt Cgot,LoL9 6/xoqu 1#/O/o/eo/I!e w/woo•al6006-!!ew//:sdllq � i -"� :y^- rv` 'rt + fix ' xtU .}.F f �'kW1- r t b r A k , a sr• k �- � ,� rev== x�,� ... .,: .t �rt z*'- ON «.. s Y n5ip 3y s y i } F ss 1 �9 r f x, , k f edf'9MM 96-£-6 MZ/9/6 BASBANES WETLAND CONSULTING 39 Hardy St. OUDSt8b|e. K4A 01827 /878\ 640-3830 SITE VISIT REPORT C}aba: 8-5-16 Project: Wellington Woods DEP #: 242 - 1555 Location: Bunfond 8t, N. Andover Date of Issuance: 9/10/2015 Owner: Bob K4eaaino Pursuant to the Order mJConditions by the North Andover Conservation Commission for the above mafmnanmgd project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order ofConditions Work on site is only the C0DSt[u{tiOn Of hOUS8S and aSSOCi8t8d grading. All of this Vv0[k is out of the 100' bUff8[ZOD8. Site is very dry due to drought. Subsequently there are no 8n3SiOn issues. The rO8dvv8y is C|e8O. Grass in the SVV8>e3 and detention basins is DOVV quite burnt. H0vv8v8r, the nUOtS should be well enough established to be provide soil stabilization despite the dry conditions. The site is stable, 8rUSi0D control iGin good shape. 8/8/2016 8-5-16 ww2.JPG e � { sIK p''r." y v. Q'I 4 � is' � 'k-• .� 1 �„y_b, '" ,. N � t tp «g�M.�'tpw d https://m ai I.google.com/m ai I/ca/u/0/#i nbox/1566a6441 d5bb75c?projector=1 1/1 8/8/2016 8-5-16ww UPG r t. t 4,r { { a t'� 1 � / hops://mail.google.com/mai I/ca/u/O/M`nbox/1566a644ld5bb75c?projector=l 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. OUnSt8b|e' MA 01827 /978\ 048-3839 SITE VISIT REPORT Date: 5-26-16 Project: Wellington Woods 0EP#: 242 - 1O55 Location: Boxford St, N. Andover Date of Issuance: 0/1O/2U15 Owner: Bob Messina Pursuant tothe Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection omthe date mfthis letter and have found the following: To our knowledge and in our opinion, the work performed tmdate is: x in compliance with the Order mfConditions not in compliance with the Order ofConditions Loam though not yet spread and seeded.in the front corner. Apparently the delay is for the utility company to install a pole and the gas line to be tied into the line in Boxford St. Go3SS iS growing well in the avva|eeand detention basins. Foundation installation 0O8 few lots has begun though these are all out the 1OO' buffer zone. The site is stable, erosion control is in good shape. 5/27/2016 - 5-26-16 ww1.PNG �a e r K r w i https:Hm ai l.googl e.com/m ai I/ca/g nbox/154f27496430caff?proj ector=1 1/1 fr j�,{ � � S i � , 110, x a k ifi Y 2 i� d Ya t4"IV EVA t � � Arms tt k I { 25 Aff > II } f g coleiY: LO it { err M y `4, g , I f £ m " F4 U cc) 1 II� g a 4 z kF m lot Of €ti Y� s 4� Yf,gA � tJ " I t4, t 1 .n L 5/27/2016 5-26-16-ww2.PN G a _ 4 ,77 .r r t ' w y wr https://m ai I.googl e.com/m ai I/ca/#i nbox/154f27496430caff?projector=1 1/1 5/27/2016 5-126-16 ww3.PN G s https://m ai l.googl e.com/m ai I/ca/A nbox/154f27496430caff?proj ector=l 1/1 ` ' BA0BANES WETLAND CONSULTING 38 Hardy St. Ounatallo, K4A 01827 /978\ 549-3839 SITE VISIT REPORT Dete: 5-19-18 Project: Wellington Woods OEP #: 242 - 1055 Location: Bnxfond St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant tothe Order of Conditions bm the North Andover Conservation Commission for the above referenced project, xvehavmpmrfornoedasitminmpmotiononthadatemfthim letter and have found the following: Tm our knowledge and in our opinion, the work performed tm date is: x in compliance with the Order ofConditions not in compliance with the Order ofConditions Loam has been brought to the area where the gas line was installed though not yet spread and needed. Grass is growing well in the ovve|eoand detention basins. Foundation installation on a few lots has begun though these are all out the 100' buffer zone. The site is atob|e, erosion control is in good shape. 5/23/2016 5-19-16 ww l.PN G ; m r M .r4 N, a re �k https:Hmail.google.com/m ai I/ca/#i nbox/154dd7adbl8l O8cc?projector=l 1/1 5/23/201 5-19-16 ww2.PN G r https:Hm ai l.googl e.com/m ai I/ca/#`nbox/154dd7adbl8108cc?projector=1 1/1 5/23/201 3 5-19-16 ww3.PNG 1, w i ' ........... M AAWA _.�=^� ,�;..e�,.,,n,,,•, .tea ' ",. -�" ""�'., https:Hmail.googl e.com/m ai I/ca/#i nbox/154dd7adbl8l O8cc?projector=l 1/1 ' ^ BASBANES WETLAND CONSULTING 39 Hardy St. [}UOSt8b|8, K1A 01827 /978\ 849-3839 SITE VISIT REPORT Date: 5-12-16 Project: Wellington Woods 0EP #: 243 - 1055 Location: Boxfond St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Gas line has been installed, electric iSinstalled. Except for the |oorninQ and Seeding of the area vvhnn* the gas line was installed and final pavement, all vvOrh in the 100' buffer has been done. Grass \s growing well in the Svvo\eSand detention basins. Work nn the house in beginning but these are all out the 1O0' buffer zone. The site is stable, 8n0SiOO CODt[0| in great shape. Please see attached letter regarding ongoing Site inspections by the Erosion control monitor. May 13 2016 Per the Order of Conditions 242-1655 issued by the North Andover Conservation Commission,the Erosion Control Monitor shall perform weekly inspections during construction. On behalf of the property owner I am requesting that the occurrence of the ECM site inspections be reduced to biweekly or a monthly basis. Please note that weekly inspections are still being performed by Christiansen and Sergi, the project engineer, per the requirements of the Planning Board; and on a regular basis by Dan Well for Fish and Wildlife requirements. Work completed in the buffer and beyond: 1. All detention basins are completed, stabilized and functioning. 2. The grass swales along the roadway up to station are completed and stable. 3. Electric utility installation is done. 4. Gas line is installed. 5. Water line and structures are installed. 6. Roadway is paved with binder coat. Work remaining in the 100' buffer zone: 1. Loam &seed area where gas line was installed along roadway(planned for week of May 16). 2. Final top coat of pavement on the roadway. Work remaining outside of the 100' buffer zone: 1. The installation of foundations 2. Construction of houses 3. Final site grading related to the house lots 4. Top coat of pavement. If you have any questions or comments, I may be reached at IbasbanLs RrMaii.corn or 978 808 1101. Sincerely, Leah Basbanes i i`n d tF {. < ; p x g } ddd k {{t 1 jy g to tft iakS if. i M 4{ t �' { y4{ v- a � z } ��44"r�I ;� N ES W li ky VI �S d 9 t16 ,' 4 # - f OR t y y Q Pti t� t W CD * C) st O i = i w i t t O O O cn 5/16/2016 5-12-16 ww l.PN G " ,y r b https://mail.googl e.com/m ai I/ca/#`nbox/154bg7aecO7lf768?projector=l 1/1 5/3/2016 Town of North Andover Mail-Fwd:wellington _sav v Bonnie VIlolstromer <bwolstromer@northandoverma.gov> hu wellington 1 message Rebecca Oldham <roldham@northandoverma.gov> Tue, May 3, 2016 at 8:33 AM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> For the file. Please also include the email to provide record of Leah's request to reduce inspections. Rebecca Oldham Staff Planner Town of North Andover 1600 Osgood Street,Suite 2043 North Andover,MA 01845 Phone: 978.688. 535 Cell: 078.404.2218 Fax: 978,688.9542 Email: ROldham@northandoverma.gov ---------- Forwarded message ---------- From: Leah Basbanes <lbasbanes@gmail.com> Date: Tue, May 3, 2016 at 8:02 AM Subject: wellington To: Jennifer Hughes <jhughes@townofnorthandover.corn>, Heidi Gaffney <H Gaffney @townofnortha ndov e r. com>, Jean Enright <jendght@townofnorthandover.com>, Bob Messina <RobtMessina@aol.corn>, Rebecca Oldham <roldham@northandoverma.gov> Hi Jen, I would like to discuss reducing the site inspections to being monthly or bi monthly. Thanks, Leah 5 attachments sue, r ww 'I.PNG w 1826K ww2.PNG https://mail.googl e.com/mai I/ca/?ui=2&i k=a2debacbl a&view=pt&search=i nbox&th=154769bf355399d7&si m l=154769bf355399d7 112 5/3/2016 ww 1.PNG a � , ,r w ' w v r a. y� t: �a https://m ai I.googl e.com/m ai I/ca/4i nbox/154769bf355399d7?proj ector=l 1/1 5/3/2016 ww2.PN G v _ r d ge ~ x 4 ppv , A , «mac �t https:Hmail.googl e.com/m ai I/ca/M nbox/154769bf355399d7?projector=l 1/1 5/3/2016 ww3.PN G w " UJ u https://m ai I.googl e.com/m ai I/ca/#i nbox/154769bf355399d7?proj ector=1 1/1 5/3/2016 ww4.PN G 55 h V a k, r r https:Hm ai l.googl e.com/mai I/ca/4A nbox/154769bf355399d7?proj ector=l 1/1 NORSE ENVIRONMENTAL SERVICES, INC. 92 Middlesex Road, Unit 4 Tyngsboro, MA 01879 TEL. (978) 649-9932 - FAX(978) 649-7582 Website: www.nor seenvironmentaLcom April 28, 2016 North Andover Conservation Commission 1600 Osgood Street—Bldg 20 Ste 2-3)6 North Andover, MA 01845 Re: Wellington Woods North Andover, MA Commissioners; An inspection was performed on April 22, 2016 and the site appears to be in substantial compliance with the Order of Conditions. The contractors installed the binder coarse on the roadway and the grass is beginning to grow•under the erosion control matting. The erosion controls are set and maintained. If you have any questions or concerns regarding the above information please do not hesitate to call. Sincerely, Maureen Herald Cc: Planning Board Leah Basbane F" a e i Y a. �t t 4 i t Wellington Woods - No Andover Wellington Woods - No Andover ir F "Ptt's t tN41 t. Wellington Woods - No Andover Wellington Woods - No Andover z � a � L t � b I VI Wellington Moods A No Andover Wellington Woods - No Andover Wellington Woods a No Andover ' BASBANES WETLAND CONSULTING 39 Hardy St. DUDS[8b|8. K4A 01827 /978\ 649-3839 SITE VUSNl[ REPORT C|abm: 4-8-18 Project: Wellington VVouda [DEP #: 242 - 1855 Location: Boxfnrd Gt, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order mfConditions by the North Andover Conservation Commission for the above referenced project, we have performed o site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order mfConditions Heavy rain event on April 7. The site held up very well. No e[OSiOD issues were noted at all. The gn8SS Svva|es have been |o8med. seeded and secured with erosion control blanket. The F08d has been brought to Subgoad8 up to the cul-de-sac. Base stone in being brought in and graded in the n]8dvvey in preparation of paving. Hoping to pave with binder the middle of April- depends on the paving plants availability. The Site is stable, e[0SiOD C8Dt[O| in good Sh3p8' S1OD8 C0OSt[UCiiOD eDt[8DCe is A00d' and no dirt is being tracked 0ntOBnxf0rdSt. 4/11/2016 4-8-16 ww 1.PN G z i y _ - a kY- r li t rr � 5? l .Yip Tom"' :-'• � .. } Rn sAn- https://m ai I.googl e.com/m ai I/ca/#i nbox/154053a666f95ffd?projector=l 1/1 4/11/2016 4-8-16 ww2.PN G https:Hm ai l.google.com/mai I/ca/#i nbox/154053a666f95ffd?projector=1 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 3-31-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Presently the grass swales are being loamed, seeded and secured with erosion control blanket. The road has been brought to subgrade up to the cul-de-sac. Roadside swales have also been graded to final subgrade. Hoping to pave with binder the beginning of April- depends on the paving plants availability. The site is stable, erosion control in good shape, stone construction entrance is good, and no dirt is being tracked on to Boxford St. 4/1/2016 3-31-16 ww2.PNG ow 3 a; https://m ai I.googl e.com/m ai I/ca/#i nbox/153cfl6499a3d8aO?projector=1 1/1 4/l/2016 3-31-16 ww l.PN G a a � N https:Hmail.googl e.com/m ai I/ca/g nbox/153cfl6499a3d8aO?projector=l 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 3-25-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Currently no work on site. Detention basins 3Pand 6P have been loamed and seeded, and secured with erosion control blankets. The road has been brought to subgrade up to the cul-de-sac. Roadside swales have also been graded to final subgrade. Hoping to pave with binder the beginning of April-depends on the paving plants availability. The site is stable, erosion control in good shape, stone construction entrance is good, and no dirt is being tracked on to Boxford St. ,#rwIt �Fr�g, t 4,'t tx AI, fsu�tht ll�ic� f r' fFp to a' F a40 sTCF�r F t, •a tswF�; - it y� l F�� �> y a� Fly w, i IC,�� �ii t�- '6t� 1��+ tFl$ �1 R. C a jY��{y3v $�4f .f gS1a# Fratpr�y��`64 Ra¥ v a 3 n1r�s tisrt �'na"�ata 7 5 1 ���� Tc 14 jj wF i zk '1 # sl.�}�iyljkli';4�� V}y� rw co ^' a r,C it >titr4:�s° it�r z ny`tu ,n'r'd'g1, g€ � {" { �! r 11 R, Tarar to aV �, t � a � co co t � b 4 t tT Y 7 4'J�ta'� y '� 'N d A�2� y1` � uaesr9rJ�}F 55 yr ry axe q.g X {§ tR �d�j iilel p err€ih arrt tA "� � ��4;tr t, n to t tt d to X a e: !O �; u:'1 , x k _ N !1 Fur C^j L Ki pit �t t CN Nfxk§# 4 r _, �F e,{ U mg,w O CD xt1Ck 3/28,/20116 3-25-16 ww3.PNG F w,. » w " a rw» 7 v r z� » https:Hm ai I.googl e.com/m ai I/ca/M nbox/153bO2l6ce6edf34?projector=1 1/1 �F s I 4 (e � fi k V t i e k � O s 1 J Y o4 X a ,,�pps S a t,�r4 C l ,e� 7 r °3 t•li �° X N M ' BASBANES WETLAND CONSULTING 39 Hardy St. OunStab|o' K8A 01827 /078\ 549-3839 SITE VISIT REPORT Date: 3-11-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St, N. Andover Date mf Issuance: S/1O/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: Tg our knowledge and in our opinion, the work performed to date is: X in compliance with the Order ofConditions not in compliance with the Order mfConditions Presently no work occurring onsite. Hoping tn have binder pavement in the next few weeks. Detention basins 3Pand 6P have been constructed and drainage structures have been installed, however the basins have not yet been |oamed and seeded. The site is stable, erosion control in good shape, stone construction entrance is good, and no dirt is being tracked on to Boxfond St. 3/14/2016 3-11-16 ww1.PNG OA k - # " ` . e s https:Hm ai I.googl e.com/m ai I/ca/#i nbox/1536cOaaa7e59572?projector=l 1/1 3/14/2016 3-11-16 ww2.PNG r m a w� _a https:Hm ai I.googl e.com/m ai I/ea/#i nbox/1536cOaaa7e59572?projector=1 1/1 3/14/2016 3-11-16 ww3.PNG �P RE s �L N x„ w ax y https://m ai I.googI e.com/mail/ca/M`nbox/1536cOaaa7e59572?projector=1 1/1 e. � tot 14d ;a I WAR not I I s j a OR, x ��� 71 '� z CM �MMy i d y I it i qppp IR lol I � t iF OPT ks, R, 0, i ��` o- t'i r4 a N b c l r t c E CD d aF 'ice } ya ja p � { t,i a° ^� in g { s i" t eM .kJ o i gyp; CAW Wq BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 3-4-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St, N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Work on the front stone retaining wall is complete. Catch basin in this area has been installed. Detention basins 3Pand 6P are currently being constructed. These should be done with drainage installed by the middle of next week. Starting to set up dates in order to get the roadway paved with binder. It is possible that plants may be open by the middle of March. Overall the site is stable, erosion control in good shape, stone construction entrance is good, and no dirt is being tracked on to Boxford St. 11 e ev 9 f{{t i�t46 i{ j aC P t � 9� d ��� 3�� yj• t t.° il • ,� � da spa��'�4r 4� 1�� oi co 4 f Y Y 4 )rIf, CL LO ;, LO a LO i` A9 «° LO CD I�r i to r 1 a co X j d' In cn rg ch � e� A � v. q i SL 7i oil pi'„ d e C f , q, (9 i d t t � a,s. � d" P t f AS o { Y' 1 ,4001 An " poll 04 f i WITS { 1 Lo S `x 4 � r,ard p Yr 18 rEwa co M dQj J'�# � 1 I r 4¢ f' 1 sr CN LO Ln 7 z � Na f i�.,d artt� LO s� LO 14 r M 3/7/2016 3-4-16 ww4.PNG x v xG n�z �- jw https:Hm ai l.googl e.com/mai I/ca/M nbox/153512dO529453a2?projector=l 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 2-25-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Post significant rain event Heavy rain occurred and there was no impact on site. The erosion control is in good shape, no breaches. No silt travelled onto Boxford St. Work on the front stone retaining wall is ongoing. Detention basins 3Pand 6P have been staked out by survey in preparation for excavation. Overall the site is stable, erosion control in good shape, stone construction entrance is good, and no dirt is being tracked on to Boxford St. 2/29/2016 2-25-16 ww 1.PN G r� P r $ r. � r 51 f -µs https:Hm ai I.googl e.com/m ai I/ca/#i nbox/153288cG4d34ab2O?projector=1 1/1 2/29/2016 2-25-16 ww2.PN G �z w e. tee✓' , ft d a a a https:Hmai I.google.com/m ai I/ca/M nbox/l53288cO4d34ab2O?projector=l 1/1 2/29/2016 2-25-16 ww3.PN G o � _ b x a e a w li a y r- https:Hm ai l.google.com/mai I/ca/lA nbox/153288cO4d34ab2O?projector=l 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 2-17-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Post significant rain event Heavy rain occurred and there was no impact on site. The erosion control is in good shape, no breaches. No silt travelled onto Boxford St. No work on site since last inspection. Detention basins 3Pand 6P have been staked out by survey in preparation for excavation. Overall the site is stable, erosion control in good shape, stone construction entrance is good, and no dirt is being tracked on to Boxford St. 2/18/2616 2-17-16 ww 1.PN G FIV ,, , , .� .;• r .ate. r a .1iL�ik7'iJ '�~�,� '�a�a'_-.- '`'��' -sg� ,._+-..,r��*.�t�k�iy'�'k•'1 :� �� � ,� https:Hm ai I.googl e.com/m ai I/ca/M nbox/152f5f230efabO66?projector=1 1/1 2/18/2016 2-17-16 ww2.PN G s., 47 77, i lip _ x W M, https:Hm ai l.googl e.com/m ai I/ca/#i nbox/152f5f230efabO66?projector=l 1/1 2/1812016' 2-17-16 ww3.PN G r ti z. 4 � Y https:Hm ai l.googi e.com/m ai I/ca/#`nbox/152f5f230efabO66?projector=1 1/1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 2-5 -16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order of Conditions Inspection performed by Norse Environmental: Currently no work on site due to weather conditions. Site is frozen, snow covered and stable. No dirt was observed on Boxford St. Erosion control throughout is good. t 4 1 rist a�"� ski ? t t t' r s;' t n t , k R Kum 40. Kam. #te t ,tlt,, t � k tfi Y} z r >t ti ,g. g Y p� y r z, r" v r � rvAN 71 Aft �ry ter,. � t r w * x- rX to sJt a AM 0 Not , C x ' d I". �� ' _ �r :s 0 Will r z As AV zt , lee r fi44 � i FPS BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 1-28-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order of Conditions The water main and drainage structures are being installed starting at the Boxford St end. No work is currently occurring in the back of the site. The stone entrance looks clean and the site is presently frozen. Though the upcoming warm weather may change that. This will be monitored closely and addressed as needed. No dirt was observed on Boxford St. Overall the site is stable. Erosion control throughout is good. F m s. ,a m r vs � � 5 Us 7 SAY v wff trio WE „r x" y r v . " - , F z .w � " r .why' �a AM— . n � y r come x t EN AWAY ". w w e �. y YMa e � a ry �e � r R AMR lapp , . i rK" A�iit m Ft � ; out T o '- MOT.� ..a', a % A` eye - " a ,.. �.� � m } oi p .r INS " c 71 i . MAC ,. R�r . „ ` ids, Ir OAK " WAY U MA r w r r s � � ¢ „ l �T z W <"' s R� �'9 �o rfi9 Lyra nY. sn ,, j BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 1-20-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Nearly all stumping is complete. The pulled stumps are stockpiled and being removed from the site. Materials for the water main have been brought to the site and currently waiting for the survey to layout the location of roadway structures i.e. catch basins, man holes, etc. before excavation begins. It is expected that excavation will being next week for the water installation. The stone entrance looks ok, some snow pack is in it but the site is frozen and no dirt was observed on Boxford St. Overall the site is stable. Erosion control throughout is good. r „ < � F r t � � s � y 7 A OR loll M AIM J 1 Jun 91 tN VIA E � Y} � n t t tEr 1 r' w t �r Y" - `;- n M r z shy < 1 6 t �r t r y ,. was � I'- . f OF OR § � mar Or t IF wM r r i x N 4 d 'V fv � s $ w . d a jig 4 PAG ARE a tt �Y 4 x ` s � y { clots b' oP E t $ pi.a o Y7 '-AW � ,: � ,�" '� � xa, `cam ✓' yam' � :-' r� k. 4k _. ; A x s y x y $ ram' 6 a ' s i` . :x# " Ni x r w� r � � v Y y NO lip d � a tsmall ` # W a oo 2 rr k s - r T. v . x k 4 i 341; -hs1�141� 6 w a �� 1, i � � x � t ' N ot 3 -g .;4 } / .. '✓ M � I r nICE AIR d p .. � ra IN M �� ° �x r F' e Ur ,Iv �F V fl u v 4 I , � r s x pp a E ° I' x,; r r E 4 e F, a AI ° IF a ice. s': ��ia sa � Fa - , e r 4 s r yf e � � µ r v F „ ,. e� " A Ilk h e x FkO JJ t w v BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 1-11-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Heavy rain on Sunday I-10-16 and no erosion or siltation issues noted on site. The stone at the entrance was replaced last week and is in good condition presently. The roadway has been brought to subgrade up to cul-de-sac. The side swales have been roughed in along portions of the roadway. A slurry pit has been excavated to capture silted runoff. Currently the work on site is stump excavation in the back of the site. Next work to begin will be to start installation of the water main. Overall the site is stable. Erosion control throughout is good. a i t p. x u+x e l d g a a "` '�. �:f�n,>.: �x�,w�r "u• �`.. ;�ft�o"t�zx*=.„>� >.�«*;*;.,,, ff�.�.� Cti; �* "��, f;. Ss,a, t, ��, � ,�rf.��,tti tT' x' rea>. . ^4 ,t, i �t' ° t?,f�.,flt�.�- fr:�a��'�,aa'4., ,��>� �, t �.<a�;<v f� ,:fxfr`�` �. tOU 3 #e�wn r t i c �' MM. , A j "A WORST ixtt ,e-..,,aa,,, e a r � ,� f i n,mno a " a 77, w ....fx. i� �, ,§Y3�. z., .��� .: �+ . ,,., •. 1 Tvilk , t - �i`,• 2 ,�i3 is t �'3i:h „t- ,.,u '� t ,+�,. n <fi' a ,at tf� ,,., ow` ��.�f da J�,: +'''� 4�. a9{.tr to -, i a" *".' a Platy .:" `a��":< Y 3 .i x `on t r n a' J 6 ""� 4 2'� ;� •�t,P � w. ;.fir, ��` r� E<�, �+ € f .4 s r• � �l��f�7`'�:� �'W; .��«s a`§':" ''_`� �. t tx� sf c �y 5 ate" f s �FwInk ft�` Aw MIN SPY -7 all s r. r y r " a IO 3 RAM r Q h> r a < eIL _ € . =A z em .. , . ,r t x z 4*0 _ •� ! .. - 7 r x g u m W a e � r s z ole z sell �x L' r,� BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 1-5-16 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions The roadway has been brought to subgrade up to cul-de-sac. The side swales have been roughed in along portions of the roadway. The stone at the entrance is functioning and trapping dirt there is no dirt tracked onto Boxford St. Once the stone defrosts a bit, it will be excavated out and replaced with new stone. A slurry pit has been excavated to capture silted runoff. Stockpiles of stumps have been removed though there is still about 1 acres of stumps to be pulled. This will be done once the area around the cul-de-sac has been graded and it is easier to get in there. Next work to begin will either be the construction of the detention basin at the front of the site or to start installation of the water main. Overall the site is stable. Erosion control throughout is good. t ,., d t ; � E 1 rk Alm A r � � ;;{, =A �; `.,,). pi�ft:'�i AE ;' h 4;,R. '�� inn ,..-< � 10 f s n h r � z r2 k 1 t? 4 k2 Y" �t t i l k r s f} 1 r ras 1 s 4 .S. G f Wl f. 'Wl r " .. WAS 15 W� ` Rn ISO,V LIE 24 x' r z 7 —Awl - ME— r �f f 0 _ f tit ' � � n z f � .. Awl _' mpg mpg. V= f 2 t ." & f MA OWN Not All 1 y O ty - , r �:r MEM MOO WSW V` ',.. ALI �v � T— All , s v R a 5 yk. AMA fu In 10SOW , s til s loll 4 .ME As IF v a toy q a G A' ti - . x" w . 04 AT OWN Aq ,: ., w s Amu Olva x �, sx `. � mow, > � � w AIv SON mom A 3^ " w wWEN jvjmqT_Y:y ''"'N ma l _ aKAK so W-n f But x ' Wft —1 mom To w � wmnx 1 w Io- TA � w �AF Amp r ik w s r BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 12-30-15 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St-N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions The roadway has been stripped and centerline staked. Also the roadway has been brought to subgrade up to station 3+00. Stockpiles of stumps are still being hauled off site. Snow yesterday has made the site a little mucky and there is some mud tracked onto the roadway by the tree stump removal trucks. I spoke with Dave Maynard and he assured me it would be cleaned up by end of day. Overall the site is ok. Erosion control throughout is ok. l c .� HIM, I OWL VP 47 Aw Am I�. ar w �5 4 } Y �i c M. 3 ' r�e� a 6 h Y v i z v , W a� �X " x, v r r k a i z L s m a 1 r. r s" yy 5° r c x, " Wolstromer, Bonnie From: Enright, Jean Sent: Sunday, December 27, 2015 11:03 AM To: Wolstromer, Bonnie Subject: FW:Wellington For the file Sincerely, Jean Enright Assistant Director Community and Economic Development Town of North Andover 1600 Osgood Street,Suite 2035 North Andover,MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: lenright@townofnorthandover.com Web: www.TownofNorthAndover.com From: Leah Basbanes [mailto:lbasbanes@gmail.com] Sent: Thursday, December 24, 2015 1:07 PM To: Hughes, Jennifer; Gaffney, Heidi; Enright, Jean; Bob Messina Subject: Wellington The stone entrance has been replaced. No siltation issues after last night's rain at all. Leah 1 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 12-17-15 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions Tree clearing has been completed, though about I acre of area still needs stumps to be removed which is ongoing. The front area has been excavated and stockpiled out back. The stockpiles of soil have been moved to the back of the property. Most of the silt fence has been re stapled but there are some spots that need to have the yellow tape replaced. The stone construction entrance needs to be cleaned up again as a result of the heavy truck traffic moving trees, stumps and rocks off site. There is however no runoff or dirt on Boxford St. The front entrance area has been cleared of stock piles and some regrading of the area has begun. Overall the site looks good and stable. ., t, v � E a i H 0 w o-„ c i t k ? s, w r� >>,yy f.7 - `... z �+ � �i i �� � � t" ia.; '3'' �s���T�<�`a;� •. ,r t�:,�'� k+ z��"�s a4 �, '`"`3iy ` 5 .# .t' x3�.yn,f i• „ti:' ;i,,fi t r� S't r r ,• i t 2, i ,. ,1.,t� z � k a t � � � � Sol ` MM VP ,.�,`;*:,.2 ra �� re• 3 2 ro` j, t i t� tit 4i yy s"� E� `. r� ,A i�:eisi+ vo ���` "?�'�' Tla Or, n W. Sr=�nllk�. ti, �' A s i � t s T t �M% , Orl it t l` �4 � m x `a ' v _ r OF IN 50 tw­ s y r w H - ., � r Awl A , rm " v -rp , di .: ymn A A W vo " ~ w _ x " '- IM r` a 4� vet a t a.. i t t t a � k t W} F. t t a r r 3s �F 4 t , s d t nl ­0 OVA Al 21 WAR All s � E n IV d r� ;. , t NSA I ? �. z NO a: ✓ x: r s Jl . x r - x v BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 12-12-15 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: x in compliance with the Order of Conditions not in compliance with the Order of Conditions Tree clearing has been completed, though about I acre of area still needs stumps to be removed. The stockpiles of soil have been moved to the back of the property. Some of the silt fence need s to stapled up, but there is no threat of siltation as the straw wattle is still in place and this nowhere near the wetlands. The stone construction entrance needs to be cleaned up again as a result of the heavy truck traffic moving trees, stumps and rocks off site. The front entrance area has been cleared of stock piles and some regrading of the area has begun. No issue in this area. F, q� -------------- ,. . ., PEI ---------- U' K Y by OVA M. r m s:' j ✓r y s 4 loot ,RA � " y Now Fam LY y z �a w K r'. 3 x „ r� i /r ! s v �.,If KOS AS r U '✓ r r Mb- 1 TWO � w e r x - r IFr . gins €� I'll-Wr r� � $ . , r-, rr^`, �`.` Nam''a A ': ' ` rw 4 r t r am,WA t r IM r a F r. 01 Al a i r' ' r $ - k r �r r , .> w r w, r w i y a " � � r �" IST F _ s a « : MM y ram„" ;�" a ,p _10 Uk.; .. r ��J V ` ss ram' ,$ - TV .� < ,. s ,r .s , rIlia d' ; �. G � � �y � y �.. �x � 4 �� y �� � � .a: -;� � � y �4 fr i r.„ -� ,� �,. �' �! p�� y � � � �� �, �� s1 �. i �F ,� � i �� � '� �, �;, ;, %' �'. � �� r a � �, �� � ,, � � ��' m x r ���. �v �•i� y��� ��`� � �� s� '� ,t i r � a a � � ��� �: � °�' r � t i , � ..� � r � � k� G � W ��. �� �f � � � � �' � �� � 1 is � � fy � � a q � n � i, �� 1 u �" � � t n,a� .. � ��� _ ,.,.a r Nf „�, �� ., :a r � �� '� >� ���� �, �" .. t r � � � � �� �' I+ I �I! f y s, � ��, �. � A � "k 3 C ". 4 ., a a a 3 � , a � � ' ��",� I � �H,., 7 n '.� �� �' ; : " � � �, � It � � � F' ' - � s�� '„' � � ��� � �� � � r � � � .� � � �� 1 `� a i �' r jI w � 'k� W � ' ��I a� ,r ,ly N i °;4�� i, � i 9'� '� " �,` ��;�`a�-� � �9b � I �� a I�i f r�'rn iI• _ � a. �� :�ze ��` '; r � , � � �� � � G� � � :, t ��. � ,�� �. � � ���� ��� �� � � � �� �.� � =r a � � � e �� � �` s ;4 � �� z �: BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 12-3-15 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions The waterline extension is completed, presently doing the chlorination test. Erosion control along Boxford St is in place and in fine condition. No issues noted. Tree clearing is also nearly complete, about I acre remaining to cut and remove. Stumps are being removed from site as quickly as possible as it is a very congested site. Erosion control throughout the site is fine. In a few places the felled branches knocked down the silt fence, but it has been repaired. The stone construction entrance has been regraded. It is being closely watched and cleaned out as needed. Tree work is expected to be done by the end of next week and then topsoil removal and stockpiling will begin. Stockpiles of rock in the front will also be removed next week. q AS T F_7X9_,_,tk�7-- -�- - I t r " w , ` '" , r y � r x , , „ �" „ sorg A x v �-1 t ZAP „ $ Amp zok, r NIL ny �. � 44, an p f " , �� � Ira OW 0 "I W.. .f , P. RK v y <` u 1„ y r � r r O tur NO, VAR �. A .: �� r ,4 w. r 1 . N xr r w m ^ 4 } 4 F d9 ti >„ o- ry #� a . w Y _ U x 4 d - y r s� s g � r 3 U z 9 SW fqlk v YJ 1phoil T 3 fig NO 16 41 low M Vc 21 4 .4 61 3 a q w f r s f� r f wf e � r 6 V w. ✓ AA Islas It ,'lilt JAY .. ,. r s AN t 7 BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 11-24-15 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions The waterline extension is nearly completed, but not yet up to the subdivision entrance. Erosion control along Boxford St is in place and in fine condition. No issues noted. Tree clearing is about half way into the site and is ongoing. Stumps are being removed from site as quickly as possible as it is a very congested site. Erosion control throughout the site is fine. In a few places the felled branches knocked down the silt fence, but it has been repaired. The stone construction entrance is ok but needs to be closely watched and cleaned out as needed. Tree work is expected to be done by the end of next week and then topsoil removal and stockpiling will begin. xN v a• 4 y,y S Se. �. &t i v i C 41 „ lii A, , t .v i A�. b vle ,., rPl kx� i i?i21' „, gta10, , s 1� 0 iw ' = t3 _ n Lozl � u H 3 N= F 4 I � tp ZIA MOT CaL i v s' F r ICE Pat R b r Y- , k } .. } lot UA tr Iwo '04- g�y 6� r � s t �,t a H �4 k b r � ar,� e �3 k' B' y v — ti. � k P a. x K $ f L � s „ y K� Wolstromer, Bonnie From: Enright,Jean Sent: Monday, November 23, 2015 12:20 PM To: Wolstromer, Bonnie Subject: FW:wellington Attachments: wellington entrance after rain.PNG Please add to the file Sincerely, Jean Enright Assistant Director Community and Economic Development Town of North Andover 1600 Osgood Street,Suite 2035 North Andover,MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email: ienright@townofnorthandover.com Web: www.TownofNorthAndover.com 0 From: Leah Basbanes [mailto:lbasbanes@gmail.com] Sent: Monday, November 23, 2015 11:56 AM To: Hughes, Jennifer; Gaffney, Heidi; Enright, Jean Subject: wellington forgot to add this photo 1 � � s ------------ � y✓ mn "Pr A1 dip INS 04 rw �.a r Rh- Jay Jq pp �t, g Y l err "TA e �3 i 54 � k w. �5_ c 1 i zoormp r Lot fitoo �t AWE i g r w t 4 0 it A All too is { _ a a -u• Ag lost AV is his � 3 d sw 9 ct s� F ✓. �tNov $at `4'Ls-� 'a & �.�,' ter"' ✓`. 'N a 3 '� ,. t 22 3 AMA ell ,ij _ V it i BASBANES WETLAND CONSULTING 39 Hardy St. Dunstable, MA 01827 (978) 649-3839 SITE VISIT REPORT Date: 11-19-15 Project: Wellington Woods DEP #: 242 - 1655 Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015 Owner: Bob Messina Pursuant to the Order of Conditions by the North Andover Conservation Commission for the above referenced project, we have performed a site inspection on the date of this letter and have found the following: To our knowledge and in our opinion, the work performed to date is: X in compliance with the Order of Conditions not in compliance with the Order of Conditions The waterline extension has begun. The dewatering sump with erosion control is in place though is so far not needed. Erosion control at wetland near Brookview Dr is in place and in fine condition. No issues noted. Tree clearing at the subdivision site has also begun. The stone construction entrance has been installed. IT is expected that the tree removal will be completed by the middle of next week. a; r a r w s� , a rt r g e H r r. d r r e a v r � r q zz" � x a a e x a � — �� �� � �o- 'fir• '=�� �; �,Sa', r s' +.rr r 9 = i r € , �. pq s v a, � w pule AM r 1 N 'z a' r _. i to a 10 £10 ; ; ,. � a - M r m r b ' i N r a: x l l $k r M TV �,r k M � WIND mys" Yin— Jay �Y" WAN Y' raw as A A AM 1 ' Otte pt �r ` - rr� r a i k e w. " 41 ^y AR e z x _ E w . �d / x F . y mm `