SITE VISIT REPORT
Date: 1-13-17
Project: Wellington Woods DEP#: 242 - 1655
Location: Boxfond St, N. Andover Date of Issuance: 8/1O/2015
Owner: Bob Messina
Pursuant tothe Order mf Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order ofConditions
not in compliance with the Order ofConditions
/
Minor sediment breach on Lot 2 but this has been cleaned and reinforced with extra hay bales.
Lot 4 final site grading has been completed, but the exposed soil have some minor rill marks
and should be mulched with straw orsomething similar. | spoke with Bob M. and he said this will
ba done asap.
Work on site is only the construction of houses and associated grading. All of this work is out of
the 1O0' buffer zone.
The roadway is clean, the site is stable, basins look great, and erosion control overall is in good
shape.
�
�
`
/
1/17/2017 1-13-17wwl.JPG
x
r
https:Hm ai l.google.com/mai I/ca/u/0/#`nbox/1599907b82b73695?proj ector=l 1/1
1/17/2017 1-13-17 ww2.JPG
At
gm
r
t
p d
t
a
t' S
,r
w
x
https:Hm ai I.googl e.com/m ai I/ca/u/0/#i nbox/1599907b82b73695?proj ector=1 1/1
1/17/2017 1-13-17 ww3.JPG
Y w.
a.
A
� F S, "
Iow
a
x
https:Hmai l.google.com/m ai I/ca/u/0/#i nbox/1599907b82b73695?projector=1 1/1
. .
BASBANESVVETLAND CONSULTING
3S Hardy St.
Dunatab|e. MA 01827
(878) 049-3839
SITE VISIT REPORT
0atm: 12-12-1G
Project: Wellington Woods 0EP #: 242 - 1055
Location: Boxford St, N. Andover Date mf Issuance: 0/1O/2O15
Owner: Bob Messina
Pursuant tm the Order mf Conditions bvthe North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order ofConditions
not in compliance with the Order ofConditions
Post rain/snow event-the site is in very good condition. Roadway is clean. The basins worked
perfectly. There is some sediment build up in the silt fence between lots 1 &2. This will be
addressed asap.
Work on site is only the construction of houses and associated grading, All of this work is out of
the 10U' buffer zone.
The roadway is clean, the site is stable, basins look great, and erosion control overall is in good
shape.
12/13/2016 silt 2.JPG
-,
Vv-
K
r
�t
a
r x
u
f ww
f
https:Hm ai I.google.com/mai I/ca/u/0/#i nbox/158fa5a262b28fd6?projector=l 1/1
12/13!2016 12-12-16 ww3.JPG
A
r
a
a.
�r
i
https:Hmail.google.com/mail/ca/u/O/#`nbox/158fa5a262b28fd6?projector=1 1/1
12/1312016 12-12-16 ww2.JPG
I �
fix a
https://m ai I.googl e.com/m ai I/ca/u/0/Mti nbox/158fa5a262b28fd6?projector=1 1/1
12/13,12016 12-12-16 ww1.J PG
Ar-
2 "
v
{
+A
https://m ai I.googl e.com/m ai I/ca/u/0/#i nbox/l 58fa5a262b28fd6?proj ector=1 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 11-1-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Post rain event-the site held up very well with the amount of rain received. The basins worked
perfectly. No erosion issues on site. Some minor erosion of some of the lots but it was all
contained on the lots.
The front area near Boxford Rd has been finished. The grass is coming up well.
Work on site is only the construction of houses and associated grading. All of this work is out of
the 100' buffer zone.
The roadway is clean, the site is stable, and erosion control is in good shape.
11.'2/2016 ww 2.JPG
if
f
r
https:Hmai I.google.com/mai I/ca/u/0/#i nbox/l5825076aal6d7fd?projector=1 1/1
11,`2/2016 ww UPG
u d `
M n
Iwo
77
,<
z�
Ac-
7777���l,,�r-'-��,�' ',-.,,��",� �"-,-- -", �-�,�-�
hftps:flmai I.google.com/m ai I/ca/u/O/#i nbox/l5825076aa16d7fd?projector=1 1/1
'
BASBANES WETLAND CONSULTING
39 Hardy St.
OUOstah|8. K8A 01827
(978) 849-3839
SITE VISIT REPORT
Date: 10-4-16
Project: Wellington Woods DEP #: 242 - 1055
Location: Boxford G[, N. Andover Date ofIssuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order ofConditions by the North Andover Conservation Commission for
the above referenced project, we have performed m site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order ofConditions
not in compliance with the Order ofConditions
The front area near BOxhJrd Rd has been |O8nnnd and seeded. It has just started to germinate.
[}8Spit8 the drought, the g[8SS is Qn]Vving well and stabilizing the soils.
Work OO site is only the SOnStrUCLiOD Of hOUSeS and aaG0Ci8iGd grading. All of this work is out Of
the 100' buffer zone. There are 4 lots that are SU|| not build yet.
The rO8dxvny is clean, the Site is Si8b|8. and erosion control is in good shape.
10/7/2016 2016-10-04 13.44.05.jpg
1-6
� 4
A +�
�f t be
u
9
r: t"
a_ 4'
tip
m.. ,,.tax. ., • .: � -
Fr -
nI
s
�� _"-•^,�+-dt- � ,-,�+ ?fit ' 4€ "` �Ga� * ��
d
w
a}k d
https://mail.goNle.com/mai I/ca/u/O/#`nbox/1579flfdecd8d93c?projector=1 1/1
10/7/2016 ww1.JPG
i
q kr
r
u
2
z }
a
e�
{ rt...
s,
Kt
https://m ail.google.com/m ai I/ca/u/O/M nbox/1579fl fdecd8d93c?projector=1 1/1
10/7/2016 ww2.J PG
�+ jj t
�lv p.
Al
}
r r
ri `�",�,
F
`} a
uti ` 5 �f
t , 3
p a
3 .,
x r
4
https://mai l.google.com/mai l/ca/u/0/#i nbox/1579flfdecd8d93c?projector=l 1/1
10/7/2016 ww3.JPG
�r ,�'°�' a.�_; t ��' �"� ,3 � ��'2�r z.�. a ➢t b4��4 '� 1 M. � �&�� .,,/r .;.; �, ��.n, s � �s ,•�
n � n� s
2
h
n`
� 4
y
a 4E i.
r
1
.n a "Svyy W.
https:Hmail.google.com/m ai I/ca/u/O/M`nbox/1579flfdecd8d93c?projector=1 1/1
10/7/2016 ww4.JPG
a d
n �
y�
v
5
v
r,r t i
e,
i
st �
sik 4
y
u n,
N 3
r
MF �
i tb+a
fi5 iA ���d ry 14 d
a�
r"�
�" '�' ,�3 ��.', :,. '� �,'•v '� f> c+� � � � ;.�;��n�"'�" �`�'� �e�`��,`'rare'-,�` ,is ;
e
v
''to
„� t � ,,� _.,�.�t � .r�.a •,"�,� a�,F� sa;'�> .' �,,,.„ ��� r � ` �",Win, a"ti;�s.a � e,v �a <���� "x � � �� �.,
, .zs.., .Y _ a* aa ..Z 6'
.. ti`
i,.,.. ,. .�. 7 "t- 'a� a4' t s
_ , z�... tn.....K �,'` .z. =•,� ,,.
.e `?'a, a : ",.., a wo-+„ ti. s .taa...,� x a 1 ra�r ,.' ,s ', a �,...-^r + ;' ' , N X ,' `ai.. t ,.' „~ ,, ah.:
a, �^,,. � .e.� rs�a:'.
,< s n� " ,ik , >. <„ 2f a".,�•*, ��" ,.� n, Y �,� ,wee.Cw ri�%��a
r �,�� ,,
'rev, e M w ;u,- �.. '^, 4.
,1�.., vj „ ,,r '. x '.., S .:, t �' H e � ,f9� ��x ,.,� �. ��:-, �� a s,.- "3 ,,, �" A}�"v a� �i�t s --WIN
.�,.
, ,
'w � , 'r
..° �;R :,e z.. t :'fie•,. �,. w;4 ,�F',..a ,r ,.._ ;., .� , uf��5 ,' t ,� s. ,, ,
}t ,a _:" ��
,,gy�pp A,a.: ,��z > ,.y:•. ,v ,,.. ,:, t L. ...� . .'d
a
H '.
�.0 f?
Pill `Z;:,
n=
--------- . _� _.a �. a �. �_
hffps://mail.googl e.com/m ai I/ca/u/0/ffi`nbox/1579fl fdecd8d93c?projector=1 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 9-3-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Site looks good overall though it is still very dry. The grassed areas look ok and still stabilizing
the soil.
Work on site is only the construction of houses and associated grading. All of this work is out of
the 100' buffer zone.
The roadway is clean, the site is stable, and erosion control is in good shape.
9/6/2016 9-3-16 ww 1.J PG
n e
y
� v
x
4zi
i
r
+Z
a„
L
https://m ai l.google.com/mai I/ca/u/0/M`nbox/1570140634bO650b?projector=l 1/1
9/6/2016 9-3-16 ww2.J PG
46
� � t
AW
� "4Y
s
T
y *y
� f
n
4 �
I
w _ z
i'a' � o
a ,; a
a=
i-n,..4,�?Stw,¢•^r F � S�"�*;,yd iS ,..x;'��,�`*,� t 'n h i:'a,�` `�'�
IS
xk.,
IN
ire ^',;_;�d
� �„°• '' �r� r "s.v�s.
r 'w t
k 3x
Y to k.Pk2 4
� + P
K w�
a �
.n ax t t
t s r J
a
https://mail.google.com/mai I/ca/u/0/#`nbox/1570140634bO650b?projector=l 1/1
9/6/2016 9-3-16 ww3.JPG
Y�
u
https://m ai l.google.com/mai I/ca/u/0/#i nbox/1570140634bD650b?projector=1 1/1
6/b 6=jo}oefojd690S909K90ti60L94/xoqu.W/0/n/eo/I!ew/woo•a!6006•1!ew//:sdA4
�t
d, c
c %S
d-
as ,w a t s�j .
„I v"',
V •�ke C�.
49
}}•y,f e 'tfl,: tf "'•)4 'fit{ 3,,= »,t "'�` 4 gt '. ''v" rv%.. ?e.. .;.
r P
1 �" s .t � h, kn .�. xw�"'� j��a„�,� "�` ,'b
3 "g, �
E �'x
r
� M
p.. p•
t '
4 q s a
N x 4
i
i
y r
a w
r r
RFC
Jdf 17mm 94-£-6 960Z/9/6
-jojoafoadZgo99ogt Cgot,LoL9 6/xoqu 1#/O/o/eo/I!e w/woo•al6006-!!ew//:sdllq
� i -"� :y^-
rv` 'rt
+ fix '
xtU .}.F f
�'kW1-
r
t b
r
A k
, a sr• k �- � ,� rev== x�,� ... .,: .t �rt z*'-
ON
«.. s
Y n5ip
3y
s y i
} F
ss
1 �9
r f
x,
,
k f
edf'9MM 96-£-6 MZ/9/6
BASBANES WETLAND CONSULTING
39 Hardy St.
OUDSt8b|e. K4A 01827
/878\ 640-3830
SITE VISIT REPORT
C}aba: 8-5-16
Project: Wellington Woods DEP #: 242 - 1555
Location: Bunfond 8t, N. Andover Date of Issuance: 9/10/2015
Owner: Bob K4eaaino
Pursuant to the Order mJConditions by the North Andover Conservation Commission for
the above mafmnanmgd project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order ofConditions
Work on site is only the C0DSt[u{tiOn Of hOUS8S and aSSOCi8t8d grading. All of this Vv0[k is out of
the 100' bUff8[ZOD8.
Site is very dry due to drought. Subsequently there are no 8n3SiOn issues. The rO8dvv8y is
C|e8O.
Grass in the SVV8>e3 and detention basins is DOVV quite burnt. H0vv8v8r, the nUOtS should be well
enough established to be provide soil stabilization despite the dry conditions.
The site is stable, 8rUSi0D control iGin good shape.
8/8/2016 8-5-16 ww2.JPG
e � { sIK
p''r."
y v. Q'I 4
� is' � 'k-• .� 1 �„y_b, '" ,. N � t tp «g�M.�'tpw d
https://m ai I.google.com/m ai I/ca/u/0/#i nbox/1566a6441 d5bb75c?projector=1 1/1
8/8/2016 8-5-16ww UPG
r
t.
t
4,r
{ {
a t'�
1 � /
hops://mail.google.com/mai I/ca/u/O/M`nbox/1566a644ld5bb75c?projector=l 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
OUnSt8b|e' MA 01827
/978\ 048-3839
SITE VISIT REPORT
Date: 5-26-16
Project: Wellington Woods 0EP#: 242 - 1O55
Location: Boxford St, N. Andover Date of Issuance: 0/1O/2U15
Owner: Bob Messina
Pursuant tothe Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection omthe date mfthis
letter and have found the following:
To our knowledge and in our opinion, the work performed tmdate is:
x in compliance with the Order mfConditions
not in compliance with the Order ofConditions
Loam though not yet spread and seeded.in the front corner. Apparently the delay is for the utility
company to install a pole and the gas line to be tied into the line in Boxford St.
Go3SS iS growing well in the avva|eeand detention basins.
Foundation installation 0O8 few lots has begun though these are all out the 1OO' buffer zone.
The site is stable, erosion control is in good shape.
5/27/2016 - 5-26-16 ww1.PNG
�a
e
r
K
r
w
i
https:Hm ai l.googl e.com/m ai I/ca/g nbox/154f27496430caff?proj ector=1 1/1
fr
j�,{ � �
S i � ,
110,
x a k ifi Y 2 i�
d Ya
t4"IV EVA
t � �
Arms
tt
k I {
25
Aff
> II }
f g
coleiY:
LO
it
{ err M
y `4,
g ,
I f £ m
" F4 U
cc)
1 II�
g
a 4 z kF m
lot
Of
€ti
Y� s
4� Yf,gA
� tJ
" I
t4,
t 1
.n L
5/27/2016 5-26-16-ww2.PN G
a _ 4
,77
.r
r
t
' w
y
wr
https://m ai I.googl e.com/m ai I/ca/#i nbox/154f27496430caff?projector=1 1/1
5/27/2016 5-126-16 ww3.PN G
s
https://m ai l.googl e.com/m ai I/ca/A nbox/154f27496430caff?proj ector=l 1/1
`
'
BA0BANES WETLAND CONSULTING
38 Hardy St.
Ounatallo, K4A 01827
/978\ 549-3839
SITE VISIT REPORT
Dete: 5-19-18
Project: Wellington Woods OEP #: 242 - 1055
Location: Bnxfond St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant tothe Order of Conditions bm the North Andover Conservation Commission for
the above referenced project, xvehavmpmrfornoedasitminmpmotiononthadatemfthim
letter and have found the following:
Tm our knowledge and in our opinion, the work performed tm date is:
x in compliance with the Order ofConditions
not in compliance with the Order ofConditions
Loam has been brought to the area where the gas line was installed though not yet spread and
needed.
Grass is growing well in the ovve|eoand detention basins.
Foundation installation on a few lots has begun though these are all out the 100' buffer zone.
The site is atob|e, erosion control is in good shape.
5/23/2016 5-19-16 ww l.PN G
; m r
M
.r4
N,
a re
�k
https:Hmail.google.com/m ai I/ca/#i nbox/154dd7adbl8l O8cc?projector=l 1/1
5/23/201 5-19-16 ww2.PN G
r
https:Hm ai l.googl e.com/m ai I/ca/#`nbox/154dd7adbl8108cc?projector=1 1/1
5/23/201 3 5-19-16 ww3.PNG
1,
w
i
' ...........
M
AAWA
_.�=^� ,�;..e�,.,,n,,,•, .tea ' ",. -�" ""�'.,
https:Hmail.googl e.com/m ai I/ca/#i nbox/154dd7adbl8l O8cc?projector=l 1/1
' ^
BASBANES WETLAND CONSULTING
39 Hardy St.
[}UOSt8b|8, K1A 01827
/978\ 849-3839
SITE VISIT REPORT
Date: 5-12-16
Project: Wellington Woods 0EP #: 243 - 1055
Location: Boxfond St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Gas line has been installed, electric iSinstalled.
Except for the |oorninQ and Seeding of the area vvhnn* the gas line was installed and final
pavement, all vvOrh in the 100' buffer has been done.
Grass \s growing well in the Svvo\eSand detention basins.
Work nn the house in beginning but these are all out the 1O0' buffer zone.
The site is stable, 8n0SiOO CODt[0| in great shape.
Please see attached letter regarding ongoing Site inspections by the Erosion control monitor.
May 13 2016
Per the Order of Conditions 242-1655 issued by the North Andover Conservation Commission,the
Erosion Control Monitor shall perform weekly inspections during construction. On behalf of the property
owner I am requesting that the occurrence of the ECM site inspections be reduced to biweekly or a
monthly basis. Please note that weekly inspections are still being performed by Christiansen and Sergi,
the project engineer, per the requirements of the Planning Board; and on a regular basis by Dan Well for
Fish and Wildlife requirements.
Work completed in the buffer and beyond:
1. All detention basins are completed, stabilized and functioning.
2. The grass swales along the roadway up to station are completed and stable.
3. Electric utility installation is done.
4. Gas line is installed.
5. Water line and structures are installed.
6. Roadway is paved with binder coat.
Work remaining in the 100' buffer zone:
1. Loam &seed area where gas line was installed along roadway(planned for week of May 16).
2. Final top coat of pavement on the roadway.
Work remaining outside of the 100' buffer zone:
1. The installation of foundations
2. Construction of houses
3. Final site grading related to the house lots
4. Top coat of pavement.
If you have any questions or comments, I may be reached at IbasbanLs RrMaii.corn or 978 808 1101.
Sincerely,
Leah Basbanes
i i`n d tF {. < ; p
x g
} ddd k {{t 1
jy
g to
tft iakS if. i M 4{ t �' {
y4{ v-
a �
z } ��44"r�I ;�
N ES W
li ky
VI
�S
d 9 t16
,' 4 # - f
OR
t y
y Q
Pti t� t
W
CD
* C)
st O
i
=
i
w i t t
O
O
O
cn
5/16/2016 5-12-16 ww l.PN G
"
,y
r
b
https://mail.googl e.com/m ai I/ca/#`nbox/154bg7aecO7lf768?projector=l 1/1
5/3/2016 Town of North Andover Mail-Fwd:wellington
_sav v Bonnie VIlolstromer <bwolstromer@northandoverma.gov>
hu
wellington
1 message
Rebecca Oldham <roldham@northandoverma.gov> Tue, May 3, 2016 at 8:33 AM
To: Bonnie Wolstromer<bwolstromer@northandoverma.gov>
For the file. Please also include the email to provide record of Leah's request to reduce inspections.
Rebecca Oldham
Staff Planner
Town of North Andover
1600 Osgood Street,Suite 2043
North Andover,MA 01845
Phone: 978.688. 535
Cell: 078.404.2218
Fax: 978,688.9542
Email: ROldham@northandoverma.gov
---------- Forwarded message ----------
From: Leah Basbanes <lbasbanes@gmail.com>
Date: Tue, May 3, 2016 at 8:02 AM
Subject: wellington
To: Jennifer Hughes <jhughes@townofnorthandover.corn>, Heidi Gaffney <H Gaffney @townofnortha ndov e r.
com>, Jean Enright <jendght@townofnorthandover.com>, Bob Messina <RobtMessina@aol.corn>, Rebecca
Oldham <roldham@northandoverma.gov>
Hi Jen, I would like to discuss reducing the site inspections to being monthly or bi monthly.
Thanks,
Leah
5 attachments
sue,
r ww 'I.PNG
w 1826K
ww2.PNG
https://mail.googl e.com/mai I/ca/?ui=2&i k=a2debacbl a&view=pt&search=i nbox&th=154769bf355399d7&si m l=154769bf355399d7 112
5/3/2016 ww 1.PNG
a � ,
,r
w
' w
v
r
a.
y�
t:
�a
https://m ai I.googl e.com/m ai I/ca/4i nbox/154769bf355399d7?proj ector=l 1/1
5/3/2016 ww2.PN G
v _
r d ge
~
x 4
ppv ,
A
,
«mac
�t
https:Hmail.googl e.com/m ai I/ca/M nbox/154769bf355399d7?projector=l 1/1
5/3/2016 ww3.PN G
w
"
UJ
u
https://m ai I.googl e.com/m ai I/ca/#i nbox/154769bf355399d7?proj ector=1 1/1
5/3/2016 ww4.PN G
55
h
V
a
k, r
r
https:Hm ai l.googl e.com/mai I/ca/4A nbox/154769bf355399d7?proj ector=l 1/1
NORSE ENVIRONMENTAL SERVICES, INC.
92 Middlesex Road, Unit 4
Tyngsboro, MA 01879
TEL. (978) 649-9932 - FAX(978) 649-7582
Website: www.nor seenvironmentaLcom
April 28, 2016
North Andover Conservation Commission
1600 Osgood Street—Bldg 20 Ste 2-3)6
North Andover, MA 01845
Re: Wellington Woods
North Andover, MA
Commissioners;
An inspection was performed on April 22, 2016 and the site appears to be in substantial
compliance with the Order of Conditions. The contractors installed the binder coarse on
the roadway and the grass is beginning to grow•under the erosion control matting. The
erosion controls are set and maintained.
If you have any questions or concerns regarding the above information please do not
hesitate to call.
Sincerely,
Maureen Herald
Cc: Planning Board
Leah Basbane
F"
a
e i
Y
a. �t
t
4
i t
Wellington Woods - No Andover Wellington Woods - No Andover
ir
F "Ptt's t
tN41
t.
Wellington Woods - No Andover Wellington Woods - No Andover
z
� a
� L
t � b
I VI
Wellington Moods A No Andover Wellington Woods - No Andover
Wellington Woods a No Andover
'
BASBANES WETLAND CONSULTING
39 Hardy St.
DUDS[8b|8. K4A 01827
/978\ 649-3839
SITE VUSNl[ REPORT
C|abm: 4-8-18
Project: Wellington VVouda [DEP #: 242 - 1855
Location: Boxfnrd Gt, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order mfConditions by the North Andover Conservation Commission for
the above referenced project, we have performed o site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order mfConditions
Heavy rain event on April 7. The site held up very well. No e[OSiOD issues were noted at all.
The gn8SS Svva|es have been |o8med. seeded and secured with erosion control blanket.
The F08d has been brought to Subgoad8 up to the cul-de-sac. Base stone in being brought in
and graded in the n]8dvvey in preparation of paving.
Hoping to pave with binder the middle of April- depends on the paving plants availability.
The Site is stable, e[0SiOD C8Dt[O| in good Sh3p8' S1OD8 C0OSt[UCiiOD eDt[8DCe is A00d' and no
dirt is being tracked 0ntOBnxf0rdSt.
4/11/2016 4-8-16 ww 1.PN G
z
i
y _
- a
kY-
r
li
t
rr
� 5?
l
.Yip Tom"' :-'• �
.. } Rn sAn-
https://m ai I.googl e.com/m ai I/ca/#i nbox/154053a666f95ffd?projector=l 1/1
4/11/2016 4-8-16 ww2.PN G
https:Hm ai l.google.com/mai I/ca/#i nbox/154053a666f95ffd?projector=1 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 3-31-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Presently the grass swales are being loamed, seeded and secured with erosion control blanket.
The road has been brought to subgrade up to the cul-de-sac. Roadside swales have also been
graded to final subgrade.
Hoping to pave with binder the beginning of April- depends on the paving plants availability.
The site is stable, erosion control in good shape, stone construction entrance is good, and no
dirt is being tracked on to Boxford St.
4/1/2016 3-31-16 ww2.PNG
ow
3
a;
https://m ai I.googl e.com/m ai I/ca/#i nbox/153cfl6499a3d8aO?projector=1 1/1
4/l/2016 3-31-16 ww l.PN G
a a �
N
https:Hmail.googl e.com/m ai I/ca/g nbox/153cfl6499a3d8aO?projector=l 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 3-25-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Currently no work on site.
Detention basins 3Pand 6P have been loamed and seeded, and secured with erosion control
blankets.
The road has been brought to subgrade up to the cul-de-sac. Roadside swales have also been
graded to final subgrade.
Hoping to pave with binder the beginning of April-depends on the paving plants availability.
The site is stable, erosion control in good shape, stone construction entrance is good, and no
dirt is being tracked on to Boxford St.
,#rwIt
�Fr�g,
t 4,'t tx AI, fsu�tht
ll�ic� f r' fFp to a'
F a40 sTCF�r F
t,
•a tswF�; - it y� l F�� �> y a� Fly w, i IC,�� �ii t�- '6t� 1��+
tFl$ �1 R. C a jY��{y3v $�4f .f gS1a#
Fratpr�y��`64
Ra¥
v a 3 n1r�s tisrt �'na"�ata 7 5 1 ���� Tc
14
jj
wF i zk '1 # sl.�}�iyljkli';4�� V}y�
rw
co
^' a r,C it >titr4:�s° it�r z ny`tu ,n'r'd'g1, g€
� {" { �!
r 11
R,
Tarar
to aV
�, t � a � co
co
t � b 4 t tT Y 7 4'J�ta'� y '� 'N d A�2� y1` �
uaesr9rJ�}F 55 yr ry axe q.g X
{§ tR �d�j
iilel
p
err€ih arrt tA
"� �
��4;tr t, n to t tt d to X
a
e: !O �;
u:'1 , x
k _
N !1 Fur
C^j L
Ki
pit �t t
CN
Nfxk§# 4 r
_, �F e,{ U
mg,w O
CD
xt1Ck
3/28,/20116 3-25-16 ww3.PNG
F
w,.
»
w
"
a
rw»
7
v r
z�
»
https:Hm ai I.googl e.com/m ai I/ca/M nbox/153bO2l6ce6edf34?projector=1 1/1
�F s
I 4
(e
� fi
k
V t i e
k
� O
s
1 J Y o4 X a ,,�pps
S
a
t,�r4 C
l ,e� 7 r °3 t•li �°
X
N
M
'
BASBANES WETLAND CONSULTING
39 Hardy St.
OunStab|o' K8A 01827
/078\ 549-3839
SITE VISIT REPORT
Date: 3-11-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St, N. Andover Date mf Issuance: S/1O/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
Tg our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order ofConditions
not in compliance with the Order mfConditions
Presently no work occurring onsite. Hoping tn have binder pavement in the next few weeks.
Detention basins 3Pand 6P have been constructed and drainage structures have been installed,
however the basins have not yet been |oamed and seeded.
The site is stable, erosion control in good shape, stone construction entrance is good, and no
dirt is being tracked on to Boxfond St.
3/14/2016 3-11-16 ww1.PNG
OA
k
-
# "
` . e
s
https:Hm ai I.googl e.com/m ai I/ca/#i nbox/1536cOaaa7e59572?projector=l 1/1
3/14/2016 3-11-16 ww2.PNG
r
m
a
w�
_a
https:Hm ai I.googl e.com/m ai I/ea/#i nbox/1536cOaaa7e59572?projector=1 1/1
3/14/2016 3-11-16 ww3.PNG
�P
RE
s
�L
N
x„
w
ax y
https://m ai I.googI e.com/mail/ca/M`nbox/1536cOaaa7e59572?projector=1 1/1
e. �
tot
14d ;a I
WAR not I I
s j
a
OR,
x
���
71 '�
z CM �MMy
i
d y
I it
i
qppp
IR
lol
I �
t iF
OPT ks, R, 0,
i ��` o- t'i r4
a N
b c l r t c E CD
d aF 'ice } ya ja p
� { t,i a° ^� in
g { s i"
t eM
.kJ o
i
gyp;
CAW
Wq
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 3-4-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St, N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Work on the front stone retaining wall is complete. Catch basin in this area has been installed.
Detention basins 3Pand 6P are currently being constructed. These should be done with
drainage installed by the middle of next week.
Starting to set up dates in order to get the roadway paved with binder. It is possible that plants
may be open by the middle of March.
Overall the site is stable, erosion control in good shape, stone construction entrance is good,
and no dirt is being tracked on to Boxford St.
11 e
ev
9
f{{t i�t46 i{ j aC P
t � 9� d ��� 3�� yj•
t t.°
il
• ,� � da spa��'�4r 4� 1�� oi
co
4 f Y
Y
4 )rIf,
CL
LO
;, LO a
LO
i` A9 «° LO
CD
I�r i to r 1 a co X j d' In
cn
rg
ch �
e� A
� v.
q i
SL 7i
oil
pi'„
d e
C
f ,
q,
(9 i d
t t � a,s. �
d"
P
t
f
AS o
{ Y'
1 ,4001
An "
poll
04
f i WITS { 1
Lo
S `x 4 �
r,ard
p Yr
18
rEwa
co
M
dQj J'�# �
1 I
r 4¢ f' 1
sr
CN
LO
Ln
7 z �
Na
f i�.,d artt�
LO
s�
LO
14
r
M
3/7/2016 3-4-16 ww4.PNG
x
v
xG
n�z
�- jw
https:Hm ai l.googl e.com/mai I/ca/M nbox/153512dO529453a2?projector=l 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 2-25-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Post significant rain event
Heavy rain occurred and there was no impact on site. The erosion control is in good shape, no
breaches. No silt travelled onto Boxford St.
Work on the front stone retaining wall is ongoing.
Detention basins 3Pand 6P have been staked out by survey in preparation for excavation.
Overall the site is stable, erosion control in good shape, stone construction entrance is good,
and no dirt is being tracked on to Boxford St.
2/29/2016 2-25-16 ww 1.PN G
r�
P
r $
r.
� r
51
f
-µs
https:Hm ai I.googl e.com/m ai I/ca/#i nbox/153288cG4d34ab2O?projector=1 1/1
2/29/2016 2-25-16 ww2.PN G
�z w
e.
tee✓' ,
ft d a a a
https:Hmai I.google.com/m ai I/ca/M nbox/l53288cO4d34ab2O?projector=l 1/1
2/29/2016 2-25-16 ww3.PN G
o � _
b x a e
a
w li
a
y
r-
https:Hm ai l.google.com/mai I/ca/lA nbox/153288cO4d34ab2O?projector=l 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 2-17-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Post significant rain event
Heavy rain occurred and there was no impact on site. The erosion control is in good shape, no
breaches. No silt travelled onto Boxford St.
No work on site since last inspection.
Detention basins 3Pand 6P have been staked out by survey in preparation for excavation.
Overall the site is stable, erosion control in good shape, stone construction entrance is good,
and no dirt is being tracked on to Boxford St.
2/18/2616 2-17-16 ww 1.PN G
FIV
,, , , .� .;• r .ate.
r
a
.1iL�ik7'iJ '�~�,� '�a�a'_-.- '`'��' -sg� ,._+-..,r��*.�t�k�iy'�'k•'1 :� �� � ,�
https:Hm ai I.googl e.com/m ai I/ca/M nbox/152f5f230efabO66?projector=1 1/1
2/18/2016 2-17-16 ww2.PN G
s.,
47
77,
i lip
_ x
W
M,
https:Hm ai l.googl e.com/m ai I/ca/#i nbox/152f5f230efabO66?projector=l 1/1
2/1812016' 2-17-16 ww3.PN G
r
ti
z.
4 �
Y
https:Hm ai l.googi e.com/m ai I/ca/#`nbox/152f5f230efabO66?projector=1 1/1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 2-5 -16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Inspection performed by Norse Environmental:
Currently no work on site due to weather conditions.
Site is frozen, snow covered and stable.
No dirt was observed on Boxford St.
Erosion control throughout is good.
t 4 1
rist a�"� ski ? t t
t' r
s;' t
n t
,
k
R Kum
40.
Kam.
#te
t ,tlt,,
t �
k
tfi
Y}
z
r >t
ti
,g.
g
Y
p�
y
r
z,
r"
v
r
� rvAN 71
Aft
�ry ter,. �
t
r
w * x-
rX to
sJt
a
AM
0 Not ,
C
x '
d
I". ��
' _
�r
:s
0 Will
r z
As
AV
zt
,
lee
r
fi44
�
i
FPS
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 1-28-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order of Conditions
The water main and drainage structures are being installed starting at the Boxford St end. No
work is currently occurring in the back of the site.
The stone entrance looks clean and the site is presently frozen. Though the upcoming warm
weather may change that. This will be monitored closely and addressed as needed.
No dirt was observed on Boxford St.
Overall the site is stable. Erosion control throughout is good.
F
m
s.
,a
m
r
vs
� � 5
Us 7
SAY v
wff
trio
WE
„r
x"
y r
v
. "
- ,
F
z
.w
� "
r
.why'
�a AM—
.
n
� y
r
come
x t EN
AWAY ".
w
w
e �.
y
YMa
e �
a
ry
�e
� r
R
AMR
lapp , . i
rK"
A�iit
m
Ft � ;
out T o
'-
MOT.� ..a', a % A` eye -
" a ,.. �.� � m
}
oi
p .r
INS
" c
71
i
. MAC
,. R�r .
„
` ids,
Ir
OAK
" WAY
U
MA
r
w
r
r
s � � ¢
„
l �T
z
W
<"' s
R� �'9 �o rfi9 Lyra nY.
sn
,, j
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 1-20-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Nearly all stumping is complete. The pulled stumps are stockpiled and being removed from the
site.
Materials for the water main have been brought to the site and currently waiting for the survey to
layout the location of roadway structures i.e. catch basins, man holes, etc. before excavation
begins. It is expected that excavation will being next week for the water installation.
The stone entrance looks ok, some snow pack is in it but the site is frozen and no dirt was
observed on Boxford St.
Overall the site is stable. Erosion control throughout is good.
r „
< � F
r t �
� s
� y 7
A OR
loll M AIM
J 1
Jun
91
tN
VIA
E
� Y}
� n
t
t tEr 1 r'
w
t
�r
Y"
- `;-
n
M r
z shy <
1
6 t
�r
t r
y ,.
was
� I'- .
f
OF
OR
§ �
mar
Or
t IF
wM
r
r
i
x
N
4
d 'V
fv �
s
$ w .
d
a
jig
4
PAG
ARE
a
tt �Y
4
x `
s
� y
{
clots
b'
oP
E t $
pi.a
o Y7 '-AW
� ,: � ,�" '� � xa, `cam ✓' yam' � :-'
r�
k. 4k
_. ;
A
x
s y
x
y
$ ram' 6 a '
s
i`
. :x#
"
Ni x
r w�
r � �
v Y
y
NO
lip
d �
a tsmall
`
# W a
oo
2
rr
k
s -
r
T.
v .
x
k
4
i
341; -hs1�141� 6
w
a �� 1, i
� � x � t ' N ot
3 -g .;4 }
/ .. '✓ M
� I
r
nICE
AIR d
p ..
� ra
IN
M ��
°
�x r
F'
e
Ur
,Iv
�F
V fl
u v 4
I
, �
r
s
x pp a
E
°
I'
x,; r
r E
4
e
F,
a
AI °
IF
a ice. s': ��ia sa
� Fa - ,
e
r
4
s
r
yf e
� � µ
r
v
F „
,.
e�
" A
Ilk
h
e
x
FkO
JJ
t
w
v
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 1-11-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Heavy rain on Sunday I-10-16 and no erosion or siltation issues noted on site.
The stone at the entrance was replaced last week and is in good condition presently.
The roadway has been brought to subgrade up to cul-de-sac. The side swales have been roughed
in along portions of the roadway.
A slurry pit has been excavated to capture silted runoff.
Currently the work on site is stump excavation in the back of the site.
Next work to begin will be to start installation of the water main.
Overall the site is stable. Erosion control throughout is good.
a
i
t p.
x u+x e
l
d
g a a
"` '�.
�:f�n,>.: �x�,w�r "u• �`.. ;�ft�o"t�zx*=.„>� >.�«*;*;.,,, ff�.�.� Cti; �* "��, f;. Ss,a, t, ��, � ,�rf.��,tti
tT' x'
rea>.
.
^4 ,t,
i
�t' °
t?,f�.,flt�.�- fr:�a��'�,aa'4., ,��>� �, t �.<a�;<v f� ,:fxfr`�` �.
tOU
3 #e�wn r t i c �' MM.
, A j "A
WORST
ixtt
,e-..,,aa,,,
e
a r
�
,� f
i
n,mno
a " a 77,
w
....fx. i� �, ,§Y3�. z., .��� .: �+ . ,,., •.
1 Tvilk ,
t - �i`,• 2 ,�i3 is t �'3i:h „t- ,.,u '� t ,+�,. n <fi' a ,at tf� ,,., ow` ��.�f da J�,: +'''� 4�.
a9{.tr
to -, i a" *".' a Platy
.:" `a��":< Y 3 .i x `on
t r
n
a' J 6
""�
4
2'� ;� •�t,P � w. ;.fir, ��` r� E<�, �+ €
f .4 s r• � �l��f�7`'�:� �'W; .��«s a`§':" ''_`� �. t tx� sf
c
�y
5
ate"
f
s
�FwInk
ft�`
Aw
MIN
SPY
-7 all
s
r.
r
y
r "
a
IO
3 RAM
r
Q
h>
r a <
eIL _ € .
=A z em
.. , . ,r t
x z
4*0
_ •� ! .. - 7
r
x
g u
m
W
a e
� r s
z
ole
z
sell
�x
L'
r,�
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 1-5-16
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
The roadway has been brought to subgrade up to cul-de-sac. The side swales have been roughed
in along portions of the roadway.
The stone at the entrance is functioning and trapping dirt there is no dirt tracked onto Boxford St.
Once the stone defrosts a bit, it will be excavated out and replaced with new stone.
A slurry pit has been excavated to capture silted runoff.
Stockpiles of stumps have been removed though there is still about 1 acres of stumps to be
pulled. This will be done once the area around the cul-de-sac has been graded and it is easier to
get in there.
Next work to begin will either be the construction of the detention basin at the front of the site or
to start installation of the water main.
Overall the site is stable. Erosion control throughout is good.
t
,.,
d t
; �
E
1
rk
Alm
A
r � �
;;{, =A �; `.,,). pi�ft:'�i AE ;' h 4;,R. '��
inn ,..-< �
10
f s n h
r � z
r2
k 1
t?
4 k2 Y"
�t
t i l k r s f} 1 r ras
1
s
4
.S.
G f Wl f.
'Wl
r " ..
WAS 15
W� `
Rn
ISO,V
LIE
24
x' r
z 7
—Awl
-
ME—
r
�f
f 0 _
f
tit '
� � n
z
f �
..
Awl
_' mpg mpg. V= f 2
t
." & f
MA
OWN
Not
All
1
y O
ty -
, r
�:r
MEM
MOO
WSW V`
',.. ALI
�v
� T— All , s
v
R
a
5 yk.
AMA
fu
In
10SOW
, s
til
s loll
4
.ME As IF
v
a toy
q
a
G A' ti - . x"
w . 04 AT
OWN
Aq ,: ., w
s
Amu Olva
x �, sx `.
� mow, > �
� w AIv
SON
mom A
3^
" w wWEN jvjmqT_Y:y
''"'N
ma
l _
aKAK
so W-n
f
But
x
' Wft
—1 mom
To
w �
wmnx 1 w
Io-
TA
� w
�AF
Amp
r
ik
w
s
r
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 12-30-15
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St-N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
The roadway has been stripped and centerline staked. Also the roadway has been brought to
subgrade up to station 3+00.
Stockpiles of stumps are still being hauled off site.
Snow yesterday has made the site a little mucky and there is some mud tracked onto the roadway
by the tree stump removal trucks. I spoke with Dave Maynard and he assured me it would be
cleaned up by end of day.
Overall the site is ok. Erosion control throughout is ok.
l
c
.�
HIM, I
OWL
VP
47
Aw
Am
I�.
ar
w
�5
4
}
Y
�i
c
M.
3 '
r�e�
a
6
h
Y
v
i
z
v
,
W
a�
�X
"
x, v
r
r
k
a
i z
L s
m a 1
r.
r
s"
yy 5°
r
c
x,
"
Wolstromer, Bonnie
From: Enright, Jean
Sent: Sunday, December 27, 2015 11:03 AM
To: Wolstromer, Bonnie
Subject: FW:Wellington
For the file
Sincerely,
Jean Enright
Assistant Director
Community and Economic Development
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover,MA 01845
Phone 978.688.9533
Fax 978.688.9542
Email: lenright@townofnorthandover.com
Web: www.TownofNorthAndover.com
From: Leah Basbanes [mailto:lbasbanes@gmail.com]
Sent: Thursday, December 24, 2015 1:07 PM
To: Hughes, Jennifer; Gaffney, Heidi; Enright, Jean; Bob Messina
Subject: Wellington
The stone entrance has been replaced. No siltation issues after last night's rain at all.
Leah
1
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 12-17-15
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Tree clearing has been completed, though about I acre of area still needs stumps to be removed
which is ongoing.
The front area has been excavated and stockpiled out back.
The stockpiles of soil have been moved to the back of the property.
Most of the silt fence has been re stapled but there are some spots that need to have the yellow
tape replaced.
The stone construction entrance needs to be cleaned up again as a result of the heavy truck traffic
moving trees, stumps and rocks off site. There is however no runoff or dirt on Boxford St.
The front entrance area has been cleared of stock piles and some regrading of the area has begun.
Overall the site looks good and stable.
.,
t,
v �
E a i H 0
w
o-„
c i
t
k ?
s,
w r�
>>,yy
f.7 - `...
z
�+
� �i
i
�� � � t" ia.; '3'' �s���T�<�`a;� •. ,r t�:,�'� k+ z��"�s a4 �,
'`"`3iy ` 5 .# .t' x3�.yn,f i• „ti:' ;i,,fi
t
r� S't r r ,• i t 2, i ,. ,1.,t� z � k
a t � � � �
Sol
` MM VP
,.�,`;*:,.2 ra �� re• 3 2
ro`
j,
t
i
t� tit 4i
yy s"� E� `. r� ,A i�:eisi+ vo
���` "?�'�' Tla Or,
n
W.
Sr=�nllk�.
ti,
�'
A
s i � t s T t
�M% ,
Orl
it t
l`
�4
�
m
x
`a '
v
_ r
OF
IN
50
tw
s
y
r w
H
- .,
� r
Awl
A ,
rm "
v
-rp
,
di .:
ymn A
A W vo
"
~ w _
x
"
'-
IM
r`
a
4� vet
a
t
a..
i
t
t t
a
� k
t W}
F.
t
t
a
r r
3s
�F
4
t , s
d
t
nl 0 OVA
Al 21
WAR
All
s � E
n IV
d
r�
;. ,
t
NSA
I ? �.
z
NO
a: ✓
x:
r
s
Jl . x
r -
x
v
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 12-12-15
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
x in compliance with the Order of Conditions
not in compliance with the Order of Conditions
Tree clearing has been completed, though about I acre of area still needs stumps to be removed.
The stockpiles of soil have been moved to the back of the property. Some of the silt fence need s
to stapled up, but there is no threat of siltation as the straw wattle is still in place and this
nowhere near the wetlands.
The stone construction entrance needs to be cleaned up again as a result of the heavy truck traffic
moving trees, stumps and rocks off site.
The front entrance area has been cleared of stock piles and some regrading of the area has begun.
No issue in this area.
F,
q�
--------------
,. . ., PEI
----------
U' K Y
by
OVA M.
r
m
s:' j ✓r
y
s
4
loot
,RA
� "
y
Now
Fam
LY
y
z �a
w
K
r'.
3
x
„
r�
i
/r !
s
v �.,If
KOS
AS
r
U
'✓ r
r
Mb-
1 TWO �
w
e
r
x -
r
IFr
. gins €�
I'll-Wr
r� � $ . , r-, rr^`, �`.` Nam''a
A
':
' ` rw
4
r
t
r
am,WA
t r
IM
r a F
r. 01
Al
a
i
r'
' r $ -
k r
�r
r
, .>
w r w,
r w
i y a "
� � r �"
IST
F _
s a
« :
MM
y
ram„" ;�" a ,p _10
Uk.; ..
r
��J
V `
ss
ram' ,$ - TV
.� <
,. s ,r .s ,
rIlia
d' ;
�.
G � � �y � y
�..
�x
� 4 ��
y
�� � � .a:
-;� � � y �4 fr i r.„
-� ,� �,. �' �! p�� y
� �
� �� �, ��
s1
�.
i
�F
,�
� i
�� � '� �,
�;,
;, %' �'. �
��
r a � �, �� �
,,
� � ��'
m x r
���. �v �•i� y���
��`�
� �� s� '� ,t i r
� a a
� � ���
�: � °�'
r �
t i ,
� ..� � r
� � k�
G � W ��.
�� �f
� � � �
�'
� �� � 1
is � � fy
� � a
q � n
� i,
�� 1
u
�" � � t n,a� .. � ��� _
,.,.a r Nf „�, �� .,
:a
r � �� '� >� ����
�, �" .. t
r �
� � � �� �'
I+ I
�I!
f
y s, � ��,
�. � A � "k 3
C ". 4 .,
a
a
a
3
� ,
a � � ' ��",� I �
�H,.,
7 n '.� �� �' ; :
" � � �, � It
� � � F' ' -
� s��
'„' � � ��� � �� � � r
� �
� .� � � ��
1 `� a
i
�' r jI
w � 'k� W � ' ��I a�
,r ,ly
N i °;4�� i, � i 9'�
'� " �,` ��;�`a�-� � �9b � I �� a I�i f r�'rn
iI• _
� a. �� :�ze ��`
';
r � ,
� � �� � �
G� � �
:, t
��. � ,��
�.
� � ����
��� ��
� � �
�� �.� � =r
a � � � e
�� �
�`
s ;4 � ��
z �:
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 12-3-15
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
The waterline extension is completed, presently doing the chlorination test. Erosion control
along Boxford St is in place and in fine condition. No issues noted.
Tree clearing is also nearly complete, about I acre remaining to cut and remove. Stumps are
being removed from site as quickly as possible as it is a very congested site. Erosion control
throughout the site is fine. In a few places the felled branches knocked down the silt fence, but it
has been repaired.
The stone construction entrance has been regraded. It is being closely watched and cleaned out
as needed.
Tree work is expected to be done by the end of next week and then topsoil removal and
stockpiling will begin. Stockpiles of rock in the front will also be removed next week.
q
AS
T F_7X9_,_,tk�7-- -�- - I
t
r
" w ,
` '" , r
y � r
x , ,
„ �" „
sorg
A x
v �-1
t ZAP
„ $
Amp zok,
r
NIL
ny
�. � 44,
an
p f "
, �� �
Ira
OW 0
"I W.. .f ,
P.
RK
v y <`
u
1„
y
r �
r
r
O
tur NO,
VAR
�.
A
.:
��
r ,4 w.
r
1 .
N
xr
r
w
m ^
4
} 4
F d9
ti
>„ o-
ry
#� a
. w
Y
_ U x
4
d
- y
r s�
s
g �
r 3
U
z
9
SW
fqlk
v
YJ
1phoil
T 3
fig
NO
16
41
low M
Vc
21 4 .4
61
3
a
q
w
f
r
s
f� r
f
wf
e � r
6
V
w.
✓ AA
Islas
It
,'lilt
JAY
.. ,.
r
s
AN
t
7
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 11-24-15
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
The waterline extension is nearly completed, but not yet up to the subdivision entrance. Erosion
control along Boxford St is in place and in fine condition. No issues noted.
Tree clearing is about half way into the site and is ongoing. Stumps are being removed from site
as quickly as possible as it is a very congested site. Erosion control throughout the site is fine.
In a few places the felled branches knocked down the silt fence, but it has been repaired.
The stone construction entrance is ok but needs to be closely watched and cleaned out as needed.
Tree work is expected to be done by the end of next week and then topsoil removal and
stockpiling will begin.
xN v a• 4 y,y S Se. �. &t
i
v
i C
41
„
lii
A,
,
t .v
i
A�.
b vle ,., rPl
kx� i
i?i21'
„,
gta10, , s 1�
0
iw '
= t3
_ n Lozl
� u
H 3 N= F
4 I �
tp
ZIA
MOT
CaL
i
v
s' F
r
ICE
Pat
R
b
r
Y- ,
k
}
.. } lot
UA
tr
Iwo
'04-
g�y
6�
r �
s
t
�,t a
H
�4
k
b
r �
ar,�
e �3 k'
B' y
v
—
ti.
� k
P
a.
x K $ f
L �
s
„ y
K�
Wolstromer, Bonnie
From: Enright,Jean
Sent: Monday, November 23, 2015 12:20 PM
To: Wolstromer, Bonnie
Subject: FW:wellington
Attachments: wellington entrance after rain.PNG
Please add to the file
Sincerely,
Jean Enright
Assistant Director
Community and Economic Development
Town of North Andover
1600 Osgood Street,Suite 2035
North Andover,MA 01845
Phone 978.688.9533
Fax 978.688.9542
Email: ienright@townofnorthandover.com
Web: www.TownofNorthAndover.com
0
From: Leah Basbanes [mailto:lbasbanes@gmail.com]
Sent: Monday, November 23, 2015 11:56 AM
To: Hughes, Jennifer; Gaffney, Heidi; Enright, Jean
Subject: wellington
forgot to add this photo
1
� � s
------------
�
y✓
mn
"Pr A1
dip
INS
04
rw
�.a r
Rh- Jay
Jq
pp
�t, g
Y
l
err "TA
e
�3
i
54
� k
w.
�5_
c 1
i
zoormp
r Lot
fitoo
�t
AWE
i
g
r
w
t
4 0
it A
All
too
is { _ a a -u•
Ag
lost AV is
his
� 3
d
sw
9
ct
s�
F
✓. �tNov
$at
`4'Ls-� 'a & �.�,' ter"' ✓`.
'N a
3 '� ,. t
22
3 AMA
ell
,ij
_ V it i
BASBANES WETLAND CONSULTING
39 Hardy St.
Dunstable, MA 01827
(978) 649-3839
SITE VISIT REPORT
Date: 11-19-15
Project: Wellington Woods DEP #: 242 - 1655
Location: Boxford St.,N. Andover Date of Issuance: 9/10/2015
Owner: Bob Messina
Pursuant to the Order of Conditions by the North Andover Conservation Commission for
the above referenced project, we have performed a site inspection on the date of this
letter and have found the following:
To our knowledge and in our opinion, the work performed to date is:
X in compliance with the Order of Conditions
not in compliance with the Order of Conditions
The waterline extension has begun. The dewatering sump with erosion control is in place though
is so far not needed. Erosion control at wetland near Brookview Dr is in place and in fine
condition. No issues noted.
Tree clearing at the subdivision site has also begun. The stone construction entrance has been
installed. IT is expected that the tree removal will be completed by the middle of next week.
a; r
a
r
w
s�
,
a rt
r g
e
H
r r.
d
r
r e
a
v r
� r q
zz"
� x
a
a e
x
a � — �� �� � �o- 'fir• '=�� �; �,Sa',
r s'
+.rr
r
9 = i
r € ,
�. pq
s
v a,
� w
pule
AM
r
1
N
'z
a' r _.
i to
a 10
£10
;
;
,. �
a
- M
r
m
r
b '
i
N r
a:
x
l
l $k
r
M TV
�,r k
M �
WIND
mys" Yin—
Jay
�Y"
WAN
Y'
raw
as A A AM
1
'
Otte
pt
�r
` -
rr� r
a
i
k
e w.
"
41
^y AR
e
z
x _
E w .
�d
/ x
F .
y
mm `