Loading...
HomeMy WebLinkAbout2021-03-16 Past Department Review 10126/2020 Town of North Andover Mali-419&435 Andover Street N > 0 W 1 9ht Jean Enright<end northandoverma. �lassaCitus l� ��. . t 9 @ 9 ov> 419 & 435 Andover Street Mike Beirne <mbelme@northandoverma.gov> Mon, Oct 26, 2020 at 7:49 AM To: Jean Enright<jenright@northandovorma.gov>,William McCarthy<wn1Gcarthy@northandoverma,gov> FD submits the following: 1.Applicant needs to perform a swept path analysis w/NAFD L 1 template. I provided the template to Jared Walsh by email on 9121120. Have yet to receive SPA. 2. Utility Plan [0501]shows fire service connections to both proposed buildings to be on sides opposite where existing hydrants are located.Will additional hydrants be Installed In locations nearer to proposed fire service connections? If not, FD requests fire service connections be moved to locations that provide FD with access to supplement sprinkler systems w/greater ease and efficiency. On Sat, Oct 24,2020 at 3:31 PM Jean Enright<jenright@northandoverma.gov>wrote: [Quoted text hidden] Lt Michael Beirne North Andover FD 795 Chickering Rd. North Andover Ma.01845 978-688-9590 irltps:l/mall,google.com/mail/u10?ik=7c2eff6265&view-pt&searclimall&perm msgfd�msg-f%3A16fl1614912204 317948&shnpl=nlsg-f%3A16BI61491220.,. 111 11/23/2020 Town of North Andover Mail-419&435 Andover Street Redevelopment No OVER MaOchV$ tj;Z Jean Enright<jenright@northandoverma.gov> 419 & 435 Andover Street Redevelopment Mike Beirne<mbeirne@northandoverma.gov> Mon, Nov 23, 2020 at 11:41 AM To: Jean Enright<jenright@northandoverma.gov> Looks good, thank you. [Quoted text hidden] https:/Imall.g oogle.com/mail/u/0?ik=7c2off6265&vlew=pt&search=all&permmsg idm msg-f°/a3Ai 684i 7001 g261566594&simpl=msg-f%3Al6B4i 7OOl926... 111 10/2612020 Town of North Andover Mall-419&435 Andover Street QR � ,lean Enright<Jenrlght@northandoverma.gov> 419 & 435 Andover Street Amy Maxner<amaxner@northandoverma.gov> Sun, Oct 25, 2020 at 4:67 PM To:Jean Enright<jenright@northandoverma.gov5 HI Jean.... This property does not contain wetlands or associated buffer zones(as you noted was discussed during the TRC meeting that l missed). Thanks —Amy On Sat,Oct 24,2020 at 3:31 PM Jean Enright<jenright@northandoverma.gov>wrote: {Quoted text hIddenl I Amy R.Maxner Conservation Admiiiisti ator Town of North Andover 120 Main Street North Andover, MA 01845 P11031e: 978-688-g53o Fax:978-688-9542 Email:amaxner@northandoverma.gov Weh:www.northandoverma.gov lillps://mail.google.coinhnailluto?lk=7c2eff6265&view=pt&search all&pormrnsgld=msg-f%3AI6d i 558946179762819&s€inphm8g-f%3Al681li5884617... 111 10/27/2020 Town of North Andover Mail-419&436 Andover Street WNW A7� Machu W� Jean Enright<jenright@northandoverma.gov> 419 & 435 Andover Street Tire Willett<lwillett@northandoverma.gov> Tue, Oct 27, 2020 at 3:39 PM To: Jean Enright<jenright@northandoverma.gov> Hi Jean, I have reviewed the proposed plan at 419 Andover St and have a few comments as follows. 1. Sewer lines shall be PVC and not HDPE as shown on the plan, and shall be installed per DPW Specifications. 2. Old water and sewer lines are to be abandoned at the Town's main lines. This will require a Mass DOT Street Opening Permit and Town Street Opening Permit. 3. New water line connections shall be live taps, not cut-in connections. 4. A sewer mitigation fee will apply based on the design flow for each new building. On Sat, Oct 24, 2020 at 3:31 PM Jean Enright<jenright@northandoverma.gov>wrote: (Quoted text hidden] https:llmall.google.comlmalf/u/0?lk=702ef(6265&view=pt&search=all&permmsgid=msg-f%3A168f 735128643885376&simpl=msg-f%3Al68173512864... 111 11/3/2020 Town of North Andover Mail-449&435 Andover Street kYa � QV Jean Enright<jenright@northandoverrt�a.gov> MOPAOu y, 419 & 435 Andover Street Brian LaGrasse <blagrasse@northandoverma.gov> Tue, Nov 3, 2020 at 3:49 PM To: Jean Enright<jenright@northandoverma.gov> Cc: John Borgesi <jborgesi@north andoverma.gov>, Paul Hutchins <phutchins@northandoverma.gov>, Daniel Lanen <dlanen@napd.us> I have no issues or concerns with this project. The developer or business will have to submit a food establishment plan review prior to building permit application [Quoted text hidden] Brian J. LaGrasse, CENT Director of Public Health Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9540 Fax 978.688.8476 Email blagrasse@northandoverma.gov Web www.northandoverma.gov https:/Imal l.goog le.com/mail/u/0?lk=7c2eff6265&view=pt&search=ali&pe rmmsgid=msg-f%3A1682373661486902i i 3&simpl=msg-i%3A168237366148... 111 11/5/2020 Town of North Andover Mail-174 Cotuit Street No NEE. Jean Enright<jenright@northandoverma.gov> Ma�s�chu ", 174 Cotu it Street Paul Hutchins <phutchins@northandoverma.gov> Thu, Nov 5,2020 at 1:08 PM To:Jean Enright<jenright@northandoverma.gov> Hi Jean, I have one concern is the driveway/roadway being only 12 wide if two cars were to approach one would have to back up a long way , looks like all setbacks meet Zoning requirements in a R4 , 4191435 Andover Street 1. Safeguarding during demolition and building,to keep separate and safe from Bertucci's customers. 2. 20 parking spaces short of required parking. 3. Signage will have to comply with Article 6 Signs and sign lighting regulations, 4. lane width for drive thru bank? htips://mall.google.com/mail/u/0?ik=7o2eff6265&view=pt&search all&permmsgld=msg-f%3Al682544775669940944&simpt=msg-f%3Al6825<4477556... 1!1 11/912020 Town of North Andover Mail-419&435 Andover Street No Jean Enright<jenright@northandoverma.gov> T Mas&�chu 419 & 435 Andover Street Daniel Lanen <dianen@napd.us> Fri, Nov 6,2020 at 9:02 AM To:Jean Enright<jenright@northandoverma.gov> They were planning on combining the curbcuts on Andover Street which is good. Also, adequate parking for the businesses. Dan [Quoted text hidden] hitps:/Imall.google.com/mail/u/0?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-t%3A1682619878806885725&simpl=msg-f%3AI68261987880,., 1/1 12/412020 Town of North Andover Mail-419-436 Andover Street Review Comments NO m . . VER 1�as�awhu i� Jean Enright<jen rig ht@n o rthandoverma.gov> 419-435 Andover Street Review Comments John Borgesi <jborgesi@northandoverma.gov> Thu, Dec 3, 2020 at 4:15 PM To:Jean Enright<jenright@northandoverma.gov> Cc: Daniel Beckley <dbeckley@north and overma.gov>, Tim Willett<twillett@northandoverma.gov> Jean, I have reviewed the proposed site plan application submitted for the 419-435 Andover Street property (Ethan Allen Site) and my only comment is to confirm that the Applicant is coordinating with the MassDOT and let them know they will be required to obtain a MassDOT Permit for any work within the Right of Way on either Andover Street or Turnpike Street. Thank you. -John John J.Borgesi,P.E. Assistant Dircetor/Town Engineer Departnicut of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978,685.09501.44021 Fax: 979,688.9573 https://mail.google.com/mail/u/0?ik=7c2aff6265&view=pt&search=all&permmsgld=msg-f%3A1685003213945476023&simpl=msg-f%3Ai6850932 i 3g4,,. 1/1 1 1124/2 02 0 Town of North Andover Mall-419&435 Andover Street Redevelopment �V Jean Enright<jenright@northandoverma.gov> h4assa�hus j �' 419 & 435 Andover Street Redevelopment Tim Willett<twiIIett@northandoverma.gov> Tue, Nov 24, 2020 at 8:28 AM To: Jean Enright<j enrig ht@ n ortha n dove rma,gov> Cc: Mike Beirne<mbelrne@northandoverma.gov>, Joan Borges[ <jborgesi@northandoverma.gov> Looks good to me. [Quoted text hidden) https:llmall,google,comlmaillu10?lk=7c2eff6265&view=pt&search=all&permmsg id=msg-f%3A1684248495854616928&simpl=msg-f%3A168424849585... 111