HomeMy WebLinkAbout2021-03-16 Past Department Review 10126/2020 Town of North Andover Mali-419&435 Andover Street
N > 0 W 1 9ht Jean Enright<end northandoverma.
�lassaCitus l� ��. . t 9 @ 9 ov>
419 & 435 Andover Street
Mike Beirne <mbelme@northandoverma.gov> Mon, Oct 26, 2020 at 7:49 AM
To: Jean Enright<jenright@northandovorma.gov>,William McCarthy<wn1Gcarthy@northandoverma,gov>
FD submits the following:
1.Applicant needs to perform a swept path analysis w/NAFD L 1 template. I provided the template to Jared Walsh
by email on 9121120. Have yet to receive SPA.
2. Utility Plan [0501]shows fire service connections to both proposed buildings to be on sides opposite where
existing hydrants are located.Will additional hydrants be Installed In locations nearer to proposed fire service
connections? If not, FD requests fire service connections be moved to locations that provide FD with access to
supplement sprinkler systems w/greater ease and efficiency.
On Sat, Oct 24,2020 at 3:31 PM Jean Enright<jenright@northandoverma.gov>wrote:
[Quoted text hidden]
Lt Michael Beirne
North Andover FD
795 Chickering Rd.
North Andover Ma.01845
978-688-9590
irltps:l/mall,google.com/mail/u10?ik=7c2eff6265&view-pt&searclimall&perm msgfd�msg-f%3A16fl1614912204 317948&shnpl=nlsg-f%3A16BI61491220.,. 111
11/23/2020 Town of North Andover Mail-419&435 Andover Street Redevelopment
No OVER
MaOchV$ tj;Z Jean Enright<jenright@northandoverma.gov>
419 & 435 Andover Street Redevelopment
Mike Beirne<mbeirne@northandoverma.gov> Mon, Nov 23, 2020 at 11:41 AM
To: Jean Enright<jenright@northandoverma.gov>
Looks good, thank you.
[Quoted text hidden]
https:/Imall.g oogle.com/mail/u/0?ik=7c2off6265&vlew=pt&search=all&permmsg idm msg-f°/a3Ai 684i 7001 g261566594&simpl=msg-f%3Al6B4i 7OOl926... 111
10/2612020 Town of North Andover Mall-419&435 Andover Street
QR � ,lean Enright<Jenrlght@northandoverma.gov>
419 & 435 Andover Street
Amy Maxner<amaxner@northandoverma.gov> Sun, Oct 25, 2020 at 4:67 PM
To:Jean Enright<jenright@northandoverma.gov5
HI Jean.... This property does not contain wetlands or associated buffer zones(as you noted was discussed during the
TRC meeting that l missed). Thanks —Amy
On Sat,Oct 24,2020 at 3:31 PM Jean Enright<jenright@northandoverma.gov>wrote:
{Quoted text hIddenl
I
Amy R.Maxner
Conservation Admiiiisti ator
Town of North Andover
120 Main Street
North Andover, MA 01845
P11031e: 978-688-g53o
Fax:978-688-9542
Email:amaxner@northandoverma.gov
Weh:www.northandoverma.gov
lillps://mail.google.coinhnailluto?lk=7c2eff6265&view=pt&search all&pormrnsgld=msg-f%3AI6d i 558946179762819&s€inphm8g-f%3Al681li5884617... 111
10/27/2020 Town of North Andover Mail-419&436 Andover Street
WNW
A7� Machu W� Jean Enright<jenright@northandoverma.gov>
419 & 435 Andover Street
Tire Willett<lwillett@northandoverma.gov> Tue, Oct 27, 2020 at 3:39 PM
To: Jean Enright<jenright@northandoverma.gov>
Hi Jean,
I have reviewed the proposed plan at 419 Andover St and have a few comments as follows.
1. Sewer lines shall be PVC and not HDPE as shown on the plan, and shall be installed per DPW Specifications.
2. Old water and sewer lines are to be abandoned at the Town's main lines. This will require a Mass DOT Street Opening
Permit and Town Street Opening Permit.
3. New water line connections shall be live taps, not cut-in connections.
4. A sewer mitigation fee will apply based on the design flow for each new building.
On Sat, Oct 24, 2020 at 3:31 PM Jean Enright<jenright@northandoverma.gov>wrote:
(Quoted text hidden]
https:llmall.google.comlmalf/u/0?lk=702ef(6265&view=pt&search=all&permmsgid=msg-f%3A168f 735128643885376&simpl=msg-f%3Al68173512864... 111
11/3/2020 Town of North Andover Mail-449&435 Andover Street
kYa � QV Jean Enright<jenright@northandoverrt�a.gov>
MOPAOu y,
419 & 435 Andover Street
Brian LaGrasse <blagrasse@northandoverma.gov> Tue, Nov 3, 2020 at 3:49 PM
To: Jean Enright<jenright@northandoverma.gov>
Cc: John Borgesi <jborgesi@north andoverma.gov>, Paul Hutchins <phutchins@northandoverma.gov>, Daniel Lanen
<dlanen@napd.us>
I have no issues or concerns with this project. The developer or business will have to submit a food establishment plan
review prior to building permit application
[Quoted text hidden]
Brian J. LaGrasse, CENT
Director of Public Health
Town of North Andover
120 Main Street
North Andover, MA 01845
Phone 978.688.9540
Fax 978.688.8476
Email blagrasse@northandoverma.gov
Web www.northandoverma.gov
https:/Imal l.goog le.com/mail/u/0?lk=7c2eff6265&view=pt&search=ali&pe rmmsgid=msg-f%3A1682373661486902i i 3&simpl=msg-i%3A168237366148... 111
11/5/2020 Town of North Andover Mail-174 Cotuit Street
No NEE.
Jean Enright<jenright@northandoverma.gov>
Ma�s�chu ",
174 Cotu it Street
Paul Hutchins <phutchins@northandoverma.gov> Thu, Nov 5,2020 at 1:08 PM
To:Jean Enright<jenright@northandoverma.gov>
Hi Jean, I have one concern is the driveway/roadway being only 12 wide if two cars were to approach one would have to
back up a long way , looks like all setbacks meet Zoning requirements in a R4 ,
4191435 Andover Street
1. Safeguarding during demolition and building,to keep separate and safe from Bertucci's customers.
2. 20 parking spaces short of required parking.
3. Signage will have to comply with Article 6 Signs and sign lighting regulations,
4. lane width for drive thru bank?
htips://mall.google.com/mail/u/0?ik=7o2eff6265&view=pt&search all&permmsgld=msg-f%3Al682544775669940944&simpt=msg-f%3Al6825<4477556... 1!1
11/912020 Town of North Andover Mail-419&435 Andover Street
No Jean Enright<jenright@northandoverma.gov>
T
Mas&�chu
419 & 435 Andover Street
Daniel Lanen <dianen@napd.us> Fri, Nov 6,2020 at 9:02 AM
To:Jean Enright<jenright@northandoverma.gov>
They were planning on combining the curbcuts on Andover Street which is good. Also, adequate parking for the
businesses.
Dan
[Quoted text hidden]
hitps:/Imall.google.com/mail/u/0?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-t%3A1682619878806885725&simpl=msg-f%3AI68261987880,., 1/1
12/412020 Town of North Andover Mail-419-436 Andover Street Review Comments
NO m . . VER
1�as�awhu i� Jean Enright<jen rig ht@n o rthandoverma.gov>
419-435 Andover Street Review Comments
John Borgesi <jborgesi@northandoverma.gov> Thu, Dec 3, 2020 at 4:15 PM
To:Jean Enright<jenright@northandoverma.gov>
Cc: Daniel Beckley <dbeckley@north and overma.gov>, Tim Willett<twillett@northandoverma.gov>
Jean,
I have reviewed the proposed site plan application submitted for the 419-435 Andover Street property (Ethan Allen Site)
and my only comment is to confirm that the Applicant is coordinating with the MassDOT and let them know they will be
required to obtain a MassDOT Permit for any work within the Right of Way on either Andover Street or Turnpike Street.
Thank you.
-John
John J.Borgesi,P.E.
Assistant Dircetor/Town Engineer
Departnicut of Public Works
Town of North Andover
384 Osgood Street
North Andover, MA 01845
Phone: 978,685.09501.44021
Fax: 979,688.9573
https://mail.google.com/mail/u/0?ik=7c2aff6265&view=pt&search=all&permmsgld=msg-f%3A1685003213945476023&simpl=msg-f%3Ai6850932 i 3g4,,. 1/1
1 1124/2 02 0 Town of North Andover Mall-419&435 Andover Street Redevelopment
�V Jean Enright<jenright@northandoverma.gov>
h4assa�hus j �'
419 & 435 Andover Street Redevelopment
Tim Willett<twiIIett@northandoverma.gov> Tue, Nov 24, 2020 at 8:28 AM
To: Jean Enright<j enrig ht@ n ortha n dove rma,gov>
Cc: Mike Beirne<mbelrne@northandoverma.gov>, Joan Borges[ <jborgesi@northandoverma.gov>
Looks good to me.
[Quoted text hidden)
https:llmall,google,comlmaillu10?lk=7c2eff6265&view=pt&search=all&permmsg id=msg-f%3A1684248495854616928&simpl=msg-f%3A168424849585... 111