HomeMy WebLinkAbout2019-09-03 Decision SPR • Town of North Andover
Office of the Planning Department
Community Development and Services DivisioJ919 SEP _4 Pn 3t1 1
120 Main Street ��WN p
North Andover,Massachusetts 01845
NOTICE OF DECISION
SITE PLAN REVIEW&REDUCTION IN PARKING SPECL4L PERMMTS
Date. September 3,2019
Public Hearings: June 4,2019,July 9,2019,
July 30,2019, September 3, 2019
Date of Decision: September 3,2019
This is to certify that twenty(20)days
have elapsed from date of decision
without filing of a , Pe Z�
Petition of: 701 Salem Street Realty Trust Date v �t�
701 Salem Street L.aude A. Burziaff
North Andover, MA 01845 Interim Town Clerk
Premises Affected: 695 &701 Salem Street
North Andover,MA 01845
Map 65,Lot 31 &41
Referring to the above petition for a Site Plan Review and Reduction in Parking Special Permit from the
requirements of the North Andover Zoning Bylaw,Site Plan Review,Parking under Part 1 (Off-street Parking
and Loading),Part 3 (Site Plan Review)and 195-10.7 and MGL c.40A, See 9.
So as to allow for the construction of approximately 8,700 sq.ft, addition to an existing building,to be used
for mixed-use retail/restaurant,together with associated parking spaces, stormwater management facilities,
landscaping,signage and other site improvements. The project is located within the General Business(GB)
Zoning District.
After a public hearing given on the above date, and upon a motion by A. Preston and 2nd by J. Simons to
APPROVE the Site Plan Review and Reduction in Parlung Special Permits as amended, and based upon
and subject to the following conditions.Vote was 5—0 in favor of the application.
Planning Board
ATTi,S`I': Eitan Goldberg,Chairman
A True Copy Kate Bargnesi
Peter Boynton
Interlm Tk pk Aaron Preston
John Simons
_ I
695 & 701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
Page 2 of 9
The Planning Board herein APPROVES the construction of 8,700 sq.ft. addition to an existing building,to
be used for mixed-use retail/restaurant,together with associated parking spaces,stormwater management
facilities,landscaping,signage and other site improvements. The project is located within the General
Business(GB)Zoning District.This Special Permit was requested by 701 Salem Street Realty Trust, The
application was filed with the Planning Board on April 30,2019. The public hearing on the above referenced
application was opened on June 4,2019,and closed by the North Andover Planning Board on September 3,
2019. The Applicant submitted a complete application,which was noticed and reviewed in accordance with
Section 8.1, 8.3, 10.3 and 10.31 of the Town of North Andover Zoning Bylaw and MGL c.40A, Sec.9,
The Planning Board voted unanimously(by a vote of 5-0)to grant the Site Plan Review and Reduction
in Parking Special Permits. A Special Permit issued by the Planning Board, as Special Permit granting
authority requires a vote of at least four members of a five-member board.
The Applicant is hereby notified that should the Applicant disagree with this decision,the Applicant has the
right,under MGL Chapter 40A,Section 17,to appeal to this decision within twenty days after the date this
decision has been filed with the Town Clerk.
The Planning Board makes the following findings as required by the North Andover Zoning Bylaws Section
8.1, 8.3, 10.3 and 10.3 1:
FINDINGS OF FACT
1) The specific Site is an appropriate location for such a use, structure or condition.As the Site is
zoned for retail and restaurant use.The Site will continue to be used for retail and restaurant use.
The Site design complements the surrounding uses and provides for sufficient traffic, curb cut
and circulation improvements, as well as sufficient water, sewer and other utilities.
2) The use as developed will not adversely affect the neighborhood character. The Project provides
appropriate building, landscaping and screening set back from the adjacent properties.The
character of the architectural style of the proposed new building will complement the
architectural style of existing buildings located along Salem Street.
3) There will be no nuisance or serious hazard to vehicles or pedestrians.Driveways have been
located to provide for the best available sight distance along Salem Street. Site improvements
have been designed to maximize on-site and off-site safety.
4) Adequate and appropriate facilities will be provided for the proper operation of the proposed use.
5) The proposed Project will provide a total of 70 parking spaces where 72 spaces would be required
in accordance with the Section 195-8.4A.("Table of Off-street Parking Regulations").Parking for
oversized vehicles will be provided onsite and marked with appropriate signage.
6) The driveways and the Salem Street curb cut has been relocated to improve site circulation,site
lines and traffic queuing and allow for safe stopping distances for safer and improved access to
and egress from the site.
7) The proposed landscaping and signs have been designed as not to impede the site distances. The
driveway and site circulation will allow for full,two-way traffic circulation on site and will also
facilitate off street loading and deliveries by trucks at the rear of the site.
2
'695 & 701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
Page 3 of 9
8) 701 Salem Street has been in business for over 20 years. A previous Site Plan Review Special
Permit for the construction of a commercial building was approved on January 7, 1997.
9) Both 701 Salem Street and 695 Salem Street are zoned General Business(G-B)which allows for F
retail and restaurant use by right.
10) Adjustments to parking requirements is appropriate given the varying peak demands of the
various uses on the Site, and in conjunction with such adjustments,the parking at the Site will not
cause detriment to the surrounding neighborhood since the proposed parking program for the Site
will not increase traffic congestion or queuing or otherwise result in unsafe conflict of motor
vehicle and pedestrian traffic.
11) Adequate and appropriate facilities will be provided for the proper operation of the proposed use.
The project is adequately and appropriately serviced by municipal water,sewer and other utilities
that adequately address the needs of the Project. Stormwater management facilities will provide
adequate treatment of stormwater in accordance with applicable requirements.
12) The use is in harmony with the general purpose and intent of this Zoning Bylaw. The location of
the proposed Project is ideally suited to add additional retail,restaurant and other uses allowed
within the B-2 Zoning District to complement and build upon the future redevelopment of the
Route 125 corridor in this area of North Andover.
13) The Plan reflects extensive discussions with the Planning Board,Peer Review Consultants,the
Planning Department, other Town Departments, and the Applicant with respect:to Site design and
stormwater management.
14) The stormwater management is designed in accordance with the Town Bylaw requirements and
Best Management Engineering and Practices, and the most recent version of the MA DEP
Stormwater Handbook, and the Plan reflects extensive discussions and review by the Town's
outside consultant engineer,Horsley Witten Group.The proposed runoff from the impervious
areas of the Site will be drained through a closed drainage system to subsurface storage/non-
infiltrating detention systems. The Project's permanent stormwater measures include: two
subsurface infiltration systems to manage stormwater runoff from the building expansion and the
additional parking area. The eastern half of the pavement area will continue to discharge to the
closed drainage system within the parking lot that discharges to an existing detention basin
located at the corner of Abbot Street and Salem Street. Stormwater runoff from the proposed
building room will be collected via a pipe and directed to the subsurface infiltration system.
There were extensive discussions between the Town's outside consultant engineer and the Project
Engineer related to the overall design and Operations&Maintenance Plan dated March 27, 2019.
(See correspondence from Horsley Witten Group, dated May 10,2019 and July 10,2019 and
Civil Design Group,LLC response comments dated July 17,2019).
15) The Plan reflects extensive discussion and review with TEC,Inc.,the Town's civil peer review
consultant and meets the requirements of the Town for Site Plan Review as stated in Section 8.3
of the Zoning Bylaw. (See emails dated July 11,2019, and Civil Design Group, LLC response
comments dated May 14, 2019 and June 25, 2019).
16) The Town Inspector of Buildings,Paul Hutchins, reviewed the project and this project requires
two additional parking spaces(see email June 30,2019).
3
I
695 & 701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
Page 4 of 9
17) The Town Engineer,John Borgesi,has reviewed the Project and has confirmed that all
engineering department comments have been adequately addressed(See memos dated August 14,
2019).
18) Lieutenant Michael Beirne of the North Andover Fire Department reviewed the Plans and
determined that the final design addresses all of the concerns the Fire Department had over the
additional hydrant and access to the Project for firefighting and rescue operations. (See email
dated August 8, 2019),
19) The Town Director of Public Health, Brian LaGrasse,reviewed the Project and confirmed that
there were no concerns(see email dated May 22, 2019).
WAIVERS
20) The Applicant has requested waivers from the following provisions of the Town of North
Andover Zoning Bylaw, including Section 195-8.3. Special regulations, 195-10.7, 195-8,Part 1,
Parking Special Permit
Finally the Planning Board finds that this Project generally complies with the Town of North Andover
Zoning Bylaw requirements as listed in Section 195-8.14, as well as under Part 3. Site Plan Review and
10.3, but requires conditions in order to be fully in compliance. The Planning Board hereby grants an
approval to the Applicant provided the following conditions are met:
PERMIT DEFINITIONS
21) The"Locus"or"Site"refers to the 61,297 Sq.Ft.parcel of land with land fronting on Salem Street
as shown on a portion of Assessors Map 65, Parcels 31 and 41, and also known as 695 and 701
Salem Street,North Andover,Massachusetts.
22) The "Plans" refer to the plans prepared by Civil Design Group, LLC. dated July 14, 2019 and
revised to July 23,2019 consisting of Sheets 1 -- 12,A100,A101,E-1 and E-2,titled"Site Plan Set
for Proposed Mixed Use Expansion 695&701 Salem Street,North Andover,MA 01845.
23) The "Project" refers to the razing of a nonconforming residential structure located at 695 Salem
Street and construction of an 8,700 square foot addition which will result in a 13,550 Square Sq.
Ft. space with 2,600 of restaurant space, 9,150 sq.ft. of retail space and 1,750 sf of storage space,
parking spaces, stormwater management facilities, landscaping, signage and other improvements
depicted on the Plans to be located on an already developed 1.407 acre parcel.This project is within
the General Business(G-B)Zoning District,
24) The "Applicant" refers to 701 Salem Street Realty Trust, 701 Salem Street, North Andover, MA
0 184 5,the Applicant for the Special Permit, its successors and assigns.
25) The "Project Owner"refers to the person or entity holding the fee interest to the title to the Locus
from time to time,which can include but is not limited to the Applicant,developer,and Owner.
SPECIAL CONDITIONS
26) The Applicant will work with individual landowners located at 710 Salem Street, 740 Salem
Street and 20 Abbott Street to provide off-site screening in a reasonable manner to shield abutting
4
i
695 &701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
I
Page 5 of 9
properties from headlight glare. An opaque fence will be erected on Salem Street in accordance
with the approved plan.
27) The Applicant will provide the Planning Board with photographic evidence 6 months to a year
from the time of occupancy while the foliage is down to ensure that screening is sufficient.
28) The Applicant will provide the Planning Board with a review of litter, lighting and traffic within
1 year of the project's occupancy date.
i
29) Signage for Large vehicle parking will be installed in specific parking spaces,
i
30) Deliveries to the Site must be limited to between the hours of 7:00 a.m. and 9:00 pin with the
exception of individual vendors approved by the Board of Health and current vendor providing
Dunkin Donuts and Newspaper deliveries.
31) The dumpsters may only be emptied between the hours of 7.00 am and 9:00 pm.
32) Two additional test pits in the location of the subsurface infiltration system must be provided
prior to construction of the subsurface infiltration system. Test pit results must be reviewed and
approved by the Planning Board.
33)Any revisions to the approved Plans shall be submitted to the Town Planner for review. If these
revisions are deemed substantial,the developer must submit revised plans to the Planning Board
for approval, all of which is in accordance with Section 8.3.8 (Revisions to Approved Site Plan).
PRIOR TO THE ENDORSEMENT OF THE PLANS
34) Unless otherwise approved by the Planning Board,the Applicant shall, upon the later to occur of
(a)thirty(30) days after the expiration date of the twenty(20)day Appeal Period of this Decision,
submit to the Planning Board for its approval a Form A application for approval of an Approval
Not Required along with an ANR Plan which proposes to combine Map 65 Lot 41 as depicted on
the Plan.No construction activities authorized by this Decision shall be commenced until the
Applicant has recorded an approved ANR Plan for said lots.
3 5) The Applicant shall submit with the ANR Plan an updated Zoning Table for each ANR Lot. The
Zoning Table shall meet the criteria listed in Section 195-8.14.E. (6).
36) A Clow Eddy hydrant, open left hydrant that shall be identified within 100 ft of the building on
the record plan. The Applicant shall contact the DPW for hydrant specifications and the hydrant
detail shall be updated.
PRIOR TO ISSUANCE OF SITE WORK,BUILDING PERMIT,OR CONSTRUCTION
37) Two (2) copies of the signed, recorded decision and the recorded plans must be delivered to the
Planning Department.
3 8) In consultation with the Staff Planner,the Applicant shall designate an Independent Construction
Monitor.The monitor shall read,sign, and return to the Planning Director the Letter of Agreement
for independent Monitors.The Construction Monitor must be available upon four(4)hours'notice
to inspect the site with the Planning Board designated official. The monitor shall make weekly
inspections of the project, provide monthly reports to the Planning Department throughout the
5
i
'695 &701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
Page 6 of 9
duration of the Project,and detail any areas of non-compliance and corrective actions.Additionally,
the monitor shall assist Town Staff in overseeing the implementation and updating of the SWPPP
throughout the development process.
39) In consultation with the Director of PIanning, the Applicant shall designate an Independent
Environmental Monitor. The monitor shall read, sign, and return to the Planning Director the
Letter of Agreement for Independent Monitors,The Environmental Monitor must be available upon
four(4) hours' notice to inspect the site with the Planning Board designated official. The monitor
shall make weekly inspections of the project,provide monthly reports to the Planning Department
throughout the duration of the Project, and detail any areas of non-compliance and corrective
actions. The monitor will also provide reports following heavy rain events.
40)A construction schedule shall be submitted to the Planning Staff for the purpose of tracking the
construction and informing the public of anticipated activities on and off the Site.
41)A bond in the amount of twenty thousand dollars ($20,000.00) shall be posted for the purpose of
insuring that the Site is constructed in accordance with the approved plan and that a final as-built
plan is provided, showing the location of all on-site structures (Site utilities, structures, curb cuts,
parking spaces and drainage facilities, including invert elevations of all stormwater structures).
This bond shall be in a form acceptable by statute.
42) Two additional test pits in the location of the subsurface infiltration system must be provided prior
to construction of the subsurface infiltration system. Test pit results must be reviewed and
approved by the Planning Board.
43)A detailed perimeter roof drain system shall be designed for each building for inclusion of details
in final construction plans. The Engineer of Record shall certify to the Town that the final design
meets the intent of the stormwater management design.
44) All dumpster locations shall be shown on the Plans and the dumpsters shall be screened with
fencing and plantings.The final details shall be reviewed with the Planning Director.
45)A copy of all local, state and federal permits required for the project must be submitted to the
Planning Department.
46) All stormwater management best practices shall be maintained as specified in the approved
Stormwater Operations and Maintenance Plan.
47) All applicable erosion control measures must be in place and reviewed and approved by the Planning
Department.
48) Yellow"Caution"tape must be placed along with the limit of clearing and grading as shown on the
Plan. The Planning Staff must be contacted prior to any cutting and or clearing on site
49) A pre-construction meeting must be held with the developer, their construction employees, and the
Planning Department (and other applicable departments) to discuss scheduling of inspections to be
conducted on the Project and the construction schedule.
DURING CONSTRUCTION
50) Dust mitigation must be performed weekly, or more frequently as directed by the Planning Director,
6
695 & 701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
Page 7 of 9
throughout the construction process.
51) Any stockpiling of materials (dirt, wood, construction material, etc.) must be shown on a plan and
reviewed and approved by the Planning Staff Any approved piles must remain covered at all times
and fenced off to minimize any dust problems that may occur with adjacent properties.
52) It shall be the responsibility of the developer to assure that no erosion from the construction Site shall
occur which will cause deposition of soil or sediment upon adjacent properties or public ways,except
as normally ancillary to off site construction. Off site erosion will be a basis for the Planning Board
making a finding that the project is not in compliance with the plan; provided, however, that the
Planning Board shall give the developer written notice of any such finding and seven days to cure said
condition.
i
53) Construction parking shall be limited to onsite at 695 Salem Street and 701 Salem Street.
PRIOR TO A CERTIFICATE OF OCCUPANCY
54) The Applicant must submit a letter from the architect and engineer of the Project stating that the
building, landscaping, lighting and Site layout substantially comply with the plans referenced at the
end of this decision as endorsed by the Planning Board and that the stormwater management
structures are functioning as designed. Alternatively,the Applicant and/or Project Owner may
provide a bond,determined by the Planning Board,to cover the full amount of the landscaping
materials and installation if weather conditions do not permit the completion of the landscaping prior
to the use of the building,
55) The Applicant must submit a letter from the engineer certifying that the lighting provided meets
minimum Illuminating Engineering Society(IES)standards.
56) The Applicant will provide a Ietter from a certified engineer stating that associated retaining walls
have been constructed in accordance with approved plans and this decision.
57) All stormwater structures shall be cleaned, in accordance with the approved Stormwater Operation
&Maintenance Plan.
5 8) All signage shall conform to the signage regulations contained within the North Andover Zoning
Bylaw, Article 6 Sign and Sign Lighting Regulations, unless a Variance is issued by the North
Andover Zoning Board of Appeals.
59) The Owner shall apply to the Board of Health for the appropriate dumpster permit.
60) The Planning Staff shall review the Site. If weather conditions do not permit the completion of the
landscaping prior to the use of the building, the Applicant and/or Property Owner may provide a
bond,determined by the Planning Board,to cover the full amount of the landscaping materials and
installation.
PRIOR TO THE FINAL RELEASE OF ALL SECURITY AND ESCROWED FUNDS
61) The Planning Staff shall review the Site. Any screening as may be reasonably required by the
Planning Staff will be added at the Project Owner's expanse. Additionally, all pedestrian warning
signage will be reviewed and any additional signage deemed necessary at non-controlled locations
such as mid-block crossings and at the roundabout shall be added at the Project Owner's expense.
7
695 &701 Salem Street
Site Plan Review&Reduction in Parking Special Permit
Page 8 of 9
62) The Applicant shall submit an as-built Plan stamped by a Registered Professional Engineer in
Massachusetts that shows all construction, including stormwater structures and other pertinent site
features. This as-built Plan shall be submitted to the Town Planner for approval and must be
provided in paper form as well as in SDF (Standard Digital File)format. Any variance to the Plan
shall be specified in memo format.
63) The Planning Board must by a majority vote make a funding that the Site is in conformance with the
approved plan.
GENERAL CONDITIONS
64) The contractor shall contact Dig Safe at least 72 hours prior to commencing any excavation.
65) Gas, Telephone, Cable and Electric utilities shall be installed underground as specified by the
respective utility companies, except for so-called "green utility boxes" as may be required by the
utility companies.
66) The hours for construction shall be limited to between 7:00 a.m. and 5:00 p.m. Monday through
Friday and between 8:00 a.m. and 5.00 p.m. on Saturday.
67)No open burning shall be done except as is permitted during burning season under the Fire
Department regulations.
68) The owner shall apply to the Board of Health for the appropriate dumpster permit.
69) The provisions of this conditional approval shall apply to and be binding upon the Applicant, its
employees and all successors and assigns in interest or control.
70) Any action by a Town Board, Commission, or Department, which requires changes in the plan or
design of the building, as presented to the Planning Board, may be subject to modification by the
Planning Board.
71) Any revisions shall be submitted to the Town Planner for review. If these revisions are deemed
substantial, the developer must submit revised plans to the Planning Board for approval using the
process outlined in Section 195-8.17 (Revisions to Approved Site Plan)of the Zoning Bylaw.
72) Pursuant to the North Andover Zoning Bylaw Section 195-10.7.A(3)this Site Plan Review
Special Permit shall be deemed to have lapsed after August 20, 2021 (two years from the date the
permit is granted),exclusive of the time required to pursue or await determination of any appeals,
unless substantial use or construction has commenced within said two-year period or for good
cause as determined by the Planning Board.
73) The following information shall be deemed part of the decision:
Plan titled: Site Plan Set for Proposed Mixed Use Expansion 695&701 Salem Street, North
Andover,MA 01845
Prepared for: 701 Salem Street Realty Trust
701 Salem Street
North Andover, MA 01845
8
' 695 & 701. Salem Street ;
Site Plan Review&Reduction in Parking Special Permit
Page 9 of 9
Prepared by: Civil Design Group
21 High Street
North Andover,Massachusetts 01845
Scale: 1"=40' 1
Date: Sheet 1 (dated 4/4/19,revised to 7/19/19),Sheet 2(dated 1/23/19,revised to 6/19/19),
Sheets 3-4 (dated 4/4/19, revised to 7/19/19), Sheet 7 (dated 4/4/19), Sheets 8-12
(dated 4/4/19 revised to 7/19/19), Sheets A100 &A 101 (dated 3/25/19, revised to
7/23/19), Sheets E-1 &E-2(dated 4/8/2019,revised to 6/24/19)
Sheets: 1 -12,A100,A101,E-1 and E-2
Stormivater Management Report
Prepared by: Civil Design Group
21 High Street
North Andover,Massachusetts 01845
Dated: April 4,2019,Revised to June 25,2019
i
cc:
Applicant
Abutters
i
i
9