Loading...
HomeMy WebLinkAbout2024-03-05 Middle School Building Committee Minutes 0 Middle School Building Committee Meeting Minutes March 5, 2024 Present: Laurie Burzlaff,Stephen Foster,Jorge Goncalves,Janice Phillips,Joe Hicks,Jennifer Whitney,Jim Mealey (remote), Kate Delisle(remote),Jen Cronan (remote) Phil Palumbo—Colliers Bill Peters—MVG Al Cuevas- MVG Jessica Drummond—Colliers Susan Taylor-design Meeting was called to order by Committee Chair Laurie Burzlaff at 4:00 p.m No public comment Approval of Minutes Motion to approve minutes of 2/13/24 made by Jenn Whitney,Second Joe Hicks, Motion approved by roll call vote 9-0. Construction update All coming along nicely.They are making good progress. Floor Discrepancy The Town used the existing survey. It was verified by surveyor for second floor. It was always the design intent on first floor to ramp down at addition but design intent on second floor was seamless transition. General contractor never verified the elevations as required by the design documents and there is discrepancy of 5 Y.inches-existing building higher than the addition.They will have ramp to fix the discrepancy. It was Hutter's fault. Not considered a major error or design change. What can we do compensation wise for us not getting what we want? Jim Mealey—it's a large concession on our part and we should receive compensation for that as project progresses. Locker color options 1—red/gray 2-green/yellow 3-blue/orange 4-red/black/white The Committee chose gray ash,gray and cardinal red for lockers Fire Shutter removal credit PCO-10 Fireshutter stainless steel sill—will receive credit of$10,822.57 Motion to approve made by Jen Whitney,seconded by Jen Cronan, motion approve by roll call vote 9-0. PCO 7-Fire protection valve cabinet Fire department wants additional fire protection valve cabinet totaling$6159.78. Motion made by Joe Hicks,seconded by Jen Whitney, motion approved by roll call vote 9-0. Vote on CDW's proposal for phones for addition Phone Proposal—$2627.52 for equipment. Motion made by Jen Whitney,seconded by Jen Cronan, motion approved by roll call vote 9-0. Vote on BCM's proposal for access control and security cameras Equipment—$16532.68 Non construction—Labor$7168.00 Construction-Labor-$7230.08 Money to come from IT capital account.Total$30,930.76 Motion made by Jen Whitney,seconded by Jen Cronan, motion approved by roll call vote 9-0. Invoices MVG—$19,260 Motion made by Joe Hicks,seconded by Jen Whitney, motion approved by roll call vote 9-0. Adjournment Motion made by Jen Whitney,seconded by Jen Cronan, motion approved by roll call vote 9-0. Adjourned 4:52