Loading...
HomeMy WebLinkAbout1997-04-18 Engineer Correspondence DEF SUB NEW ENGLAND ENGINEERING SERVICES INC January 21, 1997 I \1! North Andover Planning Board Town Hall Annex 148 Main Street North Andover,MA 01845 Re: Old Center Lane Public Hearing Dear Mr. Chairman: Please accept this letter as a request to postpone the continued public hearing for the above referenced project for an additional two weeks. Due to an illness in the family I was unable to make any substantial progress in regards to the concerns that have been raised by the Planning Board Consultant and the Abutters engineer. Thank you for your anticipated cooperation in this matter. Yours truly, Benja C, Osgood, Jr. 33 WALKER RD. SUITE 22 - NORTH ANDOVER,. MA 01845 a (508) 636-1766 I i SERVICESI"N' EW , ENGLAND ENGINEERING INC January 30, 1997 JAN 3 ► North Andover Planning Board Town Hall Annex 148 Main Street ,�ARM, ��@��� ;,:.k i E i North Andover,Ma 01845 Re: Old Center Lane Subdivision Dear Mr. Chairman: Please accept this letter as a response to the issues raised in letters from John Chessia of Coler and Colontonio,the towns consultant,and Mr. Robert Gill,a consultant that was hired by the abutters to the north of the proposed roadway. A response to each comment is listed below. RESPONSE TO LETTER FROM JOHN CHESS1A DATED DECEMBER 16,1996 LA test pit has been performed in the area of the proposed detention pond. It indicates a water table elevation 22 inches below the ground. A log of the soils found is attached to this letter. 2, Drainage issues are discussed in another letter. 3.The haybale details have been revised and the location of haybates has been shown on the plan. 4. The plan is still drawn at 1"=30'. We feel that the ability to see details is better at this scale. 5,The watershed zoning district has been indicated on sheet 1 of the plans. 6. Centerline stations are now indicated on the plans. Access is not shown to the property to the easterly side of the site. This office has demonstrated that the connection to the property to the East would require roadway slopes in excess of 12%,Further,the present developer of the property is now dealing with the planning board to redesign the plans to meet current zoning with access from Salem Street. 7.The locations of the sewer lines have been revised to enable future replacement or repair to be done totally within the right of way. 8.Additional existing topography and features have been added to the plans, 33 WALKER RD. m SUITE 22 NORTH ANDOVER, MA 01845 - (508) 686-1768 9. The plan has been revised to show all of the spruce trees.The grading has been adjusted to save all of the spruce trees except the ones closest to the outlet of the detention pond. 10,The roadway profile has been revised to meet the bylaw.Tire vertical curve information has been provided.Tile water line is not shown on the profile plan. 11. Sidewalks are not shown on the plan. It is the impression of this office that they are not usually required in projects of this size, 12.Proposed street trees have been shown. 13. A slope easement has been indicated on sheet I of the plans for the slopes that exceed 4:1. 14. The drainage has been redesigned to a catch basin manhole system. 15. A headwall detail has been provided. 16. The swale that presently exists on the site has been located and added to the plans.The outlet of the pond is proposed to discharge to this swale. 17, The pavement radii has been shown on the plan. 18. Spot grades have been added to demonstrate that water will flow out of the driveway on Lot 32B. Items 19 to 24 will be addressed in a separate letter. RESPONSE TO LETTER FROM MR.ROBERT M. GILL 1. In regards to the slope of the road. The roadway and all of the adjacent slopes meet the requirements of the planning board regulations. A guard rail has been added to the plans in all areas that have side slopes of 2:1. 2.The height of the fill area is quite high,but a 2:1 slope is an adequate slope to stabilize the surface.This has been demonstrated in many areas in town. 3, The detention pond has been designed in the customary rnanner that detention ponds are designed in North Andover.A guard rail has been added to the top of the slope and the inlet pipe has been lowered so it is at the maximum water level of the pond, Calculations for the size of rip rap needed to prevent erosion at the inlet pipe will be submitted in a separate letter. 4. This property cannot be designed to have zero effect on the flow of water in the area.The drainage design meets the North Andover requirements, and in fact lowers the peak flow off of the site. The creation of a wetlands is not necessarily a bad situation since a wetland would act to improve the quality of runoff water from the property.The effect upon the land owned by the Rodriques's will be shown on the plan as far as offsets to wetlands under current laws are concerned. f i RESPONSE TO LETTER PROM JOHN CHESSIA DATED JANUARY 21,1997 This letter generally answers khe questions raised by Mr, Gill that have been addressed above. The continents in this letter generally match the opinions of this office,The only item that needs to be addressed here is item number 4 in Mr, Chessia's letter. A test pit has been done in the area of the proposed detention basin.The soil log indicates that a seasonal High water table 22 inches below the ground surface can be found in this area. Tile construction of the pond as proposed will put the bottom of the pond below the seasonal high ground water table.It is likely that wetland vegetation will grow if the pond is not graded to slope slightly towards the outlet of the pond.This will be done to hinder the growth of wetlands plants. I hope this letter addresses all of the concerns that have been raised. I will be at your meeting February 4, 1997 to discuss this matter further. If you have any other questions or concerns,please do not hesitate to call. Yours truly, Benja"n C. Osgood,Jr. i i ,I t 1 i Hayashi Corporation Consulting Engineers I January 28, 1997 Mr, Benjamin C. Osgood, Jr. New England Engineering Services, Inc. 33 Walker Road North Andover, MA 01845 RE: Old Center Lane N. Andover, MA Dear Sir: Attached please find the revised Stormwater Management Report for referenced project dated January 28, 1997. The report and computations included therewith reflect the resolution of review comments of Mr. John C.Chessia, P.E.of Coler and Colontonio, Inc., transmitted by your December 17, 1996 letter(copy attached). Please note that we have incorporated stormwater runoff originating from the adjacent Lot 6, in accordance with the additional survey information which your office provided. As a result, the geomerty of the detention pond proposed has been modified (see report for plan view @ 1" = 30' ), and the diameter of the outlet pipe increased to 12". The revised project design incorporates resolutions of Mr. Chessia's comments and continues to result in a decreased rate of runoff under predicted conditions for 2, 5, 10 and 100 year storm events at all locations where runoff leaves the property. As discussed, we anticipate that you will incorporate onto the plans appropriate details for a "trash rack"to be installed at the inlet end of the 12"outlet pipe needed to protect same from cloggong. We trust that this submittal will meet with your approval. Should you have any questions, please contact our office. Very truly yours, iii Corporation r Robert G. Rook, P.E. Enclosure RG Rllam196-1 63/1 289 7 288 South River Rd, Bldg. A, Bedford, NH 03110-6815 21 Hog Hill Road. Pepperell MA 01453 Tel: (603) 668-6533 Fax: (603) 668-7022 TO: (800) 970-6633 Fax: (508) 433-9172 . g 1 ' 3 OLD CENTER LANE, N. ANDOVER Comment Resolution The following presents the methods used to resolve review comments of Mr. John C. Chessia, P.E., Coler and Colantonio, Inc. on the October 31, 1996 report. Response to Comment 19 Sub-Area plans and computations have been revised to reflect offsite upgradient areas contributing flow to the detention basin. As a result, the detention basin outlet pipe was revised from an 8" diameter pipe to a 12" pipe. As a result of this change and others described below, both pre and post development peak runoff rates were recomputed as follows: At Detention Basin Outlet Pre Development Peak (100 yr.) 10.9 cfs Post Development Peak (100 yr.) 7.9 cfs Reduction 3.0 efs At NortherlvPropP,ft Line Pre Development Peak (100 yr.) 6.3 cfs Post Development Peak (100 yr.) 0.8 cfs Reduction 5.5 cfs The peak elevation within the detention basin is computed to be 249.4 (revised from an elevation of 249.1 previously computed -see October 31, 1996 report). Response to Comment 20 Computations utilize Curve Numbers 74, 79 and 98. Response to Comment 21 The 300' maximum length for sheet flow was utilized in the original computations in accordance with published SCS methodology (TR 55). We understand (based on review comments received) that Natural Resource Conservation Service personnel have told Coler and Colantonio personnel that a maximum length of 50 to 100' is typical in New England. We have no objection to the use of a lower maximum and have revised computations accordingly. Response to Comment 22 The detention basin outlet has been modeled as a culvert rather than an orifice. The plans contain details for protecting the outlet pipe from clogging. Response to Comment 23 The detention basin has been modified as follows: • An 8' top width is provided 2:1 downstream slopes have been used. 3:1 upstream slopes have been used (outlet side). • Material to be used for side slopes for embankment (except where concentric with cul-de-sac) has been specified to be Clay CH Clayey sand SC Sandy clay CL, consistent with the Guideline in ASCE Manuals and Reports of Engineering Practice No. 77, "Design and Construction of Urban Stormwater Runoff Systems" (Table 11.5) i SERVICESNEW ENGLAND ENGINEERING E INC February 4, 1997 North Andover Planning Board Town Hall Annex 148 Maui Street North Andover, MA 01845 RE: Old Center Lane, Red Gate Lane Dear Mr. Chairman; Please accept this letter as a request that the Planning Board postpone the public hearings for both of the above referenced projects. On OId Center Lane the revised plans have not been reviewed by Mr. Chessia at this time and this office is still working with the abutter to the North to try to address his concerns. The Red Gate Lane submittal has not been revised at this time. A two week conthmance is requested for each hearing. Yours truly, Ben�c. Osgood,Jr., rIT/r president 33 WALKER RIB. _ SUITE 22 NORTH ANDOVER, MA 01845 _ (508) 686-1768 i 1 ' Joy NO NEW & ! ' ly �`' 37 INC February 14, 1997 North Andover Planning Board Town Hall Annex 148 Main Street North Andover, MA 01845 Re; Old Center Lane Subdivision Dear Mr. Chairman: Please accept this letter as a grant of extension of the maximum time allowed for the planning board to act upon a definitive subdivision submittal. This extension refers to Old Center Lane. This extension is for an additional 60 days. If you need any further information please do not hesitate to contact this office. Yours truly, Benj mug C. Osgood,x/EIT President 33 WALKER RD. SUITE 22 - NORTH ANDOVER, MA 01845 (503) 666-1768 i l i f ENGINEERINGNEW ENGLAND V ING r . iNAR March 5, 1997 Jo8eph V. Mahoney, Chairman i North Andover Planning Board Town Hall Annex 148 Main Street North Andover, MA 01.845 Re: Old Center Lane Definitive Plan Dear Mr . Chairman: Enclosed are 7 sets of a revised plan for the definitive subdivision submittal entitled "Old Center Lane" . This revised plan shows the access to the two proposed lots in the subdivision being a large private driveway versus the previously submitted roadway meeting all of the `Gown of North Andover design requirements. With this letter the applicants Normally request that the planning Board waive the following Town of north Andover Subdivision Design Requirements in order to construct the access to the two lots as shown on the plan. ITEMS TO BE WAIVED: 1) 7 A 3 a) Roadway grade increased from 6% to 100 2 ) 7 A 3 b) Length of leveling area reduced from 50 feet 25 feet. 3) 7 A 3 d) Allow the use of bituminous curb in lieu of granite curb on a grade steeper than 6% . 4) 7 B 1 Clear, grub, and remove loam only in the area directly under the roadway and 3 feet to either side of the roadway in lieu of the whole right of way. 5) 7 B 3 Allow inspection of the roadway by a private party in lieu of the public works. Utilities would be .inspected as with any house tie in. 33 WALKER RD. - SUITE 22 -- NORTH ANDOVER, MA 01845 - (508) 686-1768 � I T v PAGE 2 6) 7 B 4 Construct the roadway layout as shown on the plans . Construct the roadway per the details on the plans with only 20 feet of pavement in lieu of 22 feet. 7) 7 B 5 Eliminate the full turn around to the design shown on the plan. 8) 7 B 6 Allow the use of 6" of bank run gravel and 6" of processed gravel in lieu of 8" of bank run and 6" of processed. 9) 7 B 7 Allow the use of bituminous berm in lieu of granite berm on a roadway slope steeper than P 10) 7 B I c Allow 2 . 5 .inches of bituminous concrete, Type 1, consisting of 1. 5" binder coat and 1" wearing surface in lieu of 2" binder and 1 . 5" wearing surface. 11.) 7 C 1 allow a 5' shoulder in lieu of an 8 ' shoulder. 12) 7 D Waive the requirement for sidewalks . 14) 7 F Waive the requirement for a street sign. In lieu of a street sign a granite boulard 4' tall out of the ground and 8 inches square with 4" numbers engraved on all 4 sides of the boulard shall be installed where the private roadway intersects Johnson Street. The numbers will represent Johnson Street addresses. 15) 7 H 4 Waive the requirement for easements granted to the Town. The utilities and the Right of Way will be privately owned and maintained. 16) 7 o Waive the requirements for a fire alarm system. All of the above waivers, if granted, would be predicated upon the following conditions. 1 . Maintenance of the roadway, utilities, drainage structures and any other Existing or proposed improvement located within the properties encompassed by the proposed roadway and the proposed lots, lots 38A and 38B, will be the responsibility of the owners of lots 38A and 38B. 1 PAGE 3 2. The homes that will be built on lots 38A and 38B will have residential sprinklers installed. 3 . There will be no additional homes built with frontage or access onto the private driveway. Y will be at your next Planning Board meeting on March 18, 1997 to discuss this matter. if you have any questions between now and then, please do not hesitate to contact this office. `ours truly, c1 �� V Ben in C. O go d, Jr , , ETT President NEW ENGLAND ENGINEERING SERVICES INC \larch 5, 1997 Joseph V. Mahoney, Chairman rn�� w` beo Ong North Andover Planning Board r� Town Hall Annex 148 Main Street North Andover, MA 01845 Re: Old Center Lane Definitive Plan Dear Mr. Chairman: Enclosed are 7 sets of a revised plan for the definitive subdivision submittal entitled "Old Center Lane" . This revised plan shows the access to the two proposed lots in the subdivision being a large private driveway versus the previously submitted roadway meeting all of the Town of North Andover design requirements. With this setter the applicants formally request that the planning Board waive the following Town of North Andover Subdivision Design Requirements in order to construct the access to the two lots as shown on the plan. ITEMS TO BE WAIVED: 1) 7 A 3 a) Roadway grade increased from 6% to 100 2) 7 A 3 b) Length of leveling area reduced from 50 feet 25 feet. 3) 7 A 3 d) Allow the use of bit=inous curb in lieu ofz granite curb on a grade steeper than 6% . 4) 7 B 1 Clear, grub, and remove loam only in the area directly under the roadway and 3 feet to either side of the roadway in lieu of the whole right of way. 5) B 3 Allow inspection of the roadway by a private party in lieu of the public works . Utilities would be inspected as with any house tie in. 33 WALKER RD. - SUITE 22 -- NORTH ANDOVER, MA 01845 - (508) 686-1768 i PAGE 2 6) 7 B 4 Construct the roadway layout as shown on the plans . Construct the roadway per the details on the plans with only ." feet of pavement in lieu of 22 feet. 4 (� 7 ) 7 B 5 Eliminate the full turn around to the design shown on the plan. 8) 7 B 6 llo � e he us " of bank r • gravel a " o r sse � �av��xn- ie mod $"�-af b rt�run "p `oeessed. �Q 9) 7 B 7 Allow the use of bituminous berm in lieu of C� granite berm on a roadway slope steeper than a�a� d� a 0 7 1 ) B I c e, Type Na1 ns s in o 1. " bi de coa an� 1" w ar' n s r ce n lieu o 2" bin and 1 . erl g su ace. ® ( 11) 7 C allow a 5' shoulder in lieu of an 8 ' shoulder. f\COt 12) 7 D Waive the requirement for sidewalks. 14) 7 F Waive the requirement for a street sign. In lieu of a street sign a granite boulard 4 ' PVC~ tall out of the ground and 8 inches squareu� with 4" numbers engraved on all 4 sides of the boulard shall be installed where the privatei�� roadway intersects Johnson street. The numbers will represent Johnson Street addresses. 15) 7 H 4 Waive the requirement for easements granted to the Town. The utilities and the Right of Wayi� �"�� will be privately owned and maintained. (3 16) 7 O Waive the requirements for a fire alarm AV\Ve��� system. rre C) � -� All of the above waivers, if granted, would be predicated 9YP " upon the following conditions . r� 1 . Maintenance of the roadway, utilities, drainage q,u v-r— structures and any other existing or proposed improvement located within the properties encompassed by the proposed roadway and the proposed lots, Lots 38A and 38B, will be the responsibility of the owners of lots 38A and 38B. i PAGE 3 2 . The homes that will be built on Lots 38A and 38B will have residential sprinklers installed. 3 . There will be no additional homes built with frontage or access onto the private driveway. I will be at your next Planning Board meeting on March 1.8, 1997 to discuss this matter. If you have any questions between now and then, please do not hesitate to contact this office. na Yours truly, Ben. n C. 06go d, Jr. , EIT aAd President O�CCOPWAG Splt[ NEW ENGLAND ENGINEERING SERVICES INC T AL March 5, 1997 Joseph V. Mahoney, Chairman J 3 North Andover Planning Board Town Hall Annex 148 Main Street North Andover, MA 01845 Re: Old Center Lane Definitive Plan Dear Mr. Chairman: Enclosed are 7 sets of a revised plan for the definitive subdivision submittal entitled "Old Center Lane" . This revised plan shows the access to the two proposed lots in the subdivision being a large private d>iroeway versus the previously submitted roadway meeting all of the Town of North Andover design requirements . With this letter the applicants :Formally request that the planning Board waive the following Town of North Andover subdivision Design Requirements in order to construct the access to the two lots as shown on the plan. ITEMS TO BE WAIVED: 1) 7 A 3 a) Roadway grade increased from 6% to 100 3) 7 A 3 b) Length of leveling area reduced from 50 feet 25 feet. y 3) 7 A 3 d) Allow the use of bit%uninous curb in lieu of granite curb on a grade steeper than 6. 4) 7 B 1 Clear, grub, and remove loam only in the area �� � . directly under the roadway and 3 feet to e' adway in lieu of they w' oi.e right of way. 5) 7 B 3 Allow inspection of the roadway by a private party in lieu of the public works.. Utilities would be inspected as with any house tie in. 33 WALKER RD, - SUITE 22 - NORTH ANDOVER, MA 01845 - (508) 686-1768 1 FACE 2 6) B 4 Construct the roadway layout as shown on the T plans , Construct the roadway per the details t� on the plans with only 20 feet of pavement in lieu of 22 feet, 7) 7 B 5 Eliminate the full turn around to the design shown on the plan. 8) 7 B 6 Allow the use of 611 of bank run gravel and 6" of processed gravel in lieu of 8" of bank run and 611 of processed. 9) 7 B 7 Allow the use of bituminous berm in lieu of granite berm on a roadway slope steeper than 5°o. 10) 7 B T c Allow 2 . 5 inches of bituminous concrete, Type 1, consisting of 1. 5" binder coat and 1" wearing surface in lieu of 2" binder and 1 . 5" wearing surface. 11) 7 C 1 allow a 5' shoulder in lieu of an 8 ' shoulder . 12) 7 D Waive the requirement for sidewalks . 14) 7 F Waive the requirement for a street sign. In lieu of a street sign a granite boulard 4 ' tall out of the ground and 8 inches square with 4" numbers engraved on all 4 sides of the boulard shall be installed where the private 1 roadway intersects Johnson Street. The numbers will represent Johnson Street addresses . 15) 7 H 4 Waive the requirement. for easements granted to the Town. The utilities and the Right of Way ' ll be privately owned and maintained. 16) 7 O Waive the requirements for a 'fire alarh-,. system. Y All of the above waivers, if granted, would be predicated upon the following conditions. 1 . Maintenance of the roadway, utilities, drainage structures and any other existing or proposed improvement located within the properties encompassed by the proposed roadway and the proposed lots, Lots 38A and 38B, will be the responsibility of the owners of lots 38A and 38B. i PAGE 3 2 . The homes that will be built on lots 38A and 38B will have residential sprinklers installed. 3 . There will be no additional homes built with frontage or access `onto the `private driveway. I will be at your next Planning Board meeting on March 18 , 1997 to discuss this matter . If you have any questions between now and then, please do not hesitate to contact this office. Yours truly, 610 Benjamin C. G�goedo�p,�Jr . , EIT President Okek Co-) A�IO - tNEW ENGLAND ENGINEERING _+�� i SERVICES INC " E 5: it } March 24 , 1997 Joseph V. Mahoney, Chairman North Andover Planning Board Town Hall Annex 148 Main Street North Andover, MA 01845 RE: Old Center Lame Dear Mr. Chairman: This letter is being submitted to address the concerns of the North Andover Planning Board that were raised at the last public hearing regarding this matter, and the concerns raised by Mr. John Chessia of Coler and Colantonio. At the March 18, 1997 planning Board public hearing the revised plan that was submitted on March 5 and the associated waiver requests were discussed. There were a total of 15 waivers requested. In a meeting with Kathleen Colwell these waivers were modified in three .cases and two of them were eliminated. The new list of waiver requests is as follows: 1) 7 A 3 a) Roadway grade increased from 6% to 10% 2) 7 A 3 b) Length of leveling area reduced from 50 feet to 25 feet. 3) 7 A 3 d) Allow the use of bituminous curb in lieu of granite curb on a grade steeper than 60 4} 7 B 1 Clear, Grub, and remove loam only in the area directly under the roadway and 3 feet to either side of the roadway in lieu of the whole right of way. 5) 7 B 3 Allow inspection of the roadway by a private party in lieu of the public works. Utilities would be inspected as with any house tie in. 33 WALKED RD. - SUITE 22 -- NORTH ANDOVER, MA 01845 - (508) 686-1768 9 PAGE 2 6) 7 B 4 Construct the roadway layout as shown on the plans. Construct the roadway per the details on the plans with only 16 feet of pavement in lieu of 24 feet. 7) 7 B 5 Eliminate the full turn around to the design om the plan. 8) 7 B 7 Allow the use of bituminous berm in lieu of granite berm on a roadway slope steeper than 5�O 9) 7 C 1 Allow a 5 foot shoulder in lieu of an 8 .foot shoulder. 10) 7 D Waive the requirement for sidewalks. Money would be contributed to the sidewalk fund at a rate of $ 10 .00 per lin. ft. for twice the length of the roadway. The money would be paid to the Town prior to the bonds being released. 1.1) 7 F Waive the requirement for a street sign. In lieu of a street sign a granite boulard 4' tall out of the ground and II" square with 4" numbers engraved on all sides of the boulard shall be installed where the private roadway .intersects Johnson Street. The numbers will reflect Johnson street addresses. Also, a private drive sign will be installed at the front of the roadway. 12) 7 H 4 Waive the requirements for the easements to be granted to the Town. The utilities and the right of way will be privately maintained. A copy of the proposed common roadway and utility agreements will be provided to the planning board prior to endorsement of the plan. 13 ) 7 O Waive the requirements for a fire alarm system. The above .list addresses two of the largest concerns raised by the planning board. The first, the width of the drive, which was proposed at 20 feet wide, has been addressed by narrowing the drive to 16 feet. The second, lack of sidewalks, has been addressed by an agreement to contribute an amount of money to the sidewalk fund equal to the cost of the sidewalks that would have had to be installed in the subdivision. 1 P PAGE 3 All of the above waivers, if granted, would be predicated upon the following conditions. 1. Maintenance of the roadway, utilities, drainage structures and any other existing or proposed improvement located within the properties encompassed by the proposed roadway and the proposed lots, lots 38A and 38B, will be the responsibility of the owners of lots 38A and 38B. 2 . The homes that will be built on Lots 38A and 38B will have residential sprinklers installed. 3 . There will be no additional homes built with frontage or access onto the private driveway unless the roadway is built to Town standards and accepted by the Town. other issues that are still outstanding have been outlined in a letter from John Chessia to the Planning Board dated March 18, 1997 . A response to each item is listed below. The numbers correspond to the numbers in John Chessia' s letter. 1 . The detention pond does extend into the water table at it' s deepest elevation. There may be a development of wetlands vegetation. The development of wetland vegetation is not bad, and in fact is good for stormwater pollution attenuation, an issue that is of concern in the watershed. Also, if a wetland develops, it will not have an affect on the abutters ability to develop his land since the wetland will be an isolated wetland. Under state law the Conservation Commission does not have any jurisdiction over isolated wetlands. 2 . See drainage issues below 3 . Stationing has been added to the plan. 4 . A profile has not been included on the plan, however a driveway design of this size does not usually contain a profile. The road can easily be constructed without a profile. 5 . A tree detail has been included on the plans. The offset between any tree and the sewer should be a minimum of 10 feet. 6 . A pavement radius has been added to the plans. 7 . Erosion control has been added around the catch basins . PAGE 4 DRAINAGE ISSUES: 1 . A catch basin to manhole configuration was not used at the side of the driveway because the design was to direct the water flow overland through swales, sheet flow, or rip-rap, in order to attain the maximum amount of storm water treatment possible. A catch basin to manhole system does not provide as effective a treatment as overland flow. This is pointed out in the new stormwater regulations published by D.E.P. . 2 . The typographical error has been corrected. 3 . A catch basin detail has been added to the plans. 4 . The corrections requested in this comment have all been made. 5 . The pipe is shown as a pipe out of the side slope because an effort was made to try and keep the drainage structures from being too obtrusive. The side slopes of the detention pond were made more shallow, the headwall left off , and the general scope of the project were scaled down to make the visual impacts of the development as small as possible. If the Planning Board sees a need for the headwall then it can be added. 6 . Calculations for the size of the rip-rap will be submitted by Hiyashi Corp. under separate cover. 7 . The drainage calculations will be stamped by a registered professional engineer. 8 . All of the comments in this item will be addressed by Hiyashi Corp. This letter, along with the newly revised plans and the additional information to be submitted by Hiyashi Corp. should address all of the remaining concerns. If there are any outstanding items not mentioned here please contact this office and they will be addressed. Yours truly, Ben) min C. Osod, Jr, E. I .T. President 1 1 I SERVICESNEW ENGLAND ENGINEERING i INC ] April 14 , 1997 (. APR I Joseph V. Mahoney, Chairman North Andover Planning Board Town Hall Annex 140 Main Street, North Andover, MA 01845 Re: Old Center Lane Definitive Plan Dear Mr. Chairman; The purpose of this letter is to address two of the remaining concerns in regards to the above referenced definitive plan submittal. The first issue is the ability to access the detention pond in the plan that complies with the subdivision regulations of the Town. Enclosed with this letter is a copy of a sketch that has had the house location and topography near the detention pond revised so access is provided. The second issue is in regards to providing a buffer strip of trees and shrubs along the boundary between the proposed roadway and the property of the Rodrigues. The owners have retained the services of George Materazzo of Materazzo Planning Consultants, Inc. to develop a landscaping plan for this area. They are willing to have an on site meeting with the Rodrigues ' so they may have input into the proposed design. A plan will be developed taking into consideration the input from the Rodrigues ' and the owners. I, look foreword to finally having this hearing closed and a decision issued in regards to this submittal on Tuesday night. If there is any additional information needed, please do not hesitate to contact this office. Yours truly, Ben;Rmin C. 04 Jr. EIT president 33 WALKER RCS. - SUITE 22 - NORTH ANDOVER, MA 01845 - (503) 666-1763 a W ENGLAND ENGINEERINGSERVICES INC MG BWVRI'_ April 30, 1998 North Andover Planning Board 30 School Street North Andover,MA 01845 Re: Old Center Lane Dear Sirs: Enclosed are three sets of the recorded definitive plans for the above referenced subdivision and one copy of the Form I with recording information. If you have any questions please do not hesitate to contact this office. Sincerely, Benjamin C. Osgood,Jr.,EIT President 33 WALKER ROAD-SUITE 23-NORTH ANDOVER, NIA 01845-(978)686-1768-(888)359-7645-FAX(978)685-1D99 Ln Fit 0 ff NEW ENGLAND ENGINEERINGVI E IN October 1, 1998 Kathleen Colwell,Planner North Andover Planning Board 27 Charles Street North Andover,MA 01845 Dear Kathleen: Enclosed you will find the following: 1. 1 copy of the recorded planting board decision for Old Center Lane. 2. 1 copy of the recorded covenant for maintenance between the lot owners. 3. 1 copy of the form J. 4, Anew Form G and the sub account application. The North Andover public works department is preparing a letter regarding the amount of the Bond to finish the street as well as the amount of the sidewalk fund payment,You should have these amounts prior to the Meeting on Tuesday. As was discussed between Benjamin Osgood and yourself the other day during a site walk at Old Center Lane we would like the bond already in place for the watershed protection work to be released and the money moved into this new account for the construction bond, Whatever difference is left will be made up with a payment into the new bond account. If you have any questions regarding any of the above information please do not hesitate to contact this office. Sincerely B n' nin C Os go - I?, III e J . vd; . President 33 WALKER ROAD-SMITE 23-NORTH ANfJC)VER, MA 01845-(978)686W1768 (888)359-7645- FAX(978)685-1099 a �'�! '"�i+iowcOn�s,r:�,�•x.a,�.�i�r..:yekenuc.,�,t.,�,� �y�;u' .',� {` s nldh dated Much 1.3.1998 W Wooded wig the Eramt Noah IiaBistty of hoods 1 4{,?� he:rwith,be"S the awnorofprotnim i<nown u Lots 39A sad 38B a shown oa a Plan } :..- �'k�,'. ent<uoalold cent«f roe i>ara suhdtvwoa Pliaptarodf0iohsi r>3> o&' G`aVX4 Jr.of Lind on Johnson Srroct,North Andover MA■ drtod r Novemher 6 1996,rovisod Much 24 1997 . r ,Armed by xew Erngtand Eng3noorittg , Sacvicee.Ina,33 walker Road,North Andover,MA and rows ed with the Essex North A�6 Rtglttry of Deed.,Plan M13130. Tbo co ountt rot forth bm&shaft apply gM be , 4 ti , appurtaaant to the land ahoti vtt an rand PLa,ren r ' T t. he foil ,. fa owias covonauri ahallise applied in caoo�oetion with all other ooveaanta 7 tip. i :7 r :":Glsi•.�..�r>; :� rgrostrktioar mra°tty in fom and applicable to uid Lots 38A and 3m if any. 2. Old Contrr Lane,as rhoWn as raid Plan it now,and shall forever remain.a gdyata . .. w sand hu not bean a3'as ro+dwnY ooartuctod In a000rdruce with to Town of Noah l'rf Andover%toad"offisations, 3. No mtmicipa!aervicos aball be vidod by lhn Town of r.1� Nadh Andover on Old i Ctater Lane, mash and myoliaj pi4D will be providod for&a residents of l.otr t 38A and 3813 on]ohown street. 4. Ownership in and to the private way bxnvn as Old Cantor Lane,as shown on uid Pisa shall be vcttod in$0 rowrd owam of Lots MA and 38B. Each r000rd owner rr F} shall be granted as m&vidod si*percent(SOK)interest in the foo in raid way, , 1 Y;. �y fr. t• , g3fiiJ r L i i GK 5002 PG 223 :.r'.- � , Fk1}'T(,�:1rtt"P'.eFf. R.� {, ♦i:j r � f •'d t"4tt y+ , F '' �t. which ooavwjmko ti>.11 0"Inc hs�od"in thei ooavoysaob ao4 DaYa�OpOr iii pail of!bo n:Wthd Y�eya coo alike foe to eiii Iol.t;t ilridiv dod fntei eit k and to iaid wray c t ahwll these er m with the lead aM shad be d'eanod to ba inowea in each '°x° subsequent eoavoymwe of the subject lots,whether sot forth or omitted from the ' languav ofthe h mnmmt ofoonvcyanco 3. Fee in and to the dri uuge"esisanont and dope"=eat,ss ahown on bald Plan,m well sa any utility benefiting both lots,thdl be vested In the record owner of tho lot oa which"iaid casantisi or udiIty is located 710 rocordvwnar and muooesaors in 6da ofthe other lot shawa on said Ptm shall have sa eaaa=4 In sad to sisch to meat and U61hy area to utilim acid easameat or utility for every bawliil purpose 6wded a" by Uld eareaiteni or tdiliSy for'd3a bomfit of add lot owner. 6. fgotwitbiff ing dso paoentago foe int=t in Wd way,cmeanent or utility Lucas,all apmses fcr tspimp,mslnlanntca,repair,atld aq atha or additional mxp benefiting add way,eu meat orrttihty sxw shall bo"ahai;d kutly between the' r000rd owma of both Iota 7. In the event both lot owners anam agree within s mmoaable period of time,pot to exceed six(6)months,on any iewuo reWq to the way,e+asemont or utility arcs, including,but sot llan led to,war&to be performed,improvements,payment of mimbwacmmt.either lot owner,or bosh,may tocic mforoemag of these oovamm by a oommmeammt of in actioa In oomt of competent jur"ctioa,either at law or In equity,or by mediation or arbitratiom t t ;i .I j i��l ,1 INN I= MINNIN y�y ' r)1j 1 f�l'7Y!' SK 5002 PG 224 E'+' •&. These covaunb shai!cua with tiro tlidd iad�hski bindldg TT owners of own of LOU r, ..�...� .. ....,.�...•.v.�otiR+a.i-�n;U�vl�iirst,�:..a..,.;-l +sr< rre;!.36A and 980 as shown on pjd Plan as each Wsch owners hob-1,admnfskatom -!! f J 1 -, Y,' iX tUOCe/ lri title. ;i r i r:.'k y n F•' 4 ..,u bp E a I T . Exmutod this 1. e ln OLri CENTER LANE REALTY TRUST 4 ftri: LLLA oil !/'1`3;;: ..l1.' . . :'ja�1-.73 r�,P?��i.%Sp !.�n':{.i ..--4 ;y-i?a„ • �i,�e:- ..:�:. ':.Y.. Sj3 ' ' i pr 1 � r )fit 7� .��•'� trrk• j- Yrj,f c � k�•I : 1. i OK 0002 PG 225 l3rocuW thie day of 4 torch ` �'.im,r t^,�,. "x. ., .'f:t• ..iF k '.fir r; <<[rE't �,i^a y: ��. .7 r i.?"•:f- 4 r y i.tfb>a� .�h-f5'�:11bp'� �Kllftf��.fy',:}v. fA C•�' , s i r r�. OLD •CJrN X�ANff JWALTY ZA `,Y, �:'r _ ..,, f.r:.. ..o, i_ r a3sYtis-rs.:`_e"�1}laiy' .•. ., ,- 67 t, ;`,i: "•t fig':.. 1'k.::r dp; S,: u G 'a- • OI�A J jFL 7Y1flEM commoNwnALTH ON MAssAaiusBm :.�,•,. iJli1 !si 3''lV.�£.'�l'_If 4' 1re•je., ,'y4r.`: ' is i, �',�� Tbw Pa-wW}Y qpcamd the 6ove-n=4 Jahn J MmP4 7hW*t ru aforOW4 and _acknowlod®cd d►e forogoing kwftunxkt tdbo bL Ave ict!ad doed @M the fm act and doed of OLD Cmw"Ldn REAL TrrRusy, _ ':ti'��x4S.�1) �:•s.tS�1 ZCa'S!tia�S i�.L'tA'!Sk"tiP``:'�'?�!1�°'d+,a4:71�i�X�#`�L. `! f 'i- r .r r if;i! r1 i I {{1' Notice to AM'XO M/TCMN am and Certification of Action of Planning Board � 4` on Definitive Subdivision Plan entitledt Old ClOter LUC (` i7 t' �= New England Sngiheering Revised - 1/27/97 i 3/24/97 # # ! k # # i -The North Andover Planning Board has voted to APPRMZ said plan, subject to the ilk:=✓. following ccsditioaaw 1. That the rsoord onars of the aubjeot land forthwith execute and record ►e a "covenant raining with the lends, or otherwise provides aacuritT for the con- struction of wags slwd the installatiou of mimieipal services within maid auh- yI ' �6p division, sll as prcridod b7 O.L, a. 41, S. 81-U. 1� 2. That all such construction azd installations shall in all respects i conform to the governing rules and regulations of thin Board. 3. Thatw as required by the North Andover Board of Health in its report to upon loot this Baardw no building or other shall Ve built or pl&CO NO as shown on said Plan withoutd dthe priors aoneent of s of Health. j' �. 4. other conditionse N r, ` gee Attached ='r-VOC? �smm i S re 9gF AMMM I' AmneeQoFT :lrSt71Ga4NYw1M#rQ pOlduyrs t as wkoasd dam dw1�aliailmMod f 7bwn Clzrlc e: HOV 7197 vKT31 1 In the event that no appeal shall have been taken from said approval within fA. twenty days from this data, the Borth Andover Planning Board will forthwith thareaier enor es tdse its tar ]. approve1 upon said per• I;. p f The North Andover Planning Board has DI acid plasm for the CoLlowing SAPPRC74ED $ It YLL 'F I S3 I� NDRTH ANIfOV&t PLANlMG BOARD ly -.; Dates Aril 16, 1997 B73 I { [�}`0 9] t� I yg p I 3 I , X i SK 4888 PG 68 Old Center Lust Dednitive-Sulyd"ion -Conditional Approval The planning Hoard hatin AIpROVFS the De"tivo Subdivision creating two(2)new lots and roasting two(2)existing lots known as Old Center Lane. This application was submitted by 7ohn 1. Burke,North Andover,MA 01945 on November 19,19M. The am affected contains 141,415 SF of mud in a ReddenU-3 Zone ofl'of Johnson Street, The Plwxdog Hoard makes the following findings as required by the Rules and Regulations Governing tbcSub&6sion of Land: A Tho Dednitiva Plan,dated Novrnrber 6,19%,rev. 1l2707,3l24I97 includes all of tho information .indicated in Suction 3 ofthe Rules and Regulations Concerning the procedure for the submission of plans. B. The Planning Hoard has determined that a conforming subdivision roadway could be constructed based on the following plan: Man titled: Old Center LaneDefinitive Subdivision Plart of Land on Johnson Street North Andover,MA -Prepared for: John 1.Burito 8t Benjamin C.Osgood Jr. &ale: I.,=30' Sheets: 1-4 Prepared by: Nfw England Engineering Services,I= 33 Wdikur Road North Andover,MA 01845 Dated: November 6,1996,rev. 1127197 C, As provided for in M.G.L.Ch.41 Soo.31R the-Planning Board has waived a significant number of dostpn standards in order to Brake the impact on the neighborhood and the watershed protection district. In reducing the amount of pavement required,aid allowing a sttxper grade,the amount of cutting and filling is reduced as well as the amount of stoner water that must be controlled. See Cotdition14 for a detailed list ofthewaiversgrartted. x: t D. -no Definitive Plan is in conformance with the purpose-arid intent of the Subdivision Control Law. f' E. The Definitive Plan complies with all of the review comments submitted by various.town r departments in order to comply with state law,town by-laws and insure.thepublic health,safety, 1 and welfare of the town. Finally, the-Planning Board finds that the Definitive Subdivision complies with Town Bylaw requirmxnts so long as the Mowing conditions are complied with: I Prior to endorsement of the plaits by the Planning Board the applicant shall adhere to the '. -following: a) The roadway must be changedio reflect a sixteen foot width on the plan. 1 BK 4888 PG 69 1 �i b) The fiat of waivers must be added to the plan. c) The-road must be designated as a private way on the:plans. d) A profile of the proposed roadway(with-the waivers)must be provided forlhe Board to rcvidw.tho grades. e) A catch basin to manhole configuration which connects to C.B.9 i in-lieu of the rip-rap -sw k which directs runoff from Old Center Lane to the detention bagn7rust be shown onthe.plan. This is due to the steep slopelWnd inthia location. f) The manhole must be supplied with a catch basin grate in-lieu of the eofid cover and a Am elevation of259.0. g) The pipe out ofmanhole#4 must be a 13"pipe at the same 2%slope as proposed for the g"pipe to allow Abe manhole to function as an overflow structure at an elevation just lower than the- ga)cy t�way h) 'The final roadwaydwiguu and dralnago-muct be subrniued to the outside corrsultant and _to D.P.W.for find review and-approval. ' i t) A landscape plan aooeptable to both the applicant and the abutting property ownva n1f Peter&Martha 13od siques must be submitted for review and ipprovel by the Planning Department.The infant of taro WxIscape plan is to create a auWent hufferbe%W'n the abates-and the raadway.and detention pond. j) A rovemnmt must be placed upon lots MA and 38H detailing the maintenance ! . and ownership of6e roadway,ulUM",and detention pond. The covenant must ! .ahw state that-&b private drive which is not built to town standards-and will ,never:beeome a publte way. Town services will not be provided on the private way,however trade and recycling pick-up will be provided on Johnson:Street. A copy arlhe uoyea"t musOteirrrbmt(W to the JUnning Department for review and approval and subsequently recorded at the Re&".Df Deods. k) A detailed constmrctionschedule must beaubtuutted as pan of the- .plans. 1) A covenant(ROAM I)seating all lots within the Subdivision for the construction of ways and municipal services must br:strbmttted to the Planning Board.Said lots maybe released from the covenant upon posting of security as requested in Condition 3(c). nr) All apptcation-fees must-be paid in full and verified by the Town Planner. I !- n) The applicant must meet with the Town Planner in order to ensure that the plans conform with the Board's docision A Sufi set of final plans refleWng the changes outlined above,must be submitted to the-Town Planner for review endomernent b the Y Planning-Board,within ninety(90)days of Sling xhe decision with the Town Clerk. s E 2 f fE' I!' i t � , r k, f fit"t 8K 4888 F8 70 o) The Subdivision Decs`sionibr this project must'appear on the mybars. P) All domments stall be prepared u.the expense of the applicant,as required by the pwrftBoard Ruke uAReguMons Goveatirrg the Subdivision ofLand. 2. Prior to any-work an site: a) Throe(3)complew copies of-the endorsed and recorded plants and one(1)certified CM of the rworded subdivision approval, recorded coven&ra as-referenced In Condition ]tj),. and FORM F must ire aut„nitted to the Tzwn Planner as proof of recording. b) All erosion control measures must m in place and reviewed by the Town-Planner, o) Any tress to be removed from thesilc must be masked in the field and reviewed by the Town Plainer, The appicant trust preserve as many of the existing Norway Spruce as possible along the Mar hxoperty line. i 3. Prior to any tou being rtleased from the statutory covenants; a) A copy of the recorded rovawti'r(xm 1 0)rnustbe provided to the Town Planner. i b) All landscapit&along the property boundary with elf Roderiguas as sit forth in r condition must be complete. c) The applicant must comply with 8 Phased Development B a See-don Section of-the k 8.7 T-ownofNorthAndover2omng y pro? Pt from Growth Management as the ptYihmirtaryplann ores filed prior to Inlay 6,19%arsd the dalilidya pla of seven moaft.-HOWCMAO exemption Will Only runlor-figny date the endorsement plans as sd forth under MM.GCLIAw, 1 d) A complete set ofsigned plans,a copy of the Planning Hoard decision,and a copy of the € Cor►savation Commi%Om Order of.Conditions TmM be on&le at the-Division of Public Works prior to issuarwe of permits for connections to utilities. Tire subdivision ,n oonstrucnonArid installation shalt hr all respects conform to the rules and Yegulations and speciffcadont ofthe-Division of Public Works. u) AU-site erosion control measures required to protect off site properties from the effects of work on the lot proposed to be released must be in place. The Town Planning Staff shall determine whether the applicant im satisfied the requirements of this provision prior to saris lot release and shall report to tho-Pimuft Board prior to a vote to release said lot. f) The applicant must submit a lot release FOAl4I J to the Plaruting Board for signature. g) A_ erfoMX4-SWLUityy7 an amount to be determined by the Planning Board,upon the rn recommeMation of the Depar.meat ofPublie Works,$hall be posted to ensure completion of the work inaccordar.ce with the Plans-approved as part of this conditional approval. 3 n err. BK 4888 PG 71 The bond mitt be in the form of a dw k mach outAo the Town ofNorth Andover. Tida check rvi11 then be piaood in an interest bearing escrow accourt held by the Town. Item covered by-the Hord may utcltrde,but&hers]nothe Rmhed to: as-bullt drawio� ,e u) wes and tttifrtiea u3 roadway cooaftuction&M maintaunce ]v lot and we erosion control h� I" arld met eras Via) eke restoration vp fitw trite-ew mrp 4. Prior tot-FORM V verification for an Mviduallot,the following informa$on is required by the Plam ingDopartroe t: a) The applicant mwx submit a caffied copy of the recorded FORM!mTerred to in Condition 3(d)above,was Aced with the lt*stry of Deeds office. b) A_plot plan-for the lot in question must he submitted, which includes all of the following: ', i) location ofthewu mro, h location offt ddvcways, is location ofthe septic systems if explicable, iv locationnfal3 water and sewer lima, v) location of weelands and any site improvemertsmla cd under a NACC order of condition, vi) any jp&S celled for on the tot via) all roquired-Wing aetba&A vw) aocation of any drainage,utility and othertasemema. c) All approprietc erosion control naumm for the lot shall :be in Place. Final deteammahm of appropriate measures shill be made by the Planing Hoard or Staff. n h d) All catch bssim shall be protected and maintained with hay bales to prevent sltation n into.the*ain lim during construction �: o) The tat In question shell be staked in tiw.6rid.Tare location of any major departures y fvm the plan taut bo shown The Town Player shall verify this informsdon. E) lot mw bers,vWble from the roadways must be posted on-9 lots. 5. Prior toga CerMAte of Occupancy being requested for an individual lot,the following shell be-mquared: r t a) A stone boulatd 4'tau out of the ground and 8"Nu&m with 4"numbers engraved w. x 4 ._...1_......... — — — — .�,.,. 5a F of t: �i5 i V f I ry i. 'BK 4888 PG 72 upon allA sides oTibe boulard shall be installed what the private-wodway mterwQts f i Iolnson Stint, roe numbers will represent Johnson Street numbers. b) Sprinlder systems canforndng to3he requiremats of the NAFFD must be installed in the } I w tees,The �sixinkler3ysterm us rowed due to the waivers wvvto t nn.the pavement i c) The roadway mast be consuucted to at least binder coat of pavement to properly } aocesslhe lot inquatioa Prior to construction ofthe binder coat,the appficant.shall arson ttatAll reTibvd hnrysection and.tostbag-of water,sewer,and drx[if facilities has been TM applicant must submit to the Town Planter an interim as- b oatttfiedy ap ui>t, rofxtsiaul,wgiiw verifying that all utilities have been installed in r accordaoee with the plans and pmlileaheet. d) All rneoesauy pamits and approvals for the lot in question shall be obtained from the North Andovrr Board ofHealth,end Conservation Commission a) Perrrnartasz hotue-mm�must be posted on dwellings and be visible from the mad. t) All go_m on the lot in question&fall be stabilized,as solely detemrined by the Plaatrft Depsrtmettt in regards to erosion,water nun o fC and safety. g) The lot moat be raked,loaned and seeded,sodded,or mulched iFthe weather does not permit seeding or soddb g. h) Thane shall be no driveways placed where stone-bound monuments and/or catch basins are to be set. It stall be the developer's reapormbilrty to assure the-proper placement of the drivrways regardless of whether individual lots are sold. The Planning Board requires any driveway to be moved atthe ownes>•xpaue if suchAdveway isata catch basin or stom-bound_posithon. i i) The Planing Board reserves the right to review the site alter construction is complete and nequimadditiorah site saeaniing as itActmn necessary and reasonabio. b. Prior to the final rtkase of security retained for the site by the TDwn,thefollowing shall be cornpletedty the applicant: i a) -:'Private Way"sign rmst be placed at end o£the roadway. b) The&*cam rust make a dcnadon to the sidewalk fund equal to-the cod bfymviding a 4kwalk along both sides of the street for its entire lm&. The coat will be detawbW by the DPW. Adomtion is-required as the-Planning Board has waived the condruction oftheiklewalk. i c) Anas-built plant and pro61a of thesite shall be subnnitted for revrewmtd approval. d) The Town Planner shall rrnnnrethst all Planning,Conservation Commission,Board of I Health vW Uvislon of Public Works requirements are saiis&ed and that construction x 5 FFA t ys R' 1 � � r r e i w a S '- tlz� i '' ail BK 4888 PG 73 was in strict compliance with all approved Plans and conditions. 7. The Town Plana'will rrvicw any signs utilized for this project The applicant mutt obtain a sign pemrtt as nequirnd by Section 6 of the bylaw, The Planning Board shall approve arty erift"structures. Any used for the entrance ssgm must be r>moved prior.to aouVaooaof the subdivislon by the Town. B. The applicant stuff&tl"e to the following requirmwis of the Fim Department: a) Opef1 big is allowed by pertult only after eomultation with the Fire Depamnent. b) UnderrmM M uotW will be allowed in conformance with the Town Bylaws and State Smft SM only whh the review and approval of the Fire Department Cofflavatiou 3 y ; 9. Thereaball im no burying or dumping of construction materiel on site. 10, The location ofarry atttmp dumps on site nim be pr"pproved by the Planning Board. 11. The conrtraotor AW cornacl Dig Safe at least 72 hours prior to commax ing any excavation t 12. Cras,Telephone, Cable, and Dlectric utilities shall be installed as specified by the respective utrflty oompanfes. 13. Any action by a Town Board, COMMiWON or Department which requires changes in the roadway Alignment,plane Wt of any usernmts or utilities,drainage facilities,grading or no Let lines,may be mbledlo moftanon by the Plying Board. 14. The folk cowers from the Rules and ' North Ard�avrr,. ltagulattnrts Gov�errting the Subdivision of Land, : Board. Thee waivers ben granted due-to thelamall size of this subdivisi929 have bow granted on(2 lots)and A to-the fact that a portion of this site is located within the Watashed Protection District, The wavers will&lbw the&ppiicsntIo reduce the amount of inhastructure thereby rni�the �kr disturbance nn the site and the impact to thwenvironment. a) Section 7(Ax3xa):The roadway grade will be 10%to reduce the amount of filling mquired to comt W rho roadway. b) Section 7(Ax3)(b),The length of the leveling area will be reduced rrom 50 io 25 fee to mininum the arnow of felting required to construct the roadway, c) Section 7(Ax3)(b):As this road is a private way end will-not be maintained by the town,bituminous eutb vAU be allowed in lieu of granite nub. d) Section 7(13xl): As the Board is encouraging a reduction in the overall site disdubarra the.road need only be cleared in the area directly under the roadway and 3 3 feet to each side for the length of the right-of-way. 6 _— i, i i c :Ear' 3 b�� i% e) Section 7(BX4):The Ptwning Board wilt allow a pavemesrt-width of Sixteen Poet to reduce the overall di rurbance to the:its, The applicant nmrst m3tafl sprinkler systems in the homes in r amm for this waiver. t} ScWon 7(Bx5): Tba PlanifM Board will sgant a waiver an the wuu nsction of the full nuntaround,in order to mi6xdw the overall disturbance of the site. g) Section 7(Bx7):As this-road isa private way and will not be maintained by the town. bihtrrrinous curb will be allowed in lieu of granite curb, h) Section 7(C1,(1)Ari order to roduceihe amount of fill required,the Board will allow a 5' shwder. i) Seddon 7(Dxl):'Ihe applicant will make a donation to the sidewalk fund equal to the cost of providing$-shdavaik,long both sides Df the street for its entire length. The cost win be determined-by the DPW. I� Section 7(17): histead of it street signs,a private way sign and a stone bollard with the Street rnmims carved Into k will be inutalled. See condition 5(a). k) Section 7(H)(4): As this roadway will be a private way,casements for the roadway, attention pond and utilities will be privately maintained. A maintenance and ownerships st wig-be rocard as txgWred by condition-- 15, utilities mu stall st be ined arid the streets of ways cotrstrncted to binder coat by � (two-yeata from she data permit Pull the If the utilises are not Installed,she silt ens or ways are not constructed to binder coat and an Extension has not been granted by the -Planning Board by the above; referenced date, this deMdve subdivision approval will be deemed to havolvsed. This DeffnKve Subdivision Plan is based upon the Following intosmatian: which are incorporate d into this decision by refemsea: plan tided: Old Center Lane Da9nitive-Sirbdivision Plan Prepared for John J.Burke&Benjamin C.Osgood Jr. of Lard on Johnson Street,North Andover,MA Scale: .1"-30' Sheets: 1-3 Prepared by: New England Engineering Services,Inc. 33 Walker Rand North Andover,MA 01945 Dated: November r 6,19%,rev.I t27/97,3/24197 Revised Stormwater Management Report for Old Center Lane Subdivision Plan Johnson Street,North Andover,Massachusetts Prepared for: N EnWalker Road gmcenng Services,Inc. i. i r j 7 r VI i i i i t 8Y, 4$88 PG 7North ', ' Andover, 0 184 5 Pmmw by Y"m f Ha n 3 , 21 HoS hill Road Prep A MA O1463 kk; Dated: Marchz,-Im .I StatenwU oi'Pnvironme W ImpW Old Ctater Lana Nash Andover,Maas. Premed by: New Firglud I7ngineaiog Services Inc. 33 Willccr Road NorthAndover,-NIA 01945 I� �Y n� M. Conwvation Administrator Director ofP&k Works Hahn i"or B or Pofioe Chief Piro ChiefAmmor Applicant { Ftll�ni w Oid Center Lano-subdivision as rcs i A r�s 3 w I a 1 1 I+ � I k I. x� i --------------- FORM J LOT RELEASE The undersigned, being a majority of the Planning Board of the Town of North Andover, Massachusetts, hereby certify that: a. The requirements for the construction of ways and municipal services called for the Performance Bond or Surety and dated 19 and/or by the Covenant dated 3-6rAJC� +a 19 � and recorded in District Deeds, J Book , Page �.�'� ; or registered in Land Registry District as Document No. and noted on Certificate of Title No. in Registration Book , Page has been completed/partially completed, to the satisfaction of the Planning Board to adequately serve the enumerated lots shown on Plan entitled " oi& Ce., LX'k� Section (s) , Sheets Plan dated Neu 6,19y& 19 recorded by the registered red in Registry of Deeds, Plan '1315Q , or re g ' n said Land Registry District, Plan Book , Plan , and said lots are hereby released from the restriction as to sale and building specified thereon. Lots designated on said Plan as follows: (Lot Number (s) and street(s) ) t Cc,VtA_ b. (To be attested by a Registered Land Surveyor) t 1 hereby certify that lot number (s) 8 3 on Street(s) do conform to layout as shown on Definitive Plan entitled v1D C ' ,,,rSection Sheet(s) t '.t Registered Land surveyor 1 of 2 C. The Town of North Andover, a municipal corporation situated in the County of Essex, Commonwealth of Massachusetts, acting by its duly organized Planning Board, holder of a Performance Bond or surety dated , 19 , and/or Covenant dated fah6 Igge , 19 from the City/Town of County, Massachusetts recorded with the NrZM_ C,sseh District Deeds, Book 5`Q3 1_ _ _ , Page or registered in Land Registry District as Document No. and noted on Certificate of Title No. , in Registration Book, , Page , acknowledges satisfaction of the terms thereof and hereby releases its right, title and interest in the lots designated on said plan as follows: EXECUTED as a sealed instrument this day of , 19 Majority of the Planning Board of the Town of North Andover COMMONWEALTH OF MASSACHUSETTS ss , 19 Then personally appeared , one of the above members of the Planning Board of the Town of North Andover, Massachusetts and acknowledged the foregoing instrument to be the free act and deed of said Planning Board, before me. Notary Public My Commission Expires 2 of 2 C ti0 e� 1A NEW ENGLANDN N ! N SERVICES INC North Andover Planning Board J u 5' 999 27 Charles Street North Andover,MA, 01845 FEB u 110 Ile: Old Center Lane Definitive Subdivision Plan A Stone Bounds LANNING B®Ai Dear Chairman Rowen: Please accept this letter as confirmation that the nine stone bounds shown on the difinitive subdivison plan for Old Center Lane have been set in accordance with the plan. We encountered a problem while setting the bound where Old Center Lane meets Johnson Street at its southwesterly intersection. The bound was installed in a manner that was approved by Mr. James Rand of the Department of Public Works prior to setting the bound. If you have questions regarding this work,please do not hesitate to contact me or Benjamin Osgood Jr. with your concerns. Sincerely, James E. Franklin, RPLS b���4ta OF FRANKUN NO.37045 N ST[0, Q �Q�Igx LAP$v v i 33 WALKER ROAD-SUITE 23-NORTH ANDOVER, MA 01845-(978)686-1768-(888)359-7645-FAX(978)685-1099