Re: Orchard Hill Road -Definitive Subdivision/Site Plan Review
Dear Tom,
The Planning Board reviewed your request to waive or reduce the project review fees required for
the Definitive Subdivision Plan and the Site Plan Review Application for this one lot subdivision.
As $1,515.63 currently remains in the Project Review Fee Account from the preliminary review of
the subdivision and a total of$3,000 is deemed adequate to review the site, the Board agreed to
reduce the Site Plan Review Project Fee to $1,500 and to roll over the existing $1, 515.63 into
the Definitive Plan Project Review Fee.
As you are aware the Planning Board has the power,under Section 4.4(C) of the Fee
Regulations, to require a supplemental fee if the amount in these accounts should fall below 25%
of the initial fee.
Please submit the $1,500 Site Plan Review Fee by the end of this week so that the review of the
project can begin, 1f you have any questions please do not hesitate to call me at 688-9535.
Very truly yours,
Kathleen.Bradley Colw�116
Town Planner
HOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVAUON 688-9530 HEALTH 688-9540 PLANMNG 688-9535
I )
Town of North Andover WORTH
OFFICE OF °e,"• ,lye
COMMUNITY DEVELOPMENT AND SERVICES
146 Main Street ,»
North Andover,Massachusetts 01845
wILLIAM J.SCOTT ssacHU
Director
March 21, 1997
Mr, Thomas D. Zahoruiko
185 Hickory Hill Road
North Andover, MA 01845
Re: Orchard Hill Road Definitive Subdivision Plan
Dear Tom,
I have reviewed your application for a definitive subdivision known as Orchard Hill Road. A
number of required items are missing. Please review the attached check list for more information.
In order to proceed with your application before the Planning Board on April 15", this
information must be submitted by Friday April 41h so that I may have time to review it prior to
the TRC scheduled for April 10d`.
If you have any questions please do not hesitate to call me at 688-9535.
Very truly yours,
Kathleen Bradley Colwell, Town Planner
cc. J. Mahoney, Chair PB
G. Barker
S. Giles
BOARD Or APPEALS 688-9541 .. BUIl DING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
f
Definitive Subdivision Plans Submittal Requirements
Project: C rChcW- "1 I � d
Filing Forms: C, D, E;
Key Map at scale of 200' = 1":
Locus Map as scale of 600' = I":
Septic tests: -PC(-c -VSA- t0(-C>
Drainage Analysis prepared by Registered Professional Engineer: Mv-,-,A
Ownership/Encumbrances:-p,;�(z\,E,,,C, �Iv,-14 t�V,,�-&� C\c;C 1C��(YlC'�� 3CS
Construction Schedule: mU�fi Y32.SA�l�V4d
Soil Map: 1 Yl ,` ,`�rYl�► G
Review fees:
Erosion Control Plan: rfAU-,� Y_ 3VAZtY�1JACC�-n f\CVY-C[V\V C
l��Cvt_Y1C11 '��c,�
Specialized Engineering:
Plans at I" =40':
Zoning Information: `:I: -
Subdivision Name: Ck�har ii 1 (ZOod
Abutting Property Owners:
North Arrow:
Boundary Survey:
Existing/Proposed Streets
Lot Dimensions:
Easements: i/
Drainage Improvements: rG��
Topography; ' U-,CV Ia7c, ,
Existing Tree Line: kp �3e 15)-)oj-rn Cr\ -pkGy'1
Location of Septic Test Holes: --
Major Site Features: k-y- �.A'Nct VA cy-�'
Survey: ✓ A-0 �op-
Street Profiles: -�D � ►rQtrt Csz,
Street Cross-sections: Y � tCt
Signature:
Location of Existing Septic Systems/Wells:
Land Not Subdivided:
Statement of Environmental Impact:
Additional Comments:
Nke-(A conc\oy
Town of North Andover NORTH
i 0MCE or ��°.`"`° '�•.."col
COMMUNITY DEVELOPMENT AND SERVICES t'w'
146 Main Street
North Andover, Massachusetts 01845 .,gO�ATV
wa.LIM J. SCO`I'I' SSACHUS
Director
April 3, 1997
Steven J. D'Urso
22 Lilly Pond Road
Boxford, MA 01921
Re: Lot 1-2A Orchard Hill Road
This is to inform you that the proposed plans for the site referenced above have been
approved.
If you have any questions, please do not hesitate to call the Board of Health Office at the
number below.
Sincerely,
u
Sandra Starr, R.S.
Health Administrator
SS/cjp
cc: Tom Zahoruiko
BOARD OF APPEALS 688-954I BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535
9T o
lope
-e>C)A)cZs o,c H SA
o
7 ,1111
0 -ail
ZSt6C� / C 2.
a'c- e-04 M - s
78, As,c�)ox
...... .................... - - -----
i
,TARA LEIGH DEVELOPMENT CORP.
® ONSTRUCTION -
L1rqR5
Thomas D.Zahoruiko President
185 Hickory Hill Road � 1 i I y
N ortii Aixdovcr,MA 01945
Tel: (508)687-2635
Tax: (508)689-2310
APR
f€�
North Andover Planning Board
146 Main Street
North Andover, MA 01845
April 4, 1997 .
Re: Orchard Hill Road Definitive Subdivision
This Definitive plan is based on a Preliminary Plan and Approval issued 2/28/97.
There have been no material changes in the plan, although appropriate additional detail and. corrections
have been added.
Roadway construction and drainage are not changed from prior approvals issued for a substantially
larger development plan approved as plan#11761 on 3/19/90, The state DPW permit #5-20405 is
attached for reference regarding construction of the existing facilities at Orchard Hill Road.
To address your recent checklist, below is an itemized review:
Filing Forms C, D, E: Submitted
Key Map at scale of 200' = 1": On plans
Locus Map at scale of 600' = 1": On plans
Septic Tests: Shown on Plan, test data on separate page(SSDS approved on 4/3/97 by NABOH)
Drainage Analysis: Using approved drainage plan from existing plan approval referenced and submitted
Ownership/Encumbrances. No new roadway development proposed from previous plans. Hydrology
submitted with site plan for development of specific lot 1-2A, contained on site.
Construction Schedule: Submitted
Soil Map: Submitted
Review Fees : Paid
Erosion Control Plan: Hay Bales backed by silt fence will be in on all downgrade areas of
construction, across the end of existing pavement and easterly in downgrade shoulder of
Right of Way, returning south and upgrade at station 4+50 to southerly border of Right
of Way. This is also indicated on the plan.
Specilaized Engineering: None Required
I
Plans:
Zoning Information: Submitted
Subdivision Name: Submitted
Abutting Property Owners: Submitted
North Arrow: Submitted
Boundary Survey: Submitted
Existing/Proposed Streets: Submitted
Lot Dimensions: Submitted
Easements: None Proposed
Drainage Improvements: Approved plan referenced, and state DPW permit attached
Topography: Submitted; no wetlands on site, confirming with M. Howard on site 4/10/97
Existing Tree Line: Entire parcel is wooded, therefore no distinguighing line is indicated
Location of Septic Test Holes: Submitted
Major Site Features: None noted or notable
Survey: Submitted
Street Profiles: Submitted; :note that the 5% grade is consistent with previous plan approved (4.74%)
Street Cross-sections: Submitted
Signature: Submitted
Location of Existing Septic Systems/Wells: None exist
Land Not Subdivided: None
Statement of Environmental Impact: It is our understanding that this is typically not required on
proposals of this size
Preliminary Plan Issues:
1.a. The industrial zone line has been shown on the plan
Lb. The subdivision roadway drainage is only that which was previously approved, or less, and all lots
developed will have on-site controls.
1.c. The water supply has been shown on the plans
2,a. The jog in the ROW has been eliminated by providing a strip of land to the abutter to align the road
2.b. The radius at Osgood street is not provided due to the shape of the parcel, per previous approval
2.c. The grade'at the intersection with Osgood Street is +-5%, which exceeds required grades but is
consistent with the previously approved plan specifying 4.74%
2.d. Adequate aggregate shoulder width is provided, but if further development is proposed on this
site the roadway will be re-aligned slightly to fully comply. This is consistent with the intention
of trying to minimize site and infrastructure disturbance for such a small project.
2.e. Constuction of a sidewalk for the extension of this roadway 190' does not seem consistent with
safety concerns since it might encourage pedestrian traffic toward Osgood Street which has no
sidewalks. As with other projects, we are receptive to a donation to the sidewalk fund for the
equivalent 190' of roadway at the DPW bonding rate of$21.00 per foot ($3,990.00)if required.
3.a. Waiver for pavement width accepted
3.b. Waiver of construction of cul-de-sac, extension of paving to end of Parcel I-2A, and construction
of circular driveway on Parcel I-2A accepted.
Please contact me with any questions or concerns.
Sincerely,
Thomas D. Z Kko, Pres,
Tara Leigh Development Corp.
TARA LEIGH DEVELOPMENT CORP.
IWON51iRUCTION
1''7 A 5
Thomas D. Zahoiruiko,President
185 Hickory Hill Road
NwiL Andover,MA 01845
Tel: (508)687-2635
1<ax: (508)689-2310
I
North Andover Planning Board
146 Main Street
North Andover, MA 01845
Re; Orchard Hill Road Proposed Construction Schedule and Sequence
June, 1997 Silt fence/hay bales installation
Road way Extension
Lot I-2A Clearing and Site Prep
July, 1997 Begin Construction of Proposed Building
August, 1997 Continue Construction of Building
September, 1997 Complete Construction Activities
Site stabilization; landscaping, paving
_.. ., jj-/A
-
"."/
Thomas D. Za ruiko, Pres.
Tara Leigh Development.Corp,
f
TARA LEIGH DEVELOPMENT CORP. , e
MAY I S 997
j
kON-SliRUCTION rI A 5
Thomas D.Zahoruiko,President
185 Hickory Hilt Road
North Andover,MA 01845
Ter: (508)687-2635
Tax: (508)689-2310
North Andover Planning Board
146 Main Street
North Andover, MA 01845
May 15, 1997
Re: Orchard Hill Road Definitive Subdivision
This correspondence is in response to the review by John Chessia of the alcove-referenced plan.
To address the checklist, below is are itemized response. Please acknowledge that we consider this to be
a Modification to an existing plan. Most issues were favorably addressed through the Preliminary
Planning process a few months ago.
1. We (Tom Z., Kathleen Colwell, Bill Scott) discussed to satisfaction the status of the historical
permits, and that the drainage sufficiency using the previously approved plan details would be
confirmed or revised according to the Mass. State DPW, We also confirmed that the work at the
intersection was done within the time constraints provided by the permits, and subsequently
revised/reworked to satisfy State DPW concerns.
2. All erosion control plan was submitted both in plan and narrative form. A reserve stock of(20)'hay
bales and 100' of silt fence will be maintained on site for emergency needs.
3. A Professional Engineer will sign and stamp the final plans.
4. The legend has been revised and enhanced.
5. The pavement radius at Osgood Street is an existing condition previously acknowledged and
accepted in the Preliminary Review process. We have indicated an approximation of its existing radius
Oil the plan.
6. The original submission indicated in narrative form that the property was entirely wooded, and
therefore there was no need or method of indicating that on the plans.
7. The existing developed lot is not material to this subdivision. It has extensive frontage on Route 125,
and has been developed and operating for many years. We have no right to acquire or obligation to
present the topographic information of that property.
8. The road profile has been fully detailed. Again, this is an existing condition which, regardless of
technical details, was acknowledged as acceptable during the Preliminary review process. A benchmark
has been added to the plan. I do not agree that it is difficult to distinguish existing and proposed
structures, they are all clearly marked in the submitted plan and profile details.
9. The street cross-section now complies with town standards, The cross-section originally provided
reflected the agreed cross-section which was approved at the Preliminary stage. .
10. MVFCU site is not material to this project or application. (see also Item 7)
11. All abutters are noted as required. Barker property is contiguous and extensive, and cannot be
completely shown without multiple additional plan pages, which would be unnecessary.
12, It is our understanding that projects of this size and nature typically do not trigger a request for a
Statement of Environmental Impact.
13. This waiver is no longer requested.
14. No ROW radius is provided at Osgood Street because existing parcel layout does not allow.it. This
was acceptable in previously approved plans as well as the Preliminary submission. Furthermore, the
pavement radius proposed in this modification is not affected by the shape of the ROW here, and there
would be no access or utility issues involved with this layout.
IS. This waiver is no longer requested,
16. The grade at Osgood Street cues comply with grade and leveling requirements; the detail has been
revised to reflect these conditions in more detail.
17. We have provided a design for a standard cirl-de-sac.
18. This waiver is no longer requested,
19, The paving will comply with town standards in this regard (2.5" binder').
20:No waiver is being requested, The plans have been revised to blend existing edge of pavement on
the Forth side to new pavement to accommodate the acceptable shoulder of 8' as the roadway passes in
front of the Lot I2-A,
21. Yes.
22. No street trees are proposed. Extensive plantings are required through the Site Plan Review
process on each lot, and it is my understanding that NADPW would prefer not to have to maintain
additional plantings in the ROW of industrial projects.
23. Cable utilities are'the jurisdiction of the utility companies themselves, and they determine proper
layout and design. We have shown proposed facilities, although they are subject to the above. The
Planning Board regulations dictate that these elements need only be presented to DPW prior to
installation, not provided at this time.
24. The fire hydrant has been moved back to the ROW, therefore no easement is required.
25, Details of the proposed water facilities which comply with Town specifications have been added to
the plans.
26. All site development drainage is being dealt with on the individual site through the Site Plan Review.
Drainage infrastructure previously approved and partially installed is being completed as part of this
Modification and, per discussion with Kathleen Colonel and Bill Scott after review of existing permits, .
will be confirmed for continued acceptability with the State DPW, It is worth noting here that the
i Y
contribution to the state drainage facility proposed by these revisions,reflects dramatic reductions in
stortnwater contribution to the state system versus the original plan and permits, and we therefore
expect no objection through State DPW.
27, Monuments and benchmarks Have been added to the plan.
28. Inverts at the proposed manhole and catchbasins were already noted in the profile; we have now
added them on the plan page but this request is contrary to our practice and all previous work presented
to the Town.
29, Pipe material was already noted on the profile;we have now added it to the plan page but this is
contrary to our practice and all previous work presented to the Town.
30, The sewer notation has been removed from the roadway cross section detail,as all properties are to
be serviced by SSDS.
31. Handicapped ramps and retainers are not part of the subdivision submission; appropriate details will
be provided to the Building Inspector at the time of Building Permit Application.
32, The grade line at elevation 90/92 has been corrected.
I believe this response completely addresses the checklist from John Chessia.
In summary, we have changed the roadway to a standard 40' paved section and complied with all other
relevant Town design standards. Additional information has been added to the plans to reflect it] more
detail the existing conditions,as well as clarify some items requested by John Chessia regarding
proposed improvements. We intend to work with the existing conditions on the roadway, bleeding the
new improvements to accommodate a functioning, stabilized, and beautified but substandard existing
condition.
Please contact me with any questions or concerns.
Sincerely,
homas D. Zahol tko, Pres.
Tara Leigh Development Corp.
1 4? 11;. 5521 P0I
COLER
COLPSNTCNIO
FNQ WE
FACSIMILE COVER. SHEEN'
To: Planning Board
Company; c/o Bill Scott.
Phone: (508) 688-9535
x: (5(fib) 688-9542
From; John Chessia.
Company. Coler & Colantonio, ine.
Phone: (017) 98?-51443
Fat: (05 17) 982-5490
Date: May 20, 1997
Pages including this
c01Ter Page:
Comments: RE: Stop 4C shop, Orchard Hill & 2-00 Chickering Road
ste) & 8i1op
Following this sheet are a letter dated March 10, 1997, and a ,fax dated April 8, 1997, regarding
are conunonts on the project. Many +)f these issues have. been resolved. however, a final plan and
associated calctlations have not been received, As we dkemsed, it appears that the project is
c[c}5e to complete. We recommend that we review the final plan and calculations to check that
all the issues have been resolved.
Orchard Fill
We understand that 111e original subdivision design is acceptable and that the road will be
ccrosttucted, in accordancc wish this design. We, teceivcd a flax transmittal with a narrative
respontie to our coniments on May 16, 1997. To date revised plans have riot been received by
this office. We havo not prepared further come-rents due to the Irate date of the nan�ative response:
and lack o[revised plans.
200 C'.hickcrinq Read
We received revised plans and calculations On May 15. 1997. We have not had sufficient time to
fully review the package:, however, it appeaq that our concerns have l�ee.r� addressed. We. will
tznalizo our review of this project Lhis week. There does not appear to be any naajot ()utstanding
issues based on out preliminary ruvicw.
XL; Merrimack Engineering Services
TARA LEIGH DEVELOPMENT CORP.
® ONSTRUCTION - _-- -
111'7 A 5
Thomas D.Zahoruiko,President
185 Hickory Sill Road
Mordi Andover,MA 01845
Tel; (508)687-2635
Tax; (508)689-2310
North Andover Planning Board
146 Main Street
North Andover, MA 01845
Jule 20, 1997
Re: Orchard Hill Road Subdivision and Site Plan Endorsement
The appeal Period has now expired on the above-mentioned Decisions. Please place these plans on the
agenda for endorsement during the July 1, 1997 Planning Board meeting.
Please contact me with any questions or concerns.
Sincerely,
Thomas D. Zl 1 uilco, Pr es,
Tara Leigh Development Corp.
9-OS-1997 3:51 PM FROM, (_)/- `V
_ v(A AiV k
PROJECTLIUMz i
LOT 1-2A I' " ` 1,997
ff
ORCH)UD HILL ROAD EXTRNSZQN
NORTH ANDOVER,MA.
TO:TOWN PLANNER
FROM:STEVE FOSTER-DUTTON & GARFIELD, INC.
DATE: 9/5/97
REGARDING:COMMENCEMENT OF WORK
PLEASE BE ADVISED THAT WORK ON THE ABOVE MENTIONED ROAD EXTENSION
AND LOT 1--2A ON SAME ROAD WILL COMMENCE ON 9/9/97
4
THE REQUIRED SILT FENCE IS SCHEDULED FOR INSTALLATION ON OR
BEFORE 9/8/97
KINDLY VISIT THE SITE TO INSPECT SILT FENCE ON MON. (9/8/97) LAM
PLEASE CALL THIS OFFICE AT 681-8600 SHOULD YOU HAVE ANY CONCERNS
S'E.FO TER, PROJ4CT MANAGER
FILE:C: \PROJECTS\TOMZ\MEM0905B
FILE:PERMITS/APPROVALS
i
Town of North Andover HORT4
C7I'�''ICE O *6
01 E�, i n r a HpQL
COMMUNITY DEVELOPMENT AND SERVICES p
27 Charles Street
North Andover, Massachusetts 01845 �gssq��y}5�j`y
WILLIAM J. SCOTT
Director �
(978)688-9531 Fax (978) 688-9542
July 14, 1999
Mr. George Barker
1267 Osgood Street
North Andover, MA 01845
RE: Street Acceptance for Orchard Hill Development
Dear Developer;
The Planning Office is in the process of assessing active subdivisions to determine the
compliance with the approved plans and the decision. Our goal is to assist you in
reaching street acceptance with a completed project.In going through our files, we
jioticed that you have documentation required to be submitted to our department to
maintain compliance with the Town of North Andover Subdivision Regulations and the
Notice of Decision issued relative to your project. In the absence of this information,
you will be unable to get your street accepted.
On the following page, please find a detailed list of information we will need in order for
you to get your street'accepted. The list may refer to conditions in your Notice of
Decision, which we are attaching for you to easily refer to.
Additionally, I would suggest that you set up a meeting with myself, so that I may
explain to you what is left in your subdivision to be completed. At that time we can also
schedule an inspection of your subdivision by the Department of Public Works at a
mutually convenient time in order for you to be ready for street acceptance.
This list is only a preliminary review, and there may be more items outstanding that need
to be completed once an inspection.has been conducted. Upon further review your
subdivision, we will compile a mote�detailed comparison of your decision(s) and the
rules and regulations as it relates to your subdivision.
BOARD OF APPEALS 683-954 t BMLDfNG 683-9545 CONSERVATION 683-9534 HEALTH 638.9540 PLA� KING 638-9535
I
I am also attaching street acceptance guidelines with sample letters for you to utilize and
inform you how the process will work.
Sincerely,
I �cam. L1�
Heidi Griffin
Town Planner
Cc: Tim Willett, D.P.W.
Jim Rand, D.P.W.
William Scott, CD&S Director
Board of Selectmen
Attachments: List of Outstanding Items, Samples of Certificate of Compliance, Warrant
Article & Stone Bounds, Notice(s) of Decision, Street Acceptance
Guidelines
i
t t '
ITEMIZED LIST OF OUTSTANDING ITEMS FOR ORCHARD HILL
The following items are presented in three sections. Section 1 is the Recording
information required. The information checked in this section is considered missing or
incomplete. Section 2 are the items missing or incomplete as required by the Notice of
Decision for the PRD, if applicable. Sections 3 are the remaining items missing for the
Subdivision Decision. The numbers for sections 2 and 3 represent the item number in the
respective decision. Please review your enclosed decision carefully to coordinate with
this information. Rather than handle each issue separately we would recommend that all
of the necessary research to resolve all of the below issues be conducted prior to
contacting the Planning Office. This will insure that meetings to resolve these issues are
productive.
Section One
Recorded Decision
Recorded Plan
Recorded Form—I
Recorded Form-M
Recorded Growth Management Form
Recorded Form-J
Section Two. ,
Section Three
NOTICE OF DECISION ITEMS —SUBDIVISION
1. 6 (a)
In accordance with section 9a of the subdivision rules and regulations of North Andover,
you must request a certificate of compliance for a street acceptance.
rt copy of the subdivision rules and regidations are available in the Planning Office located at 27 Charles
Street for$10.00. PVe recommend that if you do not have a copy you purchase one. Obtaining specific
pages from the Regulations may not provide all of the information necessary to address your issues.
.1
1
Button a
Garfield, m
CONTRACTORS
LETTER OF TRANSMITTAL
DATE: February 27, 2002
TO: TOWN OF NORTH ANDOVER
Planning Department
27 Charles Street
North Andover, MA 01845
ATTN: Jacki Byerley
RE: Orchard Hill Road - Release of Security
WE ARE SENDING YOU _ Attached _ Under separate cover X Enclosed
COIFS DATE No, DESCRIPTION
1 4/29/01 Street Acceptance Plan —Orchard Hill Road
Certified Copy of Registered Plan #14220
1 10/30/01 Grant of Way—Certified Copy#8844
1 8/01/01 Easement—Certified Copy#8843
1 12/12/97 Plan of Land— Orchard Hill Commerce Park
Copy of Registered Plan #13206
1 8/12/98 Easement Plan of Land —Orchard Hill Road
Copy of Registered Plan #13309
THESE ARE TRANSMITTED as checked below:
_ For Review/Approval .X For Your Use _As Requested
For Review/Comment ^ For Your Information _ For Quote
For Bids Due: _ For Completion ` For Execution
REMARKS:
As required for release of balance of$21,200 for Subdivision Performance Bond for
George Barker, Jr. Please call me at (978) 681-8600 with any questions on the enclosed.
SIGNED: Jane A[mstrong, Office Manager
54 Beechwood drive 4 North Andover, MA 01845 BUILDER 109 Hillside Avenue Londonderry,NH 03053
Tel.:(978)681.8600 Fax:(978)681.7570 www.dultongarfield.corn Tel.:(603)425-2600 Fax:(603)434-9568