May 15, 1997 i
Joseph V. Mahoney, Chairman --
North Andover Planning Board
Second Street,
North Andover,MA 01845
Re: Orchard Hill
Dear Mr, Chairman:
New England Engineering Services Inc. has been retained by Mr. Thomas Zahoruiko to witness
four deep test pits at Parcel 1-2A of the Orcard Hill Subdivision. The purpose of the test pits was
to determine the seasonal high ground water elevation at each of the four proposed locations for
underground storm water leaching. The pits were logged by Benjamin C. Osgood, Jr.,a certified
soil evaluator in the state of Massachusetts.
Four test pits were done and their locations are shown on the enclosed plan. Also enclosed are
copies of four soil logs that were done on the DEP forms used by soil evaluators when doing deep
pits for septic systems.
If you need any additional information regarding these pits,please do not hesitate to contact this
office. This office is not taking over any other responsibility in regards to permitting of this project.
Any questions on any other matter regarding this site should be directed to the engineer that has
been working on this project to date.
Sincerely,
Benjamin C. Osgood, Jr.,EIT
President
Enclosures
0
33 WALKER RD. -- SUITE 22 - NORTH ANDOVER, MA 01845 -- (508) 686-1768
FORM 11 _ SOIL EVALUATOR FORM
Page 2 of 3
Location Address or Lot No. ccc ,Q S �ir� N
On-site Review
Deep Hole Number T`f' y Date: jfiz1 q'7 Time: /I: Ss Weather
Location (identify on site plan) :::...:.:......:.. .
Land Use rG ^e�r,.,,, Slope I%1 �� Surface Stones
Vegetation ,. wooDh7
Landform +r4M e� !c rr-a c
Position on landscape (sketch on the back)
Distances from:
Open Water Body feet Drainage way feet
Possible Wet Area feet Property Line feet
Drinking Water Well feet Other
DEEP OBSERVATION HOLE LOG"
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (Inches) (USDAI (Munsell) Mottling (Structure,Stones,Boulders, Consistency, %
1 Gravel)
- 38
Parent Material(gaolopicl DepthtoBedrock: E
Depth to Groundwater: Standing Water in the Hole: Weeping from Pit Face:
Estimated Seasonal High Ground Water. > 9 l
DEP APPROVED FORM- 11r07195
t .l
i
FORM 11 - SOIL EVALUATOR FORM j
Page 2 of 3
n
Location Address or Lot tea. `7c�c-(„ w
On-site Review
Deep Hole Number . -' Date: 441x 1 q'7 Time: I VI yU Weather
Location (identify on site plant :.:::::. ......:.. . :... :.,:.:.,.
Land Use ... Slope M Surface Stones
Vegetation .: W:c?c> �j.CP. .,.
Landforrn
Position on landscape (sketch on the back)
Distances from:
Open Water Body feet Drainage way feet
Possible Wet Area feet Property Line feet
Drinking Water Well feet Other
DEEP OBSERVATION HOLE LOG*
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (inches) (USDA) (Munselq Mottling (Structure,Stones, Boulders, Consistency, %
Gravel)
L ,
r ,
3 8 1
BIZ
mini OLES REG POSED
Parent Material(geologic) DepthtoBedrock:
Depth to Groundwater: Standing Water in the Hole: Weeping from Pit Face: `®
It
Estimated Seasonal High Ground Water:
ueP APPRovt:n FORM• 12107195
i
FORM 11 - SOIL EVALUATOR FORM
Page 2 of 3
Location Address or Lot No. ee e- L. C
hJ
On-site Review
side
T P #2 Date: 1 rR q 7 Time: l 1', 2 5 Weather a"
Deep Hale Number
Location (identify on site plan)
of�s slope ° S Surface Stones
Land Use .� ...:. �.. . . pe ( /oy
Vegetation
ci m z T�.,-r-n c�
Landform :K,: . . ..
Position on landscape (sketch on the back)
Distances from:
Open Water Body feet Drainage way feet
Possible Wet Area feet Property Line feet
Drinking Water Well feet Other
DEEP OBSERVATION HOLE LOG*
Depth from Soil Horizon Soil"texture Soil Color Soil Other
Surface (Inches) (USDA) (Munsell) Mottling {Structure, Stones, Boulders, Consistency, %
Gravel)
a/G `p
/ 5
TVE-Rv PAM5SED DISPOSAL AREA
Parent Material (geologic) DepthtoBodrock:
Depth to Groundwater- Standing Water in the Hole: Weeping from Pit Face:
/1
Estimated Seasonal High Ground Water:
DEP"PROVED FORM- 12107195
1
P
FORM II - SOIL EVALUATOR FojtM
Page 2 of 3
/�
{{ r
Location Address or Lot i*lo. 6eeC t JQc1_ (01 ion
On-site Review
Deep Hole Number T'�,� � Date: `'I-f ?)T1 Time: 11 - 10 Weather
Location (identify on site plant
Land Use Slope Surface Stones .
Vegetation WO cQ<c
Landform Aqr cc' _.
Position on landscape (sketch on the Back)
Distances from:
Open Water Body feet Drainage way feet
Possible Wet Area feet Property Line feet
Drinking Water Well ::: ..... . feet Other
DEEP OBSERVATION HOLE LOG{
Depth from Soil Horizon Soil Texture Soil Color Soil Other
Surface (Inches) (USDA) (Munsall) Mottling (Structure,Stones, Boulders, Consistency, %
Gravel)
/0 3/, --
,
3 y" -66" C� !,, s,
z.s117c�
6C 79" 2 Mgp �jVV r W
Parent Material (geologic) _ DepthtoBodrock:
Depth to Groundwater: Standing Water in the Hole: Weeping from Pit Face:
Estimated Seasonal High Ground Water: ' --
DEP APPROVED 1`0"I- 12107195
All
Q I
A! r i � •~
r 11w,.W I`
MI cd
r,_IT�r�t17�:1►ter►:, � I I I ., .
I I rOOF DRAINAGE
v .
PROPOSED
BUILDING
• .._,.'
/s 9,800
LEACHING PASIN
ELEV. 107.0
I '
..I
REFUSE
ENCLOSURE ,
11 �i . .• •• ► -�
70,
■
IY
f
COLER
C0LANTU VILJ Z
ENGINSFRS ANL) UCIr-NT1RTF
past-tt"brand tax transmittal memo 7671 N Qt PAges ` 7j
—
April 23, 1997 ZIa �y 1 t+ru>�
Co V
Ms. Kathleen Colwell Dept.__ Pftnna
'
Planning Director P >tx w G�
120.Main Street Ax� �:�� ,� �5 �
North Andover, MA 01845
RE: Engineering Review
Orchard Hill Road
Industrial SuUdivisiotx Definitive Platt
Dear Ms. Colwell:
In response to your request, Coler&.Cola.ntonio, Inc. has reviewed the SUbniittal pa0kage for the
above referenced site as well as the preliminary plan decision. The project has bcon reviewed for
conformance to the requirements of the "Rules and Regulations Governing the Subdivision of
Land" in North Andover-as well as standard engineering practice. The submittal package
included the following information,
Plans Entitled:
"Plan of Land located in North Andover" three`sheets dated 4/3l97, Prepared by
Scott L, Giles, R.P.L.S., Frank S. Giles.
Support:Data
• Curb Cut Pern:it
• Correspondence from Tara Loigh Development Corp., dated 4/4/97.
The site is .located on the soritherly side of Osgood Street, east ofRoute 125, approximately 900 E
feet north of Holt Road. An existing developed lot is located west of the proposed lots. The situ
slopes t'rom a higher elevation along the southerly property limlt9 to lower grades thong the north
side of the properly. No wetlands have been identified on the plans. E
We offer the following comments:
Rules and Regulations Governing;the subdivision of Land
,, ���r�ire trc.'C�►�t�•err�eI;'.
l. Section 3.C.3.d. No drainage Calculations were provided for the definitive subdivision � Yycy-- A-0
roadway. We note that the proposed plan differs from the plan provided with the approved (7CQ_t-� :..f
curb out pormil, The status of the curt)out permit is unclear. The flan copy provided does
not iticludo the entire site find do not have a copy of the originally approved subdivision G
plants.
2. Section 3.C.3.j. An erosion control plain hits not been submitted.
i
3. Section 3.C.3.k. The Plans have not Been signed and stamped by a Professional Engineer,
101 Accord Park orive,8vito ot,e 517-982-3400
Norwell, MA 02061-1685 Fax: 617-982-5490
I
x Y
4., Section 3,C;3,k,e, The l*r id is inc«nmplete.
5, Section 3.0.3,k.g. The pavement radius at Osgood Street silould be indicated oil the plates,
6 Section 3,C,31,1. Time plan does riot show tho limits of forested areas for lots I-2A and I.21.3
,14jaef,at to the roadway, Correspondeno,- indicates that the entire site is wooded,
7 Section 3,C,31m. it is unclear if the Planniag Board considers the ox.ist.ing developed lot as
part of tills subdivision and.if topographic inforn-Cation should be indioated oil the lot.
Section 3.C,3•k,p, The road profile is inadequate, Vertical Curve data should include PVI, K.
valcres, proposed slopt's at term inus, etc, LoC&tion of permanent benchmark and sidelime
grades should be shown,on the plans, It is diffioult to distinguish existing rind Proposed
structures,
Loi11 cry)-,pty Lu�. Vc_wx--�
Sectiorl 3,C:,31.q. The street cross-section does not comply with Town Standards,
\)/Section 3,C,3.1:.s. It is unclear if the Merrimack Valley Federal Credit Union has an oil-site
�Section
ptic system. If so, file Planning Board miry want the septic systern indicated on the plaits,I r 3,C.3,k.t. Tito ad oinin land of the owrlZ/ adjoining or, wlnclm is not being sul,(lt�riled, should be
shown oil the plans.
/Is ection 3A. T},pica ly Town Staff reviews the Statement of Erlvironn7erltak IrYlp, t,
Section 7.A.Lo, The Planning Board has waived the requirement for eonstmetion cif tile cttf-
de-sacs during the preliminary plan approval process,
�i . Section 7.A,1,j• No r•igllt of way radials is provided at the irmterscction of Qsgooci Street atld
Route 12S_
0�15 Section 7.A,2,e. It is our understanding a waiver has been granted for the consrtnction of the
Y cul-de-sac.
86"
Section 7.A,.3.b. The grade at the intersection with Osgood 5trzot exceeds 4% artd no
leveling area Ims been provided. It is 'Mclear if this is acocptable to the Planning Board,
Section 7,AA The regulations dc7 trot specify requirements for a dead-end street: in this
zoning district.
,I /Section TBA It is our understand ill 9 a Waiverhas been granted forthe pavement width,
The details Should show a 29' width of gravel vase for the proposed 26' wide pavoment
width.
9. section 73.II. It is unclear if a waiver is being requested for the 2.5 inch bindor c:out as
specified for till streets in Industri al.Zones. The details specify'2" tk1 k . A
2t) Section 7.G.1. It iS unclear if"a tivaiver is beitlg t'eguested fi•ona the eight($) .fc}ot shotrlder,
The details sllow a 3' shoulder on the south sick;oC Orchard dill Road. It is unclear if the N,40 r e
60' right of way can be, graded without acquiring an casement. �
2 I Section TD. Tt is our understanding a sidcmmilk will not bo constructed, instead funds will be
donawd to the sidowalk fund.
22, Smtiun 7.E, It is unclear if street trees will be required for this street. The plans do not
show proposed street trees,
r
(21)Section 7.G, All cable udlli:ie9 should be sltnwEt on the plans,
?o Section 7.HA An easoment would be required for the fire hydrant on lot i-2 A. t( 'k/'
Section 71, Details for the proposed water facilities should be included in the plans,
/Details should cmmply with Town SperifleatiOils,
Section 7.N. No drainage calculations have been provided,
27 Section 7.p. No monuments have been shown on the plans, � ��,��� G� rU�
-_
Dt114f 155tie5cr)
� v •-�������� '
G#
n28Ynberts at the
manhole and catch basins should be anted oil the plans. �-
29 Pipe material for the proposed drainage systems should be specified on the plans,
3 . The secondary roadway gross section detail shows a sever line. Based on the pions it
appears that on-site sewage disposal is proposed, L") t t Vct'� o f'f
A detail should be included for the;;reinforced concrete romining wall and handicapped
ao Bess ramp,
_, . Grades do riot tie ill correctly on Orohard Hill Road, .�-'l 0—a
We appreciate the opportunity to assist tho Planning Board on this project and hope that this
information is Sufficient for Your needs, If you have any questions please do not ltesittate to
CtlfltAU US,
Very truly yours,
CO
LER& COLANTONIO, INC.
Johrt C.
chessia, P.E.
X0 Thomas D. Zaliomiko, Pres,
Tara Leigh Development Corp.
E
i
i
i
i
I
06/04/97 10:48 N£1.661 901
®L ♦ ..
COL/ NTONIO u
ENGINCGRG ANr)SU ENMOSTS
Post-it'brand I&x transmittal memo 7671 �a�pagaa
yr, Fro !v
June 4, 1997 Co.. r
00p. Phonogfl�
Fax# }
Planning Board FoOOje5_ G S - / •9�a`
120 Main Street _
North Andover,MA 01 845
RE: Engineering Review
Orchard Hill Road
Industrial Subdivision Definitive Plan
Dear Members of the Board:
We have received the Planning Board's Conditional Approval for the above noted
subdivision and copies of two letters dated May 15, 1997 from Tara Leigh Development
Corp. to the Board, This correspondence.follows the item numbering in the conditional
approval letter format. We understand the May�l 5, 1997 letter will be considered a
modification to the existing plaits which we currently hold.
Plans Dititled:
0 "flan of Land located in North Andover"three sheets revision date 5/19/97,
Prepared by Scott L. Giles,R.P.L.S.,frank S, Giles,
According to the conditional approval letters,the following design conditions are to be
addressed prior to endorsement of the plans,
La.) Vertical curve data should include PVT,K values,proposed slopes at terminus, etc,
This data was not provided,
tb.) It was agreed to provide aright-foot shoulders 1'or the new section of roadway with a
transition to the eight feet from the existing pavelnent. The proposed roadway width
scales from 40' to 43'. 'The shoulder width varies from approximately 5' at the northwest
property corner to approximately 10' at the northeast property Corner, The Board should
determine if'this is consistent with the condition,
l.c.) The grading within the northern shoulder area has not been revised. Currently, the
proposed 92' contour ties into the existing 90' contour at station 2+00. The proposed 96' f
contour does not tie into the existing 96' contour. It is unclear if an easement will be
required to perfonn this grading. Contours are also mislabeled on the westerly side of the
MVFCU property.
l,d,) The applicant must demonstrate that the existing storm water system can
accommodate the Additional I:low from the newly constructed roadway for this project,
101 Accord Park Drive 617-982-5400
Norwoll,MA 02061-1C,05 Fax:617-982.5490
06/04/97 10:48 NO.661 D02
f
J
Calculations from the original approved subdivision were not submitted for our review.
In addition, calculations were not submitted to this office for the proposed roadway
I11yout. Reportedly, the proposed site design reduces the flow to the roadway,
t We appreciate the opportunity to Assist the Planning Board on this project and hope that
this information is sufficient for your needs. If you have ally questions please do not
hesitate to contact us.
Very truly yours,
COLER& COLANTONIO,INC,
t
. c
yIon C. Chessia,P,E.
xe Thomas U.Zahoruiko,Pres,
Tara Leigh Development Corp.
1