HomeMy WebLinkAbout1986-01-06 Drainage Calculations DEF SUB JOHN CALLAHAN ASSOCIATES ENGINEERS - ARcHITECTS - PLANNERS 166 K MAIN ST,, ANDOW.:, MASS. 01810 475.06M ORCHARD HILL COMMERCE PARK DRAINAGE CALCULATIONS _Pre-Development Runoff Use: Empirical Approach Q = Aci �S/A Total Sate= 5 . 5 Acres Avg. Slopes = 4%, c 0 . 45 i 2 . 50/Hr. on 25 Yr. Storm Q = 5 . 5 x 0 . 45 x 2 . 50 5 40/5 . 5 Q = 6. 18 x 1. 49 = 9. 2 cfs . Post Development Calculations Increase due to proposed improvements 5 . 5 Acres ; 45 . 7% covered by buildings , paving & walks = 2 . 51 Acres c = 0. 90 i = 2 . 50 Q = 2 . 51 x 0. 90 x 2 . 50 525/2 . 51 Q = 5 . 65 x 1. 59 = 8. 98 cfs . Provide storage capacity for 8. 98 cfs , for a 20 min, duration. Capacity : 8. 98 x 20 x 60 = 10 , 776 cf required, Provide an area of 4000 s . f. x 2 ' 8" deep Mote : design storage detention pond with a control outfall structure allowing small flows to exit a 15" RCP pipe. This provides for a zero runoff due to the proposed building and paving improvements, as well as a 45% reduction in flow from the existing unimproved site . STATEMENT OF ENVIRONMENTAL IMPACT at the Orchard Hill Commerce Park Development , North Andover, MA (Parcel I-2) The subject Park contains 15 . 2 Acres and is submitted as a single lot subdivision with an improved cul-de-sac roadway extending approximately 700 ' into the site . It is anticipated that perhaps 3 or 4 lots will be subsequently divided out of the parcel , this depending upon the needs of the community' s industrial-commercial growth. The site is wooded throughout with mixtures of hardwoods and soft- woods , many of which will remain outside of buildable areas , To enforce the developer' s desire to leave as much as possible of the natural landscaping, an Architectural Barriers Board has been es- tablished for site development and plan review by the developer and his architectural-engineering representative. The Environmental Impact Statement will now follow the guidelines of Section III B 5 of the Rules and Regulations Governing the Sub- division of Land, Town of North Andover (1981) . III B 5 a) Plans : Refer• �to Subdivision Plans , Sheet 1 of 1 . (1) 2 ' contours , drainage and all cultural features are shown on the plans . (2) Vegetative coverage is delineated and called out on Sheet 1 of 1. There is no wildlife habitat at the site. (3) An existing seasonal surface runoff stream extends through the northerly-most section of the site ; this area is to be left in its natural state. There is no surface water at the site. Seasonal-high groundwater varies from approximately 5 ' to 12' . (4) Soils types in accordance with U .S . D .A. Soils identi- fication are delineated on the attached plan. There { are 4 different types in the area, classified as follows : WnB: Windsor, loamy sand 3 to 8% slope WnC: Windsor, loamy sand S to 15% slope - 1 - i i De : Deerfield, loamy fine sand WaB : Walpole, fine sandy loam 3 to 8% slopes III B 5 b) Physical Environment (1) The site is a wooded sloping terrain of scenic beauty. (2) The improved site will not affect natural features . (3)� The site is to accommodate industrial-commercial enterprises commensurate with those in the area, such as Western Electric, Alco , etc. III B 5 c) Surface, Water and Soils (1) There is a natural , seasonal drainage stream that extends across and parallel to the northerly property line of the site, which will be left in its natural state. The site drainage from the westerly k of the site is to be collected into a cul-de-sac street and con- veyed to existing drainage collectors along Route 125 . In the remaining 3/4 of the site, the water will be con- veyed to the above mentioned natural seasonal drain- age stream. Said drainage stream currently conveys surface runoff under Route 125 , through the Western Electric site to the Merrimack River. (2) Erosion control will be very minimal at the site, as the only development contemplated is the development of a cul-de-sac roadway which encompasses . 8 acres . Hay bales will be used around the excavated areas for the roadway to contain erosion or sediment seepage. None of the surrounding areas would be affected by. this construction. (3) The plan delineates catch basins and surface drainage that will be collected and conveyed through the said drainage system as shown on the attached plans . There is no lowland, marshland or wetland within the proposed development area of the site. It is the intent of the .developer to allow facilities development that will provide for a zero increase from surface runoff as the parcels are developed. This is in accordance with the aforesaid noted Archie: tectural Barriers Board, 2 ( ) On site sewage disposal systems will be provided for each facility. Percolation tests and soils reveal adequate conditions with no detrimental effects . III B 5 d) Subsurface Conditions (1) Limitations set by the Architectural Barriers Board dictate that foundations for any proposed building will not extend below the seasonal high water elevation. . (2) Percolation tests and soils tests reveal a sandy loam material with an average percolation rate of 2 minutes per 1" fall . The Board of Health has records of results . (3) There will be on site sewage disposal systems for each proposed facility. It should be zero impact based on soils and percolation tests and further based on the generally low flow characteristics pro- duced by individual commercial buildings . III B 5 e) Town Services (1) It is estimated that a maximum of 3 to 4 facilities will eventually house the site, with a maximum peak vehicular flow of 100 cars in a 1-hour period. we have proposed, with pending approval by the Massachu- settsState Highway Department , acceleration and deceleration lanes to be constructed as shown on the attached plan, to alleviate congestion and backup traffic on Route 125 . There is currently approved by the State Highway Department a temporary commercial driveway permit with acceleration- deceleration lanes . (2) There are no planned dev6lopments at this time. However , all future plans will be in accordance with the Town parking requirements , and all parking will be off street parking. (3) The improved road provides full access to police and fare with added hydrants as delineated on the plan.' (4) The improved street provides for paved streets in accordance with the Town requirements and the follow- ing utilities will be underground: electric, gas water (and drainage) . (5) N/A 3 i i (6) The residual and static pressures in the area are adequate for the new 8" water distribution line extending into the' sito , with no adverse effect on the system. (7) N/A. There will be on--site sewage disposal systems . III, B 5 f) General Impact As this site has been set aside by the Town of North Andover for a industrial complex that sets among exist- ing improved comparable complexes , there is no detriment- al impact on the Town. The first building at .the Orchard Hill Commerce. Park site, (on Parcel I-1 , "Form A" site) adjacent to the subject subdivision, will be a brick facade, esthetically pleasing facility, and it is the developer ' s desire to continue with a first class type development for commerce, in- dustry and employment of the community. tl OF h1fiSs,®.. JOHN y� J. CALLAHAN N4 �612 4 -