HomeMy WebLinkAboutSeptic - Full Repair - Detail - Permits - 30 MILL ROAD 5/3/2024 5/3/24, 11:39 AM 74635
05/3/2024
Town of North Andover, MA
74635 Primary Location Applicant
Septic Disposal System 30 MILL ROAD I David Chandler
Aft
Construction Permit NORTH ANDOVER, MA 01845 6,Y 978-692-4410
Status: Active Owner ,m david@sewerworks.net
Submitted On: 9/18/2023 SALAS, BELKIS J k 26 Hillside Ave
MILL ROAD 30 NORTH Westford, MA 01886
ANDOVER, MA 01845
General Information
Application is hereby made for a permit to:* Type of building:*
Repair or replace an existing on-site Residential Dwelling
sewage disposal system
Type of Septic System:* Conventional System?(pipe and stone system)
Gravity Yes
Infiltrator or Biodiffuser(Gravel-less)?*Must attach Pressure Distribution S.A.S.(No D-Box)?
copy of certification to install this type of system
No
No
Pressure Dosed(D-Box Present)S.A.S.? Does the system require an effluent filter?
No Yes
Does plan specify make and model of filter?
Yes
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 1/8
5/3/24, 11:39 AM 74635
Owner Information:
Name:* Email:*
Belkis J. Salas not available
Is owner's address different from work site
address?:*
No
Installer Information
Name:* Company:*
David Chandler Sewer Works
Street address:* City/Town:*
26 Hillside Ave Westford
State:* Zip Code:*
MA 01886
Contact number:*
978-692-4410
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 2/8
5/3/24, 11:39 AM 74635
Electronic Signature
The applicant agrees to ensure the construction and
maintenance of the afore-described on-site sewage
disposal system in accordance with the provisions of
Title 5 of the Environmental Code,as well as the
Local Subsurface Disposal Regulations for the Town
of North Andover.I understand that until a final
Certificate of Compliance has been issued by this
Board of Health,the installed system is not
approved.
�..`�...
Septic System Installer Project Management Obligations
1. As the installer, I am obliged to obtain all permits and Board of Health approved
plans prior to performing any work on a site. I must have the approved plans and the
permit on site when any work is being done.
I understand*
L
2.As the installer, I must call for any and all inspections. If homeowner, contractor,
project manager, or any other person not associated with my company schedules an
inspection and the system is not ready, then item three shall be applied.
I understand*
Z
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 3/8
5/3/24, 11:39 AM 74635
3.As the installer, I am required to have the necessary work completed prior to the
applicable inspections as indicated below. I understand that requesting an
inspection, without completion of the items in accordance with Title 5 and the Board
of Health Regulations may result in a $50.00 fine being levied against me and/or my
company_
a. Bottom of Bed - Generally, this is the first (1st) inspection unless there is a
retaining wall, which should be done first. The installer must request the inspection
but does not have to be present.
b. Final Construction Inspection - Engineer must first do their inspection for
elevations, ties, etc. As-built of verbal OK (or e-mail to:
healthdept@northandoverma.gov) from the engineer must be submitted to the
Board of Health, after which installer calls for an inspection time. Installer must be
present for this inspection.With a pump system, all electrical work must be ready
and able to cause pump to work and alarm to function.
c. Final Grade - Installer must request inspection when all grading is complete.
Installer does not have to be on-site.
I understand*
1
4.As the installer, I understand that only I may perform the work (other than simple
excavation) and I am required to complete the installation of the system identified in
the application for installation. I further understand that work done by others
unlicensed to install septic systems in North Andover can constitute reasons for
denial of the system and/or revocation or suspension of my license to operate in the
Town of North Andover, significant fines to all persons involved are also possible.
I understand*
Z
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 4/8
5/3/24, 11:39 AM 74635
5.As the installer, I understand that I must be on-site during the performance of the
following construction steps:
a. Determination that the proper elevation of the excavation has been reached.
b. Inspection of the sand and stone to be used.
c. Final inspection by Board of Health staff or consultant.
d. Installation of tank, D-Box,pipes, stone, vent,pump chamber, retaining wall and
other components.
I understand*
Z
6.As the installer, I understand that I am solely responsible for the installation of the
system as per the approved plans. No instructions by the homeowner,_general
contractor, or any other persons shall absolve me of this obligation.
I understand*
Li
Staff Only
fo Conditions/Restrictions/Comments(if applicable)
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 5/8
5/3/24, 11:39 AM 74635
Attachments
History
Date Activity
11/17/2023,8:07:12 Brian LaGrasse assigned inspection step Final Grade Inspection to
AM Brian LaGrasse on Record 74635
11/17/2023,8:07:08 inspection step Final Grade Inspection was assigned to Shanene
AM Pierce on Record 74635
1111712023,8:07:08 Brian LaGrasse altered inspection step Final Construction Inspection,
AM changed status from Active to Complete on Record 74635
Shanene Pierce assigned inspection step Final Construction
11/7/2023,5:19:28 PM Inspection to Brian LaGrasse on Record 74635
10/6/2023, 9:51:33 inspection step Final Construction Inspection was assigned to
AM Shanene Pierce on Record 74635
10/6/2023, 9:51:32 Shanene Pierce waived inspection step Tank Hole Inspection with
AM Stone Installed on Record 74635
10/2/2023, 9:28:41 Shanene Pierce altered inspection step Bottom of Bed Inspection,
AM changed status from Active to Complete on Record 74635
10/2/2023, 9:27:53 Shanene Pierce altered inspection step Title 5 Sand Inspection - Prior
AM to use, changed status from Active to Complete on Record 74635
9/18/2023, 10:53:55 Brian LaGrasse altered Record 74635,changed expirationDate from
AM to Sep 18, 2024
9/18/2023, 10:53:53 inspection step Tank Hole Inspection with Stone Installed was
AM assigned to Shanene Pierce on Record 74635
9/18/2023, 10:53:53 inspection step Title 5 Sand Inspection - Prior to use was assigned to
AM Shanene Pierce on Record 74635
9/18/2023, 10:53:53 inspection step Bottom of Bed Inspection was assigned to Shanene
AM Pierce on Record 74635
9/18/2023, 10:53:52 Brian LaGrasse approved approval step Health Department Approval
AM on Record 74635
9/18/2023, 10:51:56 Toni Wolfenden assigned approval step Health Department Approval
AM to Brian LaGrasse on Record 74635
9/18/2023, 10:48:23 approval step Health Department Approval was assigned to Shanene
AM Pierce on Record 74635
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 6/8
5/3/24, 11:39 AM 74635
Date Activity
9/18/2023, 10:48:22 completed payment step Permit Fee on Record 74635
AM
9/18/2023, 10:46:36 Toni Wolfenden approved approval step Health Department Review on
AM Record 74635
9/18/2023, 10:44:57 approval step Health Department Review was assigned to Toni
AM Wolfenden on Record 74635
9/18/2023, 10:44:56 David Chandler submitted Record 74635
AM
9/18/2023, 10:39:33 David Chandler altered Record 74635, changed ownerStreetName
AM from "30 MILL ROAD" to "MILL ROAD"
9/18/2023, 10:39:33 David Chandler altered Record 74635, changed ownerStreetNo from
AM "" to "30"
9/18/2023, 10:38:56 David Chandler started a draft of Record 74635
AM
Timeline
Due
Label Activated Completed Assignee Date Status
Health t 9/18/2023, 9/18/2023, Toni
Department
10:44:57 AM 10:46:36 AM Wolfenden Completed
Review
Permit Fee 9/18/2023, 9/18/2023, David Completed
10:46:37 AM 10:48:22 AM Chandler
Health
9/18/2023, 9/18/2023, Brian Completed
Department 10:48:23 AM 10:53:52 AM LaGrasse p
Approval
1°" Septic
Disposal 9/18/2023, 9/18/2023,
System Completed
10:53:53 AM 10:53:53 AM
Construction
Permit
Title 5 Sand 9/18/2023, 10/2/2023, Shanene
Inspection - _ Completed
10:53:53 AM 9:27:53 AM Pierce
Prior to use
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 7/8
5/3/24, 11:39 AM 74635
Label Activated Completed Assignee Due Status
Date
III Bottom of 9/18/2023, 10/2/2023, Shanene Completed
Bed Inspection 10:53:53 AM 9:28:41 AM Pierce
III Tank Hole 9/18/2023, 10/6/2023, Shanene
Inspection with Skipped
10:53:53 AM 9:51:32 AM Pierce
Stone Installed
Final 10/6/2023, 11/17/2023, Brian
Construction _ Completed
9:51:33 AM 8:07:08 AM LaGrasse
Inspection
nn,
Final Grade 11/17/2023, Brian Active
Inspection 8:07:08 AM LaGrasse
As-Built Plan - Inactive
Certificate of
_ _ _ _ Inactive
Compliance
https://northandoverma.workflow.opengov.com/#/expl ore/records/1 0 1531/react-form-details/101531 8/8