HomeMy WebLinkAbout2018-11-13 Rea Street Monitoring #3 Stormwater Construction Site Inspection Report
General Information
Project Name Rea St. North Andover
NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W
Date of Inspection 12/11/20 Start/End Time 1:00 PM-1:30 PM
Inspector's Name(s) Scott D.Kelloway,P.E.
Inspector's Title(s) Professional Engineer
Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com
Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in
Construction site monitoring and reporting.Licensed Soil Evaluator.
Describe present phase of Past work:
construction
Install Environmental Controls
Complete construction of LOW Monument Wall. Completed 5/10/19+/-. '
Completed rough cut Roadway to Subgrade & Install Sewer and Drainage.
Completed installation of underground stormwater runoff chambers.
Complete Install water main complete.
Gravel Road, bring catch basins to grade. Complete
Pave binder coat. Complete
All grading of shoulders, loam and Hydroseeding complete.
Ongoing work:
- Construction of single family home on lots 1&4 are substantially
complete.All areas of previously exposed earth are stabilized with
suitable vegetation.
- Construction of single family home on lots#3 Is complete.
- Continued construction of single family on Lot#5.
- Continue construction of single family home on Lot#6
- Continued excavating foundation Lot#7
- Some minor intermittent site work.
Type of Inspection:
X Regular ❑ Pre-storm event ❑ During storm event Post-storm event
Weather Information
Has there been a storm event since the last inspection? ❑ Yes X No
If yes,provide:
Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in):
RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR
GREATER HAS OCCURRED:
Site Number: 01102000 & 01100627
Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1
Weather at time of this inspection?
X Clear ❑ Cloudy ❑ Lt.Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds
❑ Other: Temperature: 48 deg
Have any discharges occurred since the last inspection? ❑Yes X No
If yes,describe:
Are there any discharges at the time of inspection? ❑Yes X No
If yes,describe:
BNT BMP BMP Corrective Action.Needed and Notes
Installed? Maintenance
Required?`
1 Hay bales and siltation X Yes ❑No ❑Yes X No
controls
2 Stabilized Construction X Yes ❑No ❑ Yes X No
Entrance
3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable.
4 Dust Control ❑Yes X No ❑Yes X No
5 Minimize Disturbed X Yes ❑No ❑Yes X No
Area and Protect Natural
Features and Soil
6 Temporary ❑Yes X No ❑ Yes X No
Sedimentation Basin For
Runoff
7 De-Watering ❑Yes X No ❑ Yes X No
8 Staging/Material X Yes ❑No ❑ Yes X No All heavy equipment is stored,fueled and maintained,
Storage Area well beyond 100' from wetland resource areas.
9 Refueling/maintenance X Yes ❑No ❑ Yes X No See above.
10 Vehicle Washing X Yes ❑No ❑ Yes X No N/A
EPA SUWPPP inspection Report, Version 1.1, September 17, 2007 2
BNT BMT BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
11 Designated washout area X Yes ❑No ❑Yes X No
12 Recycling/Waste Area X Yes ❑No ❑Yes X No
13 Construction Vehicle X Yes ❑No ❑Yes X No
Parking
14 Temporary Site ❑Yes X No Yes X No
Stabilization
15 Pollution Prevention X Yes ❑No ❑ Yes X No
Practice
16 Permanent Site ❑Yes X No ❑Yes X No
Stabilization
17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No
Facilities
18 Sediment Traps ❑Yes X No ❑ Yes X No Catch sacks have been emptied
19 Storm Drain Inlets X Yes ❑No ❑Yes X No
20 Storm Drain Outlets X Yes ❑No ❑ Yes XNo
❑ Yes ❑No ❑Yes ❑No
❑Yes ❑No ❑Yes ❑No
EPA S WPPP Inspection Report, Version 1.1, September 17, 2007 3
Overall Site Issues
B /activity Implemented? Maintenance Corrective Action Needed and Notes
Required?°
1 Are all slopes and X Yes LINO ❑Yes XNo
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource X Yes LINO ❑Yes X No
areas(e.g., streams,
wetlands,trees,etc.)
protected with barriers
or similar BMPs?
3 Are perimeter controls X Yes LINO ❑Yes X No
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points and X Yes LINO ❑Yes X No
receiving waters free of
any sediment deposits?
5 Are storm drain inlets X Yes LINO ❑ Yes X No
properly protected?
6 Is the construction exit X Yes LINO ❑ Yes X No
preventing sediment
from being tracked into
the street?
7 Is trash/litter from work X Yes LINO ❑Yes X No
areas collected and
placed in covered
dumpsters?
8 Are washout facilities X Yes LINO ❑ Yes X No
(e.g.,paint, stucco,
concrete)available,
clearly marked,and
maintained?
EPA SWPPP Inspection Deport, Version 1.1, September 17, 2007 4
BM[P/activity Implemented? Maintenance Corrective Action Needed and Notes
Required?
9 Are vehicle and X Yes ®No ❑Yes X No
equipment fueling,
cleaning,and
maintenance areas free
of spills,leaks,or any
other deleterious
material?
Are materials that are X Yes ❑No ❑Yes X No
10 potential storrriwater
contaminants stored
inside or under cover.
11 Are non-stormwater X Yes ®No ®Yes X No
discharges(e.g.,wash
water,dewatering)
properly controlled?
12 (Other) ®Yes ®No
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated
the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons
directly responsible for gathering the information,the information submitted is,to the best of my knowledge and
belief,true,accurate, nd complete. I am awaynt there are significant penalties for submitting false information,
including the possibi of fine and imprisonfor knowing violations."
Print name and tit Scott D.Kello a fessional Engineer
Signature: Date: 12/11/20
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5
12/18/2020 20201211_130139.jpg
T� ^
;tr
IQ'
P�
1
cp f'
� f�� j x/•{99� _
c1P4. v ...
k $
3� w
y �
s
A
a
"! 4 ,At
https://mail.google.com/mai1/u/0/#inbox?projector=l 1/1
p
2 yfi kg �� 4R' ed 1 � tt �� F d k „p
!s ���r
r���V\w5��
ol
t
t
r
N
4i 4r R
F
t 4
F s�
� L
O
� U
Q
Cl.
x
0
c
0
E
U
N
O
� O
N €r (tS
N
.0
r
ems'low
021, a OE �
,
az
tooa..„. , •.
!
g`194U
fig- :'•'Atr, Te��Qrr otS.�..• ,} t�i� t}�a +1r,)g� .Gf " �,.° „�:;� r a �'
',!5'i.,::{ ,.,.:.>r .a„-_ 2. - �' .:.�','� _ ,_,:'•GCS$ ,, " l� :,it.�` "fir,',' '>
e 4
. K
M p,
f
,.,o ..� nagRv "4T •,,�. `"' - ;, rS, h
"�
�`�`¢'
>r,�� -�-..v6 � tie� ���"��°'`�="' � �EaP.0�' ` g�^�. X's• �-�- - ,
p _
!� Ak�
- •
a
'Wi.�� r
f �;r
now
• � � ,o
� s
n
12/18/2020 20201211_130726.jpg
r ;
t� s:
P I�
YN
q+
i* +�Ridv
y�
3
a
�.r
II
YC a f r
httn.,;J/mail.00nale-com/mail/u/0/#inhox?oroiectcr=l 1/1
12/18/2020 20201211_130910.jpg
1 �
r
- n I
W
x
5 C ,
x'
,
s I
Y
u
N
https://mail.google.com/mail/u/0/4tinbox?projector=l 1/1
r
Storwater Construction Site Inspection Report
General Information
Project Name Rea St. North Andover
NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long:71.09134W
Date of Inspection 12/4nO Start/End Time 3:00 PM-3:30 PM
Inspector's Name(s) Scott D.Kelloway,P.E.
Inspector's Title(s) Professional Engineer
Inspector's Contact Information 148 North St.Andover,Ma.01810 Ph(978)479-5648, skellowaype@yahoo.com
Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in
Construction site monitoring and reporting.Licensed Soil Evaluator.
Describe present phase of Past work:
construction
Install Environmental Controls
Complete construction of LOW Monument Wall. Completed 5/10/19+/-. '
Completed rough cut Roadway to Subgrade & Install Sewer and Drainage.
Completed installation of underground stormwater,runoff chambers.
Complete Install water main complete.
Gravel Road, bring catch basins to grade. Complete
Pave binder coat. Complete
All grading of shoulders, loam and Hydroseeding complete.
Ongoing work:
- Construction of single family home on lots 1&4 are substantially
complete.All areas of previously exposed earth are stabilized with
suitable vegetation.
- Construction of single family home on lots#3 Is complete.
- Continued construction of single family on Lot#5.
- Continue construction of single family home on Lot#6
- Continued excavating foundation Lot#7
- Some minor intermittent site work.
Type of Inspection:
X Regular ❑ Pre-storm event ❑ During storm event Post-storm event
Weather Information
Has there been a storm event since the last inspection? ❑ Yes X No
If yes,provide:
Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in):
RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR
GREATER HAS OCCURRED:
Site Number: 01102000 &01100627
Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1
Weather at time of this inspection?
X Clear ❑ Cloudy ❑ Lt.Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds
❑ Other: Temperature: 54 deg
Have any discharges occurred since the last inspection? ❑Yes X No
If yes,describe:
Are there any discharges at the time of inspection? ❑Yes X No
If yes,describe:
BMP BNT BMP . Corrective Action Needed and Notes
Installed? Maintenance
Re'uired?
1 Hay bales and siltation X Yes ❑No ❑Yes X No
controls
2 Stabilized Construction X Yes ❑No ❑Yes X No
Entrance
3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable.
4 Dust Control ❑Yes X No ❑Yes X No
5 Minimize Disturbed X Yes ❑No ❑Yes X No
Area and Protect Natural
Features and Soil
6 Temporary ❑Yes X No ❑Yes X No
Sedimentation Basin For
Runoff
7 De-Watering ❑Yes X No ❑Yes X No
8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained,
Storage Area well beyond 100' from wetland resource areas.
9 Refueling/maintenance X Yes ❑No ❑Yes X No See above.
10 Vehicle Washing X Yes ❑No ❑Yes X No N/A
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2
BNT BNT BMP Corrective Action Needed and Notes
Installed? Maintenance
Required?
11 Designated washout area X Yes ONo ❑ Yes X No
12 Recycling/Waste Area X Yes ❑No ❑Yes X No
13 Construction Vehicle X Yes ®No ®Yes X No
Parking
14 Temporary Site ❑Yes X No Yes X No
Stabilization
15 Pollution Prevention X Yes ®No ❑Yes X No
Practice
16 Permanent Site ❑Yes X No ❑Yes X No
Stabilization
17 Dumpsters and Sanitary ❑Yes X No ❑ Yes X No
Facilities
18 Sediment Traps ❑Yes X No ®Yes X No Catch sacks have been emptied
19 Storm Drain Inlets X Yes ❑No ®Yes X No
20 Storm Drain Outlets X Yes ❑No ❑ Yes XNo
❑Yes ®No ❑Yes ®No
❑Yes ❑No ❑ Yes ❑No
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3
Overall Site Issues
BMP/activity. Implemented? Maintenance Corrective Action Needed and Notes
Required?°
1 Are all slopes and X Yes ❑No ❑Yes XNo
disturbed areas not
actively being worked
properly stabilized?
2 Are natural resource X Yes ❑No ❑Yes X No
areas(e.g.,streams,
wetlands,trees,etc.)
protected with barriers
or similar BWs?
3 Are perimeter controls X Yes ❑No ®Yes X No
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points and X Yes ❑No ❑Yes X No
receiving waters free of
any sediment deposits?
5 Are storm drain inlets X Yes ❑No ®Yes X No
properly protected?
6 Is the construction exit X Yes ❑No ❑Yes X No
preventing sediment
from being tracked into
the street?
7 Is trash/litter from work X Yes ®No ®Yes X No
areas collected and
placed in covered
dumpsters?
8 Are washout facilities X Yes ®No ®Yes X No
(e.g.,paint,stucco,
concrete)available,
clearly marked,and
maintained?
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4
BMP/activity Implemented? Maintenance Corrective Action Needed and Notes i
Required?
9 Are vehicle and X Yes ❑No ❑Yes X No
equipment fueling,
cleaning,and
maintenance areas free
of spills,leaks,or any
other deleterious
material?
Are materials that are X Yes ❑No ❑Yes X No
10 potential stormwater
contaminants stored
inside or under cover.
11 Are non-stoimwater X Yes ❑No ❑Yes X No
discharges(e.g.,wash
water,dewatering)
properly controlled?
12 (Other) ❑Yes ❑No
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated
the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons
directly responsible for gathering the information,the information submitted is,to the best of my knowledge and
belief,true,accurate, and complete. I am aware that there are significant penalties for submitting false information,
including the po sibility of fine and imprisonment for knowing violations."
Print name an tle Scott D ellowa Professional Engineer
Signature: Date: 12/4/20
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5
12/10/2020- 20201204(1).jpg
https://mail.google.com/mail/u/0/#inbox/WhctKJVzfQNpQRwfWGhMChxVTRGkhWmcwbNzzRRwXrsnFkKdDNMTCKgKDwZlrFQnSpprFhg?projector=... 1/1
12/10/2020P 20201204(2).jpg
https://mail.google.com/mail/u/0/#inboxNVhctKJVzfQNpQRwfWGhMChxVT'RGkhWmcwbNzzRRwXrsnFkKdDNMTCKgKDwZlrFQnSpprFhg?projector=... 1/1
1.2/10/2020 20201204(3).jpg
https://mail.google.com/mail/u/0/#inbox/WhctKJVzfQNpQRwfWGhMChxVTRGkhWmcwbNzzRRwXrsnFkKdDNMTCKgKDwZlrFQnSpprFhg?projector=... 1/1
1010/2026 20201204(4).jpg
k
m
?9 I
{
7-
hftps://mail.google.com/mail/u/0/#inbox/WhctKJVzfQNpQRwfWGhMChxVTRGkhWmcwbNzzRRwXrsnFkKdDNMTCKgKDwZlrFQnSpprFhg?projector= 1/1
1-^110/2020 20201204(5).jpg
a
https://mail.google.comlmail/u/0/#inbox/WhctKJVzfQNpQRwfWGhMChxVTRGkhWmcwbNzzRRwXrsnFkKdDN MTCKgKDwZlrFQnSpprFhg?projector=... 1/1
Storwater Construction Site Inspection Report
General Information
Project Name Rea St. North Andover
NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W
Date of Inspection 11/201/20 Start/End Time 2:00 PM-2:30 PM
Inspector's Name(s) Scott D.Kelloway,P.E.
Inspector's Title(s) Professional Engineer
Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com
Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in
Construction site monitoring and reporting.Licensed Soil Evaluator.
Describe present phase of Past work:
construction
Install Environmental Controls
Complete construction of LOW Monument Wall. Completed 5/10/19+/-. '
Completed rough cut Roadway to Subgrade & Install Sewer and Drainage.
Completed installation of underground stormwater runoff chambers.
Complete Install water main complete.
Gravel Road, bring catch basins to grade. Complete
Pave binder coat. Complete
All grading of shoulders, loam and Hydroseeding complete.
Ongoing work:
- Construction of single family home on lots 1&4 are substantially
complete.All areas of previously exposed earth are stabilized with
suitable vegetation.
- Construction of single family home on lots#3 Is complete.
- Continued construction of single family on Lot#5.
- Continue construction of single family home on Lot#6
- Continued excavating foundation Lot#7
- Some minor intermittent site work.
Type of Inspection:
X Regular ❑ Pre-storm event ❑ During storm event X Post-stone event
Weather Information,
Has there been a storm event since the last inspection? ❑ Yes X No
If yes,provide:
Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in):
11/23—11/24 16 H rs+/- 1.5"
RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR
GREATER HAS OCCURRED:
Site Number: 01102000 & 01100627
Site Name: IPSWICH RIVER NEAR IPSWICH .& SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1
Weather at time of this inspection?
X Clear ❑ Cloudy ❑ Lt.Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds
❑ Other: Temperature: 50 deg
Have any discharges occurred since the last inspection? ❑Yes X No
If yes,describe:
Are there any discharges at the time of inspection? ❑Yes X No
If yes,describe:
BNT 'BMT BMP Corrective Action Needed and Notes
Installed?, Maintenance
Re uired?
1 Hay bales and siltation X Yes ❑No ❑Yes X No
controls
2 Stabilized Construction X Yes ❑No ❑Yes X No
Entrance
3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable.
4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as
necessary.
5 Minimize Disturbed X Yes ❑No ❑Yes X No
Area and Protect Natural
Features and Soil
6 Temporary ❑Yes X No ❑Yes X No
Sedimentation Basin For
Runoff
7 De-Watering ❑Yes X No ❑Yes X No
8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained,
Storage Area well beyond 100' from wetland resource areas.
9 Refueling/maintenance X Yes ❑No ❑Yes X No See above.
10 Vehicle Washing X Yes ❑No ❑Yes X No N/A
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2
BNT BNT BM[P Corrective Action Needed and Plates
Installed? Maintenance
Required?
11 Designated washout area X Yes ®No ❑Yes X No
12 Recycling/Waste Area X Yes ®No ®Yes X No
13 Construction Vehicle X Yes ❑No ❑Yes X No
Parking
14 Temporary Site ®Yes X No Yes X No
Stabilization
15 Pollution Prevention X Yes ®No ®Yes X No
Practice
16 Permanent Site ® Yes X No ®Yes X No
Stabilization
17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No
Facilities
18 Sediment Traps ®Yes X No ❑ Yes X No Catch sacks have been emptied
19 Storm Drain Inlets X Yes ®No ®Yes X No Catch sack btwn lots#3 &44 needs to be replaced.
20 Storm Drain Outlets X Yes ®No ®Yes XNo
® Yes ®No ®Yes ®No
®Yes ®No ®Yes ®No
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3
Overall Site Issues
BMP/activity huplemented? Maintenance Corrective Action Needed and Notes
Ile uired?
1 Are all slopes and X Yes ❑No ❑Yes XNo
disturbed areas not
actively being worked
ro erly stabilized?
2 Are natural resource X Yes ❑No ❑ Yes X No
areas(e.g.,streams,
wetlands,trees,etc.)
protected with barriers
or similar BMPs?
3 Are perimeter controls X Yes ❑No ❑Yes X No
and sediment barriers
adequately installed
(keyed into substrate)
and maintained?
4 Are discharge points and X Yes ❑No ❑ Yes X No
receiving waters free of
any sediment deposits?
5 Are storm drain inlets X Yes ❑No ❑Yes X No
properly protected?
6 Is the construction exit X Yes ❑No ❑Yes X No
preventing sediment
from being tracked into
the street?
7 Is trash/litter from work X Yes ❑No ❑Yes X No
areas collected and
placed in covered
dumpsters?
8 Are washout facilities X Yes ❑No ❑Yes X No
(e.g.,paint, stucco,
concrete)available,
clearly marked,and
maintained?
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4
BMT/activity Implemented? Maintenance Corrective Action Needed and Notes
Required?
9 Are vehicle and X Yes ❑No ❑ Yes X No
equipment fueling,
cleaning,and
maintenance areas free
of spills,leaks,or any
other deleterious
material?
Are materials that are X Yes ❑No ❑Yes X No
10 potential stormwater
contaminants stored
inside or under cover.
11 Are non-stormwater X Yes ❑No ❑Yes X No
discharges(e.g.,wash
water,dewatering)
properly controlled?
12 (Other) ❑Yes ❑No
Non-Compliance
Describe any incidents of non-compliance not described above:
CERTIFICATION STATEMENT
"I certify under penalty of law that this document and all attachments were prepared under my direction or
supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated
the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons
directly responsible gathering the information,the information submitted is,to the best of my knowledge and
belief,true,accurat d complete.I am aware that there are significant penalties for submitting false information,
including the possi ili of fine and imprisonme for knowing violations."
Print name and le: Scott D.Kellowa Prof si al En ineer
.Signature: Date: 11/27/20
EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5
1 / 1 1 1 ••
't,°;+�t+r � eW q r �
X z d4?11E �1;.��i,.�. �
' 7 c'xk
t8>r
ow
' .,.�y� "ti � ep} �r,� zt a-°�,.,x4 �z ,y lylkt 'L2•r11 ..:z`"`fir �::3 to J t5x'bl.ly�'.+ z'1 y1zk"�i b e �/: 'i`! I r r.IF^;"' n `.1�..r .,,. r
{�t;le 4 h�^f C' ,:'`3"8��4 `� � �t.3t 3}au` a t .s �z,�, �I a• '.,3"� ��
';�tr t, .� j•�tr�'' I t Lt; t *'Si{tk�•,,"��''�1;,1��}k,';,1,��-h'ef;^1�1,�;.,..�bP`, "aJrt�«,2tigg4''i�t/4{�{{,�at E�cf ts3 gill) -
1 s'z "��fg�f fir•{fir u •�.y, z% rr r
`-"6,. ,;` 6 J'K` Sn.,a r`r '3x�t�lr �.,.t ,. tr, �h•. aJ,;,11? ?I"a' 'f i
Fky, 1�A.' l ,t/,�
`4�,.,�.,�jg -ytN`��ta'� y�y���r ��S�s �Ery�„r� "�tr� rr �,� � t��' ���t{ar.tl1+Jltr;lq�"�.:•esl,�� - P�' ral+ �'n �a*.s� ,v;
p S` (� h E a ����( „F i " DS � 7�fi F A 'f r �"'✓,r� �,,G,! S i'
nr'$ n� dry; f�rY•` ( s�A�A ia' t/ )�°t t1 ::"` ,tt, d '' '`' S""n'1 r{
6•S �>e"`fit
' V['; zSy. mil
t�$ rfc• '.. 35 � af.r' y 21 'a`' 'ter„-� �+ s
1� j t®
>af' �`°
f,
r •^ s,�a f � .r �, �%rr� �,4vs4;� �,' 'R
�rfi I �, ,�, Pa aw a I Ir
' $ a , , ,rasa
s.
Sookb` ' " ta at ' mry<1I F' r� StS4,��' r�.•, h1`a:,fm;r��fa�/, ,/ +x' ;. t' `` t
R'k�ai�.E' y F•_� @.,, I-rhrj7/!`a' e 9 .ls r � 4 "�r`"e`7t'", ?I �. Sh,Elf, + �.c
,mu ,
�."•.^`�p�a
_ "'
I�r
IQ
!1��( ';i 7��� F Wi�� !� �Ip t £�r ���r �`a�,✓^r 9 ''��# `� ,>zx••
m� Oil
f / p^ 7 sr? "`d
'1
•. I
/( 4Q
Qe
say n,
t
+ r is
0391
goofs
ZRI
jt a+
� F I t � �{ �
+ t! 1 + t �i { Cll d61 I (I,S
q
AVA
77
Fr
d^ L
pillF ' { ..,,r «,,.rx».�,r•�f �z +; 4�ra+,rsmrr, + 13r,.:r,; ; .J ,r�`.
Yrd
r' - , .
- Ssi t
x �F r� + ice,"`'r'e s R zn -.'r u '
.a rJ•r ,.;:- '� ,t 9 r, ��a,+�;�.rs r-s�' (�Ir'E r, a uy r r� i f
rsSrti 'fr`. n ;;rr- .!'S•. r ft z'r�' a^✓,i3 RAC
�-� 3 e> 'viti-+
", ,.✓:.y sv- s+" /"l{ ,.a.�d4a fi� i/"f' i cj�R-�— '' /,.ea 7 id
-xr� r�+ rr"i ` r i�,� '+r^' n '�f•
� - �^xca 9't`t �-r3 a J" r rr s> 'k' L•#
.i^ i c- ti
p. t ' "•tom >7. F'Y r A T 4"H,r475^Y tz yAr 6a: � r(
na tds." .a
Amons
t �,t , .�a. `w..L''x ::?'/ ./': /�,. ,---r ,t r rlu f x 7k 9 r ��".' '`. 1 si' •+ J4.3
i�'i'J '3�f �(r l r� �„1"-'t' 't "'! � • �i � A� s,U der � � ? S i`4
rf� a j r + �, S �y..!'" rr�"T. �r+•,�jz§�� ,j' °" s rm^ T t' -s.t^ �fi, r 1 a ".! ]z" '� J �' r�'�'?r` ,.rf",,�,xt t ,� 1'a 7 rf 7:
� f I dx/AI � .�/ �'h+ ° i 4��.r `•�+-X f n +r"" t�os��:`lam �.f�?`� xry,�## k7a
r'
• 1 eJ z��## j< �s '• r;�in� sa
r-r �.0 1` r✓/ it ,r f`�'!""y'
� q
d�` 1 CSs r r§ 3 f!,.� 1 F'S;,s' �t
tk ='�ra 1 atu 'vita � +..r
1 1 1 1 1 ••
9,�i Iw��"�� .,�'�: a� f�� '�����i. \`����A;,tVaWdE����r• �f�e 6.���""� -y,`° ��� ``�� "�:6:�'+1�� �_l�'`�- t.�.
edyv G Fri t\ •\� p;f1r,��S l �Cda
1'A r/'
+1 ,� F, yrl °i �sa rr Idy fit�a�+� '
yy
-� t � •t i T, aa�vn ' �, � �s�t t 9
e• ; � I ��c�� � t, y �r e� j_ r� S � y � t jr�( ��
3 l � Y7
Mm
mac` w.* s .,. _ 'af,".� ^-•' `+' :y "' r �' �"� ,._ ..rt,-ra,
•' y u r 1 '3 ", r, n -""O' �'^�' `,�.
tltM'X�,.}m-
-r. - l t _tea' '.' F.,.�,r ''�'$; !# .r� j r �,•.,, j a'i g 4. ..
a-`�-� +fi r 07-
r<
: xy y
^a r7
y a r
4-7
x�
, nF r t rt•-•, rr F' ' F n y ,,, ax r "d, W� 6
2 v
fir, 1/r i .+ a s`
so
TWA
yy,
,Wpg�d 4 3
,r.3if'�'.�,?� �x �x-r,'` vk S.G,s� • S )�1 § d y ��4� ����,r sr,,., - . �.�� t�,�s
t
.tee-r'a .tea y``_ .k�� r .�-'rn�"'rsfd:..•,��'is'�aar�."v``�i�.�. ,;��'1\n„�=":, '* ���.'�, �i�..