Loading...
HomeMy WebLinkAbout2018-11-13 Rea Street Monitoring #5 o P- torwater Construction Site Inspection Deport General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W Date of Inspection 2/15/20 Start/End Time 3.00 PM-3:30 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19 Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Complete Install water main complete. Gravel Road, bring catch basins to grade. Complete Pave binder coat. Complete All grading of shoulders, loam and Hydroseeding complete. - Continued construction of single family home on lot#2. Foundations poured and backfilled on Lots#1. - Some minor intermittent site work. Type of Inspection: X Regular ❑ Pre-storm event ❑ During storm event Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? ❑ Clear X Cloudy ❑ Lt.Rain ❑ Sleet ❑ Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 22 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: BMP BMP BMP Corrective Action Needed and Notes' Installed? Maintenance Required? 1 Hay bales and siltation X Yes ®No ❑Yes X No controls 2 Stabilized Construction X Yes ®No ❑Yes X No Entrance 3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable. 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes ❑No ®Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑ Yes X No ❑Yes X No 8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes ®No ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ❑Yes X No N/A 11 Designated washout area X Yes ❑No ❑Yes X No 12 Recycling/Waste Area X Yes ❑No ❑Yes X No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re uired? 13 Construction Vehicle X Yes ❑No ❑Yes X No Parking 14 Temporary Site ❑Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑Yes X No J Yes X No Stabilization 17 Dumpsters and Sanitary U Yes X No El Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes UNo Ll Yes X No 20 Storm Drain Outlets X Yes ®No Ll Yes XNo ❑Yes ®No LJ Yes ®No U Yes ®No ❑Yes ®No EPA S WPPP Inspection Report Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? I Are all slopes and X Yes ®No ®Yes XNo disturbed areas not actively being worked Properly stabilized? 2 Are natural resource X Yes ®No ❑Yes X No areas (e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ❑ Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No ®Yes X No properly protected? 6 Is the construction exit X Yes ®No ®Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ®No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ®No ®Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ®No ®Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ®No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Dotes Required? 11 Are non-stormwater X Yes ®No ❑Yes X No discharges (e.g.,wash water, dewatering) properly controlled? 12 (Other) ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law a this document and all attachments were prepared under my direction or supervision in accordance wi a stem designed to assure that qualified personnel properly gathered and evaluated the information submitted. sed n my inquiry of the person or pers .who manage the system, or those persons directly responsible for gat ring e information,the information mitt is,to the best of my knowledge and belief,true, accurate,and c mpl e.I am aware that there are sig ficant p alties for submitting false information, including the possibility of me nd imprisonment for knowin iolations Print name and title: of .Kellowa fessio n in r Signature: ate: 2/15/20 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 2/20/2020 g 20200215(1).jpg AM- IS a. ".t 4 � p , . 4 rJ ma 'dye71 Syr i 1 r - b® II ,t https:llmail.goog[e.com/mail/ca/u/0/#inboxANhctKJVjXngLZdSJ KwfFzDLCMRJhPvxcQcMJjXZQsQkTdSlPdczRxtzdFMQbGhgHfGrNBpG?projector-1... 1/1 2/20/2020 20200215(4).jpg • P - r - i w Y -P n3 1 m � a, i Ss s u sz4e • t F ELM r https://mail.google.com/mail/ca/u/0/#inbox[WhctKJVjXngLZdSJ KwfFzDLCMRJhPvxcQcMJjXZQsQkTdSlPdczRxtzdFMQbGhgHfGrNBpG?projector-1... 1/1 2/20/2020 20200215(8).jpg i .. �r c - s I �y y p e� Iv r r I NOW M � t a I �w https://maiI.googIe.com/mail/ca/u/0/#inbox/WhctKJVjXngLZdSJKwfFzDLCMRJh PvxcQcMJjXZQsQkTdSIPdczRxtzdFMQbGhgHfGrNBpG?projector-1... 1/1 2/20/�2(`020 20200215(11).jpg i r ��PQ f ,. Al f • ow r e INaF;d e E � r a a, I y ,{�S4• �'F pJ F vP � 4qv :: qp�'0 .. A-:, s �`�eyA' r v J'Wd g �" p- II¢I https://mail,google.com/mail/ca/u/0/#inbox/WhctKJVjXngLZdSJKwfFzDLCMRJhPvxcQcMJjXZQsQkTdSlPdczRxtzdFMQbGhgHfGrNBpG?projector=l 2/20/2020 20200215(10).jpg y AL I IX n _r { � � r �^�?��'�,` ;�` ".�c" wx -,�' `�a`'�*.�„�� '� c" � � ✓ -:s> fir���f'��^r-:,� �. �`� s," ,,� <�. '4 Y ➢r.+,, i� r=;-' av, https://mail.google.com/mail/ca/u/0/#inbox/WhctKJVjXngLZdSJKwfFzDLCMRJhPvxcQcMJjXZQsQkTdSlPdczRxtzdFMQbGhgHfGrNBpG?projector=l 2/20/2020 20200215(14).jpg NONE f, i � F r � https://mail.google.com/mail/ca/u/0/#inbox/VVhctKJVjXngLZdSJKwfFzDLCMRJhPvxcQcMJjXZQsQkTdSlPdczRxtzdFMQbGhgHfGrNBpG?projector=l... III 2/4/2020 Town of North Andover Mail-Fwd: Rea St.No.Andover, Regular inspection report(DEP File No:242-1739) V Massachusetts Bonnie Wolstromer<bwolstromer@north andoverma.gov> Rea St. No. Andover, Regular inspection report (DEP File No: -1 ) 1 message Monica Gregoire <mgregoire@northandoverma.gov> Tue, Feb 4, 2020 at 12:20 PM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Hi Bonnie, Please log on the current project tracking sheet and file in both the paper and digital monitoring report folders. Thank you, Monica ----------Forwarded message--------- From: scott kelloway<skellowaype@yahoo.com> Date: Tue, Feb 4, 2020 at 11:56 AM Subject: Rea St. No. Andover, Regular inspection report(DEP File No: 242-1739) To: Monica Gregoire <mgregoire@northandoverma.gov>, <bcurell@northandoverma.gov>, Amy Maxner <amaxner@northandoverma.gov> Cc: Robert Innis<robertinnis@yahoo.com>, David Innis <daveinnis@gmail.com>, Jean Enright <jenright@northandoverma.gov> Project 'Team, Please see the attached copy of the regular inspection report for the Improvement of Idea St. project in North Andover EP FILE No. 242- 1739). There has been no sediment migration beyond the limit of work or notable impacts to wetland resource areas. All work is currently being conducted in compliance with the order of conditions and the project SWPPP. If you have any questions or concerns, please feel free to reply or call me directly. Scott D. Kelloway, P.E. (978)479-5648 https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1657627622893... 1/3 2/4/2020 Town of North Andover Mail-Fwd:Rea St.No.Andover, Regular inspection report(DEP File No:242-1739) Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone (978) 688-9535 Fax (978)688-9542 Email mgregoire@northandoverma.gov Web www.northandoverma.gov Hours of Operation: Monday,Wednesday, Thursday 8 AM -4:30 PM -------- - ---- —----------------- Tuesday 8 AM -6 PM, Friday 8 AM-12 PM 5 attachments 20200201_084544.jpg r 6570K 20200201_084942.jpg 4006K 20200201_085209.jpg 3354K https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f°/o3A1635598207266498569%7Cmsg-f%3A1657627622893... 2/3 2/4/2020 Town of North Andover Mail-Fwd: Rea St.No.Andover, Regular inspection report(DEP File No:242-1739) r. 20200201_085311.jpg 1350K 2-1-20 SWPPP Insp.farm REA St.pdf 353K https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1657627622893... 3/3 Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat: 42.66666N-Long: 71.09134W Date of Inspection 2/1/20 Start/End Time 8:00 AM-8:30 AM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19+/-. Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Complete Install water main complete. Gravel Road, bring catch basins to grade. Complete Pave binder coat. Complete All grading of shoulders, loam and Hydroseeding complete. - Continued construction of single family home on lot#2. Foundations poured and backfilled on Lots#1. - Some minor intermittent site work. Type of Inspection: X Regular ❑ Pre-storm event ❑ During storm event Post-storm event Weather Information Has there been a storm event since the last inspection? ❑ Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.2S INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 & 01100627 SiteName: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? ❑ Clear X Cloudy ❑ Lt. Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 30 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 Are there any discharges at the time of inspection? []Yes X No If yes,describe: BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? I Hay bales and siltation X Yes ®No ❑Yes X No controls 2 Stabilized Construction X Yes ❑No ❑Yes X No Entrance 3 Soil Stockpiles X Yes ®No ❑Yes X No Stockpiled material suitably located, and stable. 4 Dust Control ®Yes X No ❑ Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes ®No ®Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ®Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ® Yes X No 8 Staging/Material X Yes ®No [] Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes ®No ® Yes X No See above. 10 Vehicle Washing X Yes ®No ❑Yes X No N/A 11 Designated washout area X Yes ®No ®Yes X No 12 Recycling/Waste Area X Yes ®No ❑Yes X No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMT BMT Corrective Action Needed and Notes Installed? Maintenance Required? 13 Construction Vehicle X Yes LINO ❑Yes X No Parking 14 Temporary Site ❑Yes X No Yes X No Stabilization 15 Pollution Prevention X YesLJNo ❑Yes X No Practice 16 Permanent Site ❑Yes X No 11 Yes X No Stabilization 17 Dumpsters and Sanitary L)Yes X No ❑ Yes X No Facilities 18 Sediment Traps Ll Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ®No Ll Yes X-No Ll Yes LINO Ll Yes LINO L1 Yes LINO Ll Yes LINO EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Deeded and Notes Required? 1 Are all slopes and X Yes ®No ®Yes XNo disturbed areas not actively being worked 1)roi)erlv stabilized? 2 Are natural resource X Yes ®No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ®Yes X No receiving waters free of any sediment deposits? S Are storm drain inlets X Yes ®No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ®No D Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ® Yes X No (e.g.,paint,stucco, concrete) available, clearly marked,and maintained? 9 Are vehicle and X Yes ®No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ®No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. EPA SWPPP Inspection Deport, Version 1.1, September 17, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 11 Are non-stoimwater X Yes ❑No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty o aw that this document and all attachments were prepared under my direction or supervision in accordan ith a system designed to as ure that qualified personnel properly gathered and evaluated the information submitt d Based on my inquiry of t person or persons who manage the system,or those persons directly responsible for a Bring the informatio e information submitted is,to the best of my knowledge and belief,true, accurate, d mplete.I am aware t there are significant penalties for submitting false information, including the possibili o fine and imprisonme for knowing violations." Print name and title Scott D.Kellowa ofessional En ineer Signature: Date: 2/1/20 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 Stor mwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W Date of Inspection 12/21/19 Start/End Time 7:30 A -8:00 AM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19+/-. Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Complete Install water main complete. Gravel Road, bring catch basins to grade. Complete Pave binder coat. Complete 10/11—All grading of shoulders, loam and Hydroseeding complete. Foundations poured and backfilled on Lots#1&2. Continued framing single family homes. Type of Inspection: X Regular ❑ Pre-storm event ❑ During storm event X Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO DE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .& SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? ❑ Clear ❑ Cloudy X Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 30 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re aired? 1 Hay bales and siltation X Yes ❑No ❑Yes X No controls 2 Stabilized Construction X Yes ❑No ❑Yes X No Entrance 3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable. 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes ❑No ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑ Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes ❑No ❑ Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes ❑No ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ❑Yes X No N/A 11 Designated washout area X Yes ❑No ❑ Yes X No 12 Recycling/Waste Area X Yes ❑No ❑Yes X No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 13 Construction Vehicle X Yes ❑No ❑Yes X No Parking 14 Temporary Site ❑ Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑ Yes X No ❑Yes X No Stabilization 17 Dumpsters;and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑ Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ❑Yes XNo ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required. 1 Are all slopes and X Yes ®No ❑Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ®No ®Yes X No areas (e.g.,streams, wetlands,trees, etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes LINO ®Yes X No properly protected? 6 Is the construction exit X Yes ®No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ®No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ®No ❑Yes X No (e.g.,paint,stucco, concrete) available, clearly marked,and maintained? 9 Are vehicle and X Yes ®No ®Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks, or any other deleterious material? Are materials that are X Yes ®No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required. 11 Are non-stoimwater X Yes ®No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gatheriI%. e information,the information submitted is,to the best of my knowledge and belief,true, accurate, and comI am aware that ther are significant penalties for submitting false information, including the possibility of fin imprisonment f r owing violations." Print name and title: Sc Kellowa Pr essiona En ineer Signature: Date: 12/21/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 o a � h a a w qr o = frp -.r ti o i � a< 01 Wfu ;IcaP IR Amp- x Pl cn1WY�/N k Y� z t � 'Y ,r f„��'�'�- :�•.�'- �,��j wit ;�' � ��'f� ,� • •••• - 4 1 •• • • - • 1 i a ,..fee d q)p -ss- I y f • CD r � CO .� rIr r ✓��pd �.$., Y.: m / / It'% n R y ti * n r• a4 CD 0 y ` m 0 o max. u CD CL r t 1/2/2020 20191221jpg(10)•jpg V, ^� y ` ",• e ice• , � �p e i r r" a https://mail.google.com/maii/ca/u/0/#inbox?projector=l 1/1 1/2/2020 20191221jp9(12)•jp9 � pr 4. m QA. T a r m u https://mail.googIe.com/mail/ca/u/0/#inbox?projector=1 1/1 1/2/2020 20191221jpg(15)'jpg { VIS Y- I 4 �s - E v ` m i + r ,• � S B{„ d.r {- y a• - x l e - A s' a - a; https://ma!I.google.com/mail/ca/u/0/#inbox?projector=1 1/1 Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long:71.09134W Date of Inspection 11/30/19 Start/End Time 9:30 AM-10:00 AM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and re ortin .Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19+/ Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Complete Install water main complete. Gravel Road, bring catch basins to grade. Complete Pave binder coat. Complete 10/11—All grading of shoulders, loam and Hydroseeding complete. Poured foundations for Lots#1 &2. Begin framing single family homes. Type of Inspection: X Regular ❑ Pre-storm event ❑During storm event X Post-storm event Weather Information Has there been a storm event since the last inspection? X Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .& SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? X Clear X Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 30 qeg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required. 1 Hay bales and siltation X Yes LINO ❑Yes X No controls 2 Stabilized Construction X Yes LINO ❑Yes X No Entrance 3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable. 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. S Minimize Disturbed X Yes LINO ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes LINO ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes LINO ❑Yes X No See above. 10 Vehicle Washing X Yes LINO ❑Yes X No N/A 11 Designated washout area X Yes LINO ❑Yes X No 12 Recycling/Waste Area X Yes LINO ❑Yes X No 13 Construction Vehicle X Yes LINO ❑Yes X No Parking EPA SWPPP Inspection Report, Version 9.9, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 Temporary Site D Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes DNo ❑Yes X No Practice 16 Permanent Site D Yes X No D Yes X No Stabilization 17 Dumpsters and Sanitary D Yes X No ❑Yes X No Facilities 18 Sediment Traps D Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes DNo D Yes X No 20 Storm Drain Outlets X Yes DNo ❑Yes XNo ❑Yes DNo ❑Yes DNo ❑Yes ❑No ❑Yes DNo EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ®No ®Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ®No ®Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ®No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes LINO ®Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes LINO ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes LINO ®Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ®No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes LINO ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ®No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stoimwater X Yes ®No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 BAR/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTII+ICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel property gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible or gathering the information,the information submitted is,to the best of my knowledge and belief,true,accura and complete.I am awa that there are significant penalties for submitting false information, including the poss' ity of fine and impriso ent for knowing violations." Print name and t 1 : Scott ID.Kellowa Pr fe ional En ineer Signature: Date: 11/30/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 12/5/2019 WP_20191130_029.jpg c y L �y �✓ 0 2 D ¢1 �s z � m `a d v` I gal o a a - o �r oe nfl v� � a p https://mail.google.com/mail/ca/u/0/#inbox?projector=l 1/1 ,3 rT 2 1 l + f � n v� CD CDf t ° ' r �i� d�� �r 49 °� t• i � �:`hnWy 4?� y .,f f,1,U C;.S ,f ,✓j,7 .f9,set l 4guy�` �>Sx. ��$y�y:+v @+',! x�,ry.„W,. � � o - E' ���� - „-_ a yw Fa> .' o'�' e .,. ,.,�3 � y. �n.u"3y'#„ _ r ..p �qy ti P.,-�, r }f-� 7 Tr far 'v�d - - � „„�-..�,:�� _. ', .a.s ....:. ".>. w ,�;- ✓er":,rb`••'� „'J � � < s 45Yf,�✓ - r �r ' ro-.�r�"��� _�"� r _,�.�� ,'T � d�� .`2 , �. �<:: :"� �� ti !�'�,�,t�o �s.•,r s rld- i ,'pie J)t�;r,4.by �;�a .se.::.. \ � - �'.� � ,..�� �.,a� ��a$$�t:+.'..• �'�T-P'r Js i a'W. a`�- ti� ,zs �'.';�R'� 'S7g� -w � �:;> - �'�.�-�,�"�"� � i "i;�_.�� ;�.: r-� era ✓ �,� t.�r S�^ .�- � :i a L.r�7q,"' .:< � y� �� � ��<<.. �rt. t�,y.. � � 4 a.`'�y� y, .�. '` ra z�� �. l ✓ � .�.r-g .� r-.4 e - t" _ �r ,zr�t �ie ,��r ,,',�` +{ cry �` r 7 3 P ,�4 *� s XW."f a",�': ,� ..a-/ r ,.,-aY' /,:.,,� �, Ir!i i-sl 3A:, ,'�r1 ., u.;e. i , w`r� w..f• m(' P ? r -�. ifi�f cFr�t :;; Ia:-'t}; lrh,�� � i s,�,tit�r°�` �. +, t c� i:J ✓ ` "��✓ ,ro�ir y, r , � r,,c� ,l `�i �a a`� re:e�4 9�ie�� �' i c ��e � P`�7�i r.. � a� � � -., r7 .✓ '�' .' A�� =� r taf °-:rr f <a� ti D l� l V' ri � O yq r a3 y�l fi r / M, rvv,. r �i�yi i' f� rir A rCy of dL � - r k` m INN p ' r o) Q- 12/5/2019 WP_20191130_034.jpg ry https://mail.google.com/mail/ca/u/0/#inbox?projector=l 1/1 12/5/2019 WP_20191130_035.jpg i G iP= i, I A Y 3 c� ,sue 4' �ti arm i - H 1 , P t 4 e{ ' �i c i ° https:l/mai1.googIe.com/mail/ca/u/0/#inbox?projector=l 1/1 12/5/2019 WP_20191130_036.jpg r https://mail.google.com/mail/ca/u/0/#inbox?projector=l 1/1 12/5/2019 WP_20191130_037.jpg i � gyp,6- S �� ,,� r•a, t �' .�. � � �F,;:� �� ''R � tt� � „�3 https://mail.google.com/mail/ca/u/0/#inbox?projector=1 1/1 12/5/2019 WP_20191130_038.jpg '=1 lk r ++ w r a' a g0.x m � V a . ^w + c. ,m 5 � 4'� A YYY Ic , t https://mail.google.com/mail/ca/u/0/#inbox?projector=l 1/1 Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W Date of Inspection 11/8/19 Start/End Time 3:30 PM-4:00 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19+/-. Completed rough cut Roadway to Subgrade& Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Complete Install water main complete.. Gravel Road, bring catch basins to grade. Complete Pave binder coat.Complete 101 11—present.Continued grading shoulders and landscape disturbed road way. Hydroseeding same. Poured foundations for Lots#1&2. Type of Inspection: X Regular X Pre-storm event ❑During storm event X Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 & 01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .& SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? ❑ Clear X Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑ High Winds ❑ Other: Temperature: 53 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Hay bales and siltation X Yes LINO ❑Yes X No controls 2 Stabilized Construction X Yes LINO ❑Yes X No Entrance 3 Soil Stockpiles X Yes ❑No ❑Yes X No Stockpiled material suitably located,and stable. 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes ®No ®Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes LINO ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes LINO ❑Yes X No See above. 10 Vehicle Washing X Yes LINO ❑Yes X No N/A 11 Designated washout area X Yes LINO ®Yes X No 12 Recycling/Waste Area X Yes ®No ❑Yes X No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 13 Construction Vehicle X Yes JNo ❑Yes X No Parking 14 Temporary Site ❑Yes. X No Yes X No Stabilization 15 Pollution Prevention X Yes ❑No ®Yes X No Practice 16 Permanent Site ❑Yes X No ®Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ®No ®Yes X No 20 Storm Drain Outlets X Yes ❑No ®Yes XNo ❑Yes ®No ❑Yes ®No El Yes ®No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ®No ®Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees, etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ❑No 0 Yes X No properly protected? 6 Is the construction exit X Yes ®No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ®Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ®No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 9.9, September 97, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ®Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information s mitted.Based on my inquiry of the person or persons who manage the system,or those persons directly res Pon, 1 for gathering the information,the information submitted is,to the best of my knowledge and belief,true,a ur e,a d complete.I am aware that there are significant penalties for submitting false information, including th oss ili of fine and imprison nt for knowing violations." Print nam and tl : Scott U.K wa P f ssional En ineer Signatur Date: 11/8/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 11/13/2019 WP_20191108(1).jpg -------------- i k A ?� A • Q https://maiJ.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZJCspFDppgnTGZhGsZrhJjNZxl?projector=l&... 1/1 11/13/2019 WP_20191108(2).jPg rr 'r a ' https://mail,google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZJCspFDppgnTGZhGsZrhJjNZxl?projector=l&... 1/1 11/13/2019 WP_20191108(3).jpg ,i i l ^ t Vs 1 $�4 f �F J i *u a a, https://mail.google.com/mail/u/01#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZJCspFDppgnTGZhGsZrhJjNZxl?projector=l&... 1/1 11/13/2019 WP_20191108(4).jpg TV p Y` t Nd NZ k I r` a x e A s� m � a v � ) 4 m x I. https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZJCspFDppgnTGZhGsZrhJjNZxl?projector=l K. 1/1 11/13/2019 WP_201911r08(5).jpg p v PT 5A� � �! �4� �' ��,�,.S,v \ � �' ,. .� � kl e Y r••eta.� `�,� �� .y ��r i�,%.: �E' -.. ���° t t ynr ,n r o , https://mail.google,com/mail/u/0/#inboxfWhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZJCspFDppgnTGZhGsZrhJjNZxl?projector=l&... 1/1 11/13/2019 WP_20191108(6).jpg § i Ffi k � rP ! b i v a a _ ' m https://mail.google,com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZJCspFDppgnTGZhGsZrhJjNZxl?projector=1 V Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat: 42.66666N-Long: 71.09134W Date of Inspection 10/25/19 Start/End Time 3:30:00 PM-4:00 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and re ogin .Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19+/-. Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Complete Install water main complete. Gravel Road, bring catch basins to grade. Complete Pave binder coat. Complete 10/11—present. Continued grading shoulders and landscape disturbed road way. Hydroseeding same. Type of Inspection: X Regular X Pre-storm event ❑During storm event ❑ Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? X Clear ❑ Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 49 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Ile wired? 1 Hay bales and siltation X Yes ❑No D Yes X No controls 2 Stabilized Construction X Yes DNo ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes DNo ❑Yes X No Area and Protect Natural Features and Soil b Temporary ❑Yes X No D Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No D Yes X No 8 Staging/Material X Yes DNo ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes DNo ❑Yes X No See above. 10 Vehicle Washing X Yes DNo D Yes X No N/A 11 Designated washout area X Yes DNo D Yes X No 12 Recycling/Waste Area X Yes DNo D Yes X No 13 Construction Vehicle X Yes DNo ❑Yes X No Parking EPA SWPPP Inspection Report; Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Re uired? 14 Temporary Site ®Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ®No ®Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ®Yes X No ®Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ®No ❑Yes X No 20 Storm Drain Outlets X Yes ®No ®Yes XNo ❑Yes ®No ❑Yes ❑No ❑Yes ®No ®Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ❑No ❑Yes XNo disturbed areas not actively being worked ro erl stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ❑No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 1 I Are non-stormwater X Yes ❑No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 9.9, September 97, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in acco- ance with a system designed to assure that qualified personnel properly gathered and evaluated the information s tted.Based on my inqu' of the person or persons who manage the system,or those persons directly responsi e r gathering the info tion,the information submitted is,to the best of my knowledge and belief,true,acc ate d complete.I am are that there are significant penalties for submitting false information, including the p sibi ty of fine and im onment for knowing violations." Print name a ti Scott D. ell a rofessional Engineer Signature: Date: 10/25/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 10/30/2019 WP_20191025_011.jpg � Y � w X� Yf � � r ' a https://mail.google,com/mail/u/0/#inbox/VVhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSbNdkGFgPZkNggJdQHBWRCly?projector=... 1/1 10/30/2019 WP_20191025_012.jpg A" �v u n m e r � 9 �Y n d4 �.._, k 4 i4 https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSbNdkGFgPZkNggJdQHBWRCIv?projector=... 1/1 I I. O U N O Q U m S a� m Z Y N d d ,.. ,-,, �...,.. �,..-,;. ; '�>��, �d � J. :.���� � 'a 2 ea}vt�t �:v�� r:5 t e'. ��� , g�'. LL U' ,/� ., e ,. ,.. .,:.s $. $4 � R�✓`..Y"�a�, A d .<�"fic"S„ ', � �. „�-W.;; C~ waPAll IT,K•r9 .�s;a`"a ,,,, '�4at,�i,2.ii:s {��..,,s dY'� :'� .t`Z'�,.S`:,, '� ,a-`} �•�f`�r', „ �, - 'r,; r--- :a �?,:t $ .d •r� �,, ,< `w .R., ,r". 2 a "� c�(e��,r g:.. .xa? ;�Y-�- - O- ,,. ., , vv.., ,� 7,st,a ,,,n, ,rsr«', •4„t ��:.<,.. fy :, i n� M tv z,: �� ;'�rd.e }`g�-`'d' >;s�y .��> :t. ..�, k;�-� � ,. � ,,.,;, ,. �,....ppwr ,, r`.•.^- � A je. "�,' �.z,-.,r `�,fir� S.:":. �e,�r ;t ,yf,: �,�„r= �r ..�, >.y �Y �a Z� - �t - > , � � - ,Pry /�: • ��. ;a '� �,, � �<,�. fir?; b � r -z�`y J` ,s�' %, -. 4 o ',„ `.,. -.. "�1:;..< ' _y - ,,.,- � �Ma°:_ 3• ;.'• r a;. �G',�$�,�.�Q�a�s ,a`� �,tfi.,bra°a�i' a„.: r °.,.., f €4�4 3 " a� .,.t- �iP'" ,s - >.:., °�1a^9:,u' �a,: - e a•w^ :, ..r.. ::,; •�,,:,,,.. � .-o- ,� °,:;i a< J.: 1, aca,,., ,..,:,y�y, � :.k� �. C,q, ;; s � '". F, <,,.. s„3,: �,� ,. ,. ., ,..., ,. ',:„e`€•� � - �`�, a' .r - :. :.=.ax., x,.: ..;ri,,., �G1,`. ,. .fi b v.,�ter. ,.. ,.�� -dtl'..,k ,.A `�" .....:,x:.•r .,,,. ;�.,,� a, h,a ar:::,�' ..ar,, *, t' - � :z �,.gu .. ,..s'�. ", ..a,,. � s, {...@... _._. ,_ ..;, «...;: .,v �,a „�n �,, „�fit, .» µ,, ua, ;: :}.',�wr;:, 5 •� Y, 5 �, `�&`}°,�- �" �„ _- O :� ,g, , , ..v, nl:- w,,���}, xart, ,R s�"_, �" ,"w•u,'✓ (� '�^ _ 4,, z,x his �s'- �'F ;,>a.�,: �2 rn ..,. ,.",`_�xa„x e�"�-. .�.. , •-:; _�,, k,... ,,e.:, as .-a.h� ,.,,.e�'p, ,.e ��hr � .:�v, �.,, i r .. ,.�.:, ,,,,,P.,,< S.. a ,;.. -.,;� •. ._.- ,., r, < ,,, ,»., .y �°'✓` .,,". ,,.;F „ ., ,.. y t,a�i6a� �,,5,,,<. � =P < � .:,- .. ,- ...,.8k p e vs�... •;. x.. .,,,�*:.:� ..,. , r. , ,.. .. ", „w, �`y, .:,� ...,. ,'�,?r-�^ }zi�f. .", �c ',. ,... _,... .,. , ,�t .,. n j;A ,o-u.. >,k .a . ,<.�,`• a. ., _ ,: .;4".a,e,�, 'ka :, N" r i✓ V O xn '� ,r.,,,>-. .,s,..,.,,+ y. ,: _, �„ , f P .. .k d,�, m -...., ,>� .,:c� n, ,...a -„ ,:: r4i,r,i�,$4 a ^s✓.. «.g'a - ,7 t,. \.a- ,, ,,. x ;.>. -v' d :a•f r:.... " < ..;{ , ,, y (� ':.,> 9 er,. pp_, ., „ ,,k ..., U c.,..< .a ,. , ., „<� Wt,... '>k ` Jf A. ,., a, „ .,,.. ..<,,,, ...tom,.,. -.. ^ -°, „��a m ,,.,., ,z r.ta ..,, .f. � .> ,� �,��g�,�.:, „s°„ � @,•,n .�, :,1 ' '�, „�,u � n<-., r: --�" « '4 - P - ... ,,-.,.. , i. k .:v.-- WV,e , ,<.. i�t,,.. n e.Ev..-. .`k. , � . _.a..s. v" ,.< .•t,� a�°.: , a , .=R .. � ( �' - D• „v ,' .,,,. ,...,.. a`-, 41 .: �. ,;. , � I < _,.:. $ k.,.x.a, nr• ., �, n:,d -,_ .... .�d; {N� :, n., ,.,.,,� , ., ^. ->r. �:,,.....,�' a .S J a:. Y Hk ,;. a,*, a t 3�x•::,„ v ..„a � ., ,,i c� - t, § s A ,`{s5,-�.: c m� ..�':, ' d�' -=.a.,va ^},ai '_-,.. <✓a.,a - ia; c ,a, �n;,r• � 3 � t :� ��, "�.a;� � ,�> z.,,� "r" �e"� Yam„ � atis`;' '�, -.:" ,:,'s ,� arz:;` ..,.. 1'r•<. : b,i.<.. ;9 ,,,, n,., "h..; ,S', .... ae= < ,.>F_. <..,., z}}••a , -� �� -a.,- .,a, ,.srs " ,1 1 ,,;`tiv e � *,'%,. -� �� 5 d w�: .., v l� v l ,,, ,�', ., ' ', i,. .,;�, _ re>.,,,::� ,k f^;,., Syr 'as..-? �� ors_r tt n ��a Hoe ;� !_ .., x:� 4&•,s:�v^ <. .. Y 6`•? ,a: „ w.. ,.,, r, .. � - - ,,, `, -.,<•_>.. �' � FF,:.H ,r .! ms ram, 3� , :er� .ya k..`� a., - - - Q .w, .a,, .m�,.: =';: Y} s a,.: i<-. ,:^. ."...as .,,,^a. } '��� ,. -.:, '3 �;".<,• ,�: ,a ... �'"r,t..,< �; .J :�✓.. - ,.-. ., ax=,.a,:a , , ,s.r,n .,..,s - ,�: .a ...'�gi .. , ...� .,.., ,.. ,".., `< ,..> - u, ,.. r n� , o„$` n �'�<'Y' .., »e . :,.��� .• t.., tip t a '',a, � <_. -� - .v v� ,,,� 4 ,. - ,.,, , z.-..,, ,, c a,,,>,Nf �•fis.' .�,°S x ,x-, ,.,•..�. } ,e*, ,., e t' 11 �� '�,� t a. :e; St"S„�?..,,. ..,n .€� .., Z:..r n.; °bY ;.:r<. :8.&. >.p,�. , � .. .:r ,:. ,.S ��.: s, .,,z ,. ..- <.•_ '..s.,#f- F� x.,.`t a.,h ,,._ c., ±>:.' ., r"P .," � ..'� t �> i .,,..>. Si e: t.,:,. ° .y'• :✓`;., 'g'�>S`•~r&.,v_.� ,ri, J ��sx �:�. ,. �.,. r��� < s :.,`�- ks, <,. ,. ,.,.. a,., ., aca .,,. ,. .,. � 1:.. .r,,�. w ... a`a.. '� �:. .<.at a„• :�« '�: -• � ., ,.. :_: ,9„a:.,..`�� n„ a,,,,» ,. ,al ;_, ^•3,<:,, s ,a.a.. e �'��a ��:,. a. „ .::a a � ,..,} ,,�. - � +.,.. �f�� ya:* n.. t-. . ,,apt „ rP a ;, .a. ,, ,. ,r,,mow•, ,(;, � ..'W�u 9 ;'? :.,., n � ,- - .,r,gym. ;.v„ ,,,...,,'u.F,'vs .>,.. rt� 7r ,;.,.h� , , , R .,re o... r n;,.,� �...'��a y , t., 4,:. *, -• - ._�< , , 2 . �:.;,.£�,, , ,.., •v ,. a rx„a; �,,. ,, ,. >5 „x.t1 ,z:>.N.>c �s,, 4 � •,,..,.,.^ ,,,�. <.5n .,.a a d=A..::� R � @ /� .,,... ,ea ,,. ,�. f";:..C � .; a ?::, .,, ei', + �::: ..:. 's.Q'•�v =�� „.,:k ,,v- o:: ,„r„ ��a. � ,,a„� -au nt, ;.'� a „€'�� � _ `?. .: � .: �'4`=„ - f -, ,;,-. e r,a.: :7 a a:. >, ,�,• ,�.< e h .,,. ( ,,,•u �` S ).a, sf, yl',as: , -. - , .~*W`'x:. " Fa.,•, n ,:;; fad, ,r, ,.. x ,,..`f a a't� �, ,. ,.,Re, .. .n,. :t. „ss��„ t,g, ,4',�rzt.e.., a.<t. 4..�J ,nt..",:. A a -~ ,,,.a: •.'r..,p .e< �.vb"a4n\ f :,:*',1 �, , s- ..,�{.- ,, z "r,t•yvt:�,;:r, s., r,a a �,. 9,. x�.,. _., n. t, •,� ,�_ ,. � z gib. «»� «,, k :s �, °. �' ,., ,. -- �s d� x >•i`,r �-�si 'a ..� x.,,,.. , .... � ,y . .,...,x „< nA., s .:,..f: . ;° .?oa ., � .� -.'P.., } �� � a.�„ a, *a�:• „n o?' �x.ar ,'� t ^s z{±t ^:; � y?*�.F a=„� .�`�� Y ., ,.( .;,u W .2 ..:�, EF. n 6 .. ,?-.e .a .,�.,:'� ,,,::, r, E,�. .,. a � tit +..�. ;}' r'��t v a�n.+ W �. m L _� ,�,� a � a�„�., .ak , - .G= , �.; � ,. ,� -1� a>, ��; spp } tie'; F ' :� ° ea;.,t4 R® ; ��,ta.a.., y ,ae � ::'�^,,, .�, „4ir��Se�ar^r t � d e , ��td� a .� �, ,. b�'v: P^�`= {et a'ns4�'=4 t r::�� s, u� ✓.+ p ;�Sr, � ,:;f �,,.. ."is a0;, ,z . 0 O a` ��'x� "� � ,'%�ta`s'•:�,„.,, �. ar,�<.L 4�r x: :.� �a a�}P+£�N*a�' `'" $: �' 'a�.�^. n v � g� e �s7 Y 1:: r a .°b.�w°. 4' 2 z,��,8.a a t 9 F.-a`�r-nae,n ;�- '• �. a f ,,, �Z 3 �x �,�� a �.. <a d r a��.: z� t ^a, 1�:' ", `! � ..e,,.a�i„: S a ;�a,s k;:� �. ,,�'ds'§cy°v5y - "� 1 B, >r ✓n re.',f�, "n b �, �d, ; g, � ��. >! � FN, .? d' R ',� Y k„ ,>Py, � V� M•�(" S z'ia!}.� .'�.� f.. '.,A k•'$$'''77 1e� �, ,:5 �� � �' � ., ,t.-t z� 2S� r,, a�g�. .G a.�,A. ��E*.,,r�a„y tc "�` ,,� ''�•i 1^ ar9 r<, I L :d S�I. R4 — Sk?n , ,,-.- <5; y,' � o . �� .r3.5� .5=.��d 1 ,:.,.�` 4�d ,.�,Ty xfi,w•. �a e.. „ d , ¢. G5= ... 1•; h >`T' �: T` � ! - - ;«.. l i„ ?y,..:�. t,. :v ,a'S�>. fF,, �r `�i ,�Hu 4 r 5�•�4 rf ' � 'e. i ( p is 4 ,: ,3zgs,,,. „ dP ✓ ,,,rr ..:,:. w ,, .>, N ,.`✓�' ... '`�;$Y a., s-V.- n'Y a,µ,S b..- 1 ,.. -, L Y, a9,. .:.. °„ .._.w "t . .., . .�- n.., v( ,as._,- >.,... 'M,, ,n ,<w.,3. y ..,..., .,9.. ,:.n a it t ,..w..c ,....,e f Y, .,g, a =•,L. „,,�k .,, 3 a; .< a'„w fi . , !r r:i,, >�'�, {.:.c p. wa a..o.,.l 6�, .<.. w N �," ^rlr tl 9( �{{ .::: f . e� �'. �,-r § :,b ,d .1 t r,:�t.. �.�1....=.�A6 ,,, ,, 9� Y e� 9b`,;,.:..• 2�, ., ,�,,.,a,:k<>:•�r<: ,a .. ,.:4 1,..:,. fs,><, 0..3 ,,, r s .,F,': tF P„...,, l n� ..,. ,t ,> ~ 'F�19� `�:..�.^.s ,, �t.,t,i� .,, � ., �� �. ..;�v r?.Ja <...`=Sd ;v;�u•:•�>r w'G - :,v 4.-.. ,.,.,t ;.,.a>1.,,PJ' �' ,,.. �..",y ."e�.r."��S .:. ,., �e :ds:� 9,�,t.:a "�•_ �', �,�, '� O _:, ,. ...,:;:'.r. � .. .:. ..9,:� 44 a .7, `•h. �, a � m a I v :3 T>,.r !, .)'t r! tAe„(� ��6W.- �,: s fs� �.. _ ��': , -„-. ,�- ', :., } s•.,,,; ,,;-r oxj,d 1J,,yy, � -(., d+ a Pri� �.dg �•... „!�,{ Ypa.:+p �4t �7„�., 5 Ran "yam � �'�e :�, „�k � �z� U �,� a: } ..9°� r"�i✓r: e /.. �5 '+�d 'rd .S �p y 'a°�,�f,rSd�v�bG pm �®.(a�U,, a s ,. � N %,_ �a k ,,st �,r": .�1f•},i1�F� ,,e ,P J.ar,., ri, ,t9 7 v.,S hen �' rae° s d"o`?t4, ( la. � b,. — i 7 .:,�� ,t - ;,� �. 'a''p. d .;:../,P�✓ 6 x5;;ad, _...A ,_sl�i Pa �; �r (+�tarylo��p � rc:..? 3° %� ;,e � ^�� m ?.,`"ice ;g,, ., �1 ,P 1/is-ed � J t�/'� f,};P• s'f I ��"f z✓�i��r `4`tl°'^',)�'P:a @`17�:` ah ,.r �c: �, `w �", � O 'v�r�-,,,�, � _�ti ' r ''{ .•� s-P s. r v 'S,P 17 f Q.,y }� .f 41 T,e � ,� z.� i,•qq'� �� _ O `O L See2z@g wP m94y5_G Gm F-�.. . < aw\ \ �\ �� • �y � � » yed . - a� � gm±m6goog«mWmail/ o#� abx/Whc c z ADw 9s P)z QGv 2w Qe?o c Aar&PZ kNggJdQHBWR p]ect o. ld 10/30/2019 WP_20191025_016.jpg X � r UK a31 ma .. vY L am a s https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSbNdkGFgPZkNggJdQHBWRCIv?projector—... 1/1 10/30/2019 WP 20191025_018.jpg r ' ��. � . � � - s ri fit`% yt: z .® i r NO a � � s n https://mail.google.com/mail/u/O/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSbNdkGFgPZkNggJdQHBWRCIV?projector=... 1/1 10/23/2019 Town of North Andover Mail-Fwd:Rea St.No.Andover,Regular inspection report(DEP File No:242-1739) 1V®R DoV Bonnie Wolstromer<bwolstromer@northandoverma.gov> Massachusetts wd: Rea St. No. Andover, Regular inspection re (DEP File No: -1 ) 1 message Monica Gregoire <mgregoire@northandoverma.gov> Tue, Oct 22, 2019 at 9:28 AM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Hi Bonnie, Please log on the project tracking sheet and file in both the paper and digital monitoring report folders. Thank you, Monica ----------Forwarded message--------- From: scott kelloway<skellowaype@yahoo.com> Date: Mon, Oct 21, 2019 at 4:41 PM Subject: Rea St. No. Andover, Regular inspection report(DEP File No: 242-1739) To: Monica Gregoire <mgregoire@northandoverma.gov>, <bcurell@northandoverma.gov>, Amy Maxner <amaxner@northandoverma.gov> Cc: Robert Innis<robertinnis@yahoo.com>, David Innis<daveinnis@gmail.com>, Jean Enright <jen rig ht@northan dove rma.gov> Project Team, Please see the attached copy of the regular inspection report for the Improvement of Rea St. project in North Andover 'EP FILE No. 242- 1739). There was no sediment migration beyond the limit of work and there were no notable impacts to wetland resource as a result of the recent significant rain event. All work is currently being conducted in compliance with the order of conditions and the project SWPPP. If you have any questions or concerns, please feel free to reply or call me directly. Scott D. l -elloway, P.E. (978)479-5648 https://mail,google.com/mail/u/O?ik=a2debacbl a&view=pt&se arch=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1648100352003... 1/3 Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long:71.09134W Date of Inspection 10/18/19 Start/End Time 4:30:00 PM-5:00 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19 Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Continued Install water main complete. Gravel Road, bring catch basins to grade 9/5/2019—Pave binder coat 10/11 Begin grading shoulders and landscape disturbed road way Type of Inspection: X Regular ❑Pre-storm event ❑During storm event X Post-storm event Weather Information Has there been a storm event since the last inspection? X Yes ❑ No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 10/16 10 PM 36 Hours 1.2"+/- RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site (Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? X Clear ❑ Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 60 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Hay bales and siltation X Yes LINO ❑Yes X No controls 2 Stabilized Construction X Yes LINO ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes LINO ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes LINO ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes LINO ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ❑Yes X No N/A 11 Designated washout area X Yes LINO ❑Yes X No 12 Recycling/Waste Area X Yes LINO ❑Yes X No 13 Construction Vehicle X Yes LINO ❑Yes X No Parking EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 Temporary Site ❑Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ❑Yes XNo ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ❑No ❑Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g., streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ❑No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ❑No. ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Deport, Version 1.1, September 17, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIlFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the erson or persons who manage the system,or those persons directly responsible for athering the information,the ' formation submitted is,to the best of my knowledge and belief,true,accurate, omplete.I am aware that ere are significant penalties for submitting false information, including the possibil' f fine and imprisonme r knowing violations." Print name and tit : Scott D.Keflowav, rofessim I En 'neer Signature: Date: 10/18/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 ii `o U Q) .O a C X 3 m m X Fl C� .trn s � a I Al 4Wbps, CD y' +s9i ,{ ° -a a x.a 5� 4d� c ,l, 11 3 d .� ..".. tit �. edp.,.e> „ '"r5�'+�'11 �,.4„. ,• ; �uui .�`��Sx .>n�'�"�"'�a' ;�'�`" ;i�� �� .s �f r^�' 5�`§{,' �� ' �'� C/) , s a t ',��9q•e� � i•,n.' ii wy 5 u,a t' u �x � n r, � r m �� j w 0ID g,.' 47 , � Y ak`; " U g e t '% S T i � k 01. k E 9NEW y o s 10/23/2019 WP_20191018_010(2).jpg y . r y , ,a 9 rt v'�l r as ,p s� , i a t- �Rg�a �!u 4 Y Y,. .2 a f E kk t https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSZdJ RmzgTQLdDMXBgwxnsgnV?projector=... 1/1 10/23/2019 WP_20191018_010(4).jpg ° e +A a w ^ J y P (1 a W�� � ffim� d ;i ez https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSZdJRmzgTQLdDMXBgwxnsgnV?projector=.-. 1/1 10/23/2019 WP_20191018_010(5).jpg �Y Z r, r 44 / > P V \ 1 r a, a r� 2 y a- r � � F i; r � � h i c v https://mail.google.com/mail/u/0/#inboxNWhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDZCSZdJRmzgTQLdDMXBgwxnsgnV?projector=... 1/1 10/23/2019 Wp_20191018_010(7),Ipm ^ ' hupv:Hnai|.gou0|o.00m/maiVu/O/#iobox8whowmvRLGgcozLxqowkpBMaVpqzw,urSvud nv,pn8octo=— 1� 10/8/2019 Town of North Andover Mail-Fwd:Rea St.No.Andover, Regular inspection report(DEP File No:242-1739) NODTH RIOVER Massachusetts Bonnie Wolstromer<bwolstromer@northandoverma.gov> Fwd: Rea St. No. Andover, Regular inspection report (DEP File o0 242-1 ) 1 message Monica Gregoire <mgregoire@northandoverma.gov> Tue, Oct 8, 2019 at 12:02 PM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Good Afternoon Bonnie, Please log on the current project tracking sheet and file in both and paper and digital file folders. Thank you, Monica ----------Forwarded message--------- From: Scott kelloway <skellowaype@yahoo.com> Date:Wed, Oct 2, 2019 at 9:01 AM Subject: Re: Rea St. No. Andover, Regular inspection report(DEP File No: 242-1739) To: Monica Gregoire <mgregoire@northandoverma.gov>, <bcurell@northandoverma.gov>, Amy Maxner <amaxner@northandoverma.gov> Cc: Robert Innis <robertinnis@yahoo.com>, David Innis <daveinnis@gmail.com>, Jean Enright <jenright@northandoverma.gov> Project Team, Please see the attached copy of the regular inspection report for the "Improvement of Idea St." project in North Andover (DEP FILE No. 242-1739). There was no sediment migration beyond the limit of work and there were no notable impacts to wetland resource as a result of the recent rainfall. All work is currently being conducted in compliance with the order of conditions and the project SWPPP If you have any questions or concerns, please feel free to reply or call me directly. Scott D. Kelloway, P.E. (978)479-5648 https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f°/o3A1635598207266498569%7Cmsg-f`/`3Al6468416851185... 1/3 10/8/2019 Town of North Andover Mail-Fwd:Rea St. No.Andover,Regular inspection report(DEP File No:242-1739) Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone (978)688-9535 Fax (978) 688-9542 Email mgregoire@northandoverma.gov Web www.northandoverma.gov Hours of Operation: Monday, Wednesday,Thursday 8 AM-4:30 PM Tuesday 8 AM -6 PM, Friday 8 AM -12 PM 6 attachments p I� f3 psi• WP 20190927_0014pg 635K WP 20190927_0024pg 696K WP_20190927_004.jpg 1064K �w WP_20190927_005.jpg https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f°/o3A1635598207266498569%7Cmsg-f`/`3A16468416851185... 213 10/8/2019 Town of North Andover Mail-Fwd:Rea St. No.Andover, Regular inspection report(DEP File No:242-1739) 561 K WP 20190927_009.jpg 1057K �.e 9-27-19 SWPPP Insp.form REA St.pdf 350K https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3Al6468416851185... 3/3 Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long:71.09134W Date of Inspection 9/27/19 Start/End Time 4:00 PM-4:30 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19 Completed rough cut Roadway to Subgrade & Install Sewer and Drainage. Completed installation of underground stormwater runoff chambers. Continued Install water main complete. Gravel Road, bring catch basins to grade 8/12—Pave binder coat 8/19—Landscape disturbed road way Type of Inspection: X Regular ❑Pre-storm event ❑During storm event ❑ Post-storm event Weather Information Has there been a storm event since the last inspection? ❑ Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number; 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .& SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? X Clear ❑ Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 71 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 9 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? l Hay bales and siltation X Yes ❑No ❑Yes X No controls 2 Stabilized Construction X Yes ❑No ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No Contractor has applied water for dust control as necessary. 5 Minimize Disturbed X Yes ❑No ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes ❑No ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ❑Yes X No N/A 11 Designated washout area X Yes ❑No ❑Yes X No 12 Recycling/Waste Area X Yes ❑No ❑Yes X No 13 Construction Vehicle X Yes ❑No ❑Yes X No Parking EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 Temporary Site ❑Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ®No ®Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑Yes X No ®Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ®Yes XNo ❑Yes ®No ❑Yes ❑No ❑Yes ®No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ®No ❑Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ®Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ®No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ®Yes X No equipment fueling, cleaning,and maintenance areas flee of spills,leaks,or any other deleterious material? Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ®No ®Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 1.9, September 97, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes LINO Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under alty of law that this document and all attachments were prepared under my direction or supervision in rdance with a system designed to assure that qualified personnel properly gathered and evaluated the informatio mitted.Based on my inquiry o he person or persons who manage the system,or those persons directly respo or gathering the informatio the in submitted is,to the best of my knowledge and belief,true,ac and complete.I am a e at then are significant penalties for submitting false information, including the s ility of fine and impriso nt for wing violations." Print name a d 't KeUo Profes o al En iueer Signature: AA0Date: 9/27/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 l/ Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long:71.09134W Date of Inspection 8/2/19 Start/End Time 4:00 PM-4:30 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19 +/-, Continue rough cut Roadway to Subgrade&Install Sewer and Drainage. Continued installation of underground stormwater runoff chambers. Continued Install water main. Gravel Road, bring catch basins to grade 8/12—Pave binder coat 8/19—Landscape disturbed road way Type of Inspection: X Regular ❑Pre-storm event ❑During storm event X Post-storm event Weather Information Has there been a storm event since the last inspection? X Yes ❑ No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): July 31 @ 3;30 PM 1-1/2 hr+/- 1.25" RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER MA Weather at time of this inspection? X Clear ❑ Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 84 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe:. EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMW BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Hay bales and siltation X Yes LINO ❑Yes X No controls 2 Stabilized Construction X Yes LINO ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No 5 Minimize Disturbed X Yes LINO ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes LINO ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes LINO ❑Yes X No See above. 10 Vehicle Washing X Yes LINO ❑Yes X No N/A 11 Designated washout area X Yes LINO ❑Yes X No 12 Recycling/Waste Area X Yes LINO ❑Yes X No 13 Construction Vehicle X Yes LINO ❑Yes X No Parking 14 Temporary Site ❑Yes X No Yes X No Stabilization EPA SWPPP Inspection Report, Version 9.9, September 97, 2007 2 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ❑Yes XNo ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ❑No ❑Yes XNo disturbed areas not actively being worked DroiD)erlv stabilized? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 2 Are natural resource X Yes ®No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes LINO ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ®Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No ❑Yes X No properly protected? 6 Is the construction exit X Yes LINO ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes LINO ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes LINO ®Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes LINO ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes LINO ®Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes LINO ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes LINO Non-Compliance EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted aced on my inquiry o he person or persons who manage the system,or those persons directly responsible for g ring the informat he information submitted is,to the best of my knowledge and belief,true,accurate,an c plete.I am awar at there are significant penalties for submitting false information, including the possibili f ne and imprison t for knowing violations." Print name and title: Ott ell a Pr sional Engineer Signature: Date: 8/2/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 6/19/r019 Town of North Andover Mail-Fwd:Rea St.No.Andover, Regular inspection report(DEP File No:242-1739) NORTH �; vER Massachusetts _ Bonnie Wolstromer<bwolstromer@no►fihandoverma.gov> Rea St. No. Andover, Regular inspection report (DEP File o: 242-1 ) 1 message Monica Gregoire <mgregoire@northandoverma.gov> Mon, Jun 17, 2019 at 11:25 AM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Hi Bonnie, Please log on the current project tracking sheet and file in both the paper and electronic monitoring report folders. Thank you, Monica ----------Forwarded message--------- From: Scott kelloway<skellowaype@yahoo.com> Date: Sun, Jun 16, 2019 at 7:46 PM Subject: Rea St. No. Andover, Regular inspection report(DEP File No: 242-1739) To: Jennifer Hughes <jhughes@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, bcurell@northandoverma.gov <bcurell@northandoverma.gov> Cc: Robert Innis<robertinnis@yahoo.com>, David Innis <daveinnis@gmail.com>, Jean Enright <jen rig ht@northandoverma.gov> Project Team, Please see the attached copy of the regular inspection report for the Improvement of Rea St. project in North Andover EP FILE No. 242- 1739). There was no sediment migration beyond the limit of work and there were no notable impacts to wetland resource as a result of the recent rainfall. All work is currently being conducted in compliance with the order of conditions and the project SWPPP. If you have any questions or concerns, please feel free to reply or call me directly. Scott D. Kelloway, P.E. (978)479-5648 https://mail.google.com/mail/u/O?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1636601864351... 1/3 6/19/2019 Town of North Andover Mail-Fwd:Rea St. No.Andover,Regular inspection report(DEP File No:242-1739) Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone (978)688-9535 Fax (978)688-9542 Email mgregoire@northandoverma.gov Web www.northandoverma.gov Hours of Operation: Monday, Wednesday, Thursday 8 AM -4:30 PM _ .._ . Tuesday 8 AM-6 PM, Friday 8 AM -12 PM 6 attachments WP 20190614_003.jpg 823K x � =u •� k,a r' WP 20190614_004.jpg 803K F� 94 d WP_20190614_005.jpg r 790K https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1636601864351... 2/3 6/19/2019 Town of North Andover Mail-Fwd:Rea St.No.Andover,Regular inspection report(DEP File No:242-1739) rl WP_20190614_007.jpg 807K �s � WP 20190614_008.jpg 772K 6-14-19 SWPPP Insp.form REA St.pdf 309K https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1636601864351... 3/3 6/19,12019 WP_20190614_003.jpg e �a j lr. a� v a roA r i 1 ` �w *S v. r https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvZddvSXZfmFRtQDkxKnCKWQgV?projector-... 1/1 6/19/2019 WP_20190614_004.jpg gffi fY Aw- ' . WJ 1 8"h t a t WDp }y „� R 6 rt F e 04, ^ https://mail.google.com/mail/u/0/#inboxNVhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvZddvSXZfmFRtQDkxKnCKWQgV?projector—... 1/1 6/19/2019 WP_20190614_005.jpg SAM � a , r , w ' h vv 1 R x � W E j m P y + i" https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvZddvSXZfmFRtQDkxKnCKWQgV?projector-... 1/1 6/19?2019 WP_20190614_007.jpg i yi l R : y Y y J F https://mail.google.com/mail/u/0/#inboxM/hctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvZddvSXZfmFRtQDkxKnCKWQgV?projector=... 1/1 6/1 9120 1 9 WP_20190614_008.jpg s a, z f M f t I G- ti x " a b t https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvZddvSXZfmFRtQDkxKnCKWQgV?projector-... 1/1 Stornlwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat: 42.66666N-Long:71.09134W Date of Inspection 6/14/19 Start/End Time 2:00 PM-2:45 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall.Completed 5/10/19 Continue rough cut Roadway to Subgrade&Install Sewer and Drainage. Continued installation of underground stormwater runoff chambers. Begin Install Water Main.6/9+/- 7/29—8/5 Gravel Road, bring catch basins to grade 8/12—Pave binder coat 8/19—Landscape disturbed road way Type of Inspection: X Regular ❑Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? X Yes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 6/5 @ 6 PM +/- 48 Hrs+/- 1"+ RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? X Clear ❑ Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑Other: Temperature: 72 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report,, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required. 1 Hay bales and siltation X Yes ❑No ❑Yes X No controls 2 Stabilized Construction X Yes ❑No ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No 5 Minimize Disturbed X Yes ❑No ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes ❑No ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ❑Yes X No N/A 11 Designated washout area X Yes ❑No ❑Yes X No 12 Recycling/Waste Area X Yes ❑No ❑Yes X No 13 Construction Vehicle X Yes ❑No ❑Yes X No Parking EPA SWPPP Inspection Report, Version 1.1, September 97, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 Temporary Site ❑Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ❑Yes XNo ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ❑No ❑Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ❑No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? . Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stoimwater X Yes ❑No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Print name and title: Scott D.Keflowav, Pro ssional EnLyineer Signature: Date: 6/14/19 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 6/6/2019 Town of North Andover Mail-Fwd: Rea St. No.Andover, Regular inspection report(DEP File No:242-1739) No T-H AtV DIOVER Massachusetts Bonnie Wolstromer<bWolstromer@northandoverma.gov> Rea St. No. Andover, Regular inspection r (DEP File No: -1 ) 1 message Monica Gregoire <mgregoire@northandoverma.gov> Thu, Jun 6, 2019 at 9:32 AM To: Bonnie Wolstromer<bwolstromer@northandoverma.gov> Hi Bonnie, Please log on the current project tracking sheet and file in both the paper and digital monitoring report file. Thank you, Monica ---------- Forwarded message--------- From: scott kelloway <skellowaype@yahoo.com> Date: Tue, May 28, 2019 at 9:30 AM Subject: Rea St. No. Andover, Regular inspection report(DEP File No: 242-1739) To: Jennifer Hughes <jhughes@northandoverma.gov>, Monica Gregoire <mgregoire@northandoverma.gov>, bcurell@northandoverma.gov <bcurell@northandoverma.gov> Cc: Robert Innis<robertinnis@yahoo.com>, David Innis <daveinnis@gmail.com>, Jean Enright<jenright@northandoverma.gov> Project Team, Please see the attached copy of the regular inspection report for the Improvement of Rea St. project in North Andover PEP FILE No. 242-1739). There was no sediment migration beyond the limit of work and there were no notable impacts to wetland resource as a result of the recent tainfall. All work is currently being conducted in compliance with the order of conditions and the project SWPPP. If you have any questions or concerns, please feel free to reply or call me directly. https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1635598207266498569&simpl=msg-f%3A1635598207266498569&... 114 6/6/2019 Town of North Andover Mail-Fwd: Rea St.No.Andover,Regular inspection report(DEP File No:242-1739) Scott D. Kelloway, P.E. (978)479-5648 Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone (978) 688-9535 Fax (978) 688-9542 Email mgregoire@northandoverma.gov Web www.northandoverma.gov Hours of Operation: Monday,Wednesday, Thursday 8 AM -4:30 PM Tuesday 8 AM -6 PM, Friday 8 AM -12 PM 8 attachments WP_20190524_033 (1).jpg 692K https:Hmail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1635598207266498569&simpl=msg-f%3A1635598207266498569&... 2/4 6/6/2019 Town of North Andover Mail-Fwd:Rea St.No.Andover,Regular inspection report(DEP File No:242-1739) r � i V n u4. a� r r G FrON WP 20190524_033 (2).jpg 8 7 9 K WP_20190524_033 (3).jpg 789K { i WP 20190524_033 (4).jpg 859K WP 20190524_033 (5).jpg 948K https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1635598207266498569%7Cmsg-f%3A1635598207266498569&simpl=msg-f%3A1635598207266498569&... 3/4 BBZze2 9 . Town allorth AndoverMan-Fw%Rea St. Andover, mA+inspection report mEP File No:242-1739) ` . ƒ WP 20190524 3 ($]pg 2 ^ 8 6 ice. . . . \ WP2 019052 4 033 (7 Qpg ƒ 7 2K � : 5-419SWPPP Insp. form RE&S$m 3 9K qm±_u:mRmG_iG/O?i G+&±,A wP&! sear.11P& emmdlhrea 6lsadDSmmGmGSG%7Cme!%3AIQSmmwmgyG «P»m2!%aA1gSmmGeg66y. 44z St®rmwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W Date of Inspection 5/24/19 Start/End Time 4:OOPM-4:45 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma. 01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls Complete construction of LOW Monument Wall. Completed 5/10/19 +/-. Continue rough cut Roadway to Subgrade&Install Sewer and Drainage. Commence installation of underground stormwater runoff chambers. 5/27—6/10 Install Water Main 7/29—8/5 Gravel Road, bring catch basins to grade 8/12—Pave binder coat 8/19-Landscape disturbed road way Type of Inspection: X Regular ❑ Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? ❑Yes X No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? X Clear ❑ Cloudy ❑ Rain ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑Other: Temperature: 69 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Hay bales and siltation X Yes ®No D Yes X No controls 2 Stabilized Construction X Yes ®No ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No 5 Minimize Disturbed X Yes ❑No ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ®Yes X No ®Yes X No 8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100' from wetland resource areas. 9 Refueling/maintenance X Yes ❑No ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ®Yes X No N/A 11 Designated washout area X Yes ®No ❑Yes X No 12 Recycling/Waste Area X Yes ®No ®Yes X No 13 Construction Vehicle X Yes ®No ®Yes X No Parking EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 Temporary Site ❑Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 18 Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ❑Yes XNo ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes []No ❑Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ❑No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ❑No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 9.9, September 97, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes ❑No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accur e,and complete.I am ware that there are significant penalties for submitting false information, including the po ility of fine and irnp onment for knowing violations." Print name an co D. v, Professional En 'veer WA Signature: Date: -46114 . EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 6/6/2019 ¢ WP_20190524_033(1).jpg A As It qp a s y � i https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=1&messagePartld=0.2 112 6/6/2019 WP_20190524_033(1).jpg https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=1&messagePartld=0.2 2/2 6/6/2019 WP_20190524_033(2).jpg r 4A 1 g� ✓ I� s 9 T P Y� "VI wF�a fii -414 S°1s 7 tt i� ik •j �� � ��. e '�$.: �. ISM ' Fes°" w g a ®'7" NWZY F - .,,sP ✓'i�,t �C Nit q r. I � � tY m https://mail.google.com/mail/u/0/#inboxrvVhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartld=02 1/2 6/6/2019 WP_20190524_033(2).jpg https://mail.google.com/mail/u/0/#inbox/WhGtKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=1&messagePartld=0.2 2/2 6/6/2019 WP_20190524_033(3).jpg a. I <s x� _ c.e L t E t e. P ai td i T https://mail.google.com/mail/u/O/#inboxM/hctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=1&messagePartld=0.2 1/2 6/6/2019 WP_20190524_033(3).jpg https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartld=0.2 2/2 6/6/2019 WP_20190524_033(4).jpg 'r mit mom r d i} , 1 Y 5 d sae u a a x L e / R s' °D "� >y ,�o g�,i Aar '", ®" : 1• , ynm �...'�e��y,$, �C '4� https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartld=0.2 1/2 6/6/2019 WP_20190524_033(4).jpg https://mail.google.comlmail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartid=0.2 2/2 6/6/2019 WP_20190524_033(5).jpg _rt�ppGv 4. yrw �� i9 �, J � - t ✓ r p �em e a/ Y e NN , ; -° ILL ry 00 b�q e https:Hmail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartid=0.2 1/2 6/6/2019 WP_20190524_033(5).jpg https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartld=0.2 2/2 6/6/2019 WP_20190524_033(6).jpg ilk 1t 1 tto�, t '�iJ �erq N t r & ) 7 h Z t V. l MKIP", MOM m; Elm I mQ �i aft E •,b y t k " T w I sv 3 s https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=1&messagePartld=02 1/2 6/6/2019 WP_20190524_033(6).jpg https://mail.google.com/mail/u/0/#inboxM/hctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrvvtSQgZDlwl?projector=1&messagePartld=0.2 2/2 6/6/2019 WP_20190524_033(7).jpg �w r II , a v! + k V ° r 'Ilk A y p �, 4• >i gg P , �e .4� R N r+ ! OPI l https:Hmail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=l&messagePartld=0.2 112 6/6/2019 WP_20190524_033(7).jpg https://mail.google.com/mail/u/0/#inbox/WhctKJVRLGgCBZLKgDwkpBMSVpgjZNcJrSVbdBWfQMKcDXvXqMWFqFFxGBGwrwtSQgZDlwl?projector=1&messagePartld=0.2 2/2 5/14/2019 Town of North Andover Mail-Fwd:Rea St.No.Andover,Significant storm report(DEP File No:242-1739) NORTH AN HOVER Massachusetts Bonnie Wolstromer<bwolstromer@northandoverma.gov> Fwd: Rea St. No. Andover, Significant storm report (DEP File No: 242-1739) 1 message Monica Gregoire<mgregoire@northandoverma.gov> Tue, May 14,2019 at 9:50 AM To:Bonnie Wolstromer<bwolstromer@northandoverma.gov> Hi Bonnie, Please log on the current project tracking sheet and file in both the paper and digital folders. Thank you, Monica ----------Forwarded message--------- From:Scott kelloway<skellowaype@yahoo.com> Date:Mon,May 13,2019 at 4:39 PM Subject:Rea St. No.Andover,Significant storm report(DEP File No:242-1739) To:Jennifer Hughes<jhughes@northandoverma.gov>, Monica Gregoire<mgregoire@northandoverma.gov>,bcurell@northandoverma.gov <bcurell@northandoverma.gov> Cc:Robert Innis<robertinnis@yahoo.com>, David Innis<daveinnis@gmail.com>,Jean Enright<jen rig ht@northandoverma.gov> Project Team, Please see the attached copy of the regular inspection report for the Improvement of Rea St. project in North Andover (DEP FILE No. 242-1739). There was no sediment migration beyond the limit of work and there were no notable impacts to wetland resource as a result of the recent tainfall. All work is currently being conducted in compliance with the order of conditions and the project SWPPP. If you have any questions or concerns, please feel free to reply or call me directly. Scott D. Kelloway, P.E. (978)479-5648 Monica Gregoire Staff Planner Planning Department Town of North Andover 120 Main Street North Andover, MA 01845 Phone (978)688-9535 Fax (978)688-9542 Email mgregoire@northandoverma.gov https://mail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3Al632905627678163615%7Cmsg-f%3A16335155799850... 1/3 5/14/2019 Town of North Andover Mail-Fwd:Rea St. No.Andover,Significant storm report(DEP File No:242-1739) Web www.northandoverma.gov Hours of Operation: Monday,Wednesday,Thursday 8 AM-4,30 PM_ Tuesday 8 AM-6 PM,Friday 8 AM-12 PM 8 attachments4���m� '4.. WP 20190510_005.jpg 739K WP_20190510_006.jpg 4 817K K WP_20190510_007.jpg 913K 8 o WP 20190510 010.jpg 847K a r WP 20190510 013.jpg v 922K WP 20190510_014.jpg 5F � Ur 655K https:Hmail.google.com/mail/u/0?ik=a2debacbl a&view=pt&search=all&permthid=thread-f%3A1632905627678163615%7Cmsg-f%3A16335155799850... 2/3 Stormwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long: 71.09134W Date of Inspection 5/3/19 Start/End Time 10;30AM-11:15 AM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.0 18 10 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing m Construction site monitoring and re ortin .Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls - Continued clearing and grubbing,removing and stockpiling stumps. Construct LOW Monument Wall - Begin rough cut Roadway to Subgrade 5/6—5/27 Install Sewer and Drainage 5/27—6/10 Install Water Main 7/29—8/5 Gravel Road, bring catch basins to grade 8/12—Pave binder coat 8/19—Landscape disturbed road way Type of Inspection: X Regular X Pre-storm event ❑During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? XYes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 5110 8 AM (ongoing)off and on for next few days 1"+forcasted RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER MA Weather at time of this inspection? ❑ Clear ❑ Cloudy X Lt.Rain ❑Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 52 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspectionT❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Hay bales and siltation X Yes ❑No ❑Yes X No controls 2 Stabilized Construction X Yes ❑No ❑Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No 5 Minimize Disturbed X Yes ❑No ❑Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes ❑No ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100'from wetland resource areas. 9 Refueling/maintenance X Yes ❑No ❑Yes X No See above. 10 Vehicle Washing X Yes ❑No ❑Yes X No N/A 11 Designated washout area X Yes ❑No ❑Yes X No 12 Recycling/Waste Area X Yes ❑No ❑Yes X No 13 Construction Vehicle X Yes ❑No ❑Yes X No Parking 14 Temporary Site ❑Yes X No Yes X No Stabilization EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 15 Pollution Prevention X Yes ❑No ❑Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ❑Yes X No ❑Yes X No Facilities 1S Sediment Traps ❑Yes X No ❑Yes X No 19 Storm Drain Inlets X Yes ❑No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ❑Yes XNo ❑Yes ❑No ❑Yes ❑No ❑Yes []No ❑Yes ❑No Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ❑No ❑Yes XNo disturbed areas not actively being worked properly stabilized? EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ®Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ®No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ®No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ®Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ®No ®Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ®No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ®No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ®No ®Yes X No discharges(e.g.,wash water,dewatering) properly controlled? 12 (Other) ❑Yes ❑No Non-Compliance EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 4 Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am are that there are significant penalties for submitting false information, including the p 'bility of fine and im onment for knowing violations." Print name an e: Scott D. ellol, Professional Engineer Signature: Date: pe Y EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 5/14/2019 WP_20190510_005.jpg 3 yy I 2 PC " , 9�`• *.&Z 'ng�. .d''fii P. '�' a`"r 47 -� b t Oww"Tv jal a -. r rt https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKCIPdDLjKNtLmhKbqVdbNlrVb?projector-1&mess... 1/1 5/14/2019 y WP_20190510_006.jpg NI" l't�li , 7p � III y { ti n . r Al iA—b a t r � Vk V o-i T: r https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKCIPdDLjKNtLmhKbqVdbNlrVb?projector=1&mess... 1/1 5/14/2019 ^ WP_20190510_007.jpg NO u i �ro �- 3� - 7 r , :4 ol lip ' K :K-t� G° � � F 'f yn i 3.� https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKC[PdDLjKNtLmhKbgVdbNlrVb?projector=1&mess... 1/1 5/14/2019 WP_20190510_010.jpg ANA i ° n A r a s, a a � , „ a 74, i. https:/Imail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKCIPdDLjKNtLmhKbqVdbNlrVb?projector=1&mess... 1/1 5/14/2019 WP 20190510_013.jpg 4 \ ` ` xs ws fJ ct �F's.��' ,,, r �' .tea .�.� ���. � q° � r �s v".�¢�,,y s•�m - �, E f3 ��sv d ✓ 96�v h, _ � 1 tir. �o rr P �r L .." ,��+"' ..,'' .`&~ate R�F�:�. —��3'_.�_:. "max' _ :.. a #' .'.. N, t�',_,• ,.:, https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKCIPdDLjKNtLmhKbqVdbNIrVb?projector=1&mess... 1/1 5/14/2019, WP_20190510_014.jpg gi i 3 V a P "; �may'",,.s," ,. � "" �'✓- �,� � w � �.9� � �,�,�rn. r �•'W MWPt £ a low Nvor v ay 4 Ixl IN s https:/Imail.google.comlmail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKCIPdDLjKNtLmhKbqVdbNlrVb?projector=l&mess... 1/1 5,1,4;2019 W P_20190510_016.j pg M� .r, n , ay. b. r r � k n r� a h` https://mail.google.comlmail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKCIPdDLjKNtLmhKbqVdbNlrVb?projector=1&mess... 1l1 Stornlwater Construction Site Inspection Report General Information Project Name Rea St. North Andover NPDES Tracking No. MAR1001XS Location Lat:42.66666N-Long:71.09134W Date of Inspection 4/26/19 Start/End Time 3:30-4:15 PM Inspector's Name(s) Scott D.Kelloway,P.E. Inspector's Title(s) Professional Engineer Inspector's Contact Information 148 North St.Andover,Ma.01810 Ph(978)479-5648, skellowaype@yahoo.com Inspector's Qualifications Licensed Professional Engineer practicing for over 20 years specializing in Construction site monitoring and reporting.Licensed Soil Evaluator. Describe present phase of construction 4/1-4/15 Install Environmental Controls ' .Trees only,Stumps remain 4/2?—Construct LOW Monument Wall 4/29—Cut Roadway to Subgrade 5/6—5/27 Install Sewer and Drainage 5/27—6/10 Install Water Main 7/29-8/5 Gravel Road, bring catch basins to grade 8/12—Pave binder coat 8/19—Landscape disturbed road way Type of Inspection: X Regular ❑Pre-storm event X During storm event ❑Post-storm event Weather Information Has there been a storm event since the last inspection? XYes ❑No If yes,provide: Storm Start Date&Time: Storm Duration(hrs): Approximate Amount of Precipitation(in): 4/26 3 AM 12 Hrs+/- more forecasted 1"+ RAIN GAUGE TO BE USED FOR DETERMINING WHETHER A RAIN EVENT OF 0.25 INCHES OR GREATER HAS OCCURRED: Site Number: 01102000 &01100627 Site Name: IPSWICH RIVER NEAR IPSWICH .&SHAWSHEEN RIVER AT BALMORAL STREET AT ANDOVER,MA Weather at time of this inspection? ❑ Clear X Cloudy X Lt.Rain(drizzle) ❑ Sleet ❑Fog ❑ Snowing ❑High Winds ❑ Other: Temperature: 44 deg Have any discharges occurred since the last inspection? ❑Yes X No If yes,describe: Are there any discharges at the time of inspection? ❑Yes X No If yes,describe: EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 1 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 1 Hay bales and siltation X Yes ®No ❑Yes X No controls 2 Stabilized Construction X Yes ❑No ®Yes X No Entrance 3 Soil Stockpiles ❑Yes X No ❑Yes X No 4 Dust Control ❑Yes X No ❑Yes X No 5 Minimize Disturbed X Yes ®No ®Yes X No Area and Protect Natural Features and Soil 6 Temporary ❑Yes X No ❑Yes X No Sedimentation Basin For Runoff 7 De-Watering ❑Yes X No ❑Yes X No 8 Staging/Material X Yes ®No ❑Yes X No All heavy equipment is stored,fueled and maintained, Storage Area well beyond 100'from wetland resource areas. 9 Refueling/maintenance X Yes ®No ❑Yes X No See above. 10 Vehicle Washing X Yes ®No ❑Yes X No N/A 11 Designated washout area X Yes ®No ❑Yes X No 12 Recycling/Waste Area X Yes ®No ❑Yes X No 13 Construction Vehicle X Yes ®No ®Yes X No Parking EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 2 BMP BMP BMP Corrective Action Needed and Notes Installed? Maintenance Required? 14 Temporary Site ®Yes X No Yes X No Stabilization 15 Pollution Prevention X Yes ®No ❑Yes X No Practice 16 Permanent Site ❑Yes X No ❑Yes X No Stabilization 17 Dumpsters and Sanitary ®Yes X No ®Yes X No Facilities 18 Sediment Traps ❑Yes X No ®Yes X No 19 Storm Drain Inlets X Yes ®No ❑Yes X No 20 Storm Drain Outlets X Yes ❑No ®Yes XNo ❑Yes ®No ❑Yes ®No ❑Yes ®No ❑Yes ❑No EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 3 Overall Site Issues BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 1 Are all slopes and X Yes ❑No ❑Yes XNo disturbed areas not actively being worked properly stabilized? 2 Are natural resource X Yes ❑No ❑Yes X No areas(e.g.,streams, wetlands,trees,etc.) protected with barriers or similar BMPs? 3 Are perimeter controls X Yes ❑No ❑Yes X No and sediment barriers adequately installed (keyed into substrate) and maintained? 4 Are discharge points and X Yes ❑No ❑Yes X No receiving waters free of any sediment deposits? 5 Are storm drain inlets X Yes ❑No ❑Yes X No properly protected? 6 Is the construction exit X Yes ❑No ❑Yes X No preventing sediment from being tracked into the street? 7 Is trash/litter from work X Yes ❑No ❑Yes X No areas collected and placed in covered dumpsters? 8 Are washout facilities X Yes ❑No ❑Yes X No (e.g.,paint,stucco, concrete)available, clearly marked,and maintained? 9 Are vehicle and X Yes ❑No ❑Yes X No equipment fueling, cleaning,and maintenance areas free of spills,leaks,or any other deleterious material? Are materials that are X Yes ❑No ❑Yes X No 10 potential stormwater contaminants stored inside or under cover. 11 Are non-stormwater X Yes ❑No ❑Yes X No discharges(e.g.,wash water,dewatering) properly controlled? EPA SWPPP Inspection Report, Version 9.1, September 97, 2007 4 BMP/activity Implemented? Maintenance Corrective Action Needed and Notes Required? 12 (Other) ❑Yes ®No Non-Compliance Describe any incidents of non-compliance not described above: CERTIFICATION STATEMENT "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,aLte,ann�dplete.I am aware that there are significant penalties for submitting false information, including the ne andi211'W1r?y, ' oment for knowing violations." Print name acott Professional Engineer Signature: Date: _0 EPA SWPPP Inspection Report, Version 1.1, September 17, 2007 5 5/7/2019 WP_20190427_0101pg Of �. lz u rr e_ 5 � e � o � v �< �z� .t ray+ �"�; -�- �;�, �'e• - »� �',mac >` � � '•; � _ .��`�- nr "� �4 @'• � � �`.�"� .ems .` F.�' ''` e -•� C F g sa err £ � ✓ ^: a` r a https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector=l&mess... 1/1 S/7/2019 WP_20190427_002.jpg ®R,., c c x <x v ^° 1 _ s https:Hmail.google,com/mail/u/O/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector=1&mess... 1/1 5/7/2019 WP_20190427_003.jpg �a =-- , s 0 _ d ME U https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector=1&mess... 1/1 5/7/2019 WP_20190427_004.jpg 16 Al d �� � C.F �✓� y E� �� 2 .mE 11. n Y' a i Y N^ ,q �e c.TMg ,p c5 WE Xn 6• " i https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector=1&mess... 1/1 5/7/2019 r WP_20190427_005.jpg IN r r r fl r https:Hmail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector=l&mess... 1/1 '5/7/2019 WP_20190427_006.jpg r rr r t - . r s .a r , r, R r.t 1. https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector=l&mess... 1/1 5/7/2019 WP_20190427_009.jpg MOMMOMMEMM I �' , E •7' �'/ ��Y � it � r'ir i z, N N w e { r rg 1. m o=" ' TM s I � ' w a p`N w , I ti rme - u- ,-: https://mail.google.com/mail/u/0/#inbox/WhctKJVRHCgzsKfMmzXdZMxTggjndptdTjkxnCkKqMhnfJKBxcZscWppRbcMjbZkKstrScQ?projector-1&mess... 1/1