HomeMy WebLinkAbout2001-06-21 O & M Plan Revised 5/5/99 6 I DRAINAGE FACILITIES OPERATIONAL AND MAINTENANCE PLAN MAY 5, 1999 I 740 TURNPIKE STREET ROUTE 114 NORTH ANDOVER, MASSACHUSETTS OWNER: ATLANTIC REALTY TRUST MR. THOMAS LAUDANI, TRUSTEE 733 TURNPIKE STREET, SUITE 158 NORTH ANDOVER, MA 01845 PARTY RESPONSIBLE FOR 0 &M: ATLANTIC REALTY TRUST MR THOMAS LAUDANI, TRUSTEE 733 TURNPIKE STREET, SUITE 158 NORTH ANDOVER, MA 01845 (978) 470-8257 A. SHORT TERM MAINTENANCE PROGRAM DURING CONSTRUCTION 1. A site inspection shall be performed by a P.E. during the construction of the grading and drainage facilities and those improvements shown on the plan which will have an impact on the wetlands at least once every week during the applicable construction. Inspections shall not be required during periods of inactivity to these facilities. A report shall be generated and forwarded to the North Andover Conservation Commission after each inspection. 2. Care shall be taken at all times to control erosion and sediment movement by the use of compaction of disturbed areas and the use of hay bale/silt fences as shown on the plan, and per the earth stockpile plan. Other than erosion, no pollutant discharges are expected during construction, 3. The contractor shall ensure that all runoff is collected in the appropriate structures as they are constructed and that uncontrolled runoff is kept to a minimum. The contractor shall protect the safety of the personnel on site by installing grates or covers on each drainage structure when it is built. 4. Upon substantial completion of the drainage facilities a final inspection shall be performed by the P.E. and a report issued to the North Andover Conservation Commission. MERRIMACK ENGINEERING SERVICES,INC. 66 PARK STREET ANDOVER,MASSACHUSEITS 01810 ............. 5. Upon scheduling of and then successful establishment of the wetland replacement and land restoration areas an inspection shall be performed with an agent of the North Andover Conservation Commission and a report indicating that the construction and establishment of these areas are insubstantial conformance to the plans and Order of Conditions shall be presented to the North Andover,Conservation Commission. 6. Partial Certificates of Compliance may be granted by the North Andover Conservation Commission during construction of the project upon a written request for each identified unit or phase. 7. A final Certificate of Compliance may be granted by the North Andover Conservation Commission which shall be considered the commencement of the maintenance program. f I f �i -2r {{ppl I' MERRIMACK ENGINEERING SERVICES,INC. 66 PARK STREET ANDOVER,MASSACHUSETTS 01810 LONG TERM MAINTENANCE PROGRAM 1. On or about every May 1 and November 1 of each year a site inspection shall be performed by a registered professional engineer (P.E.) of the Commonwealth of Massachusetts to report on the status of the drainage features and impact to wetland areas, if any. The inspector will schedule the inspection with the responsible parties 48 hours prior to the inspection so arrangements can be made to access all manholes, including if necessary, roping off of parking spaces to assure manhole access. This report shall include the name, address and telephone number of the owner of the drainage facilities, the names, address and telephone numbers of parties responsible for the operation and maintenance of the drainage facilities, and an outline of remaining funds in the line item of the budget for drainage maintenance. The report shall also identify the current status of the drainage facility. The inspection shall include a visual inspection of each drainage structure including the catch basins, manholes, subsurface detention facilities, headwalls and end sections, buffer planting and concrete outlet structures, BMP's and any other structure or condition relating to the long term operation of the drainage facilities. The report shall outline any observed pollution, if other than normal sand and oil runoff from parking lot use. 2. The parking lot shall be power swept on the entire site at least monthly, and the sweepings disposed of off-site by the sweeping contractor. 3. Three times per year, April 1, July 1, and November 1, the fossil Filter supplier and/or approved installer, shall inspect the five (5) fossil filters and replace or repair filters, screens and inserts. Replaced filters shall be disposed of properly. A report shall be provided to the inspector(P.E.), and the Conservation Agent, as to the condition of each fossil filter and which components, if any, were replaced. 4. On or about October 15 of each year a Landscape Contractor shall complete the cleaning out of any debris in the non-catchbasin drainage structures or drainage pipes and shall prepare a short written report of the work performed to be submitted to the inspector (P.E.) for inclusion in his report. He will also inspect the buffer planting area and replant any dead vegetation. He shall report the replanting to the Conservation Agent, 5. Once every year from the date of commencement, on or about September 1, the catch basins shall be thoroughly cleaned by mechanical and/or manual means to remove any debris and settlement. 6. Once every year from the date of commencement, usually in the spring, a Landscape Contractor shall regrade, reloam and reseed or stabilize any areas which have eroded or developed sediment or which have developed conditions not shown on the plans. A written report of such activities shall be presented to the inspector for inclusion in his report. MERRIMACK ENGINEERING SERVICES.INC. • 66 PARK STREET + ANDOVER,MASSACHUSETTS 01810 7. If the inspector reports that work needs to be done to maintain any facility then the work must be completed within the next 12 weeks, unless otherwise specified, the condition of which shall be reported in the inspector's next report. 8, Snow, after plowing, which is stockpiled, shall be removed from the site within 24 hours of plowing. Sand only and no de-icing compounds or chemicals shall be used for de-icing. 9. All check valves (8" backwater flush valve) associated with the subsurface drainage facilities shall be inspected and maintained three (3) times per year (April 1, July 1, and November 1). ,2- MERRIMACK ENGNEERING SERVICES,INC. 66 PARK STREET ANDOVER.MASSACHUSETTS 01810