HomeMy WebLinkAbout2024-06-04 Middle School Building Committee Minutes Middle School Building Committee Meeting Minutes June 4, 2024 Present: Laurie Burzlaff, Stephen Foster, Janice Phillips, Jen Cronan, Joe Hicks, Jen Whitney Phil Palumbo and Brady Doyle from Colliers Absent: Jorge Goncalves and Kate DeLise Meeting was called to order by Committee Chair Laurie Burzlaff at 4:02 pm No public comment Approval of Minutes from 5-21-24 Jen Cronan made a motion, seconded by Steve Foster, motion approve 6-0. Construction Update Phil Palumbo provided the update. Brick veneer is 95% complete, continuing with MEP rough and hanging finish drywall. Phil stated the estimated completion date is on track for 8/2 Jen Whitney requested 3 week look ahead going forward so we can have more relevant discussion Review of Change Orders Change Order 22 Pla which was not known at time of initial drawings by design team. Change order is to support the opening in existing roof system for a total cost of $9723.75 Motion to approve change Order 22 made by Steve Foster, seconded by Jen Cronan, motion approved 6-0. Change Order 23 This was for additional outlets for prep room ice maker, refrigerator and dishwasher, outlet back to own dedicated circuit on board. The committee asked if can we do with our own contractor. Committee determined it would not save that much money and sub may have an issue using another electrician. Total cost is $7286.08 for 4 outlets. Motion to approve made by Jen Cronan, seconded by Steve Foster, motion approved 6-0. Change Order 28 Jorge asked for changes to the STEM room to add ceiling mounted electrical power cord reels and exhaust. The rework is going through the exterior wall which is where the expense comes in. There are operable windows in the room. Committee believe this was a change from original project and concerned about cost. Motion to deny change order 28 made by Joe Hicks, seconded by Jen Cronan, motion approved 6-0. Change Order 34 Brick weeps elevation- change due to grade conflict, flashing was raised. This will grout solid the three courses brick below between backside of brick and vapor barrier at a cost of $2,691.97. Motion to approve change order 34, seconded by Steve Foster, motion approved 6-0. Budget Update On budget for FF&E and project in general. $613,900 available in contingency. Laurie asked about BDA and the requirements. Phil explained the code is up for interpretation. The design team interpretation of code at bidding phase was different that fire department and building inspector. Currently getting quotes as test failed. Review and Vote on Equipment Procurement A. Rifton B. Southpaw C. Ulitimaker Makerbot D. Vex IQ Robotics E. Carolina Biological Supply Company F. Flinn Scientific G. Amazon H. Home Depot Budget was $450K total budget We have spent $381k Total for this loose ends equipment is $58,120.27 Motion to approve made by Joe Hicks, seconded by Jen Cronan, motion approved 6-0. Invoices Hutter Pay App 10 $166,2751.02 Colliers- $41,893.65 RPF environmental $3975.00 BCM Controls Corp.- $28,766.95 Motion to approve all invoices made by Joe Hicks, seconded by Jen Whitney, motion approved 6-0. Adjournment Next meeting 6/18/2024 4:00 PM Motion to adjourn made by Joe Hicks, seconded by Jen Whitney, motion approved 6-0. Adjourned 4:53 pm