HomeMy WebLinkAbout1986-08-18 Statement of Environmental Impact ;)ESIGN ENGINEERS ASSOC i1 .
P. 0. BOX 516
NORTH ANDOVER, MA 01845
May 1 , 1986
STATEMENT-OF ENVIRONMENTAL IMPACT
NOTE: Paragraph identification corresponds to that of
Paragraph III B. 5 of the Rules.
A. See also "Plan of Proposed Site Grading, Environmental
Impact and Erosion/Sedimentation Control" and "Definitive
Plans-Construction", by Design Engineers Assoc . P.C. , attached.
B. Physical Environment
1 . The existing general physical conditions of the
proposed subdivision site are those of a wooded tract of land
on rolling hills and valleys. Topographic elevations range
from approximately 250 feet above sea level along the eastern
property on the lower slopes of Bruin Hill to 138 feet above
sea level along the lowlands bordering a portion of ' the
southern and western property lines. The roadway and dwelling
locations are between sea level elevations of approximately 140
feet to 180 feet. Vegetation is predominantly soft and
hardwood trees of varying types and sizes, and the associated
ground cover usually found in wooded areas in northeastern
United States . There are no unusual geologic, scenic or
historic features to the site. A trail, crosses the western
portion of the property and neither extends through the entire
parcel nor connects to trails on parcels. There are no open
space links on the property. The indigenous wildlife is
minimal , due probably to adjacent development, and consists
mostly of small mammals and birds indigenous to New England.
2 . The subdivision is designed to maintain the overall
topography of the area within the confines of local development
regulations. The majority of the perimeter of the property
will remain natural after development. Obviously, all
development has an adverse effect on natural ecology. The
proposed subdivision design strives to minimize this effect.
Additionally, previous development has lessened this effect due
to its impact on the surrounding natural environment.
3 . The project consists of the development of
approximately twenty acres of land into a fifteen lot
residential subdivision. Related construction includes that
of:
a. Approximately one thousand two hundred fifty
feet of paved way, two cul-de-sacs and road slope grading
and stabilization.
-1-
b. Storm sewer and municipal water main within
the subdivision.
c. Individual subsurface disposal systems for
each lot.
d. Underground' electrical and telephone service.
ee Fifteen single family dwellings and related
services, drives and lot development.
C. Surface, Water and Soils
1 . During and immediately after rainfall, related run-off
sheet flows from the proposed subdivision property and upland
watershed properties across the property to two general
outfallss
a. Sheet flow to the low area along the southern n,
property line.
b. Sheet flow to the low area along the western
property line.
During rainfall, temporary minor ponding due+ to
topographic depressions and ihtermi.tten stream flow due to
natural erosion may exist on the subdivision property. However,
as substantiated by the preliminary findings of the North
Andover Conservation Commission, no wetlands, as defined by
State regulations exist on the property except along the
western and southern property lines.
2 . Prior to, and during construction of the subdivision,
and until stabilization of disturbed areas and paving are
completed, staked haybales will be maintained:
a. Approximately twenty-five feet from the toe of
slope on the northern side of the roadway from station
--O+SO to station -3+SO and on the southern side of the
roadway from station 2+00 to station 6+00 .
b. At all headwalls.
c. Around all catch basins.
Unstabilized slopes will be matted with hay during
seasons not conducive to germination. The base of the detention
areas will be excavated one foot deeper' than finished grade and
will act as a sedimentation basin during construction. Road
slopes will be foamed immediately after grading. Cutting and
filling operations using on-site materials will be completed
simultaneously. Easement areas will be stablized immediately
upon completion of scheduled work within the easement.
Upon completion of the drainage system , paving of the
-2-
u roadway and laI dzation of disturbed je 6 silt and debris
will, be removed from all drainage structures , pipes' and-
spillways, and the base of the retention area will be graded
and stabilized.
Although every practical, attempt will be made to
minimize exposing the entire roadway and slopes, this would be
the most severe - unprotected' condition. In this case,
approximately two acres would be cleared at one time . Based on
previous experience, haybale erosion checks would suffice in
controlling siltation of undisturbed areas. Implementation of
the other measures in conjunction with haybales insure that
this will be the case .
3 . All disturbed areas will be either paved or stabilized
with grasses. All key erosion points, that is those
immediately adjacent to headwalls, will be rip-rapped to
eliminate erosion. Additionally:
a. Flooding and pondi.ng is not anticipated on
site. The detention areas and drainage system are
designed to minimize off-site flooding or ponding.
b. The proposed surface drainage system contains
the majority of the run-off from the site and directs it
to the hydraulically controlled environment of ' the
detention area. That run-off not directed to the
detention areas is directed to its natural watershed. The
detention areas are 'designed to contain the increase in
run-off volume, due to development for a one hundred years
frequency storm event, and to outfall at a rate equal to
or lower than that presently experienced.
c. All disturbed areas will be either paved,
rip-rapped or stabilized with grasses.
d. Roadway design and proposed dwelling locations
attempt to maximize the protection of existing vegetation.
The majority of the perimeter of the property will remain
undisturbed.
e. Within the confines of the Rules, the
subdivision' s proposed grades and existing topography are
blended to preserve natural aesthetics. Road grades are
minimal and well within the regulations. Cuts and fills
for the road and lot development approximately balance.
Grading is confined to roadway and lot development with
houses located as close to the roadway as practical , thus
minimizing changes in topography in the rear of the lots.
f. There are no proposed alterations of shore
lines, marshes or seasonal wet areas on the subdivision
site* The detention areas at the two headwalls, outfall
to their adjacent wetlands and are designed to blend with
the existing topography and require minimal, upkeep.
-3-
;s depicted on the ❑ef, Jt, 've Plans the two
off road drains will be easemented to the Town. Right of
Way easements to two abutters will also be granted.
h. As depicted on sheets Two and Three of the
"Definitive Plans-Construction" by Design Engineers Assoc.
P.C. and discussed in the preceding section of this report
concerning drainage, both existing and proposed drainage
outfalls to two watersheds. The peak run-off rates and
volumes outflowing the property both before and after
development are discussed in the drainage analysis. As
demonstrated in that analysis, run-off volumes are
increased slightly after development, however run-off
rates are not. In the detention areas accumulated run-off
will remain stored until it either flows at varying rates
to the existing wetlands, percolates into the ground-water
table or evaporates into the atmosphere.
4 . The lots at Turner Estates will be serviced by
individual subsurface disposal systems designed to meet or
exceed all state and local governing statutes . Minimal impact
on surface water , ground water , soils and vegetation is
anticipated.
D. Subsurface Conditions
1-3 . As stated above, and listed on sheet Four of the
Definitive Plans, all of the lots have been tested for
subsurface disposal system designs. In general , the soils have
been established as more than adequate in supporting such
designs. The parent soil encountered was a sandy till tending
towards granular and percolation rates averaged ten minutes per
inch.
E. Town Services
1 . Turner Estates terminates with two cul-de-sacs and has
one access to a Town road, that is Bridges Lane. Traffic
within the subdivision is self contained. The maximum traffic
increase to Bridges Lane is anticipated at thirty vehicles. Of
these , not more than fifteen, and more probably, ten cars will
exit the subdivision at any one time . Bridges Lane is a
relatively straight road, in good condition. Bridges Lane
slopes downward to Foster Street, a distance of approximately
three thousand three hundred feet at an overall slope of
approximately five percent and is intersected by Vest Way
approximately five hundred feet from Turner Estates , prior to
its termination at Foster Street. Vest Way runs approximately
parallel to Bridges Lane and also terminates at Foster Street.
2 . Each dwelling will service the parking associated with
it. Garages will service the two vehicles belonging to the
dwelling. Driveways and turn-grounds will accomodate visiting
vehicles.
3 . The two cul-de-sacs at Turner Estates will minimize the
-4-
effect on Po : ie nd fire protection,, a. �l force vehicles
to travel at residential speed limits. The limited access to,
the subdivision provides security to its inhabitants. The
subdivision is designed with municipal water and fire hydrants
spaced at less than five hundred feet throughout.
4 . The project utilizes municipal water. All services
will be installed to front property lines. Each builder will be
required to connect these services to the individual dwelling.
As all materials used will. be new, meeting Town specifications
and tested to insure proper installation, no increased demand
on the Public Works Department is expected. Water use
assessments should offset any increase in cost to the
Department.
5 . The project proposes the addition of fifteen families
to the Town population. With this will be an indeterminable
increase in the demand for Town educational services. Also
associated with the population increase will be an increase in
revenue to the Town through property taxes. The dwellings will
have a value and will yield tax revenues well in excess of the
Town' s average dwelling. As the majority of tax dollars are
spent on education, the net effect on the school system by the
subdivision will be positive.
6 . The project will increase the demand on Town water by
that of fifteen families, or ' approximately fifteen thousand
gallons per day.
F. General Impact
The Turner Estates subdivision is located in an
environmentally non-intensive area . There are no wetlands on
the site► no unique vegetative cover, and minimal wildlife. The
latter is due in part to the fact that the proposed subdivision
is in direct proximity to a previously developed subdivision;
The Bridges. Development of Turner Estates is harmonious with
the surrounding development. The subsurface disposal systems
should pose no threat to the ground water aquifer and the use
of municipal water insures that the aquifer will not be drawn
down by the development. Roadway design optimizes security,
traffic control and fire protection. Finally, the proposed
dwellings will add needed revenue to the Town through its tax
structure and service fees.
The development of Turner Estates has an additional
positive influence on the surrounding natural environment. The
tract of land of which Turner Estates is a small part►
stretches from Salem Street to Foster and Winter Streets. An
agreement between the owners of this parcel and the Essex
County' Greenbelt provides for development of this fifteen acres
subdivision and one other subdivision within the tract of land.
The agreement further stipulates that the remainder of the
tract, over one hundred acres will be deeded to the Greenbelt
and remain undeveloped conservation wilderness.