HomeMy WebLinkAboutSeptic Emails - Correspondence - 9 HAWKINS LANE 6/25/2024 9/27/22,3:55 PM Town of North Andover Mail-9 Hawkins Lane review v2
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
9 Hawkins Lane review v2
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Tue, Sep 27, 2022 at 2:14 PM
To: "Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Stephen Casey
<scasey@northan dove rma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Brian, Steve, Toni—
The revised design plan for this project was reviewed and some of the previous items noted do not appear to have been
addressed, and a few small new items have been identified. I do not think this project is ready for approval yet (but I do
think it is close).
Review letter is attached. Any questions please do let me know.
Dan
Daniel Ottenheimer, PE
President
Ccw-; ILL RIVER CONSULTING
C:reatiNe soliuions lire l:ald Developmrtit
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.miliriverconsulting.com
9 Hawkins Lane Review Letter v2.docx
https:Hmail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1745147651266091792&simpl=msg-f%3A17451476512... 112
9/29/22,9:12 AM Town of North Andover Mail-9 Hawkins Lane
NORTH MDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
9 Hawkins Lane
2 messages
William Dufresne <wrd ufresne@comcast.net> Thu, Sep 29, 2022 at 8:56 AM
To: "twolfe nde n @north and overma.gov" <twolfenden@northandoverma.gov>, Daniel Ottenheimer
<dano@millriverconsulting.com>
Toni & Dan
This is my very last order of business before I leave for my noontime flight.
Attached is a pdf ZIP of the 2nd revised plans for the above subject site.
Toni could you please upload the plan to the permit site.
The Owners and attorney are working on the easement doc's. I Cannot say how quickly it will be
done. I ask that an approval letter be issued with a condition that no construction permit will be
issued until the easement doc's are received. This will give us the approval letter we need to
proceed with the Conservation filing.
thank you both for all your hard work this past week, we got lots done!
I will be back in the office on Tuesday
Bill
® 9 Hawkins SSP.zip
1799 K
Toni Wolfenden <twolfenden@northandoverma.gov> Thu, Sep 29, 2022 at 9:08 AM
To: William Dufresne <wrd ufresne@comcast.net>
Cc: Daniel Ottenheimer<dano@millriverconsulting.com>
Received, thank you.
Enjoy your trip!
Toni
Toni K. Wolfenden
Health Department Assistant
978-688-9540
[,;rcid:image002.jpg@01 CD02A1.85A49B40
[Quoted text hidden]
F�r
image001.jpg
4K
https://mai l.google.com/mail/u/0/?i k=aOc6f4e4cf&view=pt&search=all&permth id=th read-f%3A1745308820809797906&simpl=msg-f°/a3A17453088208... 1/2
10/6/22,3:10 PM Town of North Andover Mail-9 Hawkins
NORTH AN DOVER Stephen Casey<scasey@northandoverma.gov>
Massachusetts ..
9 Hawkins
2 messages
Toni Wolfenden <tolfenden@northandoverma.gov> Tue, Oct 4, 2022 at 12:01 PM
To: William Dufresne <wrdufresne@comcast.net>, Stephen Casey<scasey@northan dove rma.gov>, Brian LaGrasse
<blagrasse@northandoverma.gov>
Hi Bill,
I received this information from Dan...
"... our second review after for some other documentation to accompany the engineering drawings which has not yet
been provided so we cannot complete our review just yet until we get that information as well. Please pass it along when
it gets submitted to your office."
I'm very sorry but I'm note sure exactly what documents Dan is waiting for. Please reach out to Stephen if you have any
questions or concerns.
Send everything over asap and I would be happy to forward to Mill River.
Thanks and have a nice afternoon.
Toni
Toni K. Wolfenden
Health Department Assistant
978-688-9540
j„ cid:image002.jpg@01 CD02A1.85A49B40
image001.jpg
4K
Toni Wolfenden <tolfenden@north and overma.gov> Tue, Oct 4, 2022 at 2:40 PM
To: William Dufresne <wrdufresne@comcast.net>, Brian LaGrasse <blagrasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>
Cc: Daniel Ottenheimer<dano@millriverconsulting.com>
Ok, thanks for the update.
I will forward this information to Brian and Stephen Also.
Take care, (Great game the other night-even if the Pats lost!! Hope you had fun!!
https://mai l.goog le.com/mail/u/0/?ik=fb8Oag478f&view=pt&search=a II&permth id=thread-f%3Al 745773486564753196&sim pl=msg-f%3A17457734865... 1/2
10/6/22,3:10 PM Town of North Andover Mail-9 Hawkins
Toni K. Wolfenden
Health Department Assistant
978-688-9540
cid:image002.jpg@01 CD02A1.85A49B40
On Tue, Oct 4, 2022 at 1:48 PM William Dufresne <wrdufresne@comcast.net>wrote:
Toni
Dan had requested a draft copy of the easement and a letter from the owner authorizing the wall
to be removed. Both are being drafted by an attorney, how long I do not know, but I will forward
them once I receive them.
I had requested that the approval letter be granted and made a request that no construction
permit be given until those documents are received as we are very anxious for the approval letter
so that we can proceed with a conservation filing as Conservation will not accept an application
without BOH approval..
Thank you
Bill
[Quoted text hidden]
All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under
the Massachusetts Public Records Law.
Visit us online at www.northandoverma.gov.
image001.jpg
4K
https://mai l.goog le.com/mail/u/0/?ik=fb8Oa9478f&view=pt&search=all&permthid=thread-f%3A1745773486564753196&simpl=msg-f`/`3Al 7457734865... 2/2
10/17/22,8:28 AM Town of North Andover Mail-9 Hawkins Lane approval
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
9 Hawkins Lane approval
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Oct 13, 2022 at 7:50 AM
To: 'Brian Lag rasse (blagrasse@north andoverma.gov)" <b lag rasse@northandoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Brian, Steve, Toni—
Attached please find an approval for your consideration. You will note two line items in red which might need to be
adjusted if these documents are provided for review prior to your issuance of this letter.
My suggestion is to await those two open items and then adjust the letter accordingly, but if there is a desire to release
the letter now then I believe it is written in a clear manner that spells out what the expectations are.
Of course if there are any questions please do let me know.
Best,
Dan
Daniel Ottenheimer, PE
President
WMILL RIVER CONSULTING
t.tt-auvc'-w1itt►ous for Latut DLvc1upmt m
6 Sargent Street
https://mai l.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1746573048151900542&simpl=msg-f%3A17465730481... 1/2
10/17/22,8:28 AM Town of North Andover Mail-9 Hawkins Lane approval
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.milIriverconsulting.com
LC 9 Hawkins Lane Approval.docx
77K
https://mail.google.com/mai I/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permth id=thread-f%3A1746573048151900542&si mpl=msg-f%3A17465730481... 2/2
6/3/22,7:50 AM Town of North Andover Mail-0 Hawkins Lane soil testing
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
0 Hawkins Lane soil testing
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Thu, Jun 2, 2022 at 4:45 PM
To: Stephen Casey<scasey@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)"
<twolfenden@northandoverma.gov>
This soil test for new construction was going to occur tomorrow but due to the weather they have requested to push it off.
I will let you know when it has been re-scheduled.
Dan
ti
rLQ`j.
03 QOJ�P
& p�P
Daniel Ottenheimer, PE
President
.;� ,i
f MILL RIVER CONSULTING
OUatiV1C Statuli60%for!arid Devellopment
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
https://mail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f%3A1734557318185244281&simpl=msg-f%3A17345573181... 1/1
6/6122, 10:03 AM Town of North Andover Mail-0 Hawkins Lane soil test
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
0 Hawkins Lane soil test
2 messages
Daniel Ottenheimer<dano@millriverconsulting.com> Fri, Jun 3, 2022 at 2:35 PM
To: "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfe nden @north andoverma.gov>, Stephen Casey
<scasey@northandoverma.gov>
This is slated for Monday June 20 at 9 am.
Dan
Ali®
J Q ��A
Daniel Ottenheimer, PE ��0x��
President '�O �� t✓�
t MILL RIVER CONSULTING
Uxative Solutions for I xid Develc4ment
6 Sargent Street
Gloucester, MA 01930-2719
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
Toni Wolfenden <twolfend en @north and overma.gov> Mon, Jun 6, 2022 at 7:46 AM
To: Daniel Ottenheimer<dano@miliriverconsulting.com>
Cc: Stephen Casey<scasey@northandoverma.gov>
Thank you!
Just an FYI, that is a town holiday.
https://mai l.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=al I&permthid=thread-f%3Al 734639717900614466&simpl=msg-f%3Al 7346397179... 1/2
6/6/22, 10:03 AM Town of North Andover Mail-0 Hawkins Lane soil test
Toni K. Wolfenden
Health Department Assistant
978-688-9540
LO,;;cid:image002.jpg@01 CD02A1.85A49B40
[Quoted text hidden]
. `ysr�rum
image001.jpg
4K
https://mail.goog le.com/mai I/u/0/?i k=aOc6f4e4cf&view=pt&sea rch=a I I&permth id=th read-f%3A 1734639717900614466&si mp I=msg-f%3A17346397179... 2/2
5/15/24, 12:08 PM Town of North Andover Mail-Construction Inspection-9 Hawkins Lane
NORTH ANDOVER
Massachusetts Toni Wolfenden <twolfenden@northandoverma.gov>
Construction Inspection - 9 Hawkins Lane
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Wed, May 15, 2024 at 11:39 AM
To: "Brian Lagrasse (blagrasse@northandoverma.gov)" <b lag rasse@northan dove rma.gov>, Sharlene Pierce
<spierce@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
All went well with the construction inspection at 9 Hawkins Lane. The contractor was excellent.
A few issues to call to your attention—
1.The design plan calls for removal of a landscape wall adjacent to the leach field. This was not done. The
contractor reports he was instructed not to do so. I am not 100% sure what the design intent was of the engineer
when he said to remove that wall so I am not sure if it is acceptable for it to remain in place or not. We should
perhaps ask the designer about this. Is this something you'd like me to do, or you would do, or are you ok with the
wall remaining in place?
2.The design plans calls for a grading easement to be recorded on the deed for 39 Hawkins Lane to allow fill
material for the new septic system to be placed on their property. I am reminding you of this so that you can make
sure it is in place before issuance of a Certificate of Compliance
If I can help with either of these matters please do let me know.
Dan
Daniel Ottenheimer, PE
President
4 M LL RIVER CONSULTING
Creative Soltttimis for Lanci Ihhvelolnnent
i
6 Sargent Street
Gloucester, MA 01930-2719
https://maiI.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f:1799133655128805265&simpl=msg-f:1799133655128805265 1/2
5/15/24, 12:08 PM Town of North Andover Mail-Construction Inspection-9 Hawkins Lane
Phone: 978-282-0014 ext.802
www.millriverconsulting.com
Construction Notes -9 Hawkins Lane.docx
63K
https://mail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f:1799133655128805265&simpl=msg-f:1799133655128805265 212