HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 9 HAWKINS LANE 6/26/2027
North Andover Health Department
Community and Economic Development Division
ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES
LOCATION INFORMATION
ADDRESS: 9 Hawkins Lane MAP: 106.C LOT: 0018
INSTALLER: Christopher Saunders – 781-645-2806
DESIGNER: Vladimir Nemchenok
PLAN DATE: 07.20.2022
BOH APPROVAL DATE ON PLAN: 11.01.2022
INSPECTIONS
TANK INSPECTION: 06.11.2024 – Shanene Pierce
DATE OF BED BOTTOM INSPECTION: 05.01.2024 Shanene Pierce
DATE OF FINAL CONSTRUCTION INSPECTION: 5/14/24 D. Ottenheimer
DATE OF FINAL GRADE INSPECTION: 6/10/2024 Shanene Pierce
SITE CONDITIONS
Contractor reports any changes to design plan
Existing septic tank properly abandoned, if
present
Internal plumbing all to one building sewer
Topography not appreciably altered
Comments:
SEPTIC TANK
Building sewer in continuous grade, on
compacted firm base
Cleanouts per plan
Bottom of tank hole has 6” stone base
Tank size and loading per plan
Monolithic tank construction
If monolithic, water tightness of tank has been
achieved by visual testing
If 2-piece, water tightness of tank has been
achieved by water / vacuum test (circle one)
Inlet tee installed, centered under access port
Outlet tee installed, centered under access port
Gas baffle installed
If effluent filter, riser to finished grade over filter
Riser with cover to within 6” of finish grade
installed over one access port
Manhole and riser minimum 20 inch diameter
Pipe penetrations appear watertight using
rubber boots
Comments:
DISTRIBUTION-BOX
Installed on stable stone base
H-20 D-Box
Inlet tee (if pumped or >0.08’/foot)
Hydraulic cement around inlet & outlets
Even distribution observed
Schedule 40 PVC Pipe
Comments:
SOIL ABSORPTION SYSTEM (General)
Bottom of SAS excavated down to specified
soil layer, as provided on plan
Size of SAS excavated as per plan
Sand installed, if specified on plan
Sand displays few fines when handled
40 Mil HDPE barrier installed, if specified on
design plan
Laterals installed and ends capped
Retaining wall material, location and height if
specified on plan
Comments: 5/15/24 – Landscape wall on adjacent property was not removed as
indicated on design plan. – D. Ottenheimer
FINAL GRADE
Final cover as per plan
Loamed
Seeded
Cover per plan
Comments:
DOCUMENTS NEEDED
Certification of Installation Form submitted
by designer and signed and dated by
designer and installer
As-Built Plan by designer
BM = 110.60
HR = 24.92
HI = 135.52
SYSTEM ELEVATIONS
ROD AS-BLT INVERT DESIGN INVERT
ELEVATION ELEV ELEV
Building Sewer OUT 5.14 130.05 130.00
Septic Tank IN 5.32 129.87 129.80
Septic Tank OUT 5.66 129.53 129.55
Distribution Box IN 8.45 126.74 126.70
Distribution Box OUT 8.62 126.57 126.53
Lateral 1 BEGINNING
Lateral 1 END 8.89 126.30 126.30
Lateral 2 BEGINNING
Lateral 2 END 10.51 124.68 124.70
Lateral 3 BEGINNING
Lateral 3 END 11.81 123.38 123.40
Lateral 4 BEGINNING
Lateral 4 END 13.09 122.10 122.10