Loading...
HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 9 HAWKINS LANE 6/26/2027 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 9 Hawkins Lane MAP: 106.C LOT: 0018 INSTALLER: Christopher Saunders – 781-645-2806 DESIGNER: Vladimir Nemchenok PLAN DATE: 07.20.2022 BOH APPROVAL DATE ON PLAN: 11.01.2022 INSPECTIONS TANK INSPECTION: 06.11.2024 – Shanene Pierce DATE OF BED BOTTOM INSPECTION: 05.01.2024 Shanene Pierce DATE OF FINAL CONSTRUCTION INSPECTION: 5/14/24 D. Ottenheimer DATE OF FINAL GRADE INSPECTION: 6/10/2024 Shanene Pierce SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle installed If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum 20 inch diameter Pipe penetrations appear watertight using rubber boots Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped Retaining wall material, location and height if specified on plan Comments: 5/15/24 – Landscape wall on adjacent property was not removed as indicated on design plan. – D. Ottenheimer FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 110.60 HR = 24.92 HI = 135.52 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 5.14 130.05 130.00 Septic Tank IN 5.32 129.87 129.80 Septic Tank OUT 5.66 129.53 129.55 Distribution Box IN 8.45 126.74 126.70 Distribution Box OUT 8.62 126.57 126.53 Lateral 1 BEGINNING Lateral 1 END 8.89 126.30 126.30 Lateral 2 BEGINNING Lateral 2 END 10.51 124.68 124.70 Lateral 3 BEGINNING Lateral 3 END 11.81 123.38 123.40 Lateral 4 BEGINNING Lateral 4 END 13.09 122.10 122.10