Loading...
HomeMy WebLinkAbout2018-11-13 Response to Department Review ' I I `�I S I A DIVISION OF THE MORIN CAMERON GROUT' PROFESSIONAL ENGINEERS AND LAND SURVEYORS 160 SUMMER' STREIF, HAVER,HU, iMA OIF O €: 973-3?3 D310 r.vw.csi-engrxow fax�178-372-3960 August 3, 2018 Jean Enright Planning Director Town of North Andover Planning Department 120 Main Street North Andover, MA 01845 RE: DPW Review Improvement of Rea Street Dear Ms, Enright: We offer the following responses to comments received in a review letter of July 20, 2018 by the Town of North Andover DPW, 1. The O &M has been revised to state the Homeowner's Association will own and maintain the stormwater BMP's located within the lots, 2. The sediment forebay location has been added to the Grading and Drainage sheet. 3. The driveways are upgradient of the roadway. A gutter would remain along each driveway curb cut. We have added a construction detail showing construction and grading for the driveway aprons. 4. The swales are proposed as "grassed channels" and a detail is provided on sheet 11 of 12. 5. The outlet pipe size has been labeled on the Utilities Plan sheet 6 of 12. 6, An outlet structure detail is located on sheet 11 of 12. 7. Roof drains connected to the grassed channels are shown on sheet 5 and 6 of 12, 8. The sewer pump station design will be submitted for review upon completion of the Definitive Subdivision review process. 9. No response required, Very truly yours, Stephen Sawyer, P.E. CHRISTIANSEN & SERGI .A )1VISION OF THE P110PIN CAPIIERO ) CY'ROUP f'W)f"ESSIONAL ENGINEEOS IVIO LAND SURVEYORs' November 8, 2018 Jean Enright Planning Director Town of North Andover Planning Department 120 Main Street North Andover, MA 01845 RE: DPW Review Improvement of Rea Street Deaf Ms. Enright: We offer the following responses to comments received from the Town of North Andover DPW. 1. A note has been added on Sheet 6 and 8 stating the inverts of SMH 4 will be revised during the final pump station design. Very truly yours Stephen Sawyer, P.E.