Loading...
HomeMy WebLinkAbout- Consultant Review - 102 LOST POND LANE 7/8/2024 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 102 Lost Pond MAP: 104.B LOT: 214 INSTALLER: Peter Breen – mulch770@yahoo.com, 978-687-7774 DESIGNER: Bill Dufresne / Vladimir Nemchenok - wrdufresne@comcast.net, 978-475-3555 PLAN DATE: 05.02.2024 BOH APPROVAL DATE ON PLAN: 06.10.2024 INSPECTIONS TANK INSPECTION: 06.11.2024 DATE OF BED BOTTOM INSPECTION: 06.12.2024 DATE OF FINAL CONSTRUCTION INSPECTION: 06.25.2024 – D.Ottenheimer DATE OF FINAL GRADE INSPECTION: 7/8/2024 B. LaGrasse SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Gas baffle If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum ___ inch diameter Pipe penetrations appear watertight using rubber boots Comments: 06.25.2024 – Existing building sewer pipe re-used. Contractor reminded to have one manhole to within 6” of finish grade. – D.Ottenheimer DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Inlet tee (if pumped or >0.08’/foot) Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends connected to header Retaining wall material, location and height if specified on plan Comments: 58 x 36 – Needed a little more removed by SE Corner. All Set 06.12.2024 – B.L. DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 133.87 HR = 0.98 HI = 134.85 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Benchmark Building Sewer OUT 131.40 Septic Tank IN 5.26 129.26 128.50 Septic Tank OUT 5.52 129.00 128.25 Distribution Box IN 6.49 128.03 127.95 Distribution Box OUT 6.70 127.82 127.78 Lateral 1 BEGINNING 6.82 127.70 127.70 Lateral 1 END 7.11 127.41 127.45 Lateral 2 BEGINNING 6.81 127.71 127.70 Lateral 2 END 7.12 127.40 127.45 Lateral 3 BEGINNING 6.82 127.70 127.70 Lateral 3 END 7.12 127.40 127.45 Lateral 4 BEGINNING 6.81 127.71 127.70 Lateral 4 END 7.12 127.40 127.45