Loading...
HomeMy WebLinkAbout2024-07-02 Middle School Building Committee Minutes Middle School Building Committee Meeting Minutes July 2, 2024 Present: Laurie Burzlaff, Stephen Foster, Janice Phillips, Jorge Goncalves, Jen Cronan, Joe Hicks, Jenn Whitney, Kate DeLisle Phil Palumbo, Trey Logie and Brady Doyle from Colliers and Paul Louie from Mount Vernon Group. Meeting was called to order by Committee Chair Laurie Burzlaff at 4:06 pm No public comment Approval of Minutes from 6-18-24 Joe Hicks made a motion to approve the minutes from June 18, 2024, seconded by Jenn Whitney. Motion approved 8-0. Construction and Schedule Update Trey Logie provided an update on construction. Painting of second floor prime coat finished, unit ventilators installed and floor demolition in existing building is underway. Windows are being installed, the installation of a new manhole structure on Main Street is complete. The second floor above ceiling inspections all set. Trey reviewed the 3 week look ahead Phil Palumbo explained that substantial completion of new section is 8/2 but we are unsure if they will meet this deadline but should meet final completion deadline of 9/13. Colliers is pushing contractor to work Saturdays and longer days to get it done on time. Still expecting it to be done in time for start of school but will know more in the next two weeks. The committee asked the School Committee to come up with a Plan B should they not be finished th by August 25. Town Counsel is reviewing the contract to see what relief the Tow the substantial completion date. Joe Hicks voiced his frustration with the schedule and the possibility this will not be done by the start of school. The renovations are on schedule. Budget Update $591,600 is remaining balance of the contingency in addition to $94,000 in contract still available. In response to a question from the committee, Phil Palumbo indicated that we are in good shape as far as possible unforeseen items that we may encounter. Several of the items pending that are being carried will be resolved within the next month. Change Order 35 update Repower lighting pole bases- The site plan calls for demolition of 2 existing light pole bases, they are the first two lights in the site lighting circuit so once removed there is no power to remaining site lights. The total cost approved at the last meeting was $16,802.96. The revised cost is now $11,400.48 for a savings of $5,402.48. Review and approve change order 29 Jorge Goncalves requested some additional floors to be addressed. Jorge believes they were missed in the original plans and should have been included. The areas are the Library for a total amount of $53,978.86 and Rooms 1151 and S109 for a total of $5,948.25. There is a credit for change in the flooring for rooms c101, 105, 106 in the amount of $3,851.88 and in music room, lounge, resource room, workroom, copy room, phone rooms Add carpet in RA 106 music. The total credit is $2,790.38. Demolition and new VCT for c205 and S209 for $11,434.42 ition because it was a missed room. All carpet replaced in Symmes wing except this room. Looking at whole picture the total cost is $64,719.27. Motion to approve items 1 (Library), 3 (credit) and 4 (credit) made by Jen Cronan, seconded by Jenn Whitney, motion approved 7-1. Joe Hicks voted against. Review and approve change order 32 Rework of existing storefront based on code interpretation. This was a misinterpretation of the building code at the design stage. Steve Foster made motion to approved change order 32, seconded by Jen Cronan, motion approved 8-0. Review and approve change Order 39 Retaining wall fall hazard so needs to be mitigated by adding a fence. Trey presented 4 options ranging from $19,277.25 to $21,969.27 for 4 foot and six foot heights with either black or galvanized coating. Jenn Whitney made motion to approved change order 39 with 4 foot black fencing for a total cost of $20,344.86, seconded by Joe Hicks, motion approved 8-0. Review and approve invoices Mount Vernon Group for design services of $19,260.00 Mount Vernon Group for furniture, fixtures and equipment of $4,950.00. Motion made by Jenn Whitney to approve the Mount Vernon invoices, seconded by Joe Hicks, motion approved 8- 0. Adjournment Next meeting 7/9/2024 4:00 PM at Town Hall. Motion to adjourn made by Joe Hicks, seconded by Jenn Whitney, motion approved 8-0. Adjourned 5:13 pm