NOTICE OF DECISION(INSUBSTANTIAL CHANGE)
Date of Decision: December 22, 2016
Petition of: Nova Flagship LLC
94 Flagship Drive
North.Andover,MA 01845 1,
Premises Affected: 94 Flagship Drive
Assessors Map 107.0 Lot 77
PROJECT
On April 7, 2015 the Planning Board approved a Site Plan Review Special Permit for a 315 square foot
loading dock addition, modifications to lot entrance for truck access, modifications to drainage system to
relocate pipe lines,creation of pervious area at rear of lot, pedestrian and forklift access between 80
Flagship Drive and 94 Flagship Drive, and change of building use in the Industrial 1 (1-1)zoning district, j
On December 22, 2016 the Applicant requested to amend the existing plan and relocate the 8' x 14'
storage container and add three(3)Air Make Up units (13' x 5.33 ) at the rear of the building as required
for the completed design for the fresh air intake into the ventilation system for the plating process to be
installed per code in the building.
FINDINGS
The proposed changes are deemed to be Insubstantial and do not alter tither the intent or the conditions of
the original Site Plan Review Special Permit.
All plan revisions will be reflected on the final as-built drawings.
� 1
r can Enright,Planning Director
Garfield,
Inc.Button
CONTRACTORS
LETTER OF TRANSMITTAL
Date: December 22, 2016
To: Town of North Andover DEC 2 2 2016
Planning Department
120 Main Street y—
North Andover, MA 01845
Attn: Rebecca Oldham
Re: 94 Flagship Drive, Central Metal Finishing
We are sending you the following:
COPIES DATE NUMBER DESCRIPTION
1 12/21/2016 Letter of Explanation
2 12/14/2016 New Site Plan
2 10/9/15 Original Site Plan
These are transmitted as checked below:
❑ For your information ❑ For your use ❑ For processing ® For review/approval
❑ For review/comment ❑ For execution ❑ For quote ❑ As requested
❑ Approved as noted ❑ For completion ❑ For bids due:
Remarks:
Signed: Steven R. Webster
BUILDER
43 Gigante Drive • Hampstead, NH 03841 www.duttongarfreld,com Tel:(603) 329-5300 Fax:(603)329-5368
E
E
I
Button a WHOP Inc.
CONTRACTORS
December 21, 2016
i
i
i
i
Town of North Andover
Planning Department
120 Main Street
North Andover, MA 01845
Attn: Rebecca Oldham
Re: 94 Flagship Drive, Central Metal Finishing
Dear Rebecca,
We have attached copies of the modified site plan for the subject project that shows the relocation of
the storage container and the placement of 3 Air Make Up units as required for the completed design
for the fresh air intake into the ventilation system for the plating process to be installed per code in the
building.
We have attached a copy of the formally approved site plan as well for your ease of reference.
Please feel free to call at your earliest convenience if you have any questions.
Very truly yours,
Steven R. Webster
President
BUILDER
43 Gigante Drive • Hampstead,NH 03841 www.duttongarfiefd.com Tel:(603) 329-5300 Fax:(603)329-5368
LNGREENHECK �tm �° ° � Printed Date: 911 412 0 1 6
Job: CMF
Building Value 1n Mr. Mark: MAU-1,2,3
Model: VSU-230-H50
o H ISO
4 A%M k' '
ELEVATION VIEW
`Standard configuration for unit access Is on the right-hand side,when looking Into the unit Intake In the direction of airflow.
*Note:Order of unit sections is from Intake of unit to discharge of unit.
"Sections Included on this unit:Filter Section,Heating Section,Slower Section
*Insulation:Double Wall,from Burner Section through end of unit.
156.353 J
LJ
i
63.206
PLAN VIEW
"Standard configuration for unit access Is on the right-hand side,when looking Into the unit Intake In the direction of airflow.