Loading...
HomeMy WebLinkAbout2015-04-07 Insubstantial Change 12/22/2016 1 1 •. Town of North Andover Office of the Planning Department Community Development Division i 120 Main Street 7016 �1FC 22 North Andover, Massachusetts 01845 I j i NOTICE OF DECISION(INSUBSTANTIAL CHANGE) Date of Decision: December 22, 2016 Petition of: Nova Flagship LLC 94 Flagship Drive North.Andover,MA 01845 1, Premises Affected: 94 Flagship Drive Assessors Map 107.0 Lot 77 PROJECT On April 7, 2015 the Planning Board approved a Site Plan Review Special Permit for a 315 square foot loading dock addition, modifications to lot entrance for truck access, modifications to drainage system to relocate pipe lines,creation of pervious area at rear of lot, pedestrian and forklift access between 80 Flagship Drive and 94 Flagship Drive, and change of building use in the Industrial 1 (1-1)zoning district, j On December 22, 2016 the Applicant requested to amend the existing plan and relocate the 8' x 14' storage container and add three(3)Air Make Up units (13' x 5.33 ) at the rear of the building as required for the completed design for the fresh air intake into the ventilation system for the plating process to be installed per code in the building. FINDINGS The proposed changes are deemed to be Insubstantial and do not alter tither the intent or the conditions of the original Site Plan Review Special Permit. All plan revisions will be reflected on the final as-built drawings. � 1 r can Enright,Planning Director Garfield, Inc.Button CONTRACTORS LETTER OF TRANSMITTAL Date: December 22, 2016 To: Town of North Andover DEC 2 2 2016 Planning Department 120 Main Street y— North Andover, MA 01845 Attn: Rebecca Oldham Re: 94 Flagship Drive, Central Metal Finishing We are sending you the following: COPIES DATE NUMBER DESCRIPTION 1 12/21/2016 Letter of Explanation 2 12/14/2016 New Site Plan 2 10/9/15 Original Site Plan These are transmitted as checked below: ❑ For your information ❑ For your use ❑ For processing ® For review/approval ❑ For review/comment ❑ For execution ❑ For quote ❑ As requested ❑ Approved as noted ❑ For completion ❑ For bids due: Remarks: Signed: Steven R. Webster BUILDER 43 Gigante Drive • Hampstead, NH 03841 www.duttongarfreld,com Tel:(603) 329-5300 Fax:(603)329-5368 E E I Button a WHOP Inc. CONTRACTORS December 21, 2016 i i i i Town of North Andover Planning Department 120 Main Street North Andover, MA 01845 Attn: Rebecca Oldham Re: 94 Flagship Drive, Central Metal Finishing Dear Rebecca, We have attached copies of the modified site plan for the subject project that shows the relocation of the storage container and the placement of 3 Air Make Up units as required for the completed design for the fresh air intake into the ventilation system for the plating process to be installed per code in the building. We have attached a copy of the formally approved site plan as well for your ease of reference. Please feel free to call at your earliest convenience if you have any questions. Very truly yours, Steven R. Webster President BUILDER 43 Gigante Drive • Hampstead,NH 03841 www.duttongarfiefd.com Tel:(603) 329-5300 Fax:(603)329-5368 LNGREENHECK �tm �° ° � Printed Date: 911 412 0 1 6 Job: CMF Building Value 1n Mr. Mark: MAU-1,2,3 Model: VSU-230-H50 o H ISO 4 A%M k' ' ELEVATION VIEW `Standard configuration for unit access Is on the right-hand side,when looking Into the unit Intake In the direction of airflow. *Note:Order of unit sections is from Intake of unit to discharge of unit. "Sections Included on this unit:Filter Section,Heating Section,Slower Section *Insulation:Double Wall,from Burner Section through end of unit. 156.353 J LJ i 63.206 PLAN VIEW "Standard configuration for unit access Is on the right-hand side,when looking Into the unit Intake In the direction of airflow. Generated by:Jfavalllere@buckleyonline.com 4,21.1504 RAJob F€leslGreenheck CAPS12016\JOHN-20161CMF.gfbj Page 6 of 13