Loading...
HomeMy WebLinkAbout2015-04-07 Application SPR NORTH o q t; C r 1,1rS �I�o�e te<w4eew x �� '• 0RATIU'I 5 �SsacNuse�� .i w`'.4I f PLANNING DEPARTMENT Community Development Division Special Permit—Site Plan Review Application Please type or print clearly. 1.Petitioner: Nova Flagship LLC Petitioner's Address: 94 Flagship Drive, North Andover, MA 01845 Telephone number: 978-685-4811 2.Owners of the Land: Nova Flagship LLC Address: 94 Flagship Drive, North Andover,MA 01845 Number of years of ownership: 2 3.Year lot was created: 1981 4. Description of Proposed Project: 315 square foot loading dock addition Mod1fications to o entrances or ruc access ModificatJons to drainage system to relocate pipe lines Creation of pervious area at rear of lot Change of Building Use 5. Description of Premises: Existing Building at 94 Flagship Drive 6.Address of Property Being Affected: 94 Flagship Drive, North Andover,MA 01845 Zoning District: 11 Assessors Map: 107.0 Lot#: 77 Registry of Deeds: Book#: 13671 Page#: 0287 7, Existing Lot: Lot Area(Sq. Ft): 81334 Building Height: 2 Street Frontage: 401 Side Setbacks: 46',50' Front Setback: 35, Rear Setback: 179' Floor Area Ratio: 6.86.1 Lot Coverage: 17% 8, Proposed Lot(if applicable): N/A Lot Area (Sq. Ft): Building Height: Street Frontage: Side Setbacks: Page 4 of 5 1600 Osgood Street,North Andover,8idg.20,Suite 2-36 Planning Dept.,Massachusetts 01845 Phone 978.688,9535 Fox 978.688,9542 Web www.townofoorthandover.com Edited 9/30/10 Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: 9.Required Lot(as required by Zoning Bylaw): NIA Lot Area (Sq. Ft): Building Height: Street Frontage: Side Setbacks: Front Setback: Rear Setback: Floor Area Ratio: Lot Coverage: 10,Existing Building (if applicable): Ground Floor(Sq. Ft.): 13,354 #of Floors: 2(2nd floor 1980 sgft existing) Total Sq.Ft.: 15,534 Height: 21 Use; Office/Manufacturing Type of Construction: 2C 11. Proposed Building: Ground Floor(Sq. Ft.): 315 #of Floors; 1 Total Sq.Ft. 315 Height: 12' Use: Loading pock Type of Construction: 2C 12. Has there been a previous application for a Special Permit from the Planning Board on these premises? No If so,when and for what type of construction? 13.Section of Zoning Bylaw that Special Permit Is Being Requested 14.Petitioner and Landowner signature(s): Every application for a Special Permit shall be made on this form, which is the official form of the Planning Board. Every application shall be filed with the Town Clerk's office. It shall be the responsibility of the petitioner to furnish all supporting documentation with this application.The dated copy of this application received by the Town Clerk or Planning Office does not absolve the applicant from this responsibility. The petitioner shall be responsible for all expenses for filing and legal notification. Failure to cgr op with appl cation requirements, as cited herein and in the Planning Board Rules and Regulations may rest n a,ismi i a �� fanning Board of this application as incomplete. Petitioners Signature: ova FI shi i C Print or type name here: Car� , hlbles n� W Member Owner's Signature: ova Flagship LL Print of type name here: Carol L.Shibles, Managing Member 15.Please list title of pplans and documents you will be attaching to this application, plan of proposed Conditions revised 2l4115 Certified List of Abutters Narrative by Carol L. Shibles, Managing Member Nova Flagship LLC Page S of 5 1600 Osgood Street,North Andover,Bldg.20,Suite 2-36 Planning Dept.,Massachusetts 01845 Phone 978,688,9535 Fax 978.688.9542 Web www.townofnorthand over.corn )edited 9/30/10 Central Metal Finishing Inc. 80 Flagship Drive North Andover,MA 01845 (978)291-0500 North Andover Planning Committee RE: Project Narrative for Renovation 94 Flagship Drive, north Andover, MA and 80 Flagship Drive, North Andover, MA To Whom It May Concern, The applicant is Nova Flagship LLC, 94 Flagship Drive, North Andover, MA 01845 The property 94 Flagship Drive was purchased by Nova Flagship LLC in September 2013.The building is currently unoccupied.The building has been purchased with the intent to renovate for the purpose of establishing expanded and upgraded manufacturing operations of Central Metal Finishing Inc. currently house at 80 Flagship Drive, North Andover, MA and a second location in NH. The ownership is the same for Central Metal Finishing Inc., Galaxy LLC (80 Flagship Drive, North Andover, MA 01845) and Nova Flagship LLC. Central Metal Finishing Inc. was formed in 1977. In 1990 it located operations at 80 Flagship Drive. In 2006 it expanded operation with a NH location. The operating space based on these locations is 31500sf. The plan is to close the NH location and move operations to the 94 Flagship Drive location. In addition, to expand, move and upgrade some operation currently located at the 80 Flagship Drive location.The operating space for the two Flagship Drive locations is 43500sf. This plan provides for consolidation of operations to improve efficiencies and provide for continued growth of the company. Central Metal Finishing Inc. is a metal finishing business servicing the aerospace and related Industries with various coating to enhance product performance. Central Metal Finishing Inc. is an approved supplier to Raytheon,Textron Defense Systems, GEAE, Boeing, PWA and many prime manufacturers in the defense and aircraft industry both military and commercial. Planning has been conducted with consultation from building contracting company(Dutton &Garfield), and various engineering firms specializing, and as required and applicable licensed and certified in electrical, plumbing, HVAC, environmental, health and safety compliances. The 94 Flagship Drive building was previously used as a chemical lawn service business and basically in its current state has office space,warehouse space with minimal HVAC and large garage type entry doors at either end of the building. The 94 Flagship Drive location will require facility renovations for delivery and pick up.Therefore installation of dock system to accommodate small to large vehicles Is planned for the front of the building. The building requires renovation for closing off 2-3 of the large garage type entry doors as well various building upgrades doors, windows and other.The interior of the building will be fit out with containment, flooring, boilers, compressors, HVAC,tank ventilation systems and air scrubbers, plumbing, electrical upgrades, lighting,general cosmetic clean up. Equipment installation will be various tanks, rectifiers, tumbling units,work benches, general office equipment, computers, and general maintenance drill press, lathe,other. Accompanying this letter is a basic layout of the plan for 94 Flagship Drive. As a result of this project Central Metal Finishing Inc, should in the future create economic benefit with increased job opportunities and other. Best 1166 rds, Carol L.Sh€b es Managing Member, nova Flagship LLC Abutter to Abutter( ) Building Dept. ( X ) Conservation ( X ) zor,ltrg ( X Town of North Andover Abutters Ustina �LtULRt hlENT. MGL 40A,Scioto 11 slates In pail"Paraos In Interest as used In Wa chapter chaRmeen the pe6Uoner, abultefs,owners of land dlrectly oppos8e on any public er private way,and nbultem to obullara%VLhtn Was hundred(300)feet of the property Ilno of Ilia polIttoneras fhey eppeoron the most recent appYcoblo lax oak not vAlib Landing that the land of any such cmnor Is Iucalod In another city or town,tho planning board of the city or town,and the planMag board of every abutttng ciN artown act o e HAP PA13CEL Nerno Andress 107.0 77 Nova flopehlp LLC 94 Flogishlp FWNe,North Andover,MA 018d6 Abutters Properthu Parcot a h(eme Address 26 80 WOR Assoolatea 365 Mlddlesox Road,Wilmington MAGI 887 25 83 Rupp Realty Trust 400 Wllow Sytro at,North Andover,MA 107.0 25 ARC Really Corporation 100 Flagship Drive,North Andover,MA 01845 107.13 45 Qeiroy Smith 79 Merlon Drive,North Andover,MA 107.0 46 Paul Fahlano 89 Marlon Drive,North Andover,MA 107.0 47 Willem McNamara 111 99 Madan Drive,North Andover,MA 107.0 48 Daniel Larsen 111 Marlon Drive,North Andover,MA 1074 70 Turnpike Flagalilp Liz P.O,Box 220,Boxford,MA 01021 107,13 78 (3aiaxy,LLC 8 Lowell Street,Pepperell,MA 01463 107.0 79 Jornal LUC One Thompson Square,Charlestown,MA 02129 1074 83 OLC Compan€ea Realty Trust 115 Flagship Drive,North Andover,MA 01845 107,0 113 A&8 Margaret ritzgereld 85-A Flagship Drive,North Andover,MA 01845 107.0 113 C Damolady 5,LLC 86-C Flagship Drive,North Andover,MA 01846 107.0 113 D TBSW,LLC 85-D Flagship Drive,North Andover,MA 01846 107.0 113 E Scolt Building 22 LLC 12 Rogers Road,Haverhill,MA 01835 107.0 113 F 8e G Flagship,NA,LLC 12 Perlridga Lane,Wakolield,MA 01880 107.0 113 H Mark 5colrard 19 W1ng Road,Lynntiold,MA 01940 107.0 113 J Paul Malud 05-J Flagship Drive,North Andovar,MA 01845 107.0 113 K KY-Court Realty 85•K Flagship Drivo,Nedth Andover,MA 01845 This certifies that the names appearing on the records of the Asse-"Onsy Office as of ,— Certified by: Dale,