Loading...
HomeMy WebLinkAboutseptic email - Correspondence - 911 JOHNSON STREET 8/8/2024 7/29/24, 12:14 PM Town of North Andover Mail-911 Johnson St-final inspection NORTH ANDOVER Massachusetts Toni Wolfenden<twolfenden@northandoverma.gov> 911 Johnson St -final inspection Isaac DaRowe<isaac@earthwaterdesignsolutions.com> Wed,Jul 24,2024 at 3:29 PM To:Toni Wolfenden<tolfenden@northandoverma.gov> Cc:'Brian Lagrasse(blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Dan ext 802 Ottenheimer <dano@miliriverconsulting.com>, Isaac DaRowe<isaac@earthwaterdesignsolutions.com> Good Wednesday afternoon Brian&Toni, Please find attached the completed construction inspection form.Everything looked good on Monday morning during the final inspection. Please let me know if you have any questions. Thanks, Isaac DaRowe President Rainwater Harvesting Designer,ASSE 21120 Certified EARTHWATER DESIGN SOLUTIONS, INC. 46 Middle Street Gloucester, MA 01930 978-879-6591 www.earthwaterdesignsolutions.com [Quoted text hidden] [Quoted text hidden] All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law. Visit us online at www.northandoverma.gov. Construction Notes-911 Johnson Street.docx 66K https://mail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permmsgid=msg-f:1805489941394399493&simpl=msg-f:1805489941394399493 1/1 5/30/24,8:33 AM Town of North Andover Mail-Plan review-911 Johnson Street NORTH ANDOVER Massachus"s ,•,,,, Toni Wolfenden <twolfenden@northandoverma.gov> � e Plan review - 911 Johnson Street 1 message Daniel Ottenheimer<dano@millriverconsulting.com> Thu, May 30, 2024 at 7:30 AM To: "Bill Dufresne (wrd ufresne@com cast.net)" <wrdufresne@comcast.net> Cc: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Shanene Pierce <spierce@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov> Bill, Good morning. A few small items about the above onsite wastewater system design need attention. • The stone bed to be placed beneath the tank is not identified for the Installer on the detail • The Graphic Profile depicts the ends of the leaching pipes to be tied together and vented but the Profile and Plan do not. Clarify the design intent for this feature • The Graphic Profile contains a typographical error for the building sewer invert elevation • Form 9A line B. 1. incorrectly identifies this Upgrade as being voluntary when there appears to be a system inspection which indicated the current system was determined to be failing Let me know if any questions. Dan Daniel Ottenheimer, PE President ��. 4:�`: LL RIVER CONSULTING f naive solution"for 1"and Developnumt 6 Sargent Street Gloucester, MA 01930-2719 https://maii.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f:1800476988821119612&simpl=msg-f:l800476988821119612 1/2