911 Johnson St -final inspection
Isaac DaRowe<isaac@earthwaterdesignsolutions.com> Wed,Jul 24,2024 at 3:29 PM
To:Toni Wolfenden<tolfenden@northandoverma.gov>
Cc:'Brian Lagrasse(blagrasse@northandoverma.gov)"<baagrasse@northandoverma.gov>, Dan ext 802 Ottenheimer
<dano@miliriverconsulting.com>, Isaac DaRowe<isaac@earthwaterdesignsolutions.com>
Good Wednesday afternoon Brian&Toni,
Please find attached the completed construction inspection form.Everything looked good on Monday morning during the final inspection.
Please let me know if you have any questions.
Thanks,
Isaac DaRowe
President
Rainwater Harvesting Designer,ASSE 21120 Certified
EARTHWATER DESIGN SOLUTIONS, INC.
46 Middle Street
Gloucester, MA 01930
978-879-6591
www.earthwaterdesignsolutions.com
[Quoted text hidden]
[Quoted text hidden]
All email messages and attached content sent from and to this email account are public records unless qualified as an exemption under the Massachusetts Public Records Law.
Visit us online at www.northandoverma.gov.
Construction Notes-911 Johnson Street.docx
66K
https://mail.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permmsgid=msg-f:1805489941394399493&simpl=msg-f:1805489941394399493 1/1
5/30/24,8:33 AM Town of North Andover Mail-Plan review-911 Johnson Street
NORTH ANDOVER
Massachus"s ,•,,,, Toni Wolfenden <twolfenden@northandoverma.gov>
� e
Plan review - 911 Johnson Street
1 message
Daniel Ottenheimer<dano@millriverconsulting.com> Thu, May 30, 2024 at 7:30 AM
To: "Bill Dufresne (wrd ufresne@com cast.net)" <wrdufresne@comcast.net>
Cc: 'Brian Lagrasse (blagrasse@northandoverma.gov)"<blagrasse@northandoverma.gov>, Shanene Pierce
<spierce@northandoverma.gov>, "Toni Wolfenden (twolfenden@northandoverma.gov)" <twolfenden@northandoverma.gov>
Bill,
Good morning. A few small items about the above onsite wastewater system design need attention.
• The stone bed to be placed beneath the tank is not identified for the Installer on the detail
• The Graphic Profile depicts the ends of the leaching pipes to be tied together and vented but the Profile and Plan
do not. Clarify the design intent for this feature
• The Graphic Profile contains a typographical error for the building sewer invert elevation
• Form 9A line B. 1. incorrectly identifies this Upgrade as being voluntary when there appears to be a system
inspection which indicated the current system was determined to be failing
Let me know if any questions.
Dan
Daniel Ottenheimer, PE
President
��. 4:�`:
LL RIVER CONSULTING
f naive solution"for 1"and Developnumt
6 Sargent Street
Gloucester, MA 01930-2719
https://maii.google.com/mail/u/0/?ik=aOc6f4e4cf&view=pt&search=all&permthid=thread-f:1800476988821119612&simpl=msg-f:l800476988821119612 1/2