Loading...
HomeMy WebLinkAboutSeptic Construction Notes - Consultant Review - 531 JOHNSON STREET 8/13/2024 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 531 Johnson Street MAP: 098.A LOT: 0014 INSTALLER: John T. Shaw - 978-815-7411 DESIGNER: Bill Dufresne – Merrimack Engineering Services (978) 502-6206 (978) 475-3555 x-20 PLAN DATE: 02.02.2024 BOH APPROVAL DATE ON PLAN: 02.29.2024 INSPECTIONS TANK INSPECTION: 05.23.2024 DATE OF BED BOTTOM INSPECTION: DATE OF FINAL CONSTRUCTION INSPECTION: DATE OF FINAL GRADE INSPECTION: 6/11/24 D. Ottenheimer SITE CONDITIONS Contractor reports any changes to design plan Existing septic tank properly abandoned, if present Internal plumbing all to one building sewer Topography not appreciably altered Comments: SEPTIC TANK Building sewer in continuous grade, on compacted firm base Cleanouts per plan Bottom of tank hole has 6” stone base Tank size and loading per plan Monolithic tank construction If monolithic, water tightness of tank has been achieved by visual testing If 2-piece, water tightness of tank has been achieved by water / vacuum test (circle one) Inlet tee installed, centered under access port Outlet tee installed, centered under access port Effluent filter installed If effluent filter, riser to finished grade over filter Riser with cover to within 6” of finish grade installed over one access port Manhole and riser minimum 20 inch diameter Pipe penetrations appear watertight using rubber boots Comments: PUMP CHAMBER (Delete if not present) Bottom of tank hole has 6" stone base Weep hole plugged 1000 gallon Pump Chamber installed H-10 loading Monolithic tank construction Inlet tee installed, centered under access port Pump(s) installed on stable base Alarm float working Pump On/Off floats working Drain hole in pressure line 20” cover at final grade installed over pump access port Water tightness of tank has been achieved by Visual observation Neoprene boots around inlet & outlet Comments: CONTROL PANEL (Delete if not present) Alarm & Pump are on separate circuits Visual & audible alarm works as intended Location of control panel: Basement Comments: DISTRIBUTION-BOX Installed on stable stone base H-20 D-Box Baffle wall Hydraulic cement around inlet & outlets Even distribution observed Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) Bottom of SAS excavated down to specified soil layer, as provided on plan Size of SAS excavated as per plan Sand installed, if specified on plan Sand displays few fines when handled 40 Mil HDPE barrier installed, if specified on design plan Laterals installed and ends capped or connected to header Retaining wall material, location and height if specified on plan Comments: FINAL GRADE Final cover as per plan Loamed Seeded Cover per plan Comments: S. Pierce DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 100.00 HR = 5.65 HI = 105.65 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT 2.87 102.45 102.6 Septic Tank IN 5.10 100.22 100.2 Septic Tank OUT 5.32 100.00 99.95 Pump Chamber IN 5.36 99.96 99.00 Pump Chamber OUT Distribution Box IN Distribution Box OUT 4.08 101.24 101.18 Lateral 1 BEGINNING 4.18 101.14 101.10 Lateral 1 END 4.39 100.93 100.90 Lateral 2 BEGINNING 4.18 101.14 101.10 Lateral 2 END 4.39 100.93 100.90 Lateral 3 BEGINNING 4.18 101.14 101.10 Lateral 3 END 4.39 100.93 100.90