Loading...
HomeMy WebLinkAbout1983-09-26 Response Comments DEF SUB i r RICHARD F . KAMINSKI AND ASSOCIATES, INC. ENGINEERS •ARCHITECTS •LAND PLANNERS •SURVEYORS 451 ANDOVER STREET NORTH ANDOVER,MASS.01845 September 12, 1983 TELEPHONE W-1483 Mr. Paul Hedstrom Chairman North Andover. Planning Board Town Hall Main Street North Andover, MA 01845 Re: Fuller Meadow Road Dear Mr. Hedstrom; In reply to the comments made by the various municipal agencies relative to the development of the Fuller Meadow subdivision, 1 have the following comments : A. Board of Public Works and Fire De artment: 1. Requirements That a fire hydrant be placed at the end of the cul-de-- sac in front of lot 49. Reply: We agree to provide a fire hydrant to the specifications of the Board of Public Works in the area requested by the fire department. B Highway Surve or: 1. Requirement: Elimination of driveway berm. Rep_ly_. The driveway berm will be removed as requested. 2. Re uirement• The road binder coat width of 28 feet and the finished coat width of 26 feet over a gravel width of 30 feet. j September 12, 1983 North Andover Planning Board Page 2 B. Highway Surveyor continued) : 2. ReRl : A binder coat of 28 feet and a finished coat of 26 feet over a gravel width of 30 feet will be provided. 3. Requirement: The gravel depth be 16" instead of 1411 . Reply: Maintain the 14" of gravel as per the Subdivision Control Law. 4. Re uirement : Catch basins be provided at the entrance to the cul-de- sac, Reply : To provide two catch basins at the entrance of the cul-- de-sac would pick up a combined total of less than 1 cfs of runoff. The calculations submitted with the application show that the total road runoff to the intersection of Fuller Meadow Road and Fuller Road combined flow is 3. 5 cfs. To require catch basins at the entrance of the cul-de-sac would provide insignificant benefits with significant cost. in addition, the location of drain lines in Fuller Meadow Road, along with the wetlands at the rear of the lots, would require the siting of several leaching facilities closer than the 100 foot minimum requirement to drain lines or wetlands, which is at variance with the Rules and Regulations of the North Andover Board of Health. The definitive subdivision plans will be revised to reflect the changes noted herein. in addition, the wetland delineation originally submitted has been revised to conform with that agreed upon by this office and the North Andover Conservation Commission. } September 12, 1983 P North Andover Planning Board Page 3 If I may be of further service to you in this matter, please do not hesitate to contact this office. Respectfully submitted, Richard F. Kaminski and Associates, Inc. �aW ` Richard F. Kaminski , P.T:. President cc : Jayson Realty, Inc. RFK/j t