Loading...
HomeMy WebLinkAbout1984-08-17 Enforcement Order DEF SUB 242-449 310 CMFI 10,99 Form 9 ' DEQE file 140 242_ 449 (robe provided by€7EQE1 city town NORTH ANDOVER, RA 7 Commonwealth =i J-�W of Massachusetts Applicant Osgood U x Enforcement Order Massachusetts Wetlands Protection Act, C.L. c. 131 , §40 AND UNDER THE TOWN OF NORTH ANDOVER BYLAW, CHAPTER 3, SECTION 3.5 From NORTH ANDOVER CONSERVATION COMMISSION Issuing Authority To Osgood Associates Dale of Issuance August 30, 1989 Property lot/parcel number, address Dale Street Sever Line Extent and type of activity: The project was begun without addressing numerous conditions listed in the Order of Conditions. The applicant has neglected to post the required performance bond and has failed to contact this office as required. The NORTH ANDOVER CONSERVATION COP91ISS ION has determined that the activity described above is in violation of the Wetlands Protection Act, G.L. c. 131 , §40, and the negulalions promulgated pur- suant thereto 310 CMR 10.00, because: ❑ Said activity has beenlis being conducted withoul a valid Order of Conditions. E Said activity has been/is being conducted in violation of an Or der of Conditions issued to — Osgood Associates dated_ ,7anuar 20 1989 File number 242— 449, Condition number(s) 15, 16, _17, 18, 19, 20, 23, 34 ❑ Other(specify) The NORTH ANDOVER CONSERVATION C%%JISSION hereby orders the following: EJ The property owner, his agents, permitlees and all others shall Immediately cease and desist from lurlher activity affecting the wetland portion of this property. ❑ Welland alterations resulting from said activity shall be corrected and the site returned to Ns original con- dition. 9-1 ill of onrti r � I OFFICES OF: or �°�' OwIl Of 120 A1o'!tt S11�c I BUILDING RoOk P Nc>rll�Andover ; .� NORTH ANDOVEIi nt�tstisIchUS{'IIsc)1845 CONSERVATION r HEALTH se0Fiuuc` DIVISION O1 1.�()f�?(it�2 li4t�:i PLANNING PLANNING & COMMUNITY DEVELOPMENT KAREN 14P. NELSON, DH tEC:I O t ADDENDUM TO ENFORCEMENT ORDER DALE ST. SEWER LINE #f242-449 OSGOOD ASSOCIATES 8/30/89 VIOLATIONS 1. The NACC was not notified prior to the start of construction as required by conditions #15, 16, 17, 18. 2. No progress reports have been received as required in condition #19. 3. No prior inspection and approval was obtained for erosion control measures as required in condition 420. 4. Disturbed areas in and around resource areas have not been restored with wetland soil or loam as required in condition #23. 5. A performance bond of $5000. 00 has not been posted as required in condition #34. REQUIRED ACTIONS 1. Post the required performance bond within 10 days of receipt of this Enforcement Order. 2. Submit a detailed written description of the work completed at the crossing within 10 days. This must include dates, times, names of individuals present and a thorough description of all work completed .for this stream crossing. 3. Submit a detailed written description/sequence of the work remaining on this project within 10 days. Note : The NACC may determine that a modification of the original Order of Conditions is necessary to compensate for the lack of communication and documentation on the part of the applicant. This modification may include the requirement of additional documentation and an As-Built plan prior to the issuance of a Certificate of Compliance. This issue will be discussed at the next NACC meeting on 9/6/89. DALE STREET ASSOCIATES P.O. BOX 536 NORTH ANDOVER, MASS. 01845 * HAND DELIVERED North Andover Conservation Commission 120 Main Street North Andover, Mass. 01845 RE: D.E.Q.E. File 242-449 Dear Members: This is a response to the enforcement order regarding the above referenced file number. The enforcement order listed three actions that have to be taken to have the order lifted. The required actions and a response to each is listed below. 1.) Post the required bond. To this date the Conservation Commission has administered bonds in an unfair manner. Once a bond is posted it is for all intents and purposes lost money. The extortionary attitude that is taken by making us jump through hoop after useless hoop is appalling. For this reason we will not post a bond unless the commission agrees to submit to an arbitration committee of three unbiased individuals from the community to administer the release of the bond. These three individuals must be appointed by the Town Manager and approved by both the commission and ourselves. The three members must include one engineer, one lawyer, and one other citizen of the community with no ties to the development community or any related business. 2.) Submit a written description of the work done, Between 7/18/89 and 7/24/89 the initial clearing was done. This consisted of cutting the trees and brush and stacking them along side the work area. Between 7/25/89 and 7/27/89 the job was stocked and set up. On 7/27/89 the actual excavation began at Coventry Lane. Parker and Metcalf dial this work under my supervision. An employee of Osgood Development was on the job at all times to work erosion control only. From this point forward Mr. Hmurciak made daily inspections of the work, { Page Two The actual "tap" into the manhole at Coventry took three days and the brook crossing was not made until 7/31/89. The procedure used was exactly as was outlined to the Commission in a letter dated May 16, 1988. The condition of the brook is now exactly as it was before we started. Work proceeded up the easement towards the pines until 8/4/89 when ledge was encountered in the trench at Station 8+50. At this point we started at Station 6+50 and installed the sewer up to Station 0+00. Work then progressed again at Station 8+50 and continued to 8+00 and stopped there. The areas between 6+50 and 0+00 and Station 8+00 and 14+50 have all been haymulched and seeded per the order of conditions. 3.) Submit a detailed description of work remaining. The work remaining consists of installation of the sewer line between Stations 8+00 and 6+50 and between Station 0+00 and the present sewer lift station. This work should take one week. Once the sewer is installed it has to be tested and the area foamed, regraded and seeded. 1 will be at your next meeting to discuss this matter. Yours truly, f Benjamin C. Osgood, Jr. Agent for Dale Street Associates BCOjr/hf