Loading...
HomeMy WebLinkAbout2024-08-13 Planning Board Minutes Town of North Andover PLANNING BOARD Eitnrt Goldl�erp ChairChristopher Koskores b) �11 HR tArya ♦ Peter Boynton John Simons ' Sean Kevlahan Tuesday August 13 2024 6iO, 7 .m. 120 Main Street—Town Hall North Andover MA 01845 1 Present: E. Goldberg,I Simons,P. Boynton(arrived at 7:15 PM),C. Koskores, S. Kevlahan-remote(left meeting at 7:10 PM) 2 Absent: 3 Staff Present: J, Enright 4 5 E. Goldman Chairman: The Planning Board meeting for August 13,2024,was called to order at 7 p.m. This meeting will be 6 considered hybrid with remote and in-person attendance. 7 8 CONTINUED PUBLIC HEARINGS 9 56 Academy Road,James Warden: Application for a Historic Barn Overlay District Special Permit under Article 20 and 10 Article 10 Section 195-10.7 of the North Andover Zoning Bylaw,The Applicant proposes use of the 1950 cow barn for 11 prototyping of solar boats and ceramic art.The project is located within the Residential 3 (R-3)Zoning District. 12 J.Warden, 84 Academy Rd.: Has no additional project information. 13 E. Goldberg:Was not in attendance at last meeting;brought up to date by watching the meeting video. Requested informally 14 that before and after photos be taken of the project for benefit of others wishing to embark in a similar process,No public 15 comment has been received. 16 MOTION: J. Simons made a motion to close the public hearing for the Historic Barn Overlay District Special Permit, 56 17 Academy Road. C.Koskores seconded the motion. Roll call vote: S.Kevlahan(remote)voted yes. J. Simons voted yes.E. 18 Goldberg voted yes. C. Koskores voted yes. The vote was 4-0,unanimous in favor. 19 MOTION: J. Simons made a motion to approve the Special Permit,as written. C.Koskores seconded the motion.Roll call 20 vote: S.Kevlahan(remote)voted yes. J. Simons voted yes.E. Goldberg voted yes. C.Koskores voted yes. The vote was 4-0, 21 unanimous in favor. 22 (S.Kevlahan-remote,left the meeting @ 7:10 p.m.) 23 24 189 Willow Street,Vincent J.Grasso:Application for a Site Plan Review and Corridor Development District 1 Special 25 Permits under Article 8 Supplementary Regulations,Part 3 Site Plan Review,Article 16 Corridor Development District,and 26 Article 10 Administration(195-10.7)of the North Andover Zoning Bylaw. The Applicant proposes construction of a 6,777 27 SF single story building with 20 parking spaces,associated driveway,utilities and associated improvements. The project is 28 located within the Corridor Development District I (CDD1)Zoning District, 29 J. Enright: Informed the Board that the applicant,Vincent Grasso,through his attorney,has requested to withdraw without 30 prejudice in order to follow through with the appeal process he is pursuing. 31 E. Goldberg: This matter remains in a various state of appeals,court proceedings.Believes the Board should honor the 32 applicant's request to withdraw without prejudice. Stated that if it does get through the appeal process and comes back to the 33 Board we will be happy to take it up again. 34 MOTION: J. Simons made a motion to allow the applicant to withdraw without prejudice for 189 Willow Street. C.Koskores 35 seconded the motion.The vote was 3-0,unanimous in favor. 36 37 BOND RELEASE 38 1450 Osgood Street,Hillwood Enterprises LP: Request for partial release of the$80,000 performance bond associated with 39 the Site Plan,Parking,Conmion Driveway,Building Height, and FAR special permits,which allowed for construction of a 40 warehouse and distribution facility consisting of a 5-story building including approximately 3,835,500 sf of gross floor area. 41 The applicant is requesting$70,000 be released. 42 J.Enright: The engineer certification letter and as-built plan are included in your meeting packet. Condition 1150 of the 43 approved decision requires a post opening traffic study to evaluate on-site operations and compare trip generation and 44 operations of the proposed facility to the actual post opening trip generation and operations.The timef-ane for this study is 45 approximately 12 months from the time Amazon opened for full facility capacity,which is May 2025.Reconmiends partial 46 release of$70K of the$80K performance bond at this time,holding$1 OK to be released after the traffic study is completed. 47 E. Goldberg: That study is related to trip reduction going into the facility specific to the 4 entrance and exit drive aisles. Board 48 received canunent from A_lissa Koenig,resident,20 Methuen Ave. (240812 Koenig comment). Read comments into the 49 record requesting lesser bond amount be released due to traffic&safety issues caused by the release of Amazon worker's at 1 i Town ofNorth Andover PLANNING BOARD Eitan Goldberg, Chair t. o. ChristopherlCoslrores Peter Boynton John Simons ` Sean XKevlahan Tuesday August .13, 2024 a 7_pxm, 120_Main Street—Town Hall,North Andover,MA 01845 50 5:30 PM. In summary the email stated that the traffic blocks the entrance to her street and other side streets daily between 51 5:30-6:30 p.m.Traffic is at a standstill during this tune and an inconvenience to residents.Suggests traffic study be performed 52 prior to bond release or retain larger portion of the bond. 53 B. Goldberg: Communicated to the Board that he spoke with A.Koenig and suggested a better alternative to the bond release. 54 The Community Partnership Agreement between the Town and Amazon states 1-year post occupancy Amazon is to make a 55 $100K contribution to the town for a traffic mitigation study and improvement necessitated by the traffic generated due to the 56 full use of the project.Amazon contemplated this situation that A.Koenig raised and there are funds set aside to mitigate this; 57 the performance bond addresses conditions regarding the interior of the site and trips generated.Amazon funds will be 58 coming in May of 2025;encouraged Town officials to talk earlier,start studying these issues now.Keeping$1 OK of the 59 performance bond funds for potential interior and trip calculation makes sense, 60 J. Simons: Questioned how traffic operated at peak operations. 61 J.Enright: From memory,Western Electric had 12K workers,(Amazon 3,500) and required a police detail at 7:30 a.m. & 62 3:30 p.m, to let the traffic out onto Osgood St.There was a lot of traffic on Sutton St.This is the first time this concern has 63 been raised regarding Amazon;received calls regarding tractor trailer trucks on Rte. 125 south of the site.Will certainly 64 observe this situation going forward.Amazon also agreed to establish a$100K escrow account 30 days after the CO;those 65 funds have been received and are in an account designated for post construction traffic mitigation equipment. 66 E. Goldberg:Encouraged residents to contact Select Board members,or Town Manager's office if they are experiencing these 67 or other related issues. 68 MOTION: J. Simons made a motion to release of$70K from the$80K bond for 1450 Osgood Street,Hillwood Enterprises 69 LP. C.Koskores seconded the motion. The vote was 4-0,unanimous in favor. (Vote includes P.Boynton who joined the 70 meeting @ 7:15 p.nn) 71 72 CONTINUED PUBLIC HEARINGS 73 335 Salem Strect,JCE Property Development,LLC: Application for a Watershed Special Permit under Article 4 Part 5 74 and Article 10 Section 195-10.7 of the Zoning Bylaw to authorize construction of a new single-family house,infrastructure, 75 and site grading on an undeveloped lot within the Non-Discharge Zone and subsurface drainage within the Non-Disturbance 76 zone of the Watershed Protection District.The property is located in the Residential 3 zoning district. 77 J.Enright: The ANR plan,approved 11/2022 and subsequent Variance decision for CBA are in the meeting packet.Variance 78 was approved on June 13,2023;time stamped into the Clerk's Office June 26,2023 and according to the Zoning Enforcement 79 Officer has expired. Confirmed with the Zoning Enforcement Officer that a new application for a variance and a new public 80 hearing is required. Plans were revised to address all stormwater peer review conunents; all revisions were noted.The O&M 81 plan was updated to reflect additional information requested. 82 Jack Sullivan Sullivan Engineering&James Erb JCE Properties Development LLQ:Tasked with managing peak rate and 83 volume of runoff for site modeled on a 2, 10,25 and 100-year storm event.The 100-year event is based on 8.6"of rain;has 84 decreased the peak rate and volume in every scenario. The design is low impact design captured in a sub-surface infiltration 85 system. Selected low impact materials onsite as well,pervious pavers for driveways and walkways.All has been peer 86 reviewed by the consultant;no current stormwater management system on site. Provided pretreatment for better water quality, 87 controlling storniwater runoff,deed restrictions limiting fertilizers.This process provides more controls knowing we are in the 88 watershed.Variance expired,however we feel the developer"exercised"within the time limit.No official building permit was 89 issued because we were going through the watershed process with this Board,prior to building permit being issued.Early in 90 the process,the Inspector met with J. Erb (applicant)who has been trying to move forward. 91 Jamcs Erb: Communicated that before making an offer on the property he spoke with the Building Commissioner and 92 understood establishing a permit application or some work on the project was acceptable.There is an electrical permit on the 93 site,installed a temporary pole which was inspected,added power to it,hired Sullivan Engineering and has been going 94 through this process for 3 mmntlns.keels lne's done his due diligence as far as"exercising"what the variance called for us to 95 "exercise"considering the time line and the variance when we purchased the property. Stated Paul Hutchins assured him that 96 he would not need an extension as long as we were exercising what we needed to do on the property in order to move 97 forward.We purchased the property in April/May 2024;hired engineer right away,spoke with Planning about it as well. 98 J.Enright:Watershed Special Permit application was filed 6/11/24.Variance authorized the construction of a single-family 99 home. There is an email in your packets from the Building Commissioner with his recent determination of the expiration. 2 Town of'North Andover PLANNING BOARD Eitan Goldberg, Chah- Christopher Koslrores s� �.Q Pelee Boynton • John Simons Sean Kevlahan Tuesday August 13 2024 7 an. 120 Main Street—Town Hall North Andover MA 01 845 100 E. Goldberg: It's not this Board's place to adjudicate whether you've done enough to not need an extension. The ` 101 Commissioner or Town Counsel can give us an opinion that you've met your obligations;you call contest that opinion, 102 legally. Stated the Board will hear from other members of the public and discuss the merits of the project concerns and next 103 steps. 104 J. Simons: There is no building permit approval,or Planning Board approval. Questioned how the applicant can you say he 105 acted on it other than you tried;defers to Building Inspector and Town Counsel. 106 J.Erb: We can't obtain a building permit until we get Planning Board approval; that's the stipulation. 107 E.Goldberg: The statutory language ZBA is using is ambiguous;what does"exercise"really mean?All permits need to be in 108 hand or does it mean taking the steps,such as filing a permit that you need in the process.Filing an extension would have 109 been advisable. 110 J.Enright:No public comment has been received. III Melissa Marrama homeowner,327 Salem St.: Recapped safety and water concerns. After last meeting,came home to 13 112 boulders,36"high on the part of the driveway that belongs to Mr. Erb,which is a safety hazard. Alerted DPW,police and fire. 113 Town engineer thinks it is a safety concern and she will get that in writing. Police have installed signs for a hidden driveway 114 because it is a dead driveway there.At this point 7.5 ft,have been taken from the original driveway which was 20 ft.; it's now 115 12.5 ft. on a dead driveway. I have cleared the existing 5 ft, shrubs on Appleton and Salem Streets because the previous owner 116 was warned it was a safety issue. Overall concerned for safety issue involving her driveway. Seven vehicles have hit those 1 117 boulders;fears someone will be killed there. Stated that last week when Mr.Erb learned the variance was expiring,she came 118 home to her mailbox being relocated, admitted it was on his property.It was taken and put into a cement bucket and placed on 119 her driveway which was trespassing and the federal postmaster is investigating;NAPD made aware of it. Four feet of rocks 120 were moved from the existing,historic rock wall.Were those rocks taken into consideration with the watershed? It is a 121 historic rock wall that is being deconstructed on the property. Still has water in her barn bordering the property. 122 Nathan Styles&Bobbi Xayarath,abutters,240 Marbleridge St.,:Reiterated concerns for ponding in the area along Salem St. 123 due to the intermittent stream that flows in between the properties.Has general concern for water issues in the area. 124 Conunented on events at 40 Flagship Drive, 125 E. Goldberg: Water concerns aren't contested,focusing on whether this single-family home and respective stormwater 126 mitigation proposed and placement,will make matters worse.They need to comply with our bylaw and not make conditions 127 worse; the engineer and peer review consultant agree,it won't make it worse. 128 J. Sullivan: We are not proposing any work within 100 ft. of the wetland.Erosion controls will be staked silt fencing,we did a 129 test hole on site and there is a high-water table,water was 41"but with good sandy soils. Development is more toward Salem 130 Street,erosion controls will be in place,not a heavily treed lot,saving trees toward the front,will be residential landscaping 131 around the home. With a large infiltration system,typically an outlet is provided so it can flow out to a lower point on the lot 132 during a large storm. This scenario overdesigns the subsurface infiltration system to store and infiltrate the 100-year storm 133 event with no release toward the abutter.Incorporated requests at the ZBA meeting to snake this as low impact:as possible. 134 N. Styles&B,Xayarath;Inquired as to wiry the design of the filtration system changed; drainage field is oriented differently 135 than the original plan from a year ago, 136 J. Sullivan:The system got bigger;increased the size of the drainage system;need to stay 10 ft. off the property line and 10 ft. 137 off the foundation, meeting the performance setbacks for stormwater management. Confirmed this is on sewer, 138 E.Goldberg: Asked that more thought be given to additional water mitigation measures of protection be considered. 139 J.Erb: Has made initial considerations if homeowner wants a future pool on site the infiltration system will not have to be 140 reconfigured and relocated. . 141 J. Sullivan: If the owners want a pool,we'll be before Planning for another Watershed Special Permit. 142 N. Styles: The design of the original house has changed since a year ago at the ZBA;garage and driveway.Trees were 143 removed from the property,various designs changed,questions the accuracy of the analysis,Questioned the accuracy of the 144 peer review analysis; they are not familiar with the current changes made on site. Questioned what protections the neighbors 145 have. 146 E. Goldberg.This was peer reviewed based on the current plain and met with no objection. All conditions in our decision will 147 need to be followed;if you can find ideas that we can incorporate to make you more comfortable,let us know. 148 P.Boynton: Suggested a"look-back"condition in the decision within a timefranne. 149 E. Goldberg: Asked engineer how they measure success of a drainage system, Before and after measurements possible? 3 Town of North Andover PLANNING BOARD Eitan Goldberg, Chan ChristopherIfvslco�'es s• �6 Peter Boynton • John Simons ' Sears Kevlahan Tuesday Aullust 13, 2024 (a, 7 p.m., 120 Main Street--Town Hall,North Andover, MA 01845_ 150 J. Sullivan:Model existing conditions,has proposed design, installed and there are weekly inspections while this is being built 151 and given to the Planning Board,The infiltration system is part of the weekly inspections;has ability to measure the new 152 water levels versus existing. 153 E. Goldberg:Would like to consider a condition that measures the water level in the infiltration chamber after a significant 154 storm event and compares that level to the modeled level. This could be conditioned for three storm events after construction 155 to determine if the design is working as predicted. 156 J.Erb: Questioned adding more conditions where there are two annual reports required. 157 J. Sullivan:The first three rain events are manageable to determine efficiency. 158 E.Goldberg:Procedurally,to vote we need assurances from ZBA.Request a determination from the Zoning Enforcement 159 Officer Hutchins and/or Town Counsel next week.You'll be on the next agenda or the one after; let us know your timetable 160 beforehand. 161 [Continued to the August 27,2024 Planning Board meeting] 162 163 1101 Turnnilie Street,Metrowest Realty,LLC: Application for a Land Disturbance Permit in connection with proposed 164 construction of a parking lot expansion at the Merrimack Valley Operation and Maintenance Facility(National Grid). The 165 project consists of repaving and restriping of an existing parking area,a parking lot expansion,stormwater and ancillary 166 landscape improvements retaining wall,and utility improvements to support its use. The property is located in the Industrial 1 167 zoning district. 168 J.Enright:Applicant is proposing a 72-space parking lot expansion and repave/restripe the 6,000 SF existing lot.The 169 proposed parking lot expansion includes landscaping,utility, and stormwater improvements. Project disturbs 56,000 SF and 170 increases impervious surface by more than 22,000 SF.Portion of the proposed site work is within the 100-foot buffer zone to 171 an onsite resource area,as well as the 200-foot riverfront area of an onsite perennial stream. Proposed stormwater 172 management system includes catch basins that discharge into a gravel wetland with a sediment forebay. As a reminder,this 173 application is before you under the provisions of Chapter 160: Storinwater Management and Erosion Control bylaw and 174 Chapter 250: Stormwater Management and Erosion Control Regulations.Per Chapter 165 the Planning Board shall take final 175 action on an application within 60 days of receipt of a complete application. 176 E. Goldberg: Should we be considering a different type permit for this project? 177 J. Simons:We are trying to understand logic and rationale for their proposal;this open field is perhaps the most attractive part 178 of the property,potentially impacts wetland resources and streams,need context for the reasoning for the expansion. 179 P.Boynton: It's a slope on a principal thoroughfare;engineering is critical to a weather event impacting the roadway. At the 180 last meeting we asked what the applicant is doing at the facility that drives this decision and location;need more context to 181 make a decision. 182 Jeff Koetteritz,PE-VHB &JercMy Stevenson,PE-JLL,Project Mgr.-National Grid: From an accessibility standpoint,being 183 proximate to the building entrance was critical and is located where the majority of the staff is going;balancing around the 184 riverfront area and the 100 ft.buffer zone to the southern portion of that site was the reason for placement of the parking. 185 J. Stevenson: Chose to expand existing front parking area to locate the ADA parking in the front of the building proximate to 186 two large auditoriums in the building where many employees attend frequent trainings.This is an active storm site which 187 aeconuniodates a fair amount of people remotely located that are called in sometimes for 12-24 hours, There is not a lot of 188 parking outside the area.There is a lay down area located to the south of the building orientated on the plan accessible via a 189 steep slope that runs from the main parking area to a lay down area which gets fairly icy during the winter months which 190 prompted owners to request safe parking as close as possible to the building. 191 J. Simons: To understand this you need to understand the use of the facility,whether it's changed or whether they need an 192 alternate permit.National Grid is a long-time neighbor,the look and feel of the property is attractive today. Questioned 193 whether there will be more employees than there now. Prefers to hear an account fi•om.someone who works there. Questioned 194 how many parking spaces exist on the property today and what percentage are occupied today. 195 J,Koetteritz:There are approximately 336 spaces on site today;proposed improvements add 66 to that(432). 196 J. Stevenson:Due to varying shifts with vehicles entering and exiting, it's difficult to say how many are occupied.Parking is 197 almost entirely used in the larger area to the side the main facility. Trees bordering the parking are proposed to be increased. 198 E.Goldberg: Questioned whether there is a Site Plan Special Permit for the property currently. 4 Town of North Andover PLANNING BOARD Eitan Goldberg, Chair •� f Chr•istoplter I�osl�ores Peter Roption � John Simons Sean Hevlahan Tuesday Ara first 13 2024 7 tmn., 120 Main Street—Town Hall North Andover MA 01845 199 r.Enright:No, the existing facility likely Pre-dates site plan review. Because they attested that the use is not changing,site 200 plan review was not triggered, 201 J. Simons: Would like to know parking requirements based on the size and the use, 202 E. Goldberg: Questioned whether MEPA thresholds are triggered by the increase of 66 parking spaces on a state highway. 203 J. Koetteritz: Will check into that. 204 P.Boynton: Some of the handicapped parking spaces noted on the plan are quite a distance from the building;do the 66 total 205 new spaces simply increase the number parking spaces at the facility?The new barking lot extends so far out that it is no more 206 proximate than the rear lot. 207 J. Koetteritz: Parking increases the proximity to the building. Parking to the south is utilized for accessory parking and 208 laydown.Perspective rendering showing the building and new parking are in progress, along with the photometric plan.The 209 net cut/frll is approx. 1,300 cubic yards of export as part of this project,will follow up with documented numbers. 210 E. Goldberg:Follow up items include: Planning to research parking requirements for this type of facility,VIJB will wake sure 211 this doesn't trip any MEPA thresholds along with items requested at the last meeting, relay to National Grid attendance would 212 be helpful at(lie next meeting to convey exactly what they are doing. 213 J. Koetteritz: Still open with Conservation which will be continued tomorrow night. To close out storrnwater peer review we 214 need to perform additional test pits. 215 J. Enright: They filed for an extension to allow time to render a decision to 9/12/24,two days after the meeting 9/10/24. 216 [Continued to the August 27, 2024 Planning Board ineetingl 217 218 NEW PUBLIC HEARING 219 1250 Osgood Str•eet,1250 Osgood St LLC: Application for a Limited Site Plan Review Special Permit,and Site Plan 220 Review and Parking Special Permit under Article 8 Supplementary Regulations,Part 3 Site Plan Review[Site Plan Review], 221 Article 8 §195-8.17.1 [Limited Site Plan Review], Article 8,Part 1, §195-8.8 [Parking Special Permit],and Article 10 222 Administration§195-10.7 of the North Andover Zoning Bylaw.The applicant proposes razing of existing building and related 223 improvements, and the redevelopment of the property into a 2/3 story building of approximately 21,145 SF in size.New 224 building to be used for a child care facility and associated play areas,along with medical office uses and other uses as may be 225 allowed under the Zoning Bylaw.Property is located in the Industrial 2 zoning district. 226 J. Enright: Former site of Hokkaido restaurant.Redevelopment project proposes to remove the existing 1-story restaurant and 227 construct a 3-story daycare facility/medical office building on a 2.34-acre parcel.Existing site includes 58,209 SF of 228 impervious area;no existing storrnwater practices on site.Bordering vegetated wetland associated with a stream is shown in 229 the north corner of the parcel. Proposed redevelopment reduces total impervious area to 56,454 sf. Proposed stormwater 230 management system includes one double catch basin that directs runoff to a Stormceptor water quality unit,and a subsurface 231 chamber system that outlets via twin 18-inch HDPE pipes.Peer review services have begun for storrnwater,civil and traffic. 232 Initial stormwater peer review letter was received;number of continents need to be addressed.Applicant submitted a Notice 233 of Intent application with the Conservation Con mission.Department review comments have been received from NAPD, 234 NAFD,Conservation,and DPW Operations with no concerns.Health Department cautioned the applicant may want to 235 discuss a potential food permit. Currently,there is no food storage or prep area proposed.No other concerns expressed.The 236 applicant was granted a ZBA Variance for front setback,visual buffer requirements and rear setback requirements in April 237 2024,Variance decision is included in your packet. Waivers requested include Fiscal Impact,Continunity Impact,and 238 Conmionwealth Review. A MassDOT Vehicular Access Permit is required; application cannot be filed until Town approvals 239 are secured. 240 E. Goldberg: Clarified childcare facility is filed under our Dover Bylaw;medical facility falls under the Special Permit they 241 are filing, additionally they are seeking parking relief. 242 J. Enright:Based on site topography the building is 3-stories;however,two stories are visible from Rt. 125. 243 John Sniolak, Smalak&Vaughan LLP&Steve Stapinsky,PE,Merrimack FnL�irzeering: Introduced the team.Project is a raze 244 and rebuild,building is 21K gross floor area,a/of the building dedicated to childcare and the rest is medical office or other 245 use allowed in the I2 Zone.Project is a combination of Dover Amendment,Limited Site Plan Review and Site Plan Review 246 for the medical office use;added a Parking SP as a placeholder in the event adjustments are needed based oil peer review. 247 Obtained variances from ZBA to allow the building to be located similar to existing structure.Requested front yard setback of 248 31 ft. (100 ft.required),variance to allow for the first 50 ft. to include parking and other improvements along Osgood St., and 5 Town of North Andover PLANNING BOARD Eitan Goldberg, ir ChristopherKoskores ��YY 0f � �Lgrtt�Nf2r�� Peter Boynton • John Simons Sears Kevlahan Tuesday August 13, 2024 a, 7 p.m., 120 Main Street--Town Hall, North Andover, MA 01845 249 rear yard setback.Portion of the project is located within the wetlands buffer.Filed a NOT;first hearing is tomorrow night. 250 Will require MassDOT Access Permit to adjust curb cuts,and will file an FAA permit due to proximity to the airport. Existing 251 standing sign to be salvaged;need setback variance for sign located in the same general location. Provided site orientation, 252 existing conditions plan, stormwater improvements where none exist currently,proposing 90 parking spaces(78 required). 253 Steve Stapinsky: Site contains 2 large curb cuts provided by MassDOT;these have been made smaller to 24-18 ft.wide. 254 Circulation is one-way in and across the front for drop off of children ors the eastern side of the building,per plan. Walkway 255 leads to the daycare, 1-way circulation to the rear east/right working into a 2-way driveway to the west/left for the medical 256 offices.Handicapped parking requires significant change in grade which will be reconstructed to meet ADA and zoning 257 requirements.Exterior elevated,fenced playground(east)retaining wall with fence above,bollards and landscaped areas 258 behind building,landscaping to segregate parking areas.Post and rail fence at building's front establishes sense of place along 259 state property line-Rte. 125.Reviewed total square feet for each floor.Majority of daycare on second floor. Newly 260 constructed sidewalk along Rte. 125 and the front will be extended toward the driveways and exist around the building.New 261 curbing will be removed and reset to close the curb cuts to watch new granite curbing within ADA compliance. Building is 262 serviced by sewer lines; main is relatively new,water service-sprinkler and domestic taps are new,gas to be excavated and 263 removed;will be gas service to the building.Drainage includes the infiltration in the rear, double catch basins capture 264 drainage runoff from the newly graded area;no drainage currently on site. Stormwater runoff will be treated to comply with 265 regulations. Changes may be made based on peer review comments;currently evaluating a different system than originally 266 proposed.Lighting to be light poles on site,cut off fixtures;showed photometric lighting plan which complies with zoning. 267 Vanasse did an extensive traffic report;the dayeare has 10%less traffic(than a restaurant).Zoning requires 78 parking 268 spaces/providing 90;no changes in level of service. Site is 1-way entry to right,counterclockwise circulation around rear 269 allowing for egress to left. 270 Cheryl Schweikcr,AIA,Jarmel Kizel,Architects,N.J.:Described general floor plans,mansard roof houses mechanical, 271 building materials;masonry and brick at ground floor(front&sides only),Hardy board,asphalt roof shingles,asymmetric 272 fenestration reflect interior use. Total building height is under 39 f1, from rear, 273 J.Enright:No public continent received.Peer reviews require advancement. 274 [Continued to the August 27,2024 Planning Board meeting] 275 276 DISCUSSION ITEMS 277 Planning Board: Overview of Accessory Dwelling Units(ADU) Open Forum held July 29,2024. 278 E. Goldberg&P.Boynton:ADU Forum field at the Senior Center was successful;10 residents were present. Meeting 279 presentation available on website and YouTube. Housing Bond Bill approved and signed by the Governor;waiting on 280 guidelines regarding what will be considered and how the bylaw can be tailored to fit individual needs.Thus far we know 900 281 SF or 25%of gross floor area whichever is smaller.Need first to explore what is"allowed"to do and then figure out what we 282 "want"to do.Will the state consider our existing Farrvly Suite or will it be pre-empted because it's a local law?There will be 283 no"owner-occupancy"required,ADUs can be attached/detached and can look like anything a homeowner envisions; setbacks 284 and other parameters will need to be met. Law effective in 180 days;mid-February. 285 286 MEETING MINUTES: Approval of July 16,2024 meeting minutes. 287 MOTION: P. Boynton made a motion to accept the minutes for July 16,2024.J. Simons seconded the motion. The vote was 288 4-0,unanimous in favor. 289 290 MOTION: P.Boynton made a motion to adjourn the meeting.The motion was seconded by J. Simons.Tire vote was 4-0, 291 unanimous in favor. Meeting adjourned @ 9:13 p.m. 292 293 MEETING MATERIALS:Planning Board Meeting Agenda August 13,2024,DRAFT Planning Board Meeting Minutes July 294 16,2024;Staff Report: 240813 Staff Report; 1450 Osgood Street,Millwood Enterprises LP:Recorded Decisions: 295 Insubstantial Change Decision(Recorded Book 17875 Pg 277),Lot B (SP-SPR Decision)(B. 16635,P. 193) 296 (00182594xBC4F6),Lot B SPR-SP(Modification)Decision(B. 16635,Page 221)(00182595xBC4F6),Resident Comment: 297 240812 Koenig comment,2024-04-26 LOT B ASBUILT rev3,240521 Engineer Certification Letter; 189 Willow Street: 6 Town of North Andover PLANNING BOARD Eitan Goldberg, Chair Christopher istaplaer Koslcor es Peter Boynton • John Simons ' Serra Kevhihan Tuesday August 13 2024 A 7 pan., 120 Main Street-Town Hall North Andover MA 01845 298 Abutters List: 651 Turnpike Street cent. and Notice,Confirmation of 1 S`Notice-651 Turnpike, Confirmation of 211 Notice- 299 651 Turnpike Sheet: Applicatioa: 2023 11 06 Willow St A2.00 11 x 17,2023 11 06 Willow St First Floor Plan,Narrative 300 and Applications, Site Plan , Conservation Commission OOC Denial: 242-1881, 189 Willow Street OOC DENIAL, 301 Department Review:NAFD Comments:231213 NAFD Comment,231214 NAPD Comments, 23 t 215 Applicant resp NAFD 302 Comment,231215 Resp Swept Path 189Willow R6-Fire Access,230327 Health Comment,230327 NAPD Comment, 303 231115 DPW Operations Comment,231129 Building Dept, Comments,MassDEP Appeal Dismissal---Applicant Appeal: 304 231219 242-1881, 189 Willow Street MassDEP Dismissal Letter,Appeal of DEP dismissal OADRT Notice of 305 Claim_1 4 2024 Final,Stormwater Review: 2012 Flood Map,2023 Preliminary Flood Map, 306 240112_HW_PeerReview_189WillowStrect; 335 Salem Street: Abutter Comments: 240808 O'Neil 270 Marbleridge, 307 IMG_7389.MOV,IMG 7391.MOV, Rev Site Plan: 335 Salem 07232024 Site Plan, Stormwater Review: 335 308 Salem_07232024_Site Plan,335 Salem Response Letter 07232024,240807_21d_SWPeerReview_335SalemStreet, 309 Standalone O&M-dated 240723,ZBA Variance: 06022023 Drainage Report-335 Salem Street,06022023 Updated Plans, 310 Expired Determination 327_335 Salem Street--Variance Granted June 13,2023,Recorded Variance Decision-335 Salem 311 Street,ANR Plan_327 Salem Street Stamped;56 Academy Road,James Worden:Application:Abutters List,Application 312 for Special Permit,North Andover Historical Commission barn opinion letter 7-15-24,North Andover Historical Society barn 313 opinion letter 6 2124,Owner Cow Barn Project Authorization,240813 56 Academy Rd HBOD SP -draft; 1101 1101 314 Turnpike Sheet: Application: 1101 Turnpike Deed,1629300 Stormwatcr Report 2024-05-30,1629300 Local Approvals 315 Planset(2024-05-30)stamped,Certified Abutters List,NGrid North Andover Land Disturbance Permit 316 Application REV161101 signed, Stormwater Review:240724 VHB Stormwater Response,240730 2114 SWPeer 317 Review_I l01TurnpikeStreet; 1250 Osgood Street 1250 Osgood Street LLC:Application: A lii ations: Limited Site Plan 318 Review Application(1250 Osgood St)((00293351xBC4F6), Site Plan Review and Parking SP Application(1250 Osgood St) 319 (00293350xBC4F6), Architect: 2024-07-10-TLEMA23-217-SA-COMPILED-Architect Submission Set 320 (00293303xBC4F6), Civil Plans-Li ]g iting-Landscape: 2024-07-10-TLEMA23-217-SA-COMPILED-Architect Submission 321 Set(00293303xBC4F6), 15155SD-LA-1 LANDSCAPE-Submission Sheet(00293304xBC4F6), 15155SD-LA-1 322 LIGHTING-Submission Slrect(00293305xBC4F6), 15155SD01 -Civil Submission Set Sheet 1 (00293296xBC4F6), 323 15155SDO2-Civil Submission Set Sheet 2(00293297xBC4F6), 15I55SDO3-Civil Submission Set Sheet 3 324 (00293298xBC4F6), 15155SDO4--Civil Submission Set Sheet 4(00293299xBC4F6), 151555DO5 ---Civil Submission Set 325 Sheet 5 (00293300xBC4F6), 15155SDO6--Civil Submission Set Sheet 6(0029330lxBC4F6),Memo in Support:Final 326 Memo in Support of Limited Site Plan Review,and Site Plan Review and Parking Special Permits(Rev.7.13.24) 327 (00293230xBC4F6),Misc.Does: 15155SD-LA-RENDER(00293318xBC4F6),Applicant Authorization Letter- 1250 328 Osgood St LLCsigned(00288523xBC4F6),Dover Amendment Letter from Building COi11111issloner(00293306xBC4F6), 329 Signed Owner Letter of Authorization(Milford Learning LLC)- 1250 Osgood Street(00288540xBC4F6),Update Abutter 330 List 07.10.24- 1250 Osgood Street(00293323xBC4F6),Traffic Study: 9903 TIA 0724 wAppendix(00293342xBC4F6), 331 TIAS-Executive Summary, Department Review: 240716 Conservation Comment,240717 Health Comment,240717 NAFD 332 Com nient,240719 NAPD Comment,240724 DPW Operations Comment,Presentation: 240807-NORTH ANDOVER- 333 PLANNING BOARD, Stormwater Review: 240731_1" SWPeerReview 12500sgoodSt,ZBA Variance: 240424 ZBA 334 Variance decision. 7