Loading...
HomeMy WebLinkAboutChecklist - As-Built Plan / Installation Certificate Form - 531 Boston Street 7/19/2024 Town of North Andover — Septic System - AS-BUILT CHECKLIST 1) ✓All changes to the design plan have been reflected and noted on the as-built plan 2) ✓As-built plan has a suitable scale; (1 inch = 40 feet or fewer for plot plans) 3) ✓Street Address,Assessor's Map and Lot Number 4) Lot Lines and Location of Dwellings served by the system 5) `&/Locations,Elevations and Dimensions of As-built system components,including reserve (if applicable) 6) ` Ties to all tank openings,d-box,and leach area from dwelling or Permanent Structure /Setback distances are shown on the as-built plan from system components to: Subsurface,interceptor&foundation drains N/fir Catch basins ✓Property lines ✓ Dwellings or other structures N/A Private water supply or irrigation wells Watercourses or wetlands 8) "cations of Wells,Drains,Wetland Resource Areas within 150 feet of system 9) Location of water,gas,electric lines,cable,control panel (if applicable) 10) ✓Location of Structures within 6 Inches of Finished Grade 11) ✓Original Stamp&Signature 12) Location and holder of any easements which could impact the system 13) '' Impervious Areas;Driveways,etc 14) `: North Arrow 15) ✓ Location&Elevation of Benchmark used 16) ✓STATEMENT ON PLAN (NA 5.3) a. ✓ "I certify the locations, elevations, ties, cover material;exposed component covers etc., shown on this as-built substantially agree with the approved plan and have determined that the break out elevati s,if applicable,have been met." Signature of Desig er Date b. "If a SIUCTURAL WALL IS PRESENT W 4.9I a Letter or statement on the as-built indicatinst the wall- was. or was not.constructed in accordance with the intended design and any manufacturer's specifications." Signature of Designer Date As of:Tuesday,March 17,2015