Loading...
HomeMy WebLinkAbout- As-Built Plan / Installation Certificate Form - 531 Boston Street 7/30/2024 (3) 172- i - -- -­ W__ _ _ �. PROJECT NOTES: 7/y - - __ - __ _� - _•, ` 1. LOCATION: 531 BOSTON STREET NORTH ANDOVER, MA EX. INSPECTION PORT.. . __ ___ _- _j,6 - �� ^' MAP 107.D / LOT 51Rss� r` -5 EX. 2'W x VD x 671Ecl CONVENTIONAL TRENCHES' `T MLLIAM,i- U f / EX. VENT W/ RESERVE BETWEEN 2. OWNER: OBS BUILDERS LLC o HALL f. . \ 1 623 WHIPPLE RD CIVIL -4 `. TEWKSBURY, MA NO.5258? Ur 3. GROUND SURVEY / PARTfAL AS-BUILT WAS PERFORMED 21.0 I ' AN ON - `.(2O' MIN) BY CIVIL DESIGN CONSULTANTS, INC. IN JUNE OF 2024. 4" PVC HEADER TO VENT } 7P2�N r �w. } I1i-� 4. THIS AS-BUILT HAS BEEN PREPARED TO ILLUSTRATE INSTALLATION OF THE SEWAGE DISPOSAL SYSTEM ,AT 531 = ` I BOSTON STREET HAS BEEN PERFORMED IN SUBSTANTIAL -- ��'�---- - --• � �1 � 1 � � APPROVED PLAN AND 310 CMR 15.000: 7 / � ._,...._ „«.M,� � f !f _ COMPLIANCE WITH THE A PREPARED FOR: + / f EX. D-BOX TITLE 5 OF THE STATE ENVIRONMENTAL CODE AS WELL AS WITH 1 F (H-20 LOADING) THE ORDER OF CONDITIONS ISSUED BY THE TOWN OF NORTH > F' %= =py, .--- k ANDOVER CONSERVATION COMMISSION. r _ REFERENCE DATA: G E N4 B U I LD E RS LLC ( _ j -.����-��.'.✓~�i%vP f G fir.is.n .J. t f TP3 ' �' 1. SEE APPROVED SEPTIC SYSTEM DESIGN PLAN WITH DATED PO BOX 397 I NOVEMBER 2, 2023 WITH REVISIONS THROUGH JANUARY 12, TEWKSBURY MA 01876 E 32.4' i I j 2024, (10' MIN) = "I CERTIFY THE LOCATIONS, ELEVATIONS, TIES, COVER MATERIAL; / EX. 1500 GAL. u `" 21' OF 4" PVC ® 1.9% EXPOSED COMPONENT COVERS ETC., SHOWN ON THIS AS-BUILT PROJECT: EX. 500 GAL SINGLE COMPARTMENT D rub i SUBSTANTIALLY AGREE WITH THE APPROVED PLAN AND HAVE PROPANE TANK MONLITHIC SEPTIC TANK 40,4' ' { DETERMINED THAT THE BREAK OUT ELEVATIONS, IF APPLICABLE, G (1°' MIN) , HAVE BEEN MET." 531 BOSTON STREET 1 s' OF 4" PVC 03.3%------j C5, NORTH ANDOVER, MA l f j r SIGNATURE OF DESIGNER DATE B7 7 7 7 7 7 7 7 A /EX. (FOUNDATION CRITICAL SYSTEM ELEVATIONS: DRAIN PROPOSED AS-BUILT (MAP 107.D / LOT 51) ;�, �� f' j' ! ! DATE ISSUED: JULY 30,2024 EX. DWELLING TOP OF FOUNDATION WALL: 18L80 181.8f TC:1$1.Sf `~ N / Ir INVERT AT FOUNDATION WALL: 177.61 178.0t r SEPTIC TANK INVERT (IN): 177.37 177.4t PROJECT#: 23-10507 SEPTIC TANK INVERT (OUT): 177.12 177.2f ! 1 1 D-BOX INVERT (IN): 176.71 176.8f PREPARED BY: TW5 1 I D--BOX INVERT (OUT): 176.54 176.6f TRENCH INV. BEGIN: 176,44 176.5f EX. DRIVEWAY TRENCH INV END: 176.'10 176.1± PREPARED BY: 3 s TIES EX. WATER SERVICE­,, EX. OVERHEAD WIRES 100-FT WETLAND BUFFER c I v I L ., AC PROPERTY BC ±21.7 FT LINE (TYP.) AD f21.1-FT LDESIG CONSULTANTS, INc f� BD ±67.4-FT l y AE ±37.1-FT 344 North Main Street I Andover•MA 01810 a BE ±B4.3-FT L_ f87e?4I6-0920 j www.dvllde;.com ^ AF ±33.5-FT i BF ±79.3-FT DRAWING TITLE: 3 B�. ±34.7-FT SDS AS-BUILT 5- 50-FT NO-BUILD L SCALE HORIZONTAL o DRAWING#: 20 0 10 20 BM 2 179.09 BOSTON STREET HYDRANT �72 45 ( IN FEET) AB- 1 a 1"i20' Y