Loading...
HomeMy WebLinkAbout1968-02-09 DPW Review DEF SUB y IRVING C. HOWES, CHAIRMAN ARTHUR R. 13HUMMOND ATTY. JOHN J. WILLIS. CLERK yy oq' oR7 •�{trr TOWN OF NORTH ANDOVER, MASS. P;��AstI BOARD OF PUBLIC WORKS P. ArgIL7Ttl.7ra .?° �. 18r55 `t '� 'r�7 � WATER, SEWER, PARK, PLAYGROUND AND SCHOOL GROUNDS DEPARTMENTS >` AC 1113 SUPERINTENDENT AND ENGINEER WILLIAM B. DUFFY. R90, PROF. ENG. January 2, 1968 Mr. William Chepulis , Chairman North Andover Planning Board 120 Main Street North Andover, Mass. j 3 Dear Sir:. In connection with the plan of the Proposed Garden Type Apartments for Roy Farr (R.C.. Pressey, Inc. Reg, Prof.. Eng. 12-i�-67 ) between Edgelawn Avenue and Chickering Road we ad- vise you . a s, f o Vows Eight inch water pipe is to be class 150, cement lined, tar coated outside, seal coated inside, to be installed 15 feet from the east side of the proposed street (west and south sides reserved by agreement with the Lawrence Gas Company) on a firm foundation with 5 feet of cover below the finish grade of the street.. Eddy hydrants (5" V.�O« 5� foot trench, 6 inch hub, 2-2j inch and 1 steamer nozzle to open .eft) with slid- ing type- gate boxes marked "WATER" on the 6 inch Mueller or equal gate valves (to open left) on the hydrant branches are to be installed at stations 0 + M, 5 + 0 and 1 4 0.. An 8 Inch division valve is to be placed at...station 20. We es- timate the cost of the proposed 8-inch water main,at .13>12,000. Connection to the existing 6-inch main on Edgelawn avenue will be made by the Water Department upon the payment in advance of $800. The connection -to the existing 8-inch main on Chicker- ing Road is to be made to the existing 8-inch main on the West side of Chickering Road. To rovide adecuate fire tec __ � and domestic water supply_ o tl'ic enre_ Soriao �Greanart trio s project the 8-inch water main on the east side of Chick- ering Road is to be connected to the existing water main at Dufton Court. We estimate the cost of the above connections on Chickering Road at sj'p12000. This work may be done by tho sub-division contractor after receipt of a perforxciance bond 'or the water main connections and road repair and �100,000 :11300,000 and. 1�50,000 sj,100,000 liability insurance. coverage. y The 1.0-inch sanitary sewer as shown is to be vitrified clay L"J.edge-lock or equal, sewer pipe laid to line and grade In 6-inches of screened gravel. Four hundred pound manhole frames and covers, with 24-inch diameter covers marked "SMER't are to be provided.- Maurice Concrete Products or equal.. rea nforced con- ore,te manholes are to be installed as shown on the plan except e manhole at station 5 0 3s to be relocated at station 6 + and a new manhole installed at station 5 + 25. This will provide proper spacing for sewer maintenance . We estimate the cost of the sewer at q$,12,000.. The water and sewer installations are to be satisfactory to the Superintendent of Public Works . More detailed specifi- cations will be available as required. Very truly yours, BOARD OF PUBLIC WORKS), William 13. Duffy.-. . ,r_,.,--.-_.--.._.__ Superintendent. WBD/cm Cb, r Pressey Farr . P.S'.. We find that this oan also be accomplished by connecting the existing dead ended water main on Chickering Road to the existing water main on old Village Zane by means of a present oasement from Odd Village tane to Chiakering Feud. We estimate this will. cost "� 3800.