Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1995-01-12 Mitigative Drainage Analysis DEF SUB
v I I I I I Owner: Donald F. & Nancy A. Johnston i Mitiogatiove Drainage Analysis East Pasture Circle North Andover, Massachusetts January 1995 Hayes Engineering, Inc. Civil Engineers & Land Surveyors 603 Salem Street Wakefield, MA 01880 MITIGATIVE DRAINAGE ANALYSIS EAST PASTURE CIRCLE NORTH ANDOVER, MASSACHUSETTS January 5, 1995 INTRODUCTION This Mitigative Drainage Analysis for the East Pasture Circle subdivision was conducted in order to study the change in runoff potential from the proposed subdivision site, and to design improvements that would be effective in mitigating peak runoff impacts at the points of analysis for the project. To accomplish the goal of the design, the wetland resource area along the limit of the proposed activity on the northerly boundary was selected as the main point of comparison. Other points of comparison are also shown on the plan, and are analyzed for potential development effects. The design approach for this project was to implement sufficient stormwater management techniques within the project site so as to result in no increases in the peak rates of stormwater discharge leaving the subdivision site. METHODOLOGY Runoff which flows from the main portion of the project site travels northerly toward the identified resource area. This Mitigative Drainage Analysis is prepared to analyze the consequence of the proposed development on the existing watershed areas. The hydrological analysis for East Pasture Circle models the watershed under the existing condition. Under the existing conditions, the westerly flow, identified as Watershed A, consists of approximately 0.194 acres, and is noted as Comparison Point 1. The main northerly flow consists of four (4) sub-watersheds, identified as Watersheds B, C, D and E, which comprises approximately 3.5 acres, and is noted as Comparison Point 2. The existing composition of Watersheds B, C, D and E includes a low area in Watershed C in the existing corral area that is piped to the existing man-made ponding area in Watershed D, which then overflows toward Watershed E and the northerly resource areas off site. The northeasterly flow is identified as Watershed P, consists of approximately 3.432 acres, and is designated as Comparison Point 3. The easterly flow is identified as Watershed G, consists of approximately 0.657 acres, and is designated as Comparison Point 4. The existing watershed map shows the overland flow paths to the points of comparison. Under the proposed condition, Watershed A' continues to flow toward the west, however, the impervious area is reduced due to the driveway relocation, shown as Comparison Point 1. The tributary sub-watersheds B', C1', C2', D' and E' are combined to provide the proposed flow to Comparison Point 2. Watersheds B' and C' encompass all of the roadway impervious area, all of the new home driveways, as well as portions of the new home roof areas. This captured flow is directed to a proposed detention basin located on Lot 1 and 2 in Watershed C2% in the vicinity of the existing 10" pipe entrance. The existing pipe is retained, however, a new control structure is added at the top of the proposed detention basin berm to regulate the basin outflow. The impact of this controlled outflow from the proposed basin, shown on the attached Detention �b, ff 15o 101, is It \..Vzo 0 1V Its ID 4-1 d -0 f 49 4 179V/ 461. pp.. 'N 1ts I All O\ iy ' .�O ��/�� `' ^+~'pr�i `y`U3 /.� ii I t - -V11j,0 USGS SURVEY MAP EAST PASTURE CIRCLE sourH GROVELAND QUADRANGLE, NORTH ANDOVER,, MA `1 174 69 l•a � �`�� \ �'.\�� L�.:::� ��\ "^.//�;;j:'� - ��` _ �' �fir` .ifs%•� ' \•°0 �y'�� tJ �i�,ii f U L/r\ Ml ci OGJ 10 u' �.- �•�-�:•. '�•x..- .�� '- Imo---r •... �'�` � .i �' `•� '` fl . �f,1.... try .• < <,�• -- � �', '��:-•�_��•- ��, .O � (,� so '� 13 ! L y PK�'��U'V SOILS MAP EAST PASTURE CIRCLE (BASED ON SHEET #36) NORTH ANDOVER, MA USDA SOIL CONSERVATION SERVICE REFER TO FILE # NbA-(xs4S NAME ='- s S DATE /Z HAYES ENGINEERING, INC, MADE BY 603 SALEM STREET WAKEFIELD, MA 01880 MEMO TEL.; (617) 246-2800 FAX: (617) 246-7596 1 CALCULATION C a$AglµsD a ovrFWW oal _._ I❑ .. A - - - ____ _.acv oar. FLOW I ---..... -- — --- ............ .... PouDs.aoc, B G CNzGI - �;,�,�, .003 G�1=8o C - N=�9--- ----- --- -- _ 3 -- -— 3A32A:. . t:.3 .cte Gl=ro I �C14S_TLL_G W.ATR tkJZ D-- Nho C - -ElPa,►�Ts_0�_C�p�Q,� REFER TO FILE # j1f off}-Oo ,„� NAME DATE /2/3of 94 HAYES ENGINEERING, INC. MADE BY 603 SALEM STREET --- WAKEFIELD, MA 018BO MEMO TEL.: (617) 246-2800 FAX: (617) 246-7596 Er CALCULATION 2 poN 0 Coµ$Lu -_ vusri.aw puYFj pt�S -OLD P0141) Fil -� - - PoHDLA 3 - E CN=73 NEW or�p C; Z a 0.334144;_ 3 --- �N'&4 t- 33�"' 3.43oAc Lr+1 =lF l t :3f3�`` ._...... -- t=,1z r ,� Mitigative Drainage Analysis East Pasture Circle, North Andover, MA January 5, 1995 Basin Performance Summary TABLE I, results in reduced flows when the watersheds are combined at Comparison Point 2. The central portion of the site contained by Watershed F in the proposed condition is slightly reduced in area, due to the redirection of the proposed home, driveways and portions of the roofs being redirected to the proposed detention basin. Therefore, the proposed modification of this watershed results in a slight increase of 0.04 cfs for the 1 and 2-year design storms and reductions in the 10 and 100-year design storms, as shown at Comparison Point 3. The balance of the site flow to the east, designated as Watershed G' in the proposed condition, will result in no change from the existing conditions, as shown at Comparison Point 4. A summary of the comparative analysis points for the pre and post development conditions is shown on TABLE III. The results of the comparative analysis indicates that the proposed stormwater management plan for East Pasture Circle is effective for controlling the post development flows and mitigates potential increases due to the increased impervious areas. WATER QUALITY ENHANCEMENT Under the proposed condition, Watersheds B' and C', which encompasses all of the roadway, as well as the majority of the driveway and home impervious areas, is collected via the piped drainage system and discharged to the stormwater management area in the vicinity of the existing shed on Lot 2. The proposed piped stormwater drainage system will include the installation of sumps with gas traps to intercept potential runoff pollutants. The piped drainage is then directed to the proposed stormwater management area, which discharges the street drainage flow to a level spreader rip rap section which diffuses and reduces the velocity of the outflow. The flow then discharges through a crushed stone filter, and overland along the floor of the detention basin approximately 75 feet with a slope of approximately 0.67%. The vegetated basin floor also incorporates three (3) vegetated berms across the basin floor to encourage recharge and contact time. The discharge from the proposed basin then flows through the existing pond in Watershed D' for further enhancement, and then flows overland through established vegetated areas. During construction, and until the proposed detention basin floor has been fully vegetated, a series of temporary hay bales will be installed along the floor to prevent siltation to the downstream resource areas. The proposed rip-rap level spreader area will be over excavated to serve as a temporary siltation basin during construction. The proposed crushed stone filter will be installed and maintained throughout the active construction period. When the temporary hay bales and siltation basin are no longer deemed necessary, the rip-rap level spreader area will be cleaned and shaped to the final grades shown on the plan, and the crushed stone filter will be replaced and cleaned as needed. Mitigative Drainage Analysis East Pasture Circle, North Andover, MA January 5, 1995 DETENTION BASIN PERFORMANCE SUMMARY PROPOSED CONDITION EAST PASTURE CIRCLE NORTH ANDOVER, MASSACHUSETTS TABLE l STORM EVENT PEAK FLOW IN PEAK FLOW OUT MAXIMUM cfs cfs WATER LEVEL 1 Yr. 0.69 0.20 187.92 2 Yr. 1.18 0.28 188.16 10 Yr. 2.96 0.48 189.11 100 Yr. 6.35 0.78 190.83 Outlet control structure: 4" diameter orifice discharge at elevation 187.50 Manhole overflow weir at elevation 190.83 Emergency overflow at elevation 191.50 Top of berm at elevation 192.00 I I Mitigative Drainage Analysis East Pasture Circle, North Andover, MA January 5, 1995 COMPARATIVE ANALYSIS EAST PASTURE CIRCLE NORTH ANDOVER, MASSACHUSETTS SUMMARY OF FLOWS TABLE II STORM COMPARISON EXISTING PROPOSED CHANGE EVENTS POINTS CONDITION CONDITION Cfs Cfs Cfs 1 0.06 0.03 - 0.03 1 Yr. 2 0.84 0.71 - 0.13 2.6724 hr. 3 0.23 0.27 + 0.04 4 0.08 0.08 0.0 1 0.10 0.07 - 0.03 2 Yr. 2 1.38 1.08 - 0.30 3.1"/24 hr. 3 0.61 0.65 + 0.04 4 0.19 0.19 0.0 1 0.25 0.20 - 0.05 10 Yr. 2 3.54 2.26 - 1.28 4.6"/24 hr. 3 2.38 2.33 - 0.05 4 0.63 0.63 0.0 100 Yr. 1 0.54 0.47 - 0.07 7.0"124 hr. 2 7.46 4.12 - 3.34 3 6.20 5.89 - 0.31 4 1.51 1.51 0.0 Comparison Points Description 1 Flow to westerly watershed off site 2 Flow to northerly watershed off site 3 Flow to northeasterly watershed off site 4 Flow to easterly watershed off site 7 Mitigative Drainage Analysis East Pasture Circle, North Andover, MA 1 January 5, 1995 E i CONCLUSION I The proposed stormwater management plan for the East Pasture Circle subdivision has been designed to mitigate the potential increase in peak rates of discharge caused by the increased impervious area through the use of a detention basin, as shown in the summary tables. The overall design also incorporates acknowledged design techniques to enhance water quality aspects of surface runoff. Therefore, these design features, as well as the implementation of sedimentation and erosion control plan, will result in negligible impacts to the downstream resource areas and/or watersheds. i I 7 1 1 I EXISTING CONDITION ►NATERSHED EAST PASTURE ESTATES NORTH ANDOVER, MA TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : A --- - --- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 159 (61) - - Impervious Areas Paved parking lots, roof's, driveways - . 035 (98) -- - Total Area (by Hydrologic Soil Group) . 194 ------------------------------------------------------------------------------- SUBAREA: A TOTAL DRAINAGE AREA: . 194 Acres WEIGHTED CURVE NUMBER:68 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : B ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 535(61) - - Impervious Areas Paved parking lots, roofs, driveways - . 023 (98) - - OTHER AGRICULTURAL LANDS Woods good - . 187 (55) - - Total Area (by Hydrologic Soil Group) .745 ------------------------------------------------------------------------------- SUBAREA: B TOTAL DRAINAGE AREA: .745 Acres WEIGHTED CURVE NUMBER:61 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : C ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) - - --FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - .751.(61) - - Impervious Areas Paved parking lots, roofs, driveways - . 014 (98) - - OTHER AGRICULTURAL LANDS Woods good - . 422 (55) - Total Area (by Hydrologic Soil Group) 1. 18 ------------------------------------------------------------------------------------ SUBAREA: C TOTAL DRAINAGE AREA: 1. 187 Acres WEIGHTED CURVE NUMBER:59 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : D ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A H C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 16(61) - . 271(80) Impervious Areas Paved parking lots, roofs, driveways - . 184 (98) Total Area (by Hydrologic Soil Group) .344 . 271 ------------------------------------------------------------------------------- SUBAREA: D TOTAL DRAINAGE AREA: . 615 Acres WEIGHTED CURVE NUMBER: 80 ------------------------------------------------------------------------------- TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : E Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 566(61) - . 367 (80) Impervious Areas Paved parking lots, roofs, driveways - . 02 (98) - - Total Area (by Hydrologic Soil Group) . 586 . 367 --------------------W_--------------------------------------------------------- SUBAREA: E TOTAL DRAINAGE AREA: .953 Acres WEIGHTED CURVE NUMBER: 69 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : F ------------------------_------------------------------------------------_---_---- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - 2 . 61(61) - - Impervious Areas Paved parking lots, roofs, driveways - .064 (98) - - OTHER AGRICULTURAL LANDS Woods good .758 (55) - Total Area (by Hydrologic Soil Group) 3 . 43 --------------------------------------------------------------------_----------------- SUBAREA: F TOTAL DRAINAGE AREA: 3.432 Acres WEIGHTED CURVE NUMBER: 60 ----------------------------------_--------------------_-_---------------_---------- TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT Subarea : G ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ----------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns parks etc. ) Good condition; grass cover > 75% - .657 (61) - - i Total Area (by Hydrologic Soil Group) . 657 ------------------------------------------------------------------------------- SUBAREA: G TOTAL DRAINAGE AREA: .657 Acres WEIGHTED CURVE NUMBER: 61 ------------------------------------------------------------------------------- TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT ------------------------------------- Subarea #1 - A ----------------------------------- Flow Type 2 year Length slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3. 1 75 . 03 F 0. 163 Time of Concentration = 0. 16* -------------------------------- Subarea #2 - B --------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ---Sheet 3 . 1 100 .008 H 0.525 Shallow Concent'd 60 .005 U 0.015 Time of Concentration = 0. 54* -------------------------------- Subarea #3 - C -----------_------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) Sheet___----- 3 . 1 100 . 03 H 0.309 Shallow Concent'd 260 .0625 U 0.018 Time of Concentration = 0. 33* ----------------------- --------- Subarea #4 - D ------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ---- - Sheet 3. 1 100 .037 F 0. 189 Shallow Concent'd 65 . 18 U 0.003 Time of Concentration = 0. 19* -------------------------------- Subarea #5 - E -----_----------__------_------ Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) -Sheet 3. 1 100 .048 F 0.170 Shallow Concent'd 40 .048 U 0.003 Time of Concentration = 0. 17* I TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: EXISTING CONDITION WATERSHED ASSESSMENT -------------------------------- Subarea #6 - F Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) --------------------------------------------------....__--_-------------------____ Sheet 3 . 1 100 . 028 H 0.318 Shallow Concent'd 200 . 009 U 0. 036 Shallow Concent'd 250 .034 U 0.023 Time of Concentration = 0. 38* --------------- ------ Subarea #7 - G Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3 . 1 100 . 12 F 0. 118 Shallow Concent'd 60 . 12 U 0.003 Time of Concentration = 0. 12* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated ---- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short LIST OF INPUT DATA FOR TR-20 IIYDROLDGY****************** JOB TR-20 FULLPRINT SUMMARY NOPLOTS TITLE 001 EAST PASTURE ESTATES EXISTING CONDITION TITLE TYPE III STORM DISTRIBUTION 24 HOUR DURATION 5 RAINFL 9 .25 8 0.0 .0025 .005 .0075 .010 8 .0125 .015 .0175 .020 .0225 8 .026 .0285 .031 .0345 .037 8 .0405 .043 .0465 .050 .0535 8 .057 .0605 .064 .068 .072 8 .076 .080 .0845 .089 .094 8 .100 .1075 J 15 .1225 .130 8 .1385 .148 .157 .167 .178 8 .189 .202 .216 .2315 .250 8 ,271 .298 .3455 .500 .6555 8 .702 .7295 .751 .769 .785 8 .7985 .811 .823 .834 .8435 8 .853 .862 .870 .8785 .886 8 .8935 .900 .907 .911 .916 8 .920 .9245 .929 .9325 .936 8 .940 .944 .947 .951 .954 8 .957 .9605 .963 .9665 .969 8 .9725 .975 .9775 .981 .9835 8 .986 .9885 .991 .9935 .996 8 .9985 1.0 1.0 1.0 1.0 9 ENDTBL 3 STRUCT 01 8 186.25 0.0 0.0 8 187.5 2.42 .006600 8 188. 3.06 .013753 8 188.2 3130 .018072 8 188.3 8.49 .020874 8 188.5 32.1 .029347 9 ENDTBL 3 STRUCT 02 8 184.5 0.0 .106 8 185. 37.39 .135 8 185.3 78.46 .152 9 ENDTBL 6 RUNOFF 1 001 1 .0003031 68. .16 1 1 1 1 6 RUNOFF 1 002 2 .001164 61. .54 1 1 1 1 6 RUNOFF 1 003 3 .0018546 59. .33 1 1 1 1 6 ADDHYD 4 004 2 3 4 1 1 1 1 6 RESVOR 2 01 4 2 186.25 1 1 1 1 1 6 RUNOFF 1 005 3 .0009609 80. .19 1 1 1 1 6 ADDHYD 4 006 2 3 4 1 1 1 1 6 RESVOR 2 02 4 3 184.5 1 1 1 1 1 **********************80 80 LIST OF 114PUT DATA 6 RUNOFF 1 007 4 .001489 69. .17 1 1 1 1 6 ADDNYD 4 008 4 3 2 1 1 1 1 6 RUNOFF 1 009 3 .0053625 60. .38 1 1 1 1 6 RUNOFF 1 010 4 .0010265 61. .12 1 1 1 1 ENDATA 7 INCREH 6 0.08 7 COHPUT 7 001 010 0.0 2.6 1.0 9 2 01 01 ENDCHP 1 7 COHPUT 7 001 010 0.0 3.1 1.0 9 2 01 02 ENDCHP 1 7 COHPUT 7 001 010 0.0 4.6 1.0 9 2 01 03 ENDCHP 1 7 COHPUT 7 001 010 0.0 7.0 1.0 9 2 01 04 ENDCHP 1 ENDJOB 2 **************** **************END OF 80-80 LIST* **************►*:************* TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 1 EXECUTIVE CONTROL OPERATION INCREM MAIN TIME INCREMENT = .08 HOURS RECORD ID EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 10 RECORD I0 STARTING TIME = .00 RAIN DEPTH = 2.60 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 1 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION i OUTPUT HYDROGRAPH= 1 AREA= .00 SQ MI INPUT RUNOFF CURVE= 68. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 16.72 .01 (RUNOFF) 12.24 .06 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 11.20 OISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 12.00 015CHG .02 .03 .05 .06 .06 .04 .03 .03 .02 .02 12.80 DISCHG .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 13.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 14.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 15.20 DISCIIG .01 ,01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .33 WATERSHED INCHES, .06 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS *** WARMING-NO PEAK FOUND, MAXIMUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK OISCHARGE(CFS) PEAK ELEVATION(FEET) 23.76 .01 (RUNOFF) 12.64 .05 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.ME. 12.00 DISCHG .00 .00 .00 .01 .02 .04 .05 .05 .05 .05 12.80 DISCHG 05 .04 .04 .04 .04 .03 .03 .03 .03 .03 13.60 DISCHG .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 14.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE Z 16.00 DISCHG .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 16.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISGiG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .22 WATERSHED INCHES, .17 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 59. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCIIARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.48 .07 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TINE INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .00 .00 .02 .04 .06 .07 .06 .06 .05 12.80 DISCHG .05 .04 .04 .04 .04 .04 .04 .03 .03 .03 13.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 14.40 DISCHG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.80 DISCHG .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .18 WATERSHED INCHES, .21 CFS-HRS, .02 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB i PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 3 PEAK TIME(IRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.76 .01 (NULL) 12.56 .12 (NULL) TIHE(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .00 .00 .03 .07 .10 .11 .12 .11 .10 12.80 DISCHG .10 .09 .08 .08 .07 .07 .07 .06 .06 .06 13.60 DISCHG 06 .06 .05 .05 .05 .05 .05 .05 .05 .05 14.40 DISCHG .05 .05 .05 .05 .04 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 16.00 DISCHG .04 .04 .04 .04 .D4 .04 .03 .03 .03 .03 16.80 DISCHG .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG D2 .02 .01 .01 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 01 RUNOFF VOLUME ABOVE BASEFLOW = .19 WATERSHED INCHES, .38 CFS-HRS, .03 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPN= 4 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.76 .01 186.26 12.56 .12 186.31 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .00 .00 .02 .05 .09 .11 .12 .11 .11 12.00 ELEV 186.25 186.25 186.25 186.26 186.28 186.29 186.31 186.31 186.31 186.31 12.80 DISCHG .10 .09 .09 .08 .08 .07 .07 .07 .06 .06 12.80 ELEV 186.30 186.30 186.29 186.29 186.29 186.29 186.29 186.28 186.28 186.28 13.60 DISCHG .06 .06 .06 .05 .05 .05 .05 .05 .05 .05 13.60 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 14.40 DISCHG .05 .05 .05 .05 .04 .04 .04 .04 .04 .04 14.40 ELEV 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 15.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 15.20 ELEV 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 16.00 DISCHG .04 .04 .04 .04 .04 .04 .03 .03 .03 .03 16.00 ELEV 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 16.80 DISCHG .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 16.80 ELEV 186.27 186.27 186.27 186.26 186.26 186.26 186.26 186.26 186.26 186.26 TR20 XE0 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 4 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 17.60 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 196.26 186.26 186.26 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 ELEV 186.26 186.26 186.26 186.26 M.26 186.26 186.26 186.26 1II6.26 186.26 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 21.60 DISCHG .02 .02 .01 .01 .02 .02 .02 .02 .02 .02 21.60 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 22.40 DISCHG .02 .02 .01 .01 .01 .01 .01 .01 .01 .01 22.40 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 196.26 186.26 186.26 RUNOFF VOLUME ABOVE BASEFLOW = .19 WATERSHED INCHES, .38 CFS-HRS, .03 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 80. TIME Of CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS *"* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCNARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .47 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 S4.MI. 10.40 DISCHG .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 11.20 DISCHG .02 .02 .02 .03 .03 .04 .05 .07 .12 .23 12.00 DISCHG .31 .37 .43 .47 .45 .31 .22 .18 .14 .12 12.80 DISCHG .11 .09 .09 .08 .08 .07 .07 .07 .07 .06 13.60 DISCHG .06 .06 .05 .05 .05 .05 .05 .05 .05 .05 14.40 DISCHG .05 .05 .04 .04 D4 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .03 .03 .03 .04 .04 .03 .03 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .D2 .02 .02 .02 .02 .02 .02 .02 .02 . 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .01 .01 .01 .02 .02 .02 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .02 .01 .01 .01 .01 .01 .01 20.80 DISCHG .02 .01 .01 .01 .01 .01 .02 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .02 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 D1 .01 .01 .01 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 5 RUNOFF VOLUME ABOVE BASEFLOW = .95 WATERSHED INCHES, .59 CFS-HRS, .05 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .03 CFS. PEAK TIME(HRS) PEAK OISCIIARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 (NULL) 12.32 .50 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 10.40 DISCHG .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 11.20 DISCHG .02 .02 .02 .03 .03 .04 .05 .07 .12 .23 12.00 DISCHG .31 .37 .43 .49 .50 .40 .33 .30 .25 .22 12.80 DISCHG .21 .19 .17 .16 .15 .14 .14 .13 .13 .12 13.60 DISCHG .12 .11 .11 .11 .10 .10 .10 .10 .10 .10 14.40 DISCHG .09 .09 .09 .09 .09 .08 .08 .08 .08 .08 15.20 DISCHG .08 .08 .08 .07 .07 .07 .07 .07 .07 .07 16.00 DISCHG .07 .07 .07 .07 .07 .07 .06 .06 .06 .06 16.80 DISCHG .06 .06 .05 .05 .05 .05 .05 .04 .04 .04 17.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 18.40 DISCHG .04 .03 .03 .04 .04 .04 .04 .04 .04 Am 19.20 DISCHG .03 .03 .03 .03 .04 .04 .03 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.80 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 21.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .02 .02 RUNOFF VOLUME ABOVE BASEFLOW _ .38 WATERSHED INCHES, .97 CFS-HRS, .08 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 *; WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .03 CFS. PEAK TIME(HRS) PEAK 01SCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 184.50 12.32 .51 184.51 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 11.20 DISCHG .02 .02 .02 .02 .03 .04 .05 .06 .i1 .21 11.20 ELEV 184.50 184.50 184.50 1B4.50 184.50 184.50 184.50 184.50 184.50 184.50 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB i PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 LIO(JR DURATION PAGE 6 12.00 DISCHG .31 .37 .42 .48 .51 .42 .33 .30 .26 .23 12.00 ELEV 184.50 184.50 184.51 184.51 184.51 184.51 184.50 184.50 184.50 184.50 12.80 DISCHG .21 .19 .17 .16 .15 .15 .14 .13 .13 i3 12.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 13.60 DISCHG 12 .12 .11 .11 .10 .10 .10 .10 .10 .10 13.60 ELEV 184.50 184.50 184.50 1&4.50 184.50 184.50 164.50 184.50 184.50 184.50 14.40 DISCHG i0 .09 .09 .09 .09 .08 .08 .08 .08 .08 14.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 15.20 DISCHG .08 .08 .08 .07 .07 .07 .07 .07 .07 .07 15.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.00 DISCHG .07 .07 .07 .07 .07 .07 .06 .06 .06 .06 16.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.80 DISCHG .06 .06 .05 .05 .05 .05 .05 .04 .04 .04 16.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 .184.50 17.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 17.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 18.40 DISCHG 04 .03 .03 .04 .04 .04 .04 .04 .04 .04 18.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 19.20 DISCHG .03 .03 .03 .03 D4 .04 .03 .03 .03 .03 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.80 DISCHG 03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.80 ELEV 184.50 194,50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .03 .03. .03 .03 .03 .03 .03 .03 .03 .03 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .02 .02 23,20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = .38 WATERSHED INCHES, .97 CFS-HRS, .08 ACRE-FEET) BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .17 HOURS INTERNAL. HYDROGRAPH TIME INCREMENT= .0227 HOURS WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.32 .33 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 Sa.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .01 .05 12.00 DISCHG .12 .19 .26 .33 .33 .22 .16 .14 .11 .10 12.80 DISCHG .09 .08 .07 .07 .07 .06 .06 .06 .06 .06 13.60 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 7 14.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .03 .03 .03 .03 .03 .03 .03 .03 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .01 .01 .02 .02 .02 .02 .01 .01 .01 .01 20.00 DISCHG .01 .01 .02 .02 .02 .01 .01 .01 .01 .02 20.80 DISCHG .02 .01 .01 .01 .01 .02 .02 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .02 .02 .02 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .46 WATERSHED INCHES, .45 CFS-HRS, .04 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 4,3 OUTPUT HYDROGRAPH= 2 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .04 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .04 (NULL) 12.32 .84 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.ME. 10.40 DISCHG .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 11.20 DISCHG .02 .02 .02 .02 .03 .04 .05 .06 .12 .27 12.00 DISCHG .43 .56 .68 .81 .84 .64 .49 .44 .37 .32 12.80 DISCHG .30 .27 .25 .24 .22 .21 .20 .19 .19 .18 13.60 DISCHG .18 .17 .16 .16 .15 .15 .15 .15 .14 .14 14.40 DISCHG .14 .14 .13 .13 .12 .12 .12 .12 .12 .12 15.20 DISCHG .12 .11 .11 .11 .11 .11 .11 .11 .11 .10 16.00 DISCHG .10 .10 .10 .10 .10 .09 .09 .09 .09 .09 16.80 DISCHG .09 .08 .07 .06 .06 .07 .07 .06 .06 .06 17.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .05 .05 18.40 DISCHG .05 .05 .05 .05 .05 .05 .06 .06 .06 .05 19.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 20.00 DISCHG .04 .04 .05 .05 .05 .04 .04 .04 .04 .05 20.80 DISCHG .05 .04 .04 .04 .04 .05 .05 .05 .04 .04 21.60 DISCHG .04 .04 .04 .04 .04 .05 .05 .04 .04 .04 22.40 DISCHG .04 .04 .04 .04 D4 D4 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .03 RUNOFF VOLUME ABOVE BASEFLOW = .40 WATERSHED INCHES, 1.42 CFS-HRS, .12 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDROGRAPH= 3 AREA= .01 SQ MI INPUT RUNOFF CURVE= 60. TIME OF CONCENTRATION= .38 HOURS TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 8 INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .03 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 (RUNOFF) 12.48 .23 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 12.00 DISCHG .00 .00 .02 .07 .14 .21 .23 .23 .21 .19 12.80 DISCHG .17 .16 .15 .14 .13 .12 .12 .11 .11 .11 13.60 DISCHG .10 .10 .10 .10 .09 .09 .09 .09 .09 .09 14.40 DISCHG .09 .09 .08 .08 .08 .08 .08 .07 .07 .07 15.20 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .07 16.00 DISCHG .07 .07 .07 .06 .06 .06 .06 .06 .06 .06 16.80 DISCHG .06 .06 .05 .05 .04 .04 .04 .04 .04 .04 17.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 18.40 DISCHG .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 19.20 DISCHG .04 .03 .03 .03 .03 .04 .04 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.80 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 21.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .02 RUNOFF VOLUME ABOVE BASEFLOW = .20 WATERSHED INCHES, .69 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 10 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .12 HOURS INTERNAL HYDROGRAPH TINE INCREMENT--' .0160 HOURS *** WARNING-NO PEAK FOUND, MAXIliUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.32 .08 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .01 .04 .08 .08 .05 .05 .04 .03 .03 12.80 DISCHG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 13.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 14.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB I PASS i REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 9 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCNG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCNG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCNG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 Al .01 .00 RUNOFF VOLUME ABOVE BASEFLOU = .22 WATERSHED INCHES, .15 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS EXECUTIVE CONTROL OPERATION ENDC14P COMPUTATIONS COMPLETED FOR PASS 1 RECORD 1D TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 10 EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 10 RECORD ID STARTING TIME = .00 RAIN DEPTH = 3.10 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. HOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 2 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPII= 1 AREA= .00 SQ HI INPUT RUNOFF CURVE= 68. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 18.00 .01 (RUNOFF) 12.24 .10 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .01 .03 12.00 DISCHG .05 .07 .09 .10 .10 .06 .05 .04 .03 .03 12.80 DISCHG .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 13.60 DISCHG .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 14.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 15.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .01 .01 .00 .01 .01 .01 .01 .00 .00 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .56 WATERSHED INCHES, .11 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS *•* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.76 .01 (RUNOFF) 12.56 .13 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .01 .03 .05 .08 .11 .13 .13 .12 .11 12.80 DISCHG .10 .09 .08 .07 .07 .06 .06 .05 .05 .05 13.60 DISCHG .05 .04 .04 .04 .04 .04 .04 .04 .04 .03 14.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 15.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.00 DISCHG .03 .03 .02 .02 .02 .02 .02 .02 .02 .02 16.80 DISCHG 02 .02 .02 .02 .02 .02 .02 .02 .02 .02 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION SOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 11 17.60 DISCHG .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .40 WATERSHED INCHES, .30 CFS-HRS, .02 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 59. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.40 .20 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .02 .06 .11 .17 .20 .18 .16 .14 .12 12.80 DISCHG .10 .09 .08 .08 .07 .07 .07 .06 .06 .06 13.60 DISCHG .06 .06 .05 .05 .05 .05 .05 .05 .05 .05 14.40 DISCHG .05 .05 .04 .04 .04 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .01 .01 .01 .02 20.80 DISCHG .02 .02 .02 .01 .01 .02 .02 .02 .02 .01 21.60 DISCHG .01 .01 .01 .01 .01 .02 .02 .02 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .33 WATERSHED INCHES, .40 CFS-HRS, .03 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .02 CFS. TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 12 PEAK TIME(IRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (NULL) 12.48 .31 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .03 .08 .17 .26 .31 .31 .29 .26 .23 12.80 DISCHG .20 .18 .16 .15 .14 .13 .12 .12 .11 .11 13.60 DISCHG .10 .10 .10 .09 .09 .09 .09 .08 .08 .08 14.40 DISCHG .08 .08 .08 .08 .07 .07 .07 .07 .07 .07 15.20 DISCHG .07 .07 .07 .06 .06 .06 .06 .06 .06 .06 16.00 DISCHG .06 .06 .06 .06 .06 .06 .05 .05 .05 .05 16.80 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .04 17.60 DISCHG .03 .03 .03 .04 .04 .04 .04 .03 .03 .03 18.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 19.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .02 .02 .03 20.80 DISCHG .03 .03 .03 .02 .02 .03 .03 .03 .03 .03 21.60 DISCHG .02 .02 .02 .02 .02 .03 .03 .03 .03 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 D[SCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME ABOVE BASEFLQW = .36 WATERSHED INCHES, .70 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .02 CfS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.76 .02 186.26 12.48 .31 186.41 TIME(IRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .02 .06 .13 .22 .29 .31 .30 .27 .24 12.00 ELEV 186.25 186.26 186.28 186.32 186.36 186.40 186.41 186.40 186.39 186.37 12.80 DISCHG .21 .19 .17 .15 .14 .13 .13 .12 .11 .11 12.80 ELEV 186.36 186.35 186.34 186.33 186.32 186.32 186.31 186.31 186.31 186.31 13.60 DISCHG .11 .10 .10 .09 .09 .09 .09 .08 .08 .08 13.60 ELEV 186.30 186.30 186.30 186.30 186.30 186.30 186.29 186.29 186.29 186.29 14.40 DISCHG .08 .08 .08 .08 .07 .07 .07 .07 .07 .07 14.40 ELEV 186.29 186.29 186.29 186.29 186.29 186.29 186.29 186.29 186.29 186.29 15.20 DISCHG .07 .07 .07 .06 .06 .06 .06 .06 .06 .06 15.20 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 16.00 DISCHG .06 .06 . .06 .D6 .06 .06 .06 .05 .05 .05 16.00 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 166.28 16.80 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .04 16.80 ELEV 186.28 186.28 186.28 186.27 186.27 186.27 186.27 186.27 186.27 186.27 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 13 17.60 DISCHG .04 .03 .03 04 .04 .04 .04 .04 .03 .03 17.60 ELEV 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 186.27 18.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 18.40 ELEV 186.27 186.27 186.27 186.27 186.2T 186.27 186.27 186.27 186.27 186.27 19.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 19.20 ELEV 186.27 186.27 186.26 186.26 186.27 186.27 186.27 186.27 186.26 186.26 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .02 .03 20.00 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26' 20.80 DISCHG .03 1 .03 .03 .03 .02 .02 .03 .03 .03 .03 20.80 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 21.60 DISCHG .02 .02 .02 .02 .02 .02 .03 .03 .03 .03 21.60 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 23.20 DISCHG .02 .02 .02 .02 O2 .02 .02 .02 .02 .02 23.20 ' ELEV 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 186.26 RUNOFF VOLUME ABOVE BASEFLOW w .36 WATERSHED INCHES, .70 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CF5 OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 80. TIME OF CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT- .0253 HOURS WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .65 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 10.40 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 11.20 DISCHG .03 .03 .04 .05 .05 .07 .09 .11 .19 .35 12.00 DISCHG .46 .54 .60 .65 .62 .42 .30 .24 .19 .15 12.80 DISCHG .14 .13 .12 .11 .10 .10 .09 .09 .09 .08 13.60 DISCHG .08 .07 .07 .07 .07 .07 .07 .06 .06 .06 14.40 DISCHG .06 .06 .06 .06 .05 .05 .05 .05 .05 .05 15.20 DISCHG .05 .05 .05 .05 .04 .04 .05 .05 .05 .04 16.00 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 16.80 DISCHG .04 .03 .03 .02 .03 .03 .03 .03 .02 .02 17.60 DISCHG .02 .02 .03 .03 .03 .03 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .OR .02 .02 .02 .02 .02 .02 .02 .01 21.60 DISCHG .01 .01 .01 .02 .02 .02 .02 .02 .02 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 i i TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION J08 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 14 RUNOFF VOLUME ABOVE BASEFLOW = 1.32 WATERSHED INCHES, .82 CFS-HRS, .07 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPHI= 4 *"* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .04 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .04 (NULL) 12.32 .84 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 10.40 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 11.20 DISCRG .03 .03 .04 .05 .05 .07 .09 .11 .19 .35 12.00 DISCHG .46 .55 .66 .78 .84 .71 .60 .54 .46 .39 12.80 DISCHG .35 .31 .28 .27 .25 .23 .22 .21 .20 .19 13.60 DISCHG .19 .18 .17 .16 .16 .15 .15 .15 .15 .15 14.40 DISCHG .14 .14 .14 .13 .13 .12 .12 .12 .12 .12 15.20 DISCHG .12 .12 .11 .11 .11 .11 .11 .11 .11 .10 16.00 DISCHG .10 .10 .10 .10 .10 .10 .09 .09 .09 .09 16.80 DISCHG .09 .08 .07 .07 .07 .07 .07 .06 .06 .06 17.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .05 .05 18.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 19.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 20.00 DISCHG 04 .04 .05 .05 .05 .04 .04 .04 .04 .04 20.80 DISCHG .05 .04 .04 .04 .04 .04 .05 .04 .04 .04 21.60 DISCHG .04 .04 .04 .04 .04 .04 .05 .04 .04 .04 22.40 DISCHG 04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 A4 .04 .04 .04 .04 .04 .04 .03 RUNOFF VOLUME ABOVE BASEFLOW = .59 WATERSHED INCHES, 1.52 CFS-HRS, .13 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 i *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .04 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .04 184.50 12.32 .84 184.51 TIME(HRS) FIRST HYOROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 9.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 M.50 184.50 184.50 10.40 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 15 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 194.50 184.50 11.20 DISCHG .03 .03 .04 .05 .05 06 .09 .11 .17 .32 11.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 12.00 DISCHG .45 .54 .65 .76 .84 .74 .61 .55 .47 .40 12.00 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 12.80 DISCHG .36 .32 .29 .27 .25 .23 .22 .21 .20 .19 12.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 13.60 DISCHG .19 .18 .17 .16 .16 .16 .15 .15 .15 .15 13.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 14.40 DISCHG .14 .14 .14 .13 .13 .12 .12 .12 .12 .12 14.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 15.20 DISCHG .12 .12 .11 .11 .11 .11 .11 .11 .11 .11 15.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.00 DISCHG .10 .10 .10 .10 .10 AD .09 D9 .09 .09 16.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 194.50 184.50 16.80 DISCHG .09 .08 .08 .07 .07 .07 .07 .06 .06 .06 16.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 17.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .05 .05 17.60 ELEV 184.50 184.50 194.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 18.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 18.40 ELEV 184.50 184.50 194.50 184.50 184.50 184.50 194.50 184.50 184.50 184.50 19.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.00 DISCHG .04 .04 .05 .05 .05 .04 .04 .04 .04 .04 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.80 DISCHG .05 .04 .04 .04 .04 .04 .05 .05 .04 .04 20.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .04 .04 .04 .04 .04 .04 .05 .04 .04 .04 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .03 23.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = .59 WATERSHED INCHES, 1.52 CFS-HRS, .13 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0227 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATIDN(FEET) 23.68 .02 (RUNOFF) 12.24 .54 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .O8 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .03 .07 .18 i i i i I I TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 2 , REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 16 12.00 DISCHG .28 .37 .46 .54 .53 .34 .25 .22 .17 .14 12.80 DISCHG .13 .12 .11 .11 .10 .09 .09 .09 .09 .08 13.60 DISCHG .08 .07 .07 .07 .07 .07 .07 .07 .07 .07 14.40 DISCHG .06 .06 .06 .06 .05 .05 .05 .05 .05 .05 15.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 16.00 o1SCHG .04 .o4 .04 .04 .o4 .o4 .04 .04 .04 .04 16.80 DISCHG .04 .03 .03 .03 .03 .03 .03 .03 .03 .02 17.60 DISCIIG .03 .03 103 .03 .03 .03 .03 .02 .02 .02 18.40 DISCIIG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCIIG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCIIG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCIIG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 oIsCIIG .02 .02 .02 .02 .02 .02 .02 .02 .02 ,02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .01 ,01 RUNOFF VOLUME ABOVE BASEFLOW = .72 WATERSHED INCHES, .69 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS.SECTION 8 INPUT HYDROGRAPHS= 4,3 OUTPUT HYDROGRAPH= 2 PEAK TIME(HRS) PEAK OISCHARGE(CFS) PEAK ELEVATION(FEET) 12.29 1.38 (HULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .Do .01 .01 .01 10.40 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .03 11.20 DISCHG .03 .03 .o4 .05 .05 .06 Jo .13 .25 .50 12.00 DISCHG .73 .91 1.11 1.31 1.36 1.08 .86 .76 .63 .54 12.80 DISCHG .49 .44 .40 .37 .35 .33 .31 .30 .29 .28 13.60 DISCHG .27 .25 .24 .24 :,=23 .22 .22 .22 .21 .21 14.40 DISCHG .21 .20 .20 .19 .18 .18 .18 .18 .17 .17 15,20 DISCHG .17 .17 .16 .16 .15 .15 .16 .16 .16 .15 16.00 DISCHG .15 .15 .15 .14 .14 .14 .13 .13 .13 .13 16.80 DISCHG .13 .12 .10 .09 .09 .10 .10 .09 .09 .08 17.60 DISCHG .08 .09 .09 .09 .09 .09 .09 .08 .08 .07 18.40 DISCHG .07 .07 .07 .07 .08 .08 .08 .08 .08 .07 19.20 DISCHG .07 .07 .07 .07 .08 .07 .07 .07 .06 .06 20.00 DISCHG .06 .06 .07 .07 .07 .06 .06 .06 .06 .07 20.80 DISCHG .07 .06 .06 .06 .06 .07 .07 .06 .06 .06 21.60 DISCHG .06 .05 .05 .06 .06 .07 .07 .06 .06 .06 22.40 DISCHG .05 D5 .05 .05 .05 .05 .05 .05 .05 .05 23.20 DISCHG .05 .05 .05 ,05 .05 .05 .05 .05 .05 .04 RUNOFF VOLUME ABOVE BASEFLOW = .63 WATERSHED INCHES, 2.21 CFS-HRS, .18 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB I PASS 2 REV PC 09/83(.2) TYPE [II STORM DISTRIBUTION 24 HOUR DURATION PAGE 17 OUTPUT HYDROGRAPH= 3 AREA= .01 SQ MI INPUT RUNOFF CURVE= 60. TIME OF CONCENTRATION= .38 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .04 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23,68 .04 (RUNOFF) 12.40 .61 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 12.00 DISCHG .01 .06 .17 .34 .52 .61 .60 .54 .46 .40 12.80 DISCHG .35 .31 .28 .26 .24 .22 .21 .20 .19 .19 13.60 DISCHG .18 .18 .17 .16 .16 .15 .15 .15 .15 .15 14.40 DISCHG .14 .14 .14 .14 .13 .13 .12 .12 .12 .12 15.20 DISCHG .12 .12 .12 .12 .11 .11 .11 .11 .11 .11 16.00 DISCHG .11 i1 .10 .10 .10 .10 .10 .10 .09 .10 16.80 DISCHG .10 .09 .08 .08 .07 .07 .07 .07 .07 .06 17.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 18.40 DISCHG .05 .05 .05 .05 .05 .06 .06 .06 .06 .06 19.20 DISCHG .06 .05 .05 .05 .05 .06 .05 .05 .05 .05 20.00 DISCHG .05 .05 .05 .05 .05 .05 .05 .04 .04 .05 20.80 DISCIIG .05 .05 .05 .04 .04 .05 .05 .05 .05 .05 21.60 DISCIIG .04 .04 .04 .04 .04 .05 .05 .05 .05 .04 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = .37 WATERSHED INCHES, 1.27 CFS-HRS, .10 ACRE-FEET; BASEFLOW .00 CFS OPERATION RUNOFF CROSS SECTION 10 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .12 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0160 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .19 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1.- 12.00 DISCHG .04 .09 .14 .19 .17 .10 .09 .08 .06 .06 12.80 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .04 13.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 14.40 DISCHG .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .02 .02 .02 .02 .02 .02 O2 .02 .02 16.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.80 DISCHG .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 18 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 Al .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLON = .40 WATERSHED INCITES, .27 CFS-HRS, .02 ACRE-FEET; BASEFLOW = .00 CFS i EXECUTIVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 2 RECORD ID I TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB I PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 19 EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 1G RECORD ID STARTING TIME = .00 RAIN DEPTH = 4.60 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 3 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPH= 1 AREA= .00 SQ MI INPUT RUNOFF CURVE= 68. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS ** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .25 (RUNOFF) TIM£(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 11.20 DISCHG .01 .01 .01 .01 .01 .02 .03 .03 .07 .13 12.00 DISCHG .17 .20 .23 .25 .23 .14 .10 .09 .07 .06 12.80 DISCHG .06 .05 .05 .04 .04 .04 .04 .04 .03 .03 13.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 14.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.80 DISCHG .02 .01 .01 .01 .01. .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = 1.59 WATERSHED INCHES, .31 CFS-HRS, .03 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.48 .47 (RUNOFF) I TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 YOUR DURATION PAGE 20 i TIME([fRS) FIRST HYDROGRAPH POINT .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M[. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .01 .02 .05 12.00 DISCHG .09 .16 .24 .33 .41 .46 .47 .45 .41 .35 12.80 DISCHG .30 .26 .23 .20 .18 .16 .15 .14 .13 .12 13.60 DISCHG .12 .11 .11 .10 .10 .09 .09 .09 .09 .08 14.40 DISCHG .08 .08 .08 .08 .07 .07 .07 .07 .07 .07 15.20 DISCHG .07 .07 .06 .06 .06 .06 .06 .06 .06 .06 16.00 DISCHG .06 .06 .06 .06 .05 .05 .05 .05 .05 .05 16.80 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .03 1T.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 18.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 19.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 OZ 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME A80VE BASEFLOW = 1.12 WATERSHED INCHES, .84 CFS-HRS, .07 ACRE-FEET; BASEFLOW = OD CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 59. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .03 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 (RUNOFF) 12.32 .80 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA W .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 D1 .04 .11 12.00 DISCHG .23 .38 .54 .69 .80 .78 .66 .54 .44 .36 12.80 DISCHG .30 .27 .24 .22 .20 .19 .18 .17 .16 .16 13.60 DISCHG .15 .14 .14 .13 .13 .13 .12 .12 .12 .12 14.40 DISCHG .12 .11 .11 .11 .10 .10 .10 .10 .10 .10 15.20 DISCHG .09 .09 .09 .09 .09 .09 .09 .09 .09 .09 16.00 DISCHG .08 .08 .08 .08 .08 .08 .07 .07 .07 .07 16.80 DISCHG .07 .07 .06 .05 .05 .05 .05 .05 .05 .05 17.60 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .04 .04 18.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 19.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 20.00 DISCHG .03 .03 .04 .04 .04 .04 .03 .03 .03 .03 20.80 DISCHG .04 .04 .03 .03 .03 .03 .04 .04 .03 .03 21.60 DISCHG .03 .03 .03 .03 .03 .04 .04 .04 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 TR20 XEO 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 21 RUNOFF VOLUME ABOVE BASEFLOW = 1.01 WATERSHED INCHES, 1.21 CFS-HRS, .10 ACRE-FEET; BASEFLOW = .00 CPS OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.38 1.25 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SR.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .02 .06 .16 12.00 DISCHG .32 .54 .77 1.02 1.21 1.25 1.14 .99 .84 .71 12.80 DISCHG .61 .53 .47 .42 .38 .35 .33 .31 .29 .28 13.60 DISCHG .27 .25 .24 .23 .22 .22 .21 .21 .20 .20 14.40 DISCHG .20 .19 .19 .18 .18 .17 .17 .17 .16 .16 15.20 DISCHG .16 .16 .16 .15 .15 .15 .15 .15 .15 .14 16.00 DISCHG .14 .14 .14 .14 .13 .13 .13 .12 .12 .12 16.80 DISCHG .12 .12 .11 .10 .09 .09 .09 .09 .09 .08 17.60 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .08 .07 18.40 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .07 19.20 DISCHG .07 .07 .06 .06 .07 .07 .07 .06 .06 .06 20.00 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .05 .06 20.80 DISCHG .06 .06 .06 .06 .05 .06 .06 .06 .06 .06 21.60 DISCHG .05 .05 .05 .05 .05 .06 .06 .06 .06 .05 22.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 23.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 RUNOFF VOLUME ABOVE BASEFLOW = 1.05 WATERSHED INCHES, 2.05 CFS-HRS, .17 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.41 1.24 186.89 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = 00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .DO' .00 .00 .01 .04 .12 f 11.20 ELEV 186.25 186.25 186.25 186.25 186.25 186.25 186.25 186.26 186.27 186.31 12.00 DISCHG .25 .45 .68 .92 1.13 1.24 1.19 1.05 .90 .77 12.00 ELEV 186.38 186.48 186.60 186.72 186.84 186.89 186.86 186.79 186.72 186.65 12.80 DISCHG .65 .56 .49 .44 .40 .36 .34 .31 .30 .28 12.80 ELEV 186.59 186.54 186.50 186.48 186.45 186.44 186.42 186.41 186.40 186.40 13.60 DISCHG .27 .26 .25 .24 .23 .22 .21 .21 .21 .20 13.60 ELEV 186.39 186.38 186.38 186.37 186.37 186.36 186.36 186.36 186.36 186.35 14.40 DISCHG .20 .20 .19 .19 .18 .18 .17 .17 .17 .16 14.40 ELEV 186.35 186.35 186.35 186.35 186.34 186.34 186.34 186.34 186.34 186.33 15.20 DISCHG .16 .16 .16 .15 .15 .15 .15 .15 .15 .14 11 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 22 15.20 ELEV 186.33 186.33 186.33 186.33 186.33 186.33 186.33 186.33 186.33 186.32 16.00 DISCHG .14 .14 .14 .14 .13 .13 .13 .13 .12 .12 16.00 ELEV 186.32 186.32 186.32 186.32 186.32 186.32 186.32 186.31 186.31 186.31 16.80 DISCHG .12 ,12 .11 .10 .09 .09 .09 .09 .09 .08 16.80 ELEV 186.31 186.31 186.31 186.30 186.30 186.30 186.30 186.30 186.29 186.29 17.60 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .08 .07 17.60 ELEV 186.29 186.29 186.29 186.29 186.29 186.29 186.29 186.29 186.29 186.29 18.40 DISCHG .07 .07 .07 .07 .07 .07 ,07 .07 .07 .07 18.40 ELEV 186,29 186.29 186.28 186.28 186.29 186.29 186.29 186.29 186.29 186.29 19.20 DISCHG .07 .07 .06 .06 .07 .07 .07 .07 .06 D6 19.20 ELEV 186.29 186.28 186.28 186.28 186.28 186.29 186.29 186.28 186.28 186.28 20.00 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .05 .06 20.00 ELEV 186.28 186.28 186.28 IB6.28 186.28 186.28 186.28 186.28 186.28 186.28 20.80 DISCHG .06 .06 .06 .06 .05 .06 .06 .06 .06 .06 20.80 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 21.60 DISCHG .05 .05 .05 .05 .05 .06 .06 .06 .06 .06 21.60 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 22.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 22.40 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 186.28 23.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 23.20 ELEV 186.28 186.28 186.28 186.28 186.28 186.28 186.28 166.28 186.27 186.27 RUNOFF VOLUME ABOVE BASEFLON = 1.05 WATERSHED INCHES, 2.05 CFS-HRS, .17 ACRE-FEET; BASEFLOW = •00 CFS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 80. TIME OF CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(fEET) 12.24 1.23 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA .00 SQ.MI. 8.00 DISCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 8.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 9.60 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 10.40 DISCHG .04 .04 .05 .05 .05 .06 .06 ,07 .07 .08 11.20 DISCHG .09 .09 .11 .12 .13 .17 .22 .25 .42 .75 12.00 DISCNG .96 1.08 1.16 1.23 1.15 .78 .54 .44 .34 .28 12.80 DISCHG .25 .22 .20 .20 .18 .17 .16 .16 .15 .15 13.60 DISCHG .14 .13 .13 .12 .12 .12 .11 .11 .11 .11 14.40 DISCNG .11 .10 .10 .10 .09 .09 .09 .09 .09 .09 15.20 DISCHG .09 .08 .08 .08 .08 .08 .08 .08 .08 .07 16.00 DISCHG .07 .07 .07 .07 .07 .07 .06 06 .06 .07 16.80 DISCHG .06 .05 .04 .04 .D4 .05 .05 .04 .04 .04 17.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .03 .03 18.40 DISCHG .03 .03 .03 .04 .04 .04 .04 .04 .04 .03 19.20 DISCHG .03 .03 .03 .04 .04 .04 .03 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB I PASS 3 REV PC 09/83(.2) TYPE III STORK DISTRIBUTION 24 HOUR DURATION PAGE 23 20.80 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 21.60 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .03 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME ABOVE BASEFLOW = 2.54 WATERSHED INCHES, 1.57 CFS-HRS, .13 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.31 2.29 (HULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = 00 SQ.M1. 8.00 DISCHG .00 .00 .00 .00 .00 .OD .00 .01 .01 .01 8.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 9.60 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 10.40 DISCHG 04 .04 .05 .05 .05 .06 . .06 .07 .07 .08 11.20 DISCHG .09 .09 .11 .12 .13 .17 .22 .27 .47 .86 12.00 DISCHG 1.21 1.53 1.84 2.15 2.28 2.02 1.72 1.49 1.24 1.04 12.80 DISCHG .90 .78 .69 .63 .58 .53 .50 .47 .45 .43 13.60 DISCHG .41 .39 .37 .36 .35 .34 .33 .32 .32 .31 14.40 DISCHG .31 .30 .29 .28 .27 .26 .26 .26 .25 .25 15.20 DISCHG .25 .24 .24 .23 .23 .22 .22 .23 .22 .22 16.00 DISCHG .21 .21 .21 .21 .20 .20 .19 .19 .19 .19 16.80 DISCHG .19 .17 .16 .14 .14 .14 .14 .l3 .13 .12 17.60 DISCHG .12 .12 .12 .12 .12 .12 .12 .12 .11 .11 18.40 DISCHG .10 .10 .10 .10 .11 .11 .11 .11 .11 .11 19.20 DISCHG .10 .10 .10 .10 .10 .10 .10 .10 .09 .09 20.00 DISCHG .09 .09 .09 .09 .09 .09 .08 .08 .08 .09 20.80 DISCHG .09 .09 .08 .08 .08 .09 .09 .09 .09 .08 21.60 DISCHG .08 .08 .08 .08 .08 .09 .09 .09 .08 .08 22.40 DISCHG .08 .08 .07 .07 .07 .07 .07 .07 .07 .07 23.20 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .06 RUNOFF VOLUME ABOVE BASEFLOW = 1.41 WATERSHED INCHES, 3.62 CFS-HRS, .30 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.32 2.28 184.53 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 8.00 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 8.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 8.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 YR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING COHOITIOR JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORK DISTRIBUTION 24 HOUR DURATION PAGE 24 8.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 9.60 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 9.60 ELEV 184.50 184.50 184.50 194.50 184.50 184.50 184.50 184.50 184.50 184.50 10.40 DISCHG 04 .04 .05 .05 .05 .06 .06 .07 .07 .08 10.40 ELEV 184.50 184.50 184.50 184.5D 184.50 184,50 184.50 184.50 184.50 184.50 11.20 DISCHG .09 .09 .10 .12 .13 .16 .21 .26 .43 .81 11.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.51 184.51 12.00 DISCHG 1.18 1.49 1.81 2.11 2.26 2.07 1.75 1.52 1.27 1.06 12.00 ELEV 184.52 184.52 184.52 184.53 184.53 184.53 184.52 184.52 184.52 184.51 12.80 DISCHG .91 .80 .70 .64 .58 .54 .50 .48 .45 .43 12.80 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 13.60 DISCHG .41 .39 .38 .36 .35 .34 .33 .32 .32 .31 13.60 ELEV 184.51 184.51 184.51 184.50 184.50 184.50 184.50 184.50 184.50 184.50 14.40 DISCHG .31 .30 .29 .28 .27 .27 .26 .26 .25 .25 14.40 ELEV 1B4.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 15.20 DISCHG .25 .24 .24 .23 .23 .22 .22 .23 .22 .22 15.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.00 DISCHG .21 .21 .21 .21 .20 .20 .19 .19 .19 .19 16.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.80 DISCHG .19 .18 .16 .14 .14 .14 .14 .13 .13 .12 16.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 17.60 DISCHG .12 .12 .12 .12 .12 .12 .12 .12 .11 .11 17.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 18.40 DISCHG .10 .10 .10 .10 .11 .11 .11 .11 .11 .11 18.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 19.20 DISCHG .10 .10 .10 .10 .10 .10 .10 .10 .09 .09 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 1B4.50 184.50 184.50 184.50 20.00 DISCHG .09 .09 .09 .09 .09 .09 .09 .08 .08 .09 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.80 DISCHG .09 .09 .09 .08 .08 .09 .09 .09 .09 .08 20.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .08 .08 .08 .08 .08 .09 .09 .09 .08 .08 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 1B4.50 22.40 DISCHG .08 .08 .07 .07 .07 .07 .07 .07 .07 .07 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .06 23.20 ELEV 184.50 184.50 184.50 184.50 184.50 164.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = 1.41 WATERSHED INCHES, 3.62 CFS-HRS, .30 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 4 AREA= .00 SG MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0227 HOURS PEAK TIME{HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.25 1.30 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. TR20 XEQ 01-04-95 14056 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 25 10.40 DISCHG .00 .01 .01 .01 .01 .02 .02 .03 .03 .04 11.20 DISCHG .04 .05 .06 .07 .08 .11 .15 .18 .36 .66 12.00 DISCHG .88 1.04 1.18 1.30 1.21 .77 .55 .47 .36 .30 12.80 DISCHG .28 .25 .23 .22 .21 .20 .19 .18 .18 .17 13.60 DISCHG .16 .15 .15 .14 .14 .14 .14 .13 .13 .13 14.40 DISCHG .13 .12 .12 .11 .11 .11 .11 .11 .11 Al 15.20 DISCHG .10 .10 .10 .09 .09 .09 .10 .10 .09 .09 16.00 DISCHG .09 .09 .09 .09 .09 .08 .08 .08 .08 .08 16.80 DISCHG .08 .06 .05 .05 .05 .06 .06 .05 .05 .05 17.60 DISCHG .05 .05 A5 .05 .05 .05 .05 .05 .04 .04 18.40 DISCHG .04 .04 .04 .05 .05 .05 .05 .05 .05 .04 19.20 DISCHG .04 .04 .04 .05 .05 .04 .04 D4 .04 .04 20.00 DISCHG .04 .04 .04 .04 .04 .03 .03 .03 .04 .04 20.80 DISCHG .04 .04 .03 .03 .04 .04 .04 .04 .03 .03 21.60 DISCHG .03 .03 .03 .03 .04 .04 .04 .03 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .02 RUNOFF VOLUME ABOVE BASEFLON = 1.66 WATERSHED INCHES, 1.60 CFS-HRS, .13 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 4,3 OUTPUT HYDROGRAPH= 2 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.29 3.54 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 8.00 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 8.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .02 .02 .02 9.60 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .04 .04 10.40 DISCHG .04 .05 .05 .06 .07 .07 .08 .10 .10 .12 11.20 DISCHG .13 .14 .16 .19 .21 .27 .36 .44 .79 1.48 12.00 DISCHG 2.06 2.53 2.98 3.41 3.49 2.84 2.30 1.98 1.62 1.37 12.80 DISCHG 1.20 1.05 .93 .86 .79 .73 .70 .66 .63 .61 13.60 DISCHG .58 .54 .52 .51 .49 .48 .47 .46 .45 .44 14.40 DISCHG .43 .42 .41 .40 .38 .37 .37 .36 .36 .36 15.20 DISCHG .35 .35 .34 .33 .32 .32 .32 .32 .32 .31 16.00 DISCHG .30 .30 .30 .29 .29 .28 .27 .27 .27 .27 16.80 DISCHG .27 .24 .21 .19 .19 .19 .19 .19 .18 .17 17.60 DISCHG .17 .17 .17 .18 .18 .18 .17 .16 .16 .15 18.40 DISCHG .15 .14 .14 .15 .15 .16 .16 .16 .16 .15 19.20 DISCHG .14 .13 .14 .15 .15 .15 .14 .13 .13 .13 20.00 DISCHG .12 .13 .13 .13 .13 .12 .12 .11 .12 .13 20.80 DISCHG .13 .13 .12 .11 .12 .13 .13 .13 .12 .11 21.60 DISCHG .11 .11 .11 .11 .12 .13 .13 .12 .12 .11 22.40 DISCHG .11 .11 .11 .10 .10 .10 .10 .10 .10 AD 23.20 DISCHG .10 .10 .10 .10 .10 .10 .10 .10 .10 .09 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 3 REV PC 09183(.2) TYPE III: STORM DISTRIBUTION 24 HOUR DURATION PAGE 26 RUNOFF VOLUME ABOVE BASEFLOW = 1.48 WATERSHED INCHES, 5.22 CFS-HRS, .43 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDROGRAPH= 3 AREA= .01 SQ MI INPUT RUNOFF CURVE= 60. T114E OF CONCENTRATION= .38 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.38 2.38 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .01 .02 .05 .13 .32 12.00 DISCHG .64 1.06 1.51 1.96 2.31 2.37 2.13 1.78 1.47 1.22 12.80 DISCHG 1.03 .88 .78 .70 .64 .59 .56 .53 .50 .48 13.60 DISCHG .46 .44 .43 .41 .39 .38 .38 .37 .36 .36 14.40 DISCHG .35 .35 .34 .33 .32 .31 .30 .29 .29 .29 15.20 DISCHG .29 .28 .28 .27 .26 .26 .26 .26 .26 .26 16.00 DISCHG .25 .25 .24 .24 .24 .23 .23 .22 .22 .22 16.80 DISCHG .22 .21 .19 .17 .16 .15 .16 .16 .15 .15 17.60 DISCHG .14 .14 .14 .14 .15 .15 .15 .14 .13 .13 18.40 DISCHG .12 .12 .12 .12 .12 .13 .13 .13 .13 .13 19.20 DISCHG .12 .12 .11 .11 .12 .12 .12 .12 .11 .11 20.00 DISCHG .10 .10 .11 .11 .11 .11 .10 .10 .10 .10 20.80 DISCHG .11 .11 .10 .10 .10 .10 .11 .11 .11 .10 21.60 DISCHG .09 .09 .09 .09 .09 .10 .11 .11 .10 .10 22.40 DISCHG .09 .09 .09 .09 .09 .09 .09 .09 .09 .09 23.20 DISCHG .09 .09 .09 .09 .09 .09 .09 .09 .09 .08 RUNOFF VOLUME ABOVE BASEFLOW = 1.07 WATERSHED INCHES, 3.69 CFS-HRS, .30 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 10 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= 12 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0160 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.24 .63 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 11.20 DISCHG .00 .00 .00 .00 .01 .02 .03 .04 .14 .27 12.00 DISCHG .37 .47 .55 .63 .51 .28 .24 .21 .15 .14 12.80 DISCHG .14 .12 .12 .11 .10 .10 .10 .09 .09 .09 13.60 DISCHG .08 .08 .08 .07 .07 .07 .07 .07 .07 .07 14.40 DISCHG .07 .07 .06 .06 .06 .06 .06 .06 .06 .06 15.20 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 TR20 XEQ 01-04-95 14;56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 27 16.00 DISCHG .05 .05 .05 .05 .05 .04 .04 .04 .04 .04 16.80 DISCHG .04 .03 .03 .03 .03 .03 .03 .03 .03 .03 17.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .02 .02 .02 18.40 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .03 .02 19.20 DISCHG .02 .OR .02 .03 .03 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 OR .01 .01 RUNOFF VOLUME ABOVE BASEFLoW = 1.13 WATERSHED INCHES, .75 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS EXECUTIVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 3 RECORD ID TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE 11[ STORM DISTRIBUTION 24 HOUR DURATION PAGE 28 EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 10 RECORD ID STARTING TIME = .00 RAIN DEPTH = 7.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 4 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPH= 1 AREA= .00 SQ MI INPUT RUNOFF CURVE:= 68. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .54 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCHG .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .02 .02 .02 .03 .03 11.20 DISCHG .03 .03 .04 .05 .05 .07 .09 .10 .19 .34 12.00 DISCHG .41 .46 .50 .54 .48 .29 .21 .18 .13 .11 12.80 DISCHG .11 .09 .09 .09 .08 .07 .07 .07 .07 .06 13.60 DISCHG .06 .06 D6 .05 .05 .05 .05 .05 .05 .05 14.40 DISCHG .05 .05 .04 .04 .04 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .03 .03 .03 .04 .04 .03 .03 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .01 .01 D2 .02 .02 .02 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .02 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .02 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .02 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 3.39 WATERSHED INCHES, .66 CFS-HRS, .05 ACRE-FEET; BASEFLOW = .00 CFS i OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 j AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.43 1.23 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .00 .DI .01 .01 .01 .02 .02 .02 .03 .03 i TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 29 11.20 DISCHG .04 .05 .05 .06 .07 .08 .10 .13 .18 .26 12.00 DISCHG .40 .57 .77 .97 1.13 1.22 1.21 1.12 .98 .84 12.80 DISCHG .71 .60 .52 .45 .40 .36 .33 .30 .28 .26 13.60 DISCHG .25 .23 .22 .21 .20 .19 .19 .18 .18 .17 14.40 DISCHG .17 .17 .16 .16 .15 .15 .14 .14 .14 .14 15.20 OISCHG .13 .13 .13 .13 .13 .12 .12 .12 .12 .12 16.00 DISCHG .12 .11 .11 .11 .11 .11 .11 .10 .10 .10 16.80 DISCHG .10 .10 .09 .09 .08 .08 .07 .07 .07 .07 17.60 DISCHG .07 .06 .06 .06 .06 .06 .06 .06 .06 .06 18.40 DISCHG .06 .06 .05 .05 .05 .05 .06 .06 .D6 .06 19.20 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 20.00 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .04 .04 20.80 DISCHG .05 .05 .05 .05 .04 .04 .04 .05 .05 .05 21.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .05 .04 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = 2.68 WATERSHED INCHES, 2.01 CFS-HRS, .17 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 so MI INPUT RUNOFF CURVE= 59. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATIDN(FEET) 12.32 2.16 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M€. 10.40 DISCHG .00 .00 .01 .01 .02 .02 .03 .03 .04 .05 11.20 DISCHG .06 .07 .08 .10 .11 .14 .19 .24 .36 .63 12.00 DISCHG 1.01 1.39 1.72 1.99 2.16 2.02 1.66 1.31 1.04 .85 12.80 DISCHG .70 .61 .54 .48 .45 .41 .39 .37 .35 .34 13.60 DISCHG .33 .31 .30 .29 .28 .27 .26 .26 .26 .25 14.40 DISCHG .25 .24 .24 .23 .22 .21 .21 .20 .20 .20 15.20 DISCHG .20 .20 .19 .19 .18 .18 .18 .18 .18 .18 16.00 DISCHG .17 .17 .17 .16 .16 .16 .15 .15 .15 .15 16.80 DISCHG .15 .14 .13 .11 .10 .10 .11 .11 .10 .10 17.60 DISCHG .09 .09 .10 .10 .10 .10 .10 .09 .09 .08 18.40 DISCHG .08 .08 .08 .08 .08 .09 .09 .09 .09 .09 19.20 DISCHG .08 .08 .07 .08 .08 .08 .08 .08 .07 .07 20.00 DISCHG .07 .07 .07 .07 .08 .07 .07 .06 .06 .07 20.80 DISCHG .07 .07 .07 .06 .06 .07 .07 .07 .07 .07 21.60 DISCHG .06 .06 .06 .06 .06 .07 .07 .07 .07 .06 22.40 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 23.20 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06- .05 RUNOFF VOLUME ABOVE BASEFLOW = 2.49 WATERSHED INCHES, 2.98 CFS-HRS, .25 ACRE-FEET; BASEFLOW = .00 CFS 1 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 i REV PC 09/83(.2) TYPE III STORK DISTRIBUTION 24 HOUR DURATION PAGE 30 OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.35 3.32 (NULL) MEWS) FIRST HYDROGRAPII POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .00 .01 .02 .02 .03 .04 .05 .06 .07 .08 11.20 DISCIIG .10 .11 .13 .16 .18 .22 .29 .37 .53 .89 12.00 DISCHG 1.41 1.96 2.49 2.97 3.29 3.24 2.86 2.42 2.03 1.68 12.80 DISCHG 1.41 1.21 1.06 .94 .85 .77 .72 .67 .63 .60 13.60 DISCHG .58 .55 .52 .50 .48 .46 .45 .44 .43 .42 14.40 DISCHG .42 .41 .40 .39 .37 .36 .35 .35 .34 .34 15.20 DISCHG .33 .33 .32 .31 .31 .30 .30 .30 .30 .30 16.00 DISCHG .29 .28 .28 .28 .27 .27 .26 .25 .25 .25 16.80 DISCHG .25 .24 .22 .20 .18 .18 .18 .18 .17 .17 17.60 DISCHG .16 .16 .16 .16 .16 .16 .16 .16 .15 .14 18.40 DISCHG .14 .14 .13 .14 .14 .14 .14 .15 .15 .14 19.20 DISCHG .14 .13 .13 .13 .13 .14 .13 .13 .12 .12 20.00 DISCHG .12 .12 .12 .12 .12 .12 .11 .11 .11 .11 20.80 DISCHG .12 .12 .11 .11 .11 .11 .12 .12 .12 .11 21.60 DISCHG .11 .10 .10 .10 .10 .11 .12 .12 .11 .11 22.40 DISCHG .10 .10 .10 .10 .10 .10 .10 .10 .10 .10 23.20 DISCHG .10 i0 .10 .10 .10 .10 .10 .10 .09 .09 RUNOFF VOLUME ABOVE BASEFLOW = 2.56 WATERSHED INCHES, 4.99 CFS-HRS, .41 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.44 3.05 188.00 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .00 .00 .01 .02 .03 .03 .04 .05 .06 .08 10.40 ELEV 186.25 186.25 186.26 186.26 186.26 186.27 186.27 186.28 186.28 186.29 11.20 DISCHG .09 .11 .12 .15 .17 .21 .26 .34 .46 .74 11.20 ELEV 186.30 186.30 186.31 186.32 186.34 186.36 186.38 186.42 186.49 186.63 12.00 DISCHG 1.19 1.73 2.27 2.57 2.82 3.02 3.04 2.86 2.57 2.00 12.00 ELEV 186.87 187.15 187.42 187.61 187.81 187.97 187.98 187.84 187.62 18T.28 12.80 DISCHG 1.51 1.29 1.12 .98 .88 .80 .74 .69 .65 .62 12.80 ELEV 187.03 186.92 186.83 186.76 186.71 186.67 186.63 186.61 186.59 186.57 13.60 DISCRG .59 .56 .53 .51 .49 .47 .45 .44 .44 .43 13.60 ELEV 186.55 186.54 186.52 186.51 186.50 186.49 186.48 186.48 186.47 186.47 14.40 DISCHG .42 .41 .40 .39 .38 .37 .36 .35 .34 .34 14.40 ELEV 186.47 186.46 186.46 186.45 186.45 186.44 186.43 186.43 186.43 186.43 TR20 XEQ 01-04-95 14.56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 31 15.20 DISCHG .34 .33 .33 .32 .31 .30 .30 .30 .30 .30 15.20 ELEV 186.42 186.42 186.42 186.41 186.41 186.41 186.40 186.40 186.40 186.40 16.00 DISCHG .29 .29 .28 .28 .27 .27 .26 .26 .25 .25 16.00 ELEV 186.40 186.40 186.39 186.39 186.39 196.39 186.39 186.38 186.38 186.38 16.80 DISCHG .25 .24 .23 .21 .19 .18 .18 .18 .17 .17 16.80 ELEV 186.38 186.38 186.37 186.36 186.35 186.34 186.34 186.34 186.34 186.34 17.60 DISCHG .16 .16 .16 .16 .16 .16 .16 .16 .15 .15 17.60 ELEV 186.33 186.33 186.33 186.33 186.33 186.33 186.33 186.33 186.33 186.33 18.40 DISCHG .14 .14 .14 .13 .14 .14 .14 .14 .15 .14 18.40 ELEV 186.32 186.32 186.32 186.32 186.32 186.32 186.32 186.32 186.33 186.32 19.20 DISCHG 14 .13 .13 .13 .13 .14 .14 .13 .13 .12 19.20 ELEV 186.32 186.32 186.32 186.32 186.32 186.32 186.32 186.32 186.31 186.31 20.00 DISCHG .12 .12 .12 .12 .12 .12 .12 .11 .11 .11 20.00 ELEV 186.31 186.31 166.31 186.31 186.31 186.31 186.31 186.31 186.31 186.31 20.80 DISCHG .12 .12 .12 .11 .11 .11 .11 .12 .12 .11 20.80 ELEV 186.31 186.31 186.31 186.31 186.31 186.31 186.31 186.31 186.31 186.31 21.60 DISCHG .11 .10 .10 .10 .10 .11 .12 .12 .11 .11 21.60 ELEV 186.31 186.30 186.30 186.30 186.30 186.31 186.31 186.31 186.31 186.31 22.40 DISCHG .10 .10 .10 .10 AD .10 .10 .10 .10 .10 22.40 ELEV 186.30 186.30 186.30 186.30 186.30 186.30 186.30 186.30 186.30 186.30 23.20 DISCHG .10 .10 .10 .10 .10 .10 .10 .10 .09 .09 23.20 ELEV 186.30 186.30 186.30 186.30 186.30 186.30 186.30 186.30 186.30 186.30 RUNOFF VOLUME ABOVE BASEFLOW = 2.56 WATERSHED INCHES, 4.99 CFS-HRS, .41 ACRE-FEET; BASEFLOW = .00 CPS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 80. TIME OF CONCENTRATION .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS PEAK TIME(HRS) PEAK DISUARGE(CFS) PEAK ELEVATION(FEET) 12.22 2.20 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 6.40 DISCHG .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 7.20 DISCHG .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 8.00 DISCHG .02 .03 .03 .03 .03 .03 .03 .03 .04 .04 8.80 DISCHG .04 .04 .05 .05 .05 .05 .05 .06 .06 .06 9.60 DISCHG 07 .07 .07 .08 .08 .08 .08 .09 .10 .10 10.40 DISCHG .11 .11 .12 .13 .13 .14 .15 .17 .17 .19 11.20 DISCHG .20 .21 .23 .26 .28 .35 .46 .52 .85 1.46 12.00 DISCHG 1.82 2.01 2.12 2.20 2.03 1.36 .93 .75 .58 .47 12.80 DISCHG .43 .38 .35 .33 .31 .29 .28 .27 .25 .25 13.60 DISCHG .24 .22 .21 .21 .20 .20 .19 .19 .19 .18 14.40 DISCHG .18 .17 .17 .16 .15 .15 .15 .15 .15 .15 15.20 DISCHG .14 .14 .14 .13 .13 .13 .13 .13 .13 .12 16.00 DISCHG .12 .12 .12 .12 .12 .11 .10 .10 .11 .11 16.80 DISCHG .11 .09 .07 .07 .07 .08 .08 .07 .07 .06 17.60 DISCHG .07 .07 .07 .07 .07 .07 .07 .06 .06 .06 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EK[STING CONOITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 32 18.40 DISCIIG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 19.20 DISCIIG .05 .05 .05 .06 .06 .06 .05 .05 .05 .05 20.00 DISCHG .05 .05 .05 .05 .05 .05 .04 .04 .05 .05 20.80 DISCHG .05 .05 .04 .04 .05 .05 .05 .05 .04 .04 21.60 DISCHG .04 .04 .04 .04 .05 .05 .05 .05 .04 .04 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .03 RUNOFF VOLUME ABOVE BASEFLOW = 4.68 WATERSHED INCHES, 2.90 CFS-HRS, .24 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 i PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.29 4.88 (HULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 6.40 DISCHG .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 7.20 DISCHG .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 8.00 DISCHG .02 .03 .03 .03 .03 .03 .03 .03 ,04 .04 8.80 DISCHG .04 .04 .05 .05 .05 .05 .05 .06 .06 .06 9.60 DISCHG .07 .07 .07 .08 .08 .08 .08 .09 .10 .10 10.40 DISCHG 11 .11 .13 .15 .16 .17 .20 .22 .24 .26 11.20 DISCHG .29 .31 .36 .41 .45 .56 .72 .96 1.32 2.20 12.00 DISCHG 3.01 3.74 4.39 4.76 4.85 4.39 3.97 3.61 3.15 2.47 12.80 DISCHG 1.93 1.67 1.47 1.32 1.19 1.09 1.02 .96 .90 .86 13.60 DISCHG .82 .78 .74 .71 .68 .66 .65 .63 .62 .61 14.40 DISCHG .60 .58 .57 .55 .53 .52 .50 .50 .49 .48 15.20 DISCHG .48 .47 .46 .45 .44 .43 .43 .43 .43 .42 16.00 DISCHG .41 .40 .40 .40 .39 .38 .37 .36 .36 .36 16.80 DISCHG .36 .33 .30 .27 .26 .26 .26 .25 .24 .23 17.60 DISCHG .23 .23 .23 .23 .23 .24 .23 .22 .21 .20 18.40 DISCHG .20 .19 .19 .19 .20 .20 .21 .21 .21 .20 19.20 DISCHG .19 .18 .18 .19 .19 .19 .19 .18 .17 .17 20.00 DISCHG .17 .17 .17 .17 .18 .17 .16 .15 .16 .16 20.80 DISCHG .17 .17 .16 .15 .16 .16 .17 .17 .16 .15 21.60 DISCIIG .15 .14 .14 .14 .15 .16 .17 .16 .16 .15 22.40 DISCIIG .14 .14 .14 .14 .14 .14 .14 .14 .14 .14 23.20 DISCHG .14 .14 .14 .14 .14 .14 .14 .14 .13 .12 RUNOFF VOLUME ABOVE BASEFLOW = 3.07 WATERSHED INCHES, 7.89 CFS-HRS, .65 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.30 4.87 184.57 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION J08 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 33 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 5Q.M1. 6.40 DISCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 6.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 IB4.50 184.50 184.50 7.20 DISCHG .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 7.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 8.00 DISCHG .02 .03 .03 .03 .03 .03 .03 .03 .04 .04 8.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 8.80 DISCHG .04 .04 .05 .05 .05 .05 .05 .06 .06 .06 8.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 9.60 DISCHG .07 .07 .07 .08 .08 .08 .08 .09 .10 .10 9.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 10.40 DISCHG .11 .11 .13 .14 .16 .17 .19 .22 .24 .26 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 11.20 DISCHG .29 .31 .35 .40 .45 .54 .70 .84 1.24 2.08 11.20 ELEV 184.50 184.50 184.50 184.51 184.51 184.51 184.51 184.51 184.52 184.53 12.00 DISCHG 2.93 3.65 4.32 4.73 4.85 4.47 3.99 3.66 3.20 2.56 12.00 ELEV 184.54 184.55 184.56 184.56 184.56 184.56 184.55 184.55 184.54 184.53 12.80 DISCHG 1.98 1.70 1.49 1.33 1.21 1.10 1.03 .96 .91 .87 12.80 ELEV 1B4.53 184.52 184.52 184.52 W.52 184.51 184.51 184.51 184.51 184.51 13.60 DISCHG .83 .78 .75 .72 .69 .67 .65 .63 .62 .61 13.60 ELEV 184.51 184.51 184.51 184.51 _ 184.51 184.51 184.51 184.51 184.51 184.51 14.40 DISCHG .60 .59 .57 .55 .53 .52 .50 .50 .49 .49 14.40 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 194.51 15.20 DISCHG .48 .47 .46 .45 .44 .43 .43 .43 .43 .42 15.20 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 16.00 DISCHG .41 .40 .40 .40 .39 .38 .37 .36 .36 .36 16.00 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.50 184.50 184.50 184.50 16.80 DISCHG .36 .34 .30 .28 .26 .26 .26 .25 .24 .23 16.80 ELEV 184.50 184.50 184.50 194.50 184.50 184.50 184.50 184.50 184.50 184.50 17.60 DISCHG .23 .23 .23 .23 .23 .24 .23 .22 .21 .20 17.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 18.40 DISCHG .20 .19 .19 .19 .20 .20 .21 .21 .21 .20 18.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 19.20 DISCHG .19 .18 .18 .19 .19 .19 .19 .18 .17 .17 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.00 DISCHG .17 .17 .17 .17 .18 .17 .16 .15 .16 .16 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 1B4.50 20.80 DISCHG .17 .17 .16 .15 .15 .16 .17 .17 .16 .15 20.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .15 .14 .14 .14 .15 .16 .17 .16 .16 .15 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 22.40 DISCHG .15 .14 .14 .14 .Sk .14 .14 .14 .14 .14 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .14 .14 .14 .14 .14 .14 .14 .14 .13 .12 23.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = 3.07 WATERSHED INCHES, 7.89 CFS-HRS, .65 ACRE-FEET; BASEFLOW = .00 CFS I i YR20 XEQ 01.04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STOR14 DISTRIBUTION 24 HOUR DURATION PAGE 34 1 OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT- .0227 HOURS PEAK TIME(HRS) PEAK DISCIIARGE(CFS) PEAK ELEVATION(FEET) 12.23 2.69 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 8.80 01SCHG .01 .01 .01 .01 .01 .02 .02 .02 .02 .03 9.60 DISCHG .03 .03 .04 .04 .04 .04 .05 .06 .06 .07 10.40 DISCHG .07 .08 .08 .09 .10 .10 .12 .13 .14 .15 11.20 DISCHG .17 .18 .21 .24 .26 .34 .45 .52 .95 1.66 12.00 DISCHG 2.08 2.33 2.53 2.69 2.44 1.54 1.09 .91 .70 .59 12.80 DISCHG .54 .48 .44 .43 .40 .37 .36 .35 .33 .33 13.60 DISCHG .31 .29 .28 .27 .26 .26 .25 .25 .25 .24 14.40 DISCHG .23 .23 .22 .21 .20 .20 .20 .20 .20 .19 15.20 DISCHG .19 .19 .18 .17 .17 .17 .18 .18 .17 J6 16.00 D[SCHG .16 .16 .16 .16 .16 .15 .14 .14 .15 .15 16.80 D[SCHG .14 .11 .09 .09 .10 .10 .11 .10 .09 .09 17.60 DISCHG .09 .09 .10 .10 .10 .10 .09 .08 .08 .08 18.40 DISCHG .08 .08 .08 .08 .09 .09 .09 .09 .09 .08 19.20 DISCHG .07 .07 .07 .08 .09 .08 .07 .07 .07 .07 20.00 DISCHG .07 .07 .07 .08 .07 .06 .06 .06 .07 .07 20.80 DISCHG .07 .06 .06 .06 O7 .07 .07 .07 .06 .06 21.60 DISCHG .06 .05 .05 .06 .07 .07 .07 .06 .06 .06 22.40 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 23.20 DISCHG .05 .06 .06 .06 .06 .06 .06 .05 .05 .04 RUNOFF VOLUME ABOVE BASEFLON = 3.50 WATERSHED INCITES, 3.36 CFS-HRS, .28 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 4,3 OUTPUT NYDROGRAPH= 2 I PEAK TIME(HRS) PEAK OISCHARGE(CFS) PEAK ELEVATION(FEET) 12.27 7.46 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 6.40 DISCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 7.20 DISCHG .01 .01 .01 .01 .01 .02 .02 .02 .02 .02 8.00 DISCHG .02 .03 .03 .03 .03 .03 .03 .03 .04 .04 8.80 DISCHG .05 .05 .06 .06 .07 .07 .07 .08 .08 .09 9.60 DISCHG .10 .10 .11 .12 .12 .12 .13 .15 .16 .17 10.40 DISCHG .18 .19 .21 .24 .26 .28 .31 .35 .37 .41 11.20 DISCHG .46 .49 .56 .64 .71 .89 1.15 1.36 2.19 3.75 12.00 DISCHG 5.01 5.99 6.85 7.42 7.29 6.01 5.09 4.57 3.90 3.15 12.80 DISCHG 2.52 2.18 1.93 1.76 1.60 1.47 1.39 1.31 1.24 1.19 TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE I[[ STORM DISTRIBUTION 24 HOUR DURATION PAGE 35 13.60 DISCIiG 1.13 1.07 1.02 .99 .95 .92 .90 .88 .87 .86 14.40 DISCHG .83 .82 .80 .76 .73 .72 .70 .70 .69 .68 15.20 DISCHG .67 .66 .64 .62 .61 .60 .61 .61 .60 .59 16.00 DISCHG .57 .56 .56 .56 .55 .53 .51 .50 .50 .51 16.80 DISCHG .50 .45 .40 .37 .36 .36 .36 .35 .33 .32 17.60 DISCHG .32 .32 .33 .33 .33 .33 .33 .31 .29 .28 18.40 DISCHG .27 .27 .27 .28 .28 .29 .29 .29 .29 .28 19.20 DISCHG .26 .25 .26 .27 .28 .27 .26 .25 .24 .24 20.00 DISCHG .23 .23 .24 .25 .25 .23 .22 .21 .22 .24 20.80 DISCHG .24 .23 .22 .21 .22 .23 .24 .24 .22 .21 21.60 DISCHG .20 .20 .20 .20 .22 .24 .24 .22 .21 .21 22.40 DISCHG .20 .20 .19 .19 .19 .19 .19 .19 .19 .19 23.20 DISCHG .19 .19 .19 .19 .19 .19 .19 .19 .18 .16 RUNOFF VOLUME ABOVE BASEFLOW = 3.19 WATERSHED INCHES, 11.25 CFS-HRS, .93 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDROGRAPH= 3 AREA= .01 SQ MI INPUT RUNOFF CURVE= 60. TIME OF CONCENTRATION= .38 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.35 6.20 (RUNOFF) TIH£(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.141. 9.60 DISCHG .00 00 .00 .00 .00 .00 .00 .00 .00 .01 10.40 DISCHG .02 .02 .04 .05 .06 .08 .09 .11 .14 .16 11.20 DISCHG .19 .22 .25 .29 .35 .42 .54 .70 1.01 1.67 12.00 DISCHG 2.66 3.74 4.75 5.60 6.16 6.05 5.28 4.31 3.48 2.83 12.80 DISCHG 2.36 2.00 1.74 1.55 1.41 1.30 1.21 1.14 1.08 1.04 13.60 DISCHG .99 .95 .91 .87 .84 .81 .79 .78 .76 .75 14.40 DISCHG .74 .72 .71 .69 .66 .64 .62 .61 .60 .60 15.20 DISCHG .59 .58 .57 .56 .54 .53 .53 .53 .53 .53 16.00 DISCHG .51 .50 .49 .49 .49 .48 .46 .45 .44 .44 16.80 DISCHG .44 .43 .39 .35 .32 .31 .31 .31 .31 .29 17.60 DISCHG .28 .28 .28 .29 .29 .29 .29 .28 .27 .26 18.40 DISCHG .25 .24 .24 .24 .25 .25 .26 .26 .26 .26 19.20 DISCNG .25 .23 .22 .23 .24 .25 .24 .23 .22 .21 20.00 DISCHG .21 .21 .21 .22 .22 .22 .21 .19 .19 .20 20.80 D[SCHG .21 .21 .21 .20 .19 .20 .21 .21 .21 .20 21.60 DISCHG .19 .18 .18 .18 .19 .20 .21 .21 .20 .19 22.40 DISCHG .18 .18 .17 .17 .17 .17 .17 .17 .17 .17 23.20 DISCHG .17 .17 .17 .17 .17 .17 .17 .17 .17 .16 RUNOFF VOLUME ABOVE BASEFLOW = 2.59 WATERSHED INCHES, 8.95 CFS-HRS, .74 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 10 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= 12 HOURS i TR20 XEQ 01-04-95 14.56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 36 INTERNAL HYDROGRAPH TIME INCREMENT= .0160 HOURS PEAK TIMEORS) PEAK DISCRARGE(CFS) PEAK ELEVATION(FEET) 12.22 1.51 (RUNOFF) T1MEORS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 D I SCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .03 .03 .04 .04 .05 11.20 DISCHG .06 .06 .08 .09 .10 .16 .20 .23 .58 .92 12.00 DISCHG 1.11 1.26 1.39 1.50 1.18 .64 .53 .46 .34 .31 12.80 DISCHG .30 .26 .25 .24 .22 .21 .21 .19 .19 .19 13.60 DISCHG .17 .16 .16 .15 .15 .15 .15 .15 .15 .14 14.40 DISCHG .14 .13 .13 .12 .12 .12 .12 .12 .12 .11 15.20 DISCHG .11 .11 .10 .10 .10 .10 .11 .11 .10 .10 16.00 DISCHG .09 .09 .09 .09 .09 .08 .08 .08 .09 .09 16.80 DISCHG .08 .06 .05 .05 .06 .06 .06 .06 .05 .05 17.60 DISCHG .06 .06 .06 .06 .06 .06 .05 .05 .05 .05 18.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 19.20 DISCHG .04 .04 .05 .05 .05 .04 .04 .04 .04 .04 20.00 DISCHG .04 .04 .05 .05 .04 .03 .03 .04 .04 .05 20.80 DISCHG .04 .04 .03 .03 .04 .05 .05 .04 .03 .03 21.60 DISCHG .03 .03 .03 .04 .05 .05 .04 .03 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 i 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .02 RUNOFF VOLUME ABOVE BASEFLOW = 2.69 WATERSHED INCHES, 1.78 CFS-HRS, .15 ACRE-FEET; BASEFLOW = .00 CFS EXECUTIVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 4 RECORD ID EXECUTIVE CONTROL OPERATION ENDJOB RECORD ID TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 SUMMARY REV PC 09/83(.2) TYPE [II STORM DISTRIBUTION 24 HOUR DURATION PAGE 37 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE HOIST TIME ---------------------`•-- RUNOFF -------------------------------------- 10 OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (OR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 1 XSECTION 1 RUNOFF .00 9 2 .08 .0 2.60 24.00 .33 - 12.24 .06 202.8 XSECTION 2 RUNOFF .00 9 2 .08 .0 2.60 24.00 .22 --- 12.64 .05 46.3 XSECTION 3 RUNOFF .00 9 2 .08 .0 2.60 24.00 .18 --- 12.48 .07 35.6 XSECTION 4 ADDRYD .00 9 2 .08 .0 2.60 24.00 .19 --- 12.56 .12 38.5 STRUCTURE 1 RESVOR .00 9 2 .08 .0 2.60 24.00 .19 186.31 12.56 .12 38.3 XSECTION 5 RUNOFF .00 9 2 .08 .0 2.60 24.00 .95 --- 12.24 .47 489.2 XSECTION 6 ADDHYD .00 9 2 .08 .0 2.60 24.00 .38 --- 12.32 .50 126.6 STRUCTURE 2 RESVOR .00 9 2 .08 .0 2.60 24.00 .38 184.51 12.32 .51 127.0 XSECTION 7 RUNOFF .00 9 2 .08 .0 2.60 24.00 .46 --- 12.32 .33 222.1 XSECTION 8 ADDHYD ..01 9 2 .08 .0 2.60 24.00 .40 --- 12.32 .84 152.9 XSECTION 9 RUNOFF .01 9 2 .08 .0 2.60 24.00 .20 --- 12.48 .23 43.5 XSECTION 10 RUNOFF .00 9 2 .08 .0 2.60 24.00 .22 --- 12.32 .08 79.9 s ALTERNATE 1 STORM 2. XSECTION 1 RUNOFF .00 9 2 .08 .0 3.10 24.00 .56 - 12.24 .10 341.9 XSECTION 2 RUNOFF .00 9 2 .08 .0 3.10 24.00 .40 --- 12.56 .13 110.5 XSECTION 3 RUNOFF .00 9 2 .08 .0 3.10 24.00 .33 --- 12.40 .20 105.9 XSECTION 4 ADDHYD .00 9 2 .08 .0 3.10 24.00 .36 --- 12.48 .31 101.8 STRUCTURE 1 RESVOR .00 9 2 .08 .0 3.10 24.00 .36 186.41 12.48 .31 102.3 XSECTION 5 RUNOFF .00 9 2 .08 .0 3.10 24.00 1.32 --- 12.24 .65 676.8 XSECTION 6 ADDHYD .00 9 2 .08 .0 3.10 24.00 .59 --- 12.32 .84 210.9 STRUCTURE 2 RESVOR .00 9 2 .08 .0 3.10 24.00 .59 184.51 12.32 .84 210.5 XSECTION 7 RUNOFF .00 9 2 .08 .0 3.10 24.00 .72 --- 12.24 .54 363.2 XSECTION 8 ADDHYD .01 9 2 .08 .0 3.10 24.00 .63 --- 12.29 1.38 252.7 XSECTION 9 RUNOFF .01 9 2 .08 .0 3.10 24.00 .37 -- 12.40 .61 114.3 XSECTION 10 RUNOFF .00 9 2 .08 .0 3.10 24.00 .40 - 12.24 .19 188.6 ALTERNATE I STORM 3 XSECTION 1 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.59 --- 12.24 .25 840.0 XSECTION 2 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.12 --- 12.48 .47 407.7 XSECTION 3 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.01 --- 12.32 .80 433.6 XSECTION 4 AODHYD .00 9 2 .08 .0 4.60 24.00 1.05 --- 12.38 1.25 414.2 STRUCTURE 1 RESVOR .00 9 2 .08 .0 4.60 24.00 1.05 186.89 12.41 1.24 410.8 i i TR20 XEQ 01-04-95 14:56 EAST PASTURE ESTATES EXISTING CONDITION J08 1 SUMMARY REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 38 SUMMARY TABLE I - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK M INDICATES A HYDROGRAPH KITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------ ------ ----- RUNOFF -------------- ------------ ------- 10 OPERATION AREA 9 COND INCREH BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SO H1) OR) (HR) (IN) (HR) (1N) (FT) (HR) (CFS) (CSM) ALTERNATE I STORM 3 XSECTION 5 RUNOFF .00 9 2 .08 .0 4.60 24.00 2.54 --- 12.24 1.23 1279.7 XSECTION 6 ADDHYD .00 9 2 .08 .0 4.60 24.00 1.41 ... 12.31 2.29 574.8 STRUCTURE 2 RESVOR .00 9 2 .08 .0 4.60 24.00 1.41 184.53 12.32 2.28 572.8 XSECTION 7 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.66 --- 12.25 1.30 870.2 XSECTION 8 ADDHYD .01 9 2 .08 .0 4.60 24.00 1.48 --- 12.29 3.54 647.4 XSECTION 9 RUNOFF .01 9 2 .08 .0 4.60 24.00 1.07 12.38 2.38 444.6 XSECTION 10 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.13 --- 12.24 .63 613.0 ALTERNATE I STORM 4 XSECTION I RUNOFF .00 9 2 .08 .0 7.00 24.00 3.39 ... 12.24 .54 1767.7 XSECTION 2 RUNOFF .00 9 2 .08 .0 7.00 24.00 2.68 --- 12.43 1.23 1054.5 XSECTION 3 RUNOFF .00 9 2 D8 .0 7.00 24.00 2.49 --- 12.32 2.16 1165.0 XSECTION 4 ADDHYD .00 9 2 .08 .0 7.00 24.00 2.56 --- 12.35 3.32 1098.9 STRUCTURE I RESVOR .00 9 2 .08 .0 7.00 24.00 2.56 188.00 12.44 3.05 1012.0 XSECTION 5 RUNOFF .00 9 2 .08 .0 7.00 24.00 4.68 --- 12.22 2.20 2290.5 XSECTION 6 ADDHYD .00 9 2 .08 .0 7.00 24.00 3.07 . 12.29 4.88 1226.4 STRUCTURE 2 RESVOR .00 9 2 .08 .0 7.00 24.00 3.07 184.57 12.30 4.87 1222.8 XSECTION 7 RUNOFF .00 9 2 .08 .0 7.00 24.00 3.50 --- 12.23 2.69 1807.1 XSECTION 8 ADDHYD .01 9 2 .08 .0 7.00 24.00 3.19 --- 12.27 7.46 1363.7 XSECTION 9 RUNOFF .01 9 2 .08 .0 7.00 24.00 2.59 --- 12.35 6.20 1156.7 XSECTION 10 RUNOFF .00 9 2 .08 .0 7.00 24.00 2.69 --- 12.22 1.51 14T3.9 TR20 XEQ 01-04-95 14.56 EAST PASTURE ESTATES EXISTING CONDITION JOB 1 SUMMARY REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 39 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (So MI) 1 2 3 4 STRUCTURE 2 .00 ALTERNATE 1 .51 .84 2.28 4.87 STRUCTURE 1 .00 ALTERNATE 1 .12 .31 1.24 3.05 XSECTION 1 .00 ALTERNATE 1 .06 .10 .25 .54 XSECTION 2 .00 ALTERNATE 1 .05 .13 .47 1.23 XSECTION 3 .00 ALTERNATE 1 .07 .20 .80 2.16 XSECTION 4 .00 ALTERNATE 1 .12 .31 1.25 3.32 XSECTION 5 .00 ALTERNATE 1 .47 .65 1.23 2.20 XSECTION 6 .00 ALTERNATE 1 .50 .84 2.29 4.88 XSECTION 7 .00 ALTERNATE 1 .33 .54 1.30 2.69 XSECTION 8 .01 ALTERNATE 1 .84 1.38 3.54 7.46 XSECTION 9 .01 ALTERNATE 1 .23 .61 2.38 6.20 XSECTION 10 .00 ALTERNATE 1 .08 .19 .63 1.51 PROPOSED CONDITION WATERSHED EAST PASTURE ESTATES NORTH ANDOVER, MA i i REFER TO FILE # A10 -. ` NAME DATE 1 _` 1 9 S HAYES ENGINEERING, INC. MADE BY 603 SALEM STREET WAKEFIELD, MA 01880 MEMO TEL., (617) 246-2800 FAX: (617) 246-7596 CALCULATION —BASED UPo_M NIA+�1tillNG Fd�PMVLA SvZ n b L-eC-In SJ VOt-"loo-el Li �}44.T. ... . . j _ o •785 FtZKl.4�� (0 2S 3 Z — [ --- --- - --( �z, _ x (o.oac�) 2-,74n CFS Q � d 1ao, w = 2,22cFS _C6 3��jo�7o-�Drn�43+gg�3 - -- l� x Ca.25) (6.00L z 3.6 GFS Qe� lvoy� =3,dtJ�fs. . arc O•oi3 pMN 3�+g$� E�aD 1,4SP ,� Cv.4bCFS f�pi'� raoy► S.°}GF�;.oIG o.oi3 WILLIAIV!R. -BE RON._._. _.. - CML .._..No.-29464..... . 9 O Is TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : A' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% . 184 (61) - - Impervious Areas Paved parking lots, roofs, driveways - .013 (98) - - Total Area (by Hydrologic Soil Group) . 197 ------------------------------------------------------------------------------- SUBAREA: A' TOTAL DRAINAGE AREA: . 197 Acres WEIGHTED CURVE NUMBER: 63 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : B' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - .538 (61) - - Impervious Areas Paved parking lots, roofs, driveways - . 265(98) - OTHER AGRICULTURAL LANDS Woods good - . 187 (55) - - Total Area (by Hydrologic Soil Group) .99 ------------------------------------------------------------------------------- SUBAREA: B' TOTAL DRAINAGE AREA: .99 Acres WEIGHTED CURVE NUMBER:70 ------------------------------------------------------------------------------- TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : C1' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% .59 (61) - - Impervious Areas Paved parking lots, roofs, driveways - . 376 (98) -- - OTHER AGRICULTURAL LANDS Woods good - ,436(55) - . - Total Area (by Hydrologic Soil Group) 1.40 SUBAREA: C1 ' TOTAL DRAINAGE AREA: 1. 402 Acres WEIGHTED CURVE NUMBER: 69 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 1.1. Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : C2 ' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) --------------------------------------_-------------------------------------------- FULLX DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 750 - .307 (61) - -- Impervious Areas Paved parking lots, roofs, driveways - .023 (98) - -- Total. Area (by Hydrologic Soil Group) . 33 ----------------------------------------------_------__--------------------------- SUBAREA: C2 ' TOTAL DRAINAGE AREA: . 33 Acres WEIGHTED CURVE NUMBER:64 -------------------------------------------------------__---------------------------- I TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County : State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : D' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 044 (61) .271(80) Impervious Areas Paved parking lots, roots, driveways - . 125(98) - - Total Area (by Hydrologic Soil Group) . 169 . 271 SUBAREA: D' TOTAL DRAINAGE AREA: .44 Acres WEIGHTED CURVE NUMBER:83 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County . State: Checked: Date: Subtitle. PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : E' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ----------------------------------------------------------------------------------------- FULLx DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 750 - .25(61) - . 367 (80) Impervious Areas Paved parking lots, roofs, driveways - .02 (98) - - Total Area (by Hydrologic Soil Group) .27 . 367 ----------------------------------------___---------------------------------_---------- SUBAREA: E' TOTAL DRAINAGE AREA: .637 Acres WEIGHTED CURVE NUMBER:73 TR-55 CURVE NUMBER COMPUTATION VERSION 1.11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County : State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : F' ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A H C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - 2.25(61) - - Impervious Areas Paved parking lots, roofs, driveways - . 124 (98) - -- OTHER AGRICULTURAL LANDS Woods good - .756 (55) - Total Area (by Hydrologic Soil Group) 3. 13 -----------------------------_----------------------__-------------------------------- SUBAREA: F' TOTAL DRAINAGE AREA: 3 . 13 Acres WEIGHTED CURVE NUMBER: 61 ------------------------------------------------------------------------------- TR-55 CURVE NUMBER COMPUTATION VERSION 1.11 Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT Subarea : G' --_______W___________ Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - . 657 (61) - - Total Area (by Hydrologic Soil Group) . 657 SUBAREA: GI TOTAL DRAINAGE AREA: . 657 Acres WEIGHTED CURVE NUMBER:61 I TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 i j Project : EAST PASTURE ESTATES User: wrb Date: 01-03-95 County State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT I ----------------------------------- Subarea #1 - A' ----------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) Sheet 3 . 1 75 . 03 F 0. 163 Time of Concentration = 0. 16* -------------------------------- Subarea #2 - B' --------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ----Sheet 3 . 1 100 . 008 H 0.525 Shallow Concent'd 60 . 005 U 0. 015 Time of Concentration = 0.54* ------------------------------- Subarea #3 - C11 ------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------- --_- Sheet 3 . 1 100 .03 H 0. 309 Shallow Concent'd 155 .072 U 0.010 Shallow Concent'd 90 .014 P 0.010 Time of Concentration 0.33* -------------------------------- Subarea #4 - C2 ' ------------------------------ Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ----------------------------- ---------------------------------- Sheet 3 . 1 100 . 14 F 0. 111 Time of Concentration = 0.11* --------------------------------- Subarea #5 - D' --------------------------_------ Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ---__--- ------- --___- Sheet 3 . 1 100 .037 F 0. 189 Shallow Concent'd 65 . 18 U 0.003 Time of Concentration = 0. 19* TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 Project : EAST PASTURE ESTATES User: wrb Date: 01--03-95 County State: Checked: Date: Subtitle: PROPOSED CONDITION WATERSHED ASSESSMENT ------------------------------- Subarea #6 - E' ---- ---- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------.._-------------------------------------- Sheet 3 . 1 100 . 048 F 0. 170 Shallow Concent'd 40 . 048 U 0.003 Time of Concentration = 0.17* ------------------------------- Subarea #7 - F' --------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3 . 1 100 . 028 H 0.318 Shallow Concent'd 200 . 009 U 0.036 Shallow Concent'd 250 . 034 U 0.023 Time of Concentration = 0.38* -------------------------------- Subarea #8 - G' ------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ----------------------------......_-----------------------------------------....----.. Sheet 3 . 1 100 . 12 F 0.118 Shallow Concent'd 60 . 12 U 0.003 Time of Concentration = 0. 12* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated - -- B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short ***k***kk*********80 80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY****************** JOB TR-20 FULLPRINT SUMMARY NOPLOTS TITLE 001 EAST PASTURE ESTATES PROPOSED CONDITION TITLE TYPE III STORM DISTRIBUTION 24 HOUR DURATION 5 RAINFL 9 .25 8 0.0 .0025 .005 .0075 .010 8 .0125 .015 .0175 .020 .0225 8 .026 .0285 .031 .0345 .037 8 .0405 .043 .0465 .050 .0535 8 .057 .0605 .064 .068 .072 8 .076 .080 .0845 .089 .094 8 .100 .1075 .115 .1225 .130 8 .1385 .148 .157 .167 .178 8 .189 .202 .216 .2315 .250 8 .271 .298 .3455 .500 .6555 8 .702 .7295 .751 .769 .785 8 .7985 .811 .823 .834 .8435 8 .853 .862 .870 .8785 .886 8 .8935 .900 .907 .911 .916 8 .920 .9245 .929 .9325 .936 8 .940 .944 .947 .951 .954 8 .957 .9605 .963 .9665 .969 8 .9725 .975 .9775 .981 .9835 8 .986 .9885 .991 .9935 .996 8 .9985 1.0 1.0 1.0 1.0 9 ENDTBL 3 STRUCT 01 8 186.25 0.0 0.0 8 187.5 0.0001 .008609 8 188. 0.24 .035824 8 190. 0.68 .267917 8 191.5 0.86 .508 8 192. 10.04 .588578 9 ENDTBL 3 STRUCT 02 8 184.5 0.0 .106 8 185. 37.39 .135 8 185.3 78.46 .152 9 ENDT8L 6 RUNOFF 1 001 1 .0003078 63. .16 1 1 1 1 6 RUNOFF 1 002 2 .0015468 70. .54 1 1 1 1 6 RUNOFF 1 003 3 .0021906 69. .33 1 1 1 1 6 ADDHYD 4 004 2 3 4 1 1 1 1 6 RUNOFF 1 005 5 .0005156 64. .11 1 1 1 1 6 ADDHYD 4 006 4 5 3 1 t 1 I 6 RESVOR 2 01 3 2 186.25 1 1 1 1 1 6 RUNOFF 1 007 3 .0006875 83. .19 1 1 1 1 x**xxx*xx*xx**x**xx***80 IIO LIST OF INPUT DATA (CONTINUED)********************** 6 ADDHYD 4 008 2 3 4 1 1 1 1 6 RESVOR 2 02 4 3 W.5 1 1 1 1 1 6 RUNOFF 1 009 4 /0009953 73. .17 1 1 1 1 6 ADDHYD 4 010 4 3 2 1 1 1 1 6 RUNOFF 1 011 3 .0048906 61. .38 1 1 1 1 6 RUNOFF 1 012 4 .0010265 61. .12 1 1 1 1 ENDATA 7 INCREM 6 0.08 7 COMPUT 7 001 012 0.0 2.6 1.0 9 2 01 01 ENDCMP 1 7 COMPUT 7 001 012 0.0 3.1 1.0 9 2 01 02 ENDCMP 1 7 COMPUT T 001 012 0.0 4.6 1.0 9 2 01 03 ENDCMP 1 7 COMPUT 7 001 012 0.0 7.0 1.0 9 2 01 04 ENDCMP 1 ENDJOS 2 xx*xxxxxxx*xxxxxx*xxxxx*xxxxxx*END OF 80-80 i TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 ; REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 1 EXECUTIVE CONTROL OPERATION INCREM HAIR TIME INCREMENT = .08 HOURS RECORD ID EXECUTIVE CONTROL OPERATION COMPUT FROM. XSECTION 1 TO XSECTION 12 RECORD ID STARTING TIME _ .00 RAIN DEPTH = 2.60 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. MOIST. CORD= 2 ALTERNATE NO.= 1 STORM HO.= 1 MAIN TINE INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT RYDROGRAPH= 1 AREA= .00 SQ HI INPUT RUNOFF CURVE= 63. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPII TIME INCREMENT= .0213 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 15.76 .01 (RUNOFF) 12.32 .03 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .DO SQ.MI. 12.00 DISCIIG .00 .01 .02 .03 .03 .02 .02 .02 .01 .01 12.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 13.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 14.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 15.20 DISCHG .01 .01 .00 .00 .00 .00 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .17 WATERSHED INCHES, 03 CFS-HRS, .00 ACRE-FEET; 8ASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .00 SQ Mi INPUT RUNOFF CURVE= 70. TINE OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.48 .26 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TINE INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.NI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 12.00 DISCHG .03 .06 .10 .15 .21 .24 .26 .25 .23 .20 12.80 DISCHG .18 .15 .14 .12 .11 .10 .09 .09 .08 .08 13.60 DISCHG .07 .07 .07 .06 .06 .06 .06 .05 .05 .05 14.40 DISCHG .05 .05 .05 .05 .05 .05 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 16.00 DISCHG .04 .04 .04 .04 .04 .03 .03 .03 .03 .03 16.80 DISCHG .03 .03 .03 .03 .03 .02 .02 .02 .02 .02 i TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 2 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 20.80 DISCHG .01 .02 .02 .02 .01 .01 .01 .02 .02 .02 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .02 .02 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .50 WATERSHED INCHES, .50 CFS-HRS, .04 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPHo 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.40 .41 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .02 12.00 DISCHG .07 .15 .24 .33 .41 .41 .35 .29 .24 .20 12.80 DISCHG .17 .15 .13 .12 .11 , .11 .10 .10 .09 .09 13.60 DISCHG .09 .08 .08 .08 .07 .07 .07 .07 .07 .07 14.40 DISCHG .07 .07 .06 .06 .06 .06 .06 .06 '.06 .06• 15.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 16.00 DISCHG .05 .05 .05 .05 .05 .05 .04 .04 .04 .04 16.80 DISCHG .04 .04 .04 .03 .03 .03 .03 .03 .03 .03 17.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .02 18.40 DISCHG .02 G2 .02 .02 .02 .03 .03 .03 .03 .03 19.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCIIG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME ABOVE BASEFLOW W .46 WATERSHED INCHES, .66 CFS-HRS, .05 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .03 CFS. I TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOTS 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 3 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 (NULL) 12.40 .65 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA .00 SQ.M[. 11.20 D[SCiIG .00 .00 .00 .00 .00 .00 .00 .00 .00 .03 12.00 D[SCIIG .10 .21 .34 .49 .61 .65 .61 .54 .47 .40 12.80 D[SCHG .34 .30 .27 .24 .22 .20 .19 .18 .17 .16 13.60 DISCHG .16 .15 .14 .14 .13 .13 .13 .12 .12 .12 14.40 DISCHG .12 .12 .11 .11 .11 .10 .10 .10 .10 .10 15.20 DISCHG .10 .10 .09 .09 .09 .09 .09 .09 .09 .09 16.00 DISCHG .09 .08 .08 .08 .08 .08 .08 .08 .07 .07 16.80 DISCHG .07 .07 .07 .06 .06 .05 .05 .05 .05 .05 17.60 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 18.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 19.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 20.00 DISCHG .04 .04 .04 .04 .04 .04 .04 .03 .03 .04 20.80 DISCHG .04 .04 .04 .03 .03 .03 .04 .04 .04 .03 21.60 DISCHG .03 .03 .03 .03 .03 .03 .04 .04 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 RUNOFF VOLUME ABOVE BASEFLOW = .48 WATERSHED INCHES, 1.15 CFS-HRS, .10 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 5 AREA= .00 SQ MI INPUT RUNOFF CURVE= 64. TIME OF CONCENTRATION= .11 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0147 HOURS **' WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 18.00 .01 (RUNOFF) 12.24 .07 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .01 .03 .05 .07 .06 .04 .03 .03 .02 .02 12.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .01 .01 .01 13.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 14.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 15.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .01 .00 .00 .01 .01 .01 .00 .00 .00 17.60 DISCHG .01 .01 .01 .01 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .23 WATERSHED INCHES, .08 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 4 OPERATION ADDRYO CROSS SECTION 6 INPUT HYDROGRAPHS= 4,5 OUTPUT HYDROGRAPH= 3 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .03 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.92 .o3 (NULL) 12.40 .69 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG -00 .00 .00 .00 .00 Do .00 .00 .00 .03 12.00 DISCHG .11 .24 .39 .56 .67 .69 .64 .57 .49 .42 12.80 DISCHG .36 .32 .29 .26 .24 .22 .21 .19 .19 .18 13.60 DISCHG .17 .16 .16 .15 .15 .14 .14 .14 .13 .13 14.40 DISCHG .13 .13 .12 .12 .12 .11 .11 .11 .11 .11 15.20 DISCHG .11 .11 AD .10 .10 .10 .10 .10 .10 .10 16.00 DISCHG .09 .09 .09 .09 .09 .09 .08 .08 .08 .08 16.80 DISCHG .08 .08 .07 .06 .06 .06 .06 .05 .05 .05 17.60 DISCIIG .05 .05 .05 .05 .05 .06 .05 .05 .05 .o4 18.40 DISCHG .04 .04 .04 .04 .04 .04 .04 o4 .04 .04 19.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 20.00 DISCHG .04 .04 .04 .04 .04 .04 .04 .03 .03 .04 20.80 DISCHG .04 .04 .04 .03 .03 .03 .04 .04 .04 .03 21.60 DISCHG .03 .03 .03 .03 .03 .03 .o4 .04 .03 .03 2Z.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 RUNOFF VOLUME ABOVE BASEFLOW = .45 WATERSHED INCHES, 1.23 CFS-HRS, .10 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= 3 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .20 CFS. PEAK TIME(HRS) PEAK DISCHARGE WS) PEAK ELEVATION(FEET) 13.28 .20 187.92 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT W .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .00 .00 .00 .02 .o6 .09 .12 .14 .16 12.00 ELEV 186.25 186.25 186.25 186.25 187.54 187.62 187.69 187.75 187.80 187.84 12.80 DISCHG .18 .18 .19 .20 .20 .20 .20 .20 .20 .Zo 12.80 ELEV 187.87 187.89 187.90 187.91 187.91 187.92 187.92 187.92 187.92 187.92 13.60 DISCHG .20 .20 .19 .19 .19 .19 .18 .18 .18 .18 13.60 ELEV 187.91 187.91 187.90 187.90 187.89 187.89 187.88 187.88 187.87 187.87 14.40 DISCHG .17 .17 .17 .17 .16 .16 .16 .16 .15 .15 14.40 ELEV 187.86 187.86 187.65 187.85 187.84 187.83 187.83 187.82 187.82 187.81 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 5 15.20 DISCHG .15 .15 .14 .14 .14 .14 .13 .13 .13 .13 15.20 ELEV 187.81 187.80 187.80 187.79 187.79 187.78 187.78 187.77 187.77 187.77 16.00 DISCHG .13 .12 .12 .12 .12 .12 .12 .11 .11 .11 16.00 ELEV 187.76 187.76 187.75 187.75 187.75 187.74 187.74 187.74 187.73 187.73 16.80 DISCHG .11 .11 .10 .10 .10 .10 .10 .09 .09 .09 16.80 ELEV 187.73 187.72 187.72 187.71 187.71 187.70 187.70 187.69 187.69 187.69 17.60 DISCHG .09 .08 .08 .08 .08 .08 .08 .08 .07 .07 17.60 ELEV 187.68 187.68 187.67 187.67 187.67 187.66 187.66 187.66 187.65 187.65 18.40 DISCHG .07 .07 .07 .07 .06 .06 .06 .06 .06 .06 18.40 ELEV 187.65 187.64 187.64 187.64 187.63 187.63 187.63 187.63 187.63 187.62 19.20 DISCHG .06 .06 .06 .06 .05 .05 .05 .05 .05 .05 19.20 ELEV 187.62 187.62 187.62 187.62 187.61 187.61 187.61 187.61 187.61 187.61 20.00 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .04 .04 20.00 ELEV 187.60 187.60 187.60 187.60 187.60 187.60 187.60 187.59 187.59 187.59 20.80 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 20.80 ELEV 187.59 187.59 187.59 187.59 187.59 187.59 187.59 187.59 187.58 187.58 21.60 DISCIIG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 21.60 ELEV 187.58 18T.58 187.58 187.58 187.58 187.58 187.58 187.58 187.58 187.58 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .03 .03 .03 22.40 ELEV 187.58 187.58 187.58 187.58 187.57 187.57 187.57 187.57 187.57 187.57 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 ELEV 187.57 187.57 187.57 187.57 187.57 187.57 187.57 167.57 187.57 187.57 RUNOFF VOLUME ABOVE BASEFLOW = .39 WATERSHED INCHES, 1.08 CFS-HRS, .09 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 83. TIME Of CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS *"* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .40 (RUNOFF) TINE(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M[. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 10.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 11.20 DISCHG .02 .02 .02 .03 .03 .04 .06 .07 .12 .21 12.00 DISCHG .28 .33 .37 .40 .38 .26 .18 .15 .11 .09 12.80 DISCHG .09 .08 .07 .07 .06 .06 .06 .05 .05 .05 13.60 DISCNG .05 .05 .04 .04 .04 .04 .04 .04 .04 .04 14.40 DISCHG .04 .04 .04 .03 .03 .03 .03 .03 .03 .03 15.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.00 DISCIIG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 16.80 DISCIIG .02 .02 .02 .01 .02 .02 .02 .02 .01 .01 17.60 DISCHG .01 .01 .02 .02 .02 .02 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 TR20 XEa 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 6 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 1.12 WATERSHED INCITES, .50 CFS-HRS, .04 ACRE-FEET; BASEFLOW _ .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .05 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 22.00 .05 (NULL) 12.32 .40 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SO.MI. 9.60 DISCHG .00 .00 .00 .00 M .00 .00 .00 .01 .01 10.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 11.20 DISCHG .02 .02 .02 .03 .03 .04 .06 .07 .12 .21 12.00 DISCHG .28 .33 .37 .40 .40 .32 .27 .27 .26 .26 12.80 DISCHG .26 .26 .26 .26 .26 .26 .26 .26 .25 .25 13.60 DISCHG .25 .24 .24 .23 .23 .23 .22 .22 .22 .21 14.40 DISCHG .21 .21 .20 .20 .20 .19 .19 .19 .18 .18 15.2G DISCHG .18 .18 .17 .17 .17 .16 .16 .16 .16 .15 16.00 DISCHG .15 .15 .15 .15 .14 .14 .14 .14 .13 .13 16.80 DISCHG .13 .13 .12 .12 .12 .11 .11 .11 .11 .10 17.60 DISCHG .10 .10 .10 .10 .10 .09 .09 .09 .09 .08 18.40 DISCHG .08 .08 .08 .08 .08 .08 .08 .00 .07 .07 19.20 DISCHG .07 .07 .07 .07 .07 .07 .06 .06 .06 .06 20.00 DISCIIG .06 .06 .06 .06 .06 .06 .06 .05 .06 .06 20.80 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 21.60 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 22.40 DISCHG .05 .05 .05 .05 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = .50 WATERSHED INCHES, 1.58 CFS-HRS, .13 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPII= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .05 CFS. TR20 XEQ 01.04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 7 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 22.00 .05 184.50 12.32 .40 184.51 TIME(HRS) FIRST HYOROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 9.60 ELEV 184 M 184.50 184.50 184.50 184.50 184.50 184.50 1B4.50 184.50 184.50 10.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 11.20 DISCHG .02 .02 .02 .03 .03 .04 .05 .07 .11 .20 11.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 12.00 DISCHG .28 .32 .36 .39 .40 .33 .27 .27 .26 .26 €2.00 ELEV 184.50 194.50 184.50 184.51 184.51 184.50 184.50 184.50 184.50 .184.50 12.80 DISCHG .26 .26 .26 .26 .26 .26 .26 .26 .25 .25 12.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 13.60 DISCHG .25 .24 .24 .24 .23 .23 .22 .22 .22 .22 13.60 ELEV 184.50 184.50 184.50 184.50 184.50 164.50 184.50 184.50 184.50 184.50 14.40 DISCHG .21 .21 .20 .20 .20 .19 .19 .19 .18 .18 14.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 15.20 DISCHG .18 .16 .17 .17 .17 .16 .16 .16 .16 .15 15.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.00 DISCHG .15 .15 .15 .15 .14 .14 .14 .14 .13 .13 16.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.80 DISCIIG .13 .13 .12 .12 .12 .11 .11 .11 .11 .10 16.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 17.60 DISCHG .10 .10 .10 .10 .10 .09 .09 .09 .09 .08 17.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 €84.50 18.40 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 OT .07 18.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 19.20 DISCHG .07 .07 .07 .07 .07 .07 .06 .06 .06 .06 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 1B4.50 184.50 184.50 184.50 20.00 DISCHG .06 .06 .06 .06 .06 .06 .06 .05 .06 .06 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 1B4.50 184.50 184.50 184.50 20.80 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 20.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 22.40 DISCHG .05 .05 .05 .05 .04 .04 .04 .04 .04 .04 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .04 .04 ,04 .04 .04 .04 .04 .04 .04 .04 23.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = .50 WATERSHED INCHES, 1.58 CFS-HRS, .13 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0227 HOURS TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 8 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .31 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .02 .05 .11 12.00 DISCHG .16 .22 .27 .31 .30 .20 .14 .12 .10 .08 12.80 DISCHG .08 .07 .06 .06 .06 .05 .05 .05 .05 .05 13.60 DISCHG .05 .04 .04 .04 .04 .04 .04 .04 .04 .04 14.40 DISCHG .04 .04 .03 .03 .03 .03 .03 .03 .03 .03 15.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.00 DISCHG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 16.80 DISCHG .02 .02 .02 .01 .02 .02 .02 .02 .01 .01 17.60 DISCHG .01 .02 .02 .02 .02 .02 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE SASEFLOW = .62 WATERSHED INCHES, .40 CFS-HRS, .03 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 10 INPUT HYDROGRAPHS= 4,3 OUTPUT HYDROGRAPH= 2 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .06 CFS. PEAK TIME(HRS) PEAK DISCIIARGE(CFS) PEAK ELEVATION(FEET) 22.00 .06 (NULL) 12.24 .71 (HULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 10.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 11.20 DISCHG .02 .02 .02 .03 .03 .04 .06 .08 .15 .31 12.00 DISCHG .44 .54 .63 .71 .70 .53 .42 .39 .36 .34 12.80 DISCHG .34 .33 .32 .32 .32 .31 .31 .31 .30 .30 13.60 DISCHG .29 .28 .28 .28 .27 .27 .26 .26 .26 .25 14.40 DISCHG .25 .24 .24 .23 .23 .22 .22 .22 .21 .21 15.20 DISCHG .21 .20 .20 .20 .19 .19 .19 .19 .19 .18 16.00 DISCHG .18 .18 .17 .17 .17 .16 .16 .16 .16 .16 16.80 DISCHG .15 .15 .14 .13 .13 .13 .13 .13 .12 .12 17.60 DISCHG .12 .12 .11 .11 .11 .11 .11 .10 .10 .10 111 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 9 18.40 DISCHG .10 .09 .09 .09 .09 .09 .09 .09 .09 .08 19.20 DISCHG .08 .08 .08 .08 .08 .08 .08 .07 .07 .07 20.00 DISCHG .07 .07 .07 .07 .07 .07 .06 .06 .07 .07 20.80 DISCHG .07 .06 .06 .06 .06 .07 .OT .06 .06 .06 21.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 22.40 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 23.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 RUNOFF VOLUME ABOVE BASEFLOW = .52 WATERSHED INCHES, 1.98 CFS-HRS, .16 ACRE-FEET; BASEFLOW = .00 CPS OPERATION RUNOFF CROSS SECTION 11 OUTPUT HYDROGRAPHI= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .38 HOURS INTERNAL HYDRDGRAPH TIME INCREMENT= .0507 HOURS WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .03 CPS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 (RUNOFF) 12.48 .27 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .00 .01 .03 .10 .19 .25 .27 .25 .23 .20 12.80 DISCHG .18 .17 .15 .14 .13 .13 .12 .12 .11 .11 13.60 DISCHG .11 .10 .10 .10 .09 .09 .09 .09 .09 .09 14.40 DISCHG .09 .08 .08 .08 .08 .08 .08 .07 .07 .07 15.20 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .07 16.00 DISCHG .07 .07 .06 .06 .06 .06 .06 .06 .06 .06 16.80 DISCHG .06 O6 .05 .05 .o4 .04 .04 .04 .04 .04 17.60 DISCHG .04 .04 .o4 .o4 o4 .04 .04 .04 .04 .04 18.40 DISCHG .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 19.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.80 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 21.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .02 .02 RUNOFF VOLUME ABOVE BASEFLOW = .22 WATERSHED INCHES, .71 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CPS OPERATION RUNOFF CROSS SECTION 12 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .12 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0160 HOURS *�* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CPS. TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 1 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 10 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.32 .08 (RUNOFF) TIHE(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.H1. 12.00 DISCIIG .00 .01 .04 .08 .08 .05 .05 .04 .03 .03 12.80 DISCHG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 13.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 14.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .22 WATERSHED INCHES, .15 CFS-HRS, .01 ACRE-FEET; BASEFLOW r .00 CFS EXECUTIVE CONTROL OPERATION ENDCHP COMPUTATIONS COMPLETED FOR PASS 1 RECORD ID TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 11 i EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 12 RECORD ID STARTING TIME = .00 RAIN DEPTH = 3.10 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. HOIST. CORD= 2 ALTERNATE NO.= 1 STORM NO.= 2 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPH= 1 AREA= .00 SQ III INPUT RUNOFF CURVE= 63. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 16.72 .01 (RUNOFF) 12.32 .07 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.HI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 12.00 DISCHG .02 .03 .05 .07 .07 .04 .03 .03 .02 .02 12.80 DISCHG .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 13.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 14.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 15.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .35 WATERSHED INCHES, .07 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 DUTPUT HYDROGRAPH= 2 AREA= .00 SQ MI INPUT RUNOFF CURVE= 70. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.48 .43 (RUNOFF) TIHE(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 OD .00 .00 .00 .01 .02 .04 12.00 DISCHG .08 .14 .21 .30 .37 .42 .43 .41 .37 .32 12.80 DISCHG .27 .24 .21 .18 .16 .15 .14 .13 .12 .11 13.60 DISCHG .10 .10 .09 .09 .09 .08 .08 .08 .08 .08 14.40 DISCHG .07 .07 .07 .07 .07 .07 .06 .06 .06 .06 15.20 DISCHG .06 .06 .06 .06 .06 .05 .05 .05 .05 .05 16.00 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 16.80 DISCHG .04 .04 .04 .04 .04 .03 .03 .03 .03 .03 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 12 17.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 18.40 DISCHG .03 .03 .02 .02 .02 .02 .03 .03 .03 .03 19.20 DISCHG .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME ABOVE OASEFLOW = .76 WATERSHED INCHES, .76 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS **� WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .02 CFS. PEAK TIME(IIRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.32 .69 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .02 .04 .11 12.00 DISCHG .22. .34 .47 .60 .69 .67 .56 .45 .37 .30 12.80 DISCHG .25 .22 .20 .18 .17 .16 .15 .14 .13 .13 13.60 DISCHG .13 .12 .11 .11 .11 .10 ..10 .10 .10 .10 14.40 DISCHG .10 .09 .09 .09 .09 .08 .08 .08 .08 .08 15.20 DISCHG .08 .08 .08 .07 .07 .07 .07 .07 .07 .07 16.00 DISCHG .07 .07 .07 .07 .07 .06 .06 .06 .06 .06 16.80 DISCHG .06 .06 .05 .04 .04 .04 .04 .04 .04 .04 17.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .03 18.40 DISCHG .03 .03 .03 .03 .03 .04 .04 .04 .04 .04 19.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.80 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 21.60 DISCHG .03 .02 .02 .02 .03 .03 .03 .03 .03 .03 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME ABOVE BASEFLOW = .72 WATERSHED INCHES, 1.02 CFS-HRS, .08 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .04 CFS. i TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB I PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 13 i PEAK TIRE 11 S PEAK DISCHARGE CFS PEAK ELEVATION FEET 23.68 .04 (NULL) 12.40 1.08 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME 114CREMENT = .08 YOURS DRAINAGE AREA = .00 SQ.M1. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .03 .06 .15 12.00 DISCHG .30 .49 .69 .89 1.06 1.08 .99 .86 .73 .62 12.80 DISCHG .53 .46 .40 .36 .33 .30 .28 .27 .25 .24 13.60 DISCHG .23 .22 .21 .20 .19 .19 .18 .18 .18 .17 14.40 DISCHG .1T .17 .16 .16 .15 .15 .14 .14 .14 .14 15.20 DISCHG .14 .14 .13 .13 .13 .13 .12 .12 .12 .12 16.00 DISCHG .12 .12 .12 .12 .11 .11 .11 .11 .11 .11 16.80 DISCHG .10 .10 .09 .08 .08 .08 .08 .08 .07 .07 17.60 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .06 .06 18.40 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 19.20 DISCHG .06 .06 .05 .06 .06 .06 .06 .06 .05 .05 20.00 DISCHG .05 .05 .05 .05 .05 .05 .05 .G5 .05 .05 20.80 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 21.60 DISCHG .05 .04 .04 .04 .05 .05 .05 .05 .05 .05 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = .74 WATERSHED INCHES, 1.78 CFS-HRS, .15 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 5 AREA= .00 SQ MI INPUT RUNOFF CURVE= 64. TIME OF CONCENTRATION= .11 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0147 HOURS WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAT( TIME(HRS) PEAK DISCIIARGE(CFS) PEAK ELEVATION(FEET) 22.00 .01 (RUNOFF) 12.24 .14 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .02 12.00 DISCHG .05 .08 .11 .14 .11 .06 .05 .05 .04 .03 12.80 DISCHG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 13.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 14.40 DISCHG .02 .02 .02 .01 .01 .01 .01 .01 .01 .01 15.20 DtSCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 16.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .00 .00 .01 .01 .01 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 14 20.80 DISCHG .01 .00 .00 .00 .01 .01 .01 .00 .00 .00 21.60 DISCHG .00 .00 .00 .01 .01 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = .47 WATERSHED INCHES, .16 CFS-HRS, .01 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT IIYDROGRAPHS= 4,5 OUTPUT HYDROGRAPH= 3 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.35 1.18 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .00 .01 .03 .06 .18 12.00 DISCHG .36 .57 .80 1.03 1.17 1.15 1.05 .91 .77 .65 12.80 DISCHG .56 .49 .43 .39 .35 .33 .31 .29 .27 .26 13.60 DISCHG .25 .24 .23 .22 .21 .21 .20 .20 .19 .19 14.40 DISCHG .19 .18 .18 .17 .17 .16 .16 .16 .16 .15 15.20 DISCHG .15 .15 .15 .14 .14 .14 .14 .14 .14 .14 16.00 DISCHG .13 .13 .13 .13 .13 .12 .12 .12 .12 .12 16.80 DISCHG .12 .11 .10 .09 .09 .08 .08 .08 .08 .08 17.60 O[SCHG .08 .08 .08 .08 .08 .08 .08 .07 .07 .07 18.40 DISCHG .07 .06 .06 .06 .07 .07 .07 .07 .07 .07 19.20 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 20.00 DISCHG .06 .06 .06 .06 .06 .05 .05 .05 .05 .05 20.80 D[SCHG .06 .05 .05 .05 .05 .05 .06 .05 .05 .05 21.60 DISCHG .05 .04 .04 .05 .05 .05 .06 .05 .05 .05 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = .70 WATERSHED INCHES, 1.93 CFS-HRS, .16 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= 3 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 **� WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .28 CfS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 13.44 .28 188.16 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.141. 12.00 DISCHG .00 .00 .02 .07 .13 .18 .24 .25 .26 .26 12.00 ELEV 186.25 186.25 187.54 187.64 187.76 187.89 187.99 188.04 188.07 188.10 12.80 DISCHG .27 .27 .27 .27 .27 .28 .28 .28 .28 .28 12.80 ELEV 188.12 188.13 188.14 188.15 188.16 188.16 188.16 188.16 188.16 188.16 13.60 DISCHG .28 .28 .27 .27 .27 .27 .27 .27 .27 .27 13.60 ELEV 188.16 188.16 188.16 188.16 188.15 188.15 188.14 188.14 188.14 188.13 14.40 DISCHG .27 .27 .27 .26 .26 .26 .26 .26 .26 .26 TRIO XEC 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONOITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 15 14.40 ELEV 188.13 188.12 188.12 188.11 188.11 188.10 188.10 188.09 188.08 188.08 15.20 DISCHG .26 .25 .25 .25 .25 .25 .25 .25 .25 .24 15.20 ELEV 188.07 188.07 188.06 188.05 188.05 188.04 188.04 188.03 188.02 188.02 16.00 DISCHG .A .24 .24 .23 .23 .22 .21 .21 .20 .20 16.00 ELEV 188.01 188.00 188.00 187.98 187.97 187.96 187.95 187.94 187.92 187.91 16.80 DISCHG .19 .19 .18 .18 .17 .17 .16 .16 .16 .15 16.80 ELEV 187.90 187.90 187.89 187.87 187.86 187.85 187.84 187.83 187.82 187.82 17.60 DISCHG .15 .14 .14 .14 .13 .13 .13 .12 .12 .12 17.60 ELEV 187.81 187.80 187.79 187.78 187.78 187.77 187.76 187.76 187.75 187.74 18.40 DISCHG .11 .11 .11 .11 .10 .10 i0 .10 .10 AD 18.40 ELEV 187.74 187.73 187.73 187.72 187.72 187.71 187.71 187.70 187.70 187.70 19.20 DISCHG .09 .09 .09 .09 .09 .09 .08 .08 .08 .08 19.20 ELEV 187.69 187.69 187.69 187.68 187.68 187.68 187.68 187.67 187.67 187.67 20.00 DISCHG .08 .08 .08 .08 .07 .07 .07 .07 .07 .07 20.00 ELEV 187.66 187.66 187.66 187.66 187.65 187.65 187.65 187.65 187.65 187.64 20.80 DISCHG .07 .07 .07 .07 .06 .06 .06 .06 .06 .06 20.80 ELEV 187.64 187.64 187.64 187.64 187.63 187.63 187.63 187.63 187.63 187.63 21.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 21.60 ELEV 187.63 187.62 187.62 187.62 187.62 187.62 187.62 187.62 187.62 187.62 22.40 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 22.40 ELEV 187.62 187.61 187.61 187.61 187.61 187.61 187.61 187.61 187.60 187.60 23.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 23.20 ELEV 187.60 187.60 187.60 187,60 187.60 187.60 187.60 187.60 187.60 187.60 RUNOFF VOLUME ABOVE BASEFLOW = .64 WATERSHED INCHES, 1.77 CFS-HRS, .15 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ HI INPUT RUNOFF CURVE= 83, TIME OF CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS **� WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .53 (RUNOFF) TIMEORS) FIRST HYGROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .02 .02 .02 .03 .03 11.20 DISCHG .03 .03 .04 .05 .05 .06 .09 .10 .17 .31 12.00 DISCHG AD .46 .50 .53 .50 .34 .24 .19 .15 .12 12.&0 DISCHG .11 .10 .09 .09 .08 .08 .07 .07 .07 .07 13.60 DISCHG .06 .06 .06 .06 .05 .05 .05 .05 .05 .05 14.40 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .04 .03 .03 .04 .04 .04 .03 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 TR20 XEa 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 16 18.40 DISCHG .02 .02 .02 .02. .02 .02 .02 .OR .02 .02 19.20 DISCHG .01 .01 .01 O2 .02 .02 .01 .01 .01 Al 20.00 DISCHG .01 .01 .01 .02 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .02 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .02 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 1.52 WATERSHED INCHES, .67 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .07 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 22.00 .07 (NULL) 12.32 .63 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.Mi. 9.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .02 .02 .02 .03 .03 11.20 DISCHG .03 .03 .04 .05 .05 .06 .09 .10 .17 .31 12.00 DISCHG .40 .46 .52 .60 .63 .53 .47 .44 .41 .38 12.80 DISCHG .38 .37 .36 .36 .36 .35 .35 .35 .34 .34 13.60 DISCHG .34 .33 .33 .33 .33 .32 .32 .32 .32 .32 14.40 DISCHG .32 .31 .31 .31 .30 .30 .30 .30 .30 .30 15.20 DISCHG .29 .29 .29 .29 .29 .28 .28 .28 .28 .28 16.00 DISCHG .28 .27 .27 .26 .26 .25 .24 .24 .23 .23 16.80 D[SCHG .22 .21 .20 .20 .19 .19 .19 .18 .17 .17 17.60 DISCHG .17 .16 .16 .16 .15 .15 .15 .14 .14 .13 18.40 DISCHG .13 .13 .12 .12 .12 .12 .12 .12 .11 .11 19.20 DISCHG .11 .11 .10 .10 .10 .10 .10 .10 .10 .09 20.00 DISCHG .09 .09 .09 .09 .09 .09 .08 .08 .08 .08 20.80 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .07 .07 21.60 D[SCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .07 22.40 DISCHG .07 .07 .07 .06 .06 .06 .06 .06 .06 .06 23.20 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .05 RUNOFF VOLUME ABOVE BASEFLOW = .77 WATERSHED INCHES, 2.44 CFS-HRS, .20 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .07 CFS. i i TR20 XEO 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 17 PEAK T1ME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 22.00 .07 184.50 12.32 .63 184.51 TIME(IRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 S©.Mi. 9.60 01SCHG .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 9.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 10.40 OISCHG .01 .01 .02 .02 .02 .02 .02 .02 .03 .03 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 %4.50 184.50 11.20 DISCHG .03 .03 .04 .04 .05 .06 .08 .10 .16 .29 11.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 12.00 DISCHG .39 .45 .51 .59 .63 .55 .47 .45 .41 .39 12.00 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 .184.51 12.80 DISCHG .38 .37 .36 .36 .36 .,35 .35 .35 .34 .34 12.80 ELEV 184.51 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 13.60 DISCHG .34 .33 .33 .33 .33 .33 .32 .32 .32 .32 13.60 ELEV 184.50 184.50 184.50 i84.50 184.50 184.50 184.50 184.50 184.50 184.50 14.40 DISCHG .32 .31 .31 .31 .30 .30 .30 .30 .30 .30 14.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 15.20 DISCHG .29 .29 .29 .29 .29 .28 .28 .28 .28 .28 15.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.00 DISCHG .28 .27 .27 .27 .26 .25 .24 .24 .23 .23 16.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 16.80 DISCHG .22 .22 .21 .20 .19 .19 .19 .18 .17 .17 16.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 17.60 DISCHG .17 .16 .16 .16 .15 .15 .15 .14 .14 .13 17.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 18.40 DISCHG .13 .13 .12 .12 .12 .12 .12 .12 .11 .11 18.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 19.20 DISCHG .11 .11 .10 .10 .10 .10 .10 .10 .10 .09 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.00 DISCHG .09 .09 .09 .09 .09 .09 .08 .08 .08 .08 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.80 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .07 .07 20.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .07 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 22.40 DISCHG .07 .07 .07 .06 .06 .06 .06 .06 .06 .06 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .05 23.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = 77 WATERSHED INCHES, 2.44 CFS-HRS, .20 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDROGRAPH= 4 AREA= .00 So MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT- .0227 HOURS TRIO XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION J00 1 PASS 2 REV PC 09/83(.2) TYPE III: STORM DISTRIBUTION 24 HOUR DURATION PAGE 18 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .47 (RUNOFF) TIME(IIRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA .00 SQ.MI. 11.20 DISCHG .00 .01 .01 .01 .02 .02 .04 .05 .10 .21 12.00 DISCHG .29 .36 .42 .47 .45 .29 .21 .18 .14 .12 12.80 DISCHG .11 .10 .09 .09 .08 .08 .07 .07 .07 .07 13.60 DISCHG .06 .06 .06 .06 .05 .05 .05 .05 .05 .05 14.40 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .04 15.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .03 .02 .02 .02 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 18.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 19.20 DISCIIG .02 .01 .02 .02 .02 .02 .02 .01 .01 .01 20.00 DISCIIG .01 .02 .02 .02 .02 .01 .01 .01 .02 .02 20.80 DISCHG .02 .01 .01 .01 .01 .02 .02 .02 .01 .01 21.60 DISCHG .01 .01 .01 .01 .02 .02 .02 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEfLOW = .91 WATERSHED INCHES, .59 CFS-HRS, .05 ACRE-FEET; 9ASEFLOW = .00 CFS OPERATION ADOHYD CROSS SECTION 10 INPUT HYDROGRAPHS= 4,3 OUTPUT HYDROGRAPH= 2 *"* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .09 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 22.00 .09 (NULL) 12.32 1.08 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.M1. 9.60 DISCHG .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .02 .02 .02 .03 .03 11.20 DISCHG .03 .04 .05 .06 .07 .09 .12 .15 .26 .49 12.00 DISCHG .68 .81 .93 1.06 1.08 .83 .68 .63 .54 .50 12.80 DISCHG .49 .47 .45 .45 .44 .43 .42 .42 .41 .41 13,60 DISCHG .40 .39 .39 .39 .38 .38 .38 .37 .37 .37 14.40 DISCHG .37 .36 .36 .35 .35 .35 .34 .34 .34 .34 15.20 DISCHG .34 .33 .33 .32 .32 .32 .32 .32 .32 .31 16,00 DISCHG .31 .31 .31 .30 .29 .28 .27 .27 .27 .26 16.80 DISCHG .26 .24 .23 .22 .22 .21 .21 .20 .19 .19 17.60 DISCHG .19 .18 .18 .18 .17 .17 .17 .16 .15 .15 I TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 ' REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 [[OUR DURATION PAGE 19 1B.40 DISCHG .15 .14 .14 .14 .14 .14 .14 .14 .13 ,13 19.20 DISCHG .12 .12 .12 .12 .12 .12 .1i .11 .11 .11 20.00 DISCHG .11 .11 .11 .11 .11 .10 .10 .10 .10 .10 20.80 DISCHG .10 .10 .09 .09 .09 .09 .10 .09 .09 .09 21.60 DISCHG .08 .08 .08 .08 .09 .09 .09 .08 .08 .08 22.40 DISCHG .08 .08 .08 .08 .08 .08 .08 .07 .07 .07 23.20 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .06 RUNOFF VOLUME ABOVE BASEFLOW = .79 WATERSHED INCHES, 3.03 CFS-I[RS, 25 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 11 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .38 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .04 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .04 (RUNOFF) 12.40 .65 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .02 .09 .22 .39 .56 .65 .62 .55 .47 .40 12.80 DISCHG .35 .31 .28 .25 .24 .22 .21 .20 .19 .19 13.60 DISCHG .18 .17 .17 .16 .15 .15 .15 .15 .14 .14 14.40 DISCHG .14 .14 .14 .13 .13 .12 .12 .12 .12 .12 15.20 DISCHG .12 .12 .11 .11 .11 .11 .11 .11 .11 .11 16.00 DISCHG .10 .10 AD .10 .10 .10 .10 .09 .09 .09 16.80 DISCHG .09 .09 .08 .07 .07 .07 OT .07 .06• .06 17.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .05 18.40 DISCHG .05 .05 .05 .05 .05 .05 .06 .06 .06 .06 19.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 20.00 DISCHG .05 .04 .05 .05 .05 .05 .04 .04 .04 .04 20.80 DISCHG .05 .05 .05 .04 .04 .04 .05 .05 .05 .04 21.60 DISCHG .04 .04 .04 .04 .04 .04 .05 .05 .04 .04 22.40 DISCHG 04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = .40 WATERSHED INCHES, 1.26 CFS-HRS, .10 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 12 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .12 HOURS INTERNAL HYOROGRAPH TIME INCREMENT= .0160 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 2 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 20 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .19 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 12.00 DISCHG .04 .09 .14 .19 .17 .10 .09 .08 .06 .06 12.80 DISCHG .05 .05 .05 .04 .04 .04 .04 .04 .04 .04 13.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 14.40 DISCHG .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .OR 16.80 DISCHG .02 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG 01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = .40 WATERSHED INCHES, .27 CFS-HRS, .02 ACRE-FEET; BASEFLOW = .00 CFS EXECUTIVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 2 RECORD ID TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB i PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 21 EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 12 RECORD ID STARTING TIME = .00 RAIN DEPTH = 4.60 RAIN DURATION= 1.00 RAIN TABLE ND.= 9 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM HO.= 3 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPH= 1 AREA= .00 SQ MI INPUT RUNOFF CURVE= 63. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS '** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .20 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .00 .01 .01 .02 .04 .08 12.00 DISCHG .12 .15 .18 .20 .19 .12 .09 .07 .06 .05 12.80 DISCHG .05 .04 .04 .04 .03 .03 .03 .03 .03 .03 13.60 DISCHG .03 .03 .03 .02 .02 .02 .02 .02 .02 .02 14.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 15.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 16.00 DISCHG .02 .02 .02 .02 .01 .01 .01 .01 .01 .01 16.90 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 17.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = 1.25 WATERSHED INCHES, .25 CFS-HRS, .02 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .00 SQ MI INPUT RUNOFF CURVE= 70. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .03 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .03 (RUNOFF) 12.40 1.04 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. TR20 XEa 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 22 10.40 DISCHG .00 .00 .01 .01 .01 .01 .02 .02 .02 .03 11.20 DISCHG .03 .04 04 .05 .06 .07 .08 .11 .15 .22 12,00 DISCHG .34 .49 .66 .83 .97 1.04 1.% .96 .84 .72 12.80 DISCNG .61 .52 .45 .39 .35 .31 .28 .26 .24 .23 13.60 DISCHG .21 .20 .19 .18 .17 .17 .16 .16 .15 .15 14.40 DISCHG .15 .14 .14 .14 .13 .13 .13 .12 .12 .12 15.20 DISCNG .12 .11 .11 .11 .11 .11 .10 .10 .10 .10 16.00 DISCNG .10 .10 .10 .10 .09 .09 .09 .09 .09 .09 16.80 DISCHG .09 .08 .08 .08 .07 .07 .06 .06 .06 .06 17.60 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .05 .05 18.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 19.20 DISCHG .05 .05 .05 .04 .05 .05 .05 ,05 .04 .04 20.00 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 20.80 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 21.60 DISCHG .04 .04 .04 .03 .04 .04 .04 .04 .04 .04 22.40 DISCHG 04 O4 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 RUNOFF VOLUME ABOVE BASEFLOW = 1.73 WATERSHED INCHES, 1.73 CFS-HRS, .14 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 SG NI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TINE INCREMENT= .0440 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.32 1.70 (RUNOFF) TIHE(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .00 OO .01 .01 .01 .02 .02 .03 .03 .04 11.20 DISCHG .05 .06 .07 .08 .09 .11 .15 .20 .29 .51 12.00 DISCHG .81 1.10 1.36 1.58 1.70 1.59 1.30 1.03 .82 .66 12.80 DISCHG .55 .48 .42 .38 .35 .32 .30 .29 .28 .27 13.60 DISCHG .26 .25 .23 .22 .22 .21 .21 .20 .20 .20 14.40 DISCHG .19 .19 .18 .18 .17 .17 .16 .16 .16 .16 15.20 DISCHG .16 .15 .15 .15 .14 .14 .14 .14 .14 .14 16.00 DISCHG .13 .13 .13 .13 .13 .12 .12 .12 .12 .12 16.80 DISCHG .12 .11 .10 .09 .08 .08 .08 .08 .08 .08 17.60 DISCHG .07 .07 .08 .08 .08 .08 .08 .07 .07 .07 18.40 DISCHG .06 .06 .06 .06 .07 .07 .07 .07 .07 .07 19.20 DISCNG .06 .06 .06 .06 .06 .07 .06 .06 .06 .06 20.00 DISCHG .05 .05 .06 .06 .06 .06 .05 .05 .05 .05 20.80 DISCHG .06 .06 .05 .05 .05 .05 .06 .06 .05 .05 21.60 DISCHG .05 .05 .05 .05 .05 .05 .06 .06 .05 .05 22.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 23.20 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .04 .04 RUNOFF VOLUME ABOVE BASEFLOW = 1.66 WATERSHED INCHES, 2.35 CFS-HRS, .19 ACRE-FEET; BASEFLOW = .00 CFS i i TR20 XER 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 3 , REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 23 OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPII= 4 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.35 2.69 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SOX. 10.40 DISCHG .00 .00 .01 .02 .02 .03 .04 .05 .06 .07 11.20 DISCIIG .08 .09 .11 .13 .15 .18 .23 .30 .44 .73 12.00 DISCHG 1.14 1.59 2.01 2.40 2.67 2.63 2.34 1.99 1.67 1.39 12.80 DISCHG 1.16 1.00 .87 .77 .70 .64 .59 .55 .52 .49 13.60 DISCHG .47 .45 .42 .41 .39 .38 .37 .36 .35 .35 14.40 DISCHG .34 .33 .33 .32 .30 .29 .29 .28 .28 .28 15.20 DISCHG .27 .27 .26 .26 .25 .25 .24 .24 .24 .24 16.00 DISCHG .24 .23 .23 .23 .22 .22 .21 .21 .20 .20 16.80 DISCHG .20 .20 .18 .16 .15 .15 .15 .14 .14 .14 17.60 DISCHG .13 .13 .13 .13 .13 .13 J3 .13 .12 .12 18.40 DISCHG .11 .11 .11 .11 .11 .12 .12 .12 .12 .12 19.20 DISCHG .11 .11 .10 .11 .11 .11 .11 .11 .10 .10 20.00 DISCHG .10 .10 .10 .10 .10 .10 .09 .09 .09 .09 20.80 DISCHG .10 .10 .09 .09 .09 .09 .10 .10 .09 .09 21.60 DISCHG .09 .08 .08 .08 .09 .09 .10 .09 .09 D9 22.40 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .08 .08 23.20 DISCHG .08 .08 108 .08 .08 .08 .08 .08 .08 .07 RUNOFF VOLUME ABOVE BASEFLOW = 1.69 WATERSHED INCHES, 4.08 CFS-HRS, .34 ACRE-FEET; 8ASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 5 AREA= .00 SQ MI INPUT RUNOFF CURVE= 64. TIME OF CONCENTRATION= .11 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0147 HOURS R*k WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .38 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .01 .01 .01 .02 .03 .04 .11 .19 12.00 DISCHG .25 .29 .34 .38 .29 .16 .13 .12 .09 .08 12.80 DISCHG .08 .07 .07 .06 .06 .06 .06 .05 .05 .05 13.60 DISCHG .05 .04 .04 .04 .04 .04 .04 .04 .04 .04 14.40 DISCHG .04 .04 .04 .03 .03 .03 .03 .03 .03 .03 15.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.00 DISCHG .03 .03 .03 .03 .02 .02 .02 .02 .02 .02 16.80 DISCHG .02 .02 .01 .01 .02 .02 .02 .02 .01 .01 TR20 XEQ 01.04-95 15.02 EAST PASTURE ESTATES PROPOSED CONDITION JOB l PASS 3 REV PC 09/83(.2) TYPE )II STORM DISTRIBUTION 24 HOUR DURATION PAGE 24 17.60 DISCHG .02 .02 .02 .02 .02 .02 .01 .01 .01 .01 18.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 Al 19.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 1.32 WATERSHED INCHES, .44 CFS-HRS, .04 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 4,5 OUTPUT HYDROGRAPH= 3 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.32 2.96 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 10.40 DISCHG .00 .00 .01 .02 .02 .03 .04 .05 .06 .07 11.20 DISCHG .08 .09 .12 .14 .16 .20 .26. .34 .55 .92 12.00 DISCHG 1.39 1.89 2.35 2.78 2.96 2.79 2.47 2.10 1.75 1.47 12.80 DISCHG 1.24 1.06 .93 .83 .75 .69 .64 .60 .57 .54 13.60 DISCHG .52 .49 .47 .45 .43 .42 .41 .40 .39 .38 14.40 DISCHG .38 .37 .36 .35 .34 .33 .32 .31 .31 .31 15.20 DISCHG .30 .30 .29 .28 .28 .27 .27 .27 .27 .27 16.00 DISCHG .26 .26 .25 .25 .25 .24 .24 .23 .23 .23 16.80 DISCHG .23 .21 .19 .18 .17 .16 .16 .16 .15 .15 17.60 DISCHG .15 .15 .15 .15 .15 .15 .15 .14 .14 .13 18.40 DISCHG .13 .12 .12 .12 .13 .13 .13 .13 .13 .13 19.20 DISCHG .12 .12 .12 .12 .12 .12 .12 .12 .11 .11 20.00 DISCHG .11 .11 .11 .11 .11 .11 AD .10 .10 .11 20.80 DISCHG .11 .11 .10 .10 .10 .10 .11 .11 .10 .10 21.60 DISCHG .10 .09 .09 .09 .10 .10 .11 .10 .10 .10 22.40 DISCHG .09 .09 .09 .09 .09 .09 .09 .09 .09 .09 23.20 DISCHG .09 .09 .09 .09 .09 .09 .09 .09 .08 .08 RUNOFF VOLUME ABOVE BASEFLOW = 1.64 WATERSHED INCHES, 4.51 CFS-HRS, .37 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 INPUT HYDROGRAPH= 3 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE W .48 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 13.68 .48 189.11 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. i TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB I PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 25 11.20 DISCHG .00 .00 .00 .00 .00 00 AO .01 .04 .08 11.20 ELEV 186.25 186.25 186.25 186.25 186.25 186.25 186.25 187.53 187.58 187.66 12.00 DISCHG .14 .22 .26 .29 .32 .35 .38 .40 .42 .44 12.00 ELEV 187.79 187.96 188.09 188.22 188.37 188.51 188.64 188.75 188.83 188.90 12.80 DISCHG .45 .46 .47 .47 .47 .48 .48 .48 .48 .48 12.80 ELEV 188.95 188.99 189.02 189.05 189.07 189.08 189.09 189.10 189.10 189.11 13.60 DISCHG .48 .4II .48 .48 .48 .48 .48 .4II .48 .48 13.60 ELEV 189.11 189.11 189.11 189.11 189.11 189.10 189.10 189.10 189.09 189.09 14.40 DISCHG .48 .48 .48 .47 .47 .47 .47 .47 .46 .46 14.40 ELEV 189.08 189.07 189.07 189.06 189.05 189.05 189.04 189.03 189.02 189.01 15.20 DISCHG .46 .46 .46 .45 .45 .45 .45 .45 .44 .44 15.20 ELEV 189.00 188.99 188.98 188.97 188.97 188.96 188.95 188.94 188.93 188.92 16.00 DISCHG .44 .44 .43 .43 .43 .43 .43 .42 .42 .42 16.00 ELEV 188.91 188.90 188.89 188.87 188.86 188.85 188.84 188.83 1B8.82 188.81 16.80 DISCHG .42 .41 .41 .41 .41 .40 .40 .40 .39 .39 16.80 ELEV 188.80 , 188.79 188.78 188.76 188.75 188.74 188.72 188.71 188.70 188.68 17.60 DISCHG .39 .38 .38 .38 .38 .37 .37 .37 .36 .36 17.60 ELEV 188.67 188.66 188.64 188.63 188.62 188.60 188.59 188.58 188.56 188.55 18.40 DISCHG .36 .36 .35 .35 .35 .34 .34 .34 .34 .33 18.40 ELEV 188.54 188.53 188.51 188.50 188.49 188.47 188.46 188.45 188.44 188.43 19.20 DISCHG .33 .33 .33 .32 .32 .32 .32 .31 .31 .31 19.20 ELEV 188.42 188.40 188.39 188.38 188.37 188.36 188.35 188.33 188.32 188.31 20.00 DISCHG .31 .30 .30 .30 .30 .29 .29 .29 .29 .28 20.00 ELEV 188.30 188.29 188.28 188.27 188.26 188.25 188.24 188.22 188.21 188.20 20.80 DISCHG .28 .28 .28 .28 .27 .27 .27 .27 .27 .26 20.80 ELEV 188.19 188.18 188.17 188.16 188.15 188.14 188.13 188.13 188.12 188.11 21.60 DISCHG .26 .26 .26 .26 .25 .25 .25 .25 .25 .24 21.60 ELEV 188.10 188.09 188.08 188.07 188.06 188.05 188.04 188.04 188.03 188.02 22.40 DISCHG .24 .24 .23 .23 .22 .21 .20 .20 .19 .18 22.40 ELEV 188.01 188.00 187.99 187.97 187.95 187.94 187.92 187.91 187.90 187.88 23.20 DISCHG .18 .17 .17 .16 .16 .16 .15 .15 .14 .14 23.20 ELEV 187.87 187.86 187.85 187.84 187.83 187.82 187.82 187.81 187.80 187.79 RUNOFF VOLUME ABOVE BASEFLOW = 1.54 WATERSHED INCHES, 4.22 CFS-HRS, .35 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 83. TIME OF CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.24 .96 (RUNOFF) TIM£(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 8.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 8.80 DISCHG .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 TR20 XEQ 01-04-95 15.02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 26 9.60 DISCHG .02 .02 .03 .03 .03 .03 .03 .03 .04 .04 10.40 DISCHG .04 .04 .04 .05 .05 .05 .06 .06 .07 .07 11.20 DISCHG .08 .08 .09 .10 .11 .14 .19 .21 .35 .61 12.00 DISCHG .77 .86 .92 .96 .89 .60 .41 .33 .26 .21 12.80 DISCHG .19 .17 .15 .15 .14 .13 .13 .12 .11 .11 13.60 DISCHG .11 .10 .10 .09 .09 .09 .09 .09 .08 .08 14.40 DISCHG .08 .08 .08 .07 .07 .07 .07 .07 .07 .07 15.20 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 16.00 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .05 16.80 DISCHG .05 .04 .03 .03 .03 .03 .04 .03 .03 .03 17.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 18.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 19,20 DISCHG .02 .02 .02 .03 .03 .03 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 O2 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 G2 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .01 RUNOFF VOLUME ABOVE BASEFLOW = 2.80 WATERSHED INCHES, 1.24 CFS-HRS, .10 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .28 CFS. PEAK TIME(HRS) PEAK DISCI€ARGE(CFS) PEAK ELEVATION(FEET) 21.92 .28 (NULL) 12.24 1.25 (NULL) TIMEORS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 8.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 8.80 DISCHG .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 9.60 DISCHG .02 .02 .03 .03 .03 .03 .03 .03 .04 .04 10.40 DISCHG .04 .04 .04 .05 .05 .05 .06 .06 .07 .07 11.20 DISCHG .08 .08 .09 .10 .11 .14 .19 .23 .39 .69 12.00 DISCHG .91 1.08 1.18 1.25 1.21 .95 .79 .74 .68 .65 12.80 DISCHG .64 .63 .62 .62 .61 .61 .61 .60 .60 .60 13.60 DISCHG .59 .58 .58 .58 .57 .57 .57 .57 .56 .56 14.40 DISCHG .56 .55 .55 .55 .54 .54 .54 .53 .53 .53 15.20 DISCIIG .52 .52 .52 .51 .51 .51 .51 .51 .50 .50 16.00 DISCHG .49 .49 .49 .49 .48 .48 .47 .47 .47 .47 16.80 DISCHG .46 .45 .44 .44 .44 .44 .43 .43 .42 .42 17.60 DISCHG .42 .42 .41 .41 .41 .40 .40 .39 .39 .39 18.40 DISCHG .38 .38 .38 .38 .38 .37 .37 .37 .36 .36 19.20 DISCHG .35 .35 .35 .35 .35 .35 .34 .34 .33 .33 20.00 DISCHG .33 .33 .33 .32 .32 .32 .31 .31 .31 .31 20.80 DISCHG .31 .30 .30 .29 .30 .30 .29 .29 .29 .28 TR20 XEQ 01-04.95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 27 21.60 DISCHG .28 .28 .28 .28 .28 .28 .27 .27 .27 .26 22.40 DISCHG .26 .26 .25 .24 .24 .23 .22 .21 .21 .20 23.20 DISCHG .20 .19 .19 .18 .18 .17 .17 .17 .16 .15 RUNOFF VOLUME ABOVE BASEFLOW = 1.71 WATERSHED INCITES, 5.46 CFS-HRS, .45 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYOROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 *'* WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .28 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 21.92 .28 184.50 12.24 1.24 184.52 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SO.MI. 8.00 DISCHG .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 8.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 8.80 DISCHG .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 8.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 9.60 DISCHG .02 .02 .03 .03 .03 .03 .03 .03 .04 .04 9.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 10.40 DISCHG .04 .04 .04 .05 .05 .05 .06 .06 .07 .07 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 11.20 DISCHG .08 .08 .09 .10 .11 .14 .18 .22 .36 .65 11.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 194.50 184.50 184.50 184.51 12.00 DISCHG .89 1.06 1.17 1.24 1.22 .99 .80 .75 .69 .65 12.00 ELEV 184.51 184.51 184.52 184.52 184.52 184.51 184.51 184.51 1B4.51 184.51 12.80 DISCHG .64 .63 .62 .62 .61 .61 .60 .60 .60 .60 12.80 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 13.60 DISCHG .59 .58 .58 .58 .57 .57 .57 .57 .56 .56 13.60 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 14.40 DISCHG .56 .55 .55 .55 .54 .54 .54 .53 .53 .53 14.40 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 164.51 184.51 15.20 DISCHG .53 .52 .52 .51 .51 .51 .51 .51 .50 .50 15.20 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 16.00 DISCHG .49 .49 .49 .49 .48 .48 .47 .47 .4T .47 16.00 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 194.51 184.51 184.51 184.51 16.80 DISCITG .46 .46 .44 .44 .44 .44 .43 .43 .42 .42 16.80 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 1T.60 DISCHG .42 .42 .41 .41 .41 .41 .40 .40 .39 .39 17.60 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 18.40 DISCHG .38 .38 .38 .38 .38 .37 .3T .37 .37 .36 18.40 ELEV 184.51 184.51 184.51 184.51 184.51 184.50 184.50 184.50 164.50 184.50 19.20 DISCHG .36 .35 .35 .35 .35 .35 .34 .34 .33 .33 19.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 20.00 DISCHG .33 .33 .33 .32 .32 .32 .31 .31 .31 .31 20.00 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 164.50 TR20 XEO 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 28 20.80 DISCHG .31 .30 .30 .30 .29 .30 .29 .29 .29 .28 20.80 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 21.60 DISCHG .28 .28 .28 .28 .28 .28 .27 .27 .27 .26 21.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 22.40 DISCHG .26 .26 .25 .24 .24 .23 .22 .22 .21 .20 22.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 23.20 DISCHG .20 .19 .19 .18 .18 .17 .17 .17 .16 .16 23.20 ELEV 184.50 184.50 184.50 184.50 184.50 1B4.50 184.50 184.50 184.50 184.50 RUNOFF VOLUME ABOVE BASEFLOW = 1.71 WATERSHED INCITES, 5.46 CFS-HRS, .45 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDRDGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0227 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE = .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.24 1.02 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 S4.MI. 9.60 DISCHG .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 10.40 DISCHG .02 .02 .02 .02 .02 .03 .03 .04 .04 .04 11.20 DISCHG .05 .05 .06 .07 .08 .11 .15 .17 .32 .58 12.00 DISCHG .74 .85 .94 1.02 .94 .59 .42 .35 .27 .23 12.80 DISCHG .21 .19 .17 .17 .16 .15 .14 .14 .13 .13 13.60 DISCHG .12 .11 .11 .11 .10 .10 .10 .10 .10 .10 14.40 DISCHG .09 .09 .09 .08 .08 .08 .08 .08 .08 .08 15.20 DISCHG .08 .08 .07 .07 .07 .07 .07 .07 .07 .07 16.00 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 16.80 DISCHG .06 .05 .04 .04 .04 .04 .04 .04 .04 .04 17.60 DISCHG .04 .04 .04 .04 .04 .04 .04 .03 .03 .03 18.40 DISCHG .03 .03 .03 .03 .03 .03 .04 .04 .03 .03 19.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 20.00 DISCHG .03 .03 .03 .03 .03 .03 .02 .02 .03 .03 20.80 DISCHG .03 .03 .02 .02 .03 .03 .03 .03 .02 .02 21.60 DISCHG .02 .02 .02 .02 .03 .03 .03 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 RUNOFF VOLUME ABOVE BASEFLOW = 1.96 WATERSHED INCHES, 1.26 CFS-HRS, .10 ACRE-FEET; BASEFLOW = .00 CfS OPERATION ADDHYO CROSS SECTION 10 INPUT HYOROGRAPHS= 4,3 OUTPUT HYDROGRAPH= 2 i TR20 XEO 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION SOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 29 i PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.25 2.26 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SD.M1. 8.00 DISCHG .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 8.80 DISCHG .01 .01 .01 .02 .02 .02 .02 .02 .02 .02 9.60 DISCHG .02 .02 .03 .03 .03 .04 .04 .04 .05 .05 10.40 DISCHG .06 .06 .06 .07 .07 .08 .09 .10 .11 .12 11.20 DISCHG .13 .13 .15 .18 .19 .25 .33 .39 .68 1.23 12.00 DISCHG 1.63 1.91 2.12 2.26 2.16 1.59 1.22 1.10 .96 .88 12.80 DISCHG .85 .82 .79 .79 .77 .75 .75 .74 .73 .72 13.60 DISCHG .71 .70 .69 .69 .68 67 .67 .67 .66 .66 14.40 DISCHG .65 .65 .64 .63 .62 .62 .62 .61 .61 .61 15.20 DISCHG .60 .60 .59 .58 .58 .58 .58 .58 .57 .56 16.00 DISCHG .56 .56 .55 .55 .55 .54 .53 .53 .53 .53 16.80 DISCHG .52 .50 .48 .48 .48 .48 .48 .47 .46 .46 17.60 DISCHG .45 .45 .45 .45 .45 .44 .44 .43 .42 .42 18.40 DISCHG .41 .41 .41 .41 .41 .41 .41 .40 .40 .39 19.20 DISCHG .38 .38 .38 .38 .38 .38 .37 .36 .36 .36 20.00 DISCHG .35 .35 .35 .35 .35 .34 .33 .33 .34 .34 20.80 DISCHG .34 .33 .32 .32 .32 .33 .32 .32 .31 .31 21.60 DISCHG .30 .30 .30 .30 .30 .31 .30 .29 .29 .29 22.40 DISCHG .28 .28 .28 .27 .26 .25 .24 .24 .23 .23 23.20 DISCHG .22 .22 .21 .21 .20 .20 .19 .19 .18 .17 RUNOFF VOLUME ABOVE BASEFLOW = 1.75 WATERSHED INCHES, 6.T2 CFS-HRS, .56 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 11 OUTPUT HYDROGRAPH= 3 AREA= .00 So MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .38 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.37 2.33 (RUNOFF) TIME(HRS) FIRST HYOROGRAPH POINT W .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SO.MI. 11.20 DISCHG .00 .00 .00 .00 .01 .02 .04 .08 .16 .36 12.00 DISCHG .68 1.09 1.52 1.94 2.26 2.31 2.07 1.72 1.41 1.17 12.80 DISCHG .98 .85 .74 .67 .61 .57 .53 .50 .48 .46 13.60 DISCHG .44 .42 .40 .39 .38 .36 .36 .35 .34 .34 14.40 DISCHG .33 .33 .32 .31 .30 .29 .28 .28 .28 .27 15.20 DISCHG .27 .27 .26 .26 .25 .25 .24 .25 .25 .24 16.00 DISCHG .24 .23 .23 .23 .23 .22 .21 .21 .21 .21 16.80 DISCHG .21 .20 .18 .16 .15 .15 .15 .15 .14 .14 17.60 DISCHG .13 .13 .13 .14 .14 .14 .14 .13 .13 .12 18.40 DISCHG .12 .11 .11 .11 .12 .12 .12 .12 .12 .12 19.20 DISCHG .12 .11 .11 .11 .11 .12 .11 .11 .10 .10 20.00 DISCHG .10 .10 .10 .10 .10 .10 .10 .09 .09 .10 TR20 XE4 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 3 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 30 20.80 DISCHG .10 .10 .10 .09 .09 .09 .10 .10 .10 .09 21.60 DISCHG .09 .09 .08 .08 .09 .10 .10 .10 .10 .09 22.40 DISCHG .09 .08 .08 .08 .08 .08 .08 .08 .08 .08 23.20 DISCHG .08 .08 .08 O8 .08 .08 .08 .08 .08 .08 RUNOFF VOLUME ABOVE BASEFLOW = 1.13 WATERSHED INCHES, 3.56 CFS-HRS, .29 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 12 OUTPUT HYDROGRAPH= 4 AREA= .00 54 MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .12 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0160 HOURS *** WARNING-NO PEAK F(XUND, MAXIMUM DISCHARGE _ .02 CFS. PEAK TIME(HRS) PEAK OISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.24 .63 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 11.20 DISCHG .00 .00 .00 .00 .01 .02 .03 .04 .14 .27 12.00 DISCHG .37 .47 .55 .63 .51 .28 .24 .21 .15 .14 12.80 DISCHG .14 .12 .12 .11 .10 .10 .10 .09 .09 .09 13.60 DISCHG .08 .08 .08 .07 .07 .07 .07 .07 .07 .07 14.40 DISCHG .07 .07 .06 .06 .06 .06 .06 .06 .06 .06 15.20 DISCIIG .06 .05 .05 .05 .05 .05 .05 .05 .05 .05 16.00 DISCHG .05 .05 .05, .05 .05 .04 .04 .04 .04 .04 16.80 DISCHG .04 .03 .03 .03 .03 .03 .03 .03 .03 .03 17.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .02 .02 .02 18.40 DISCHG .02 .02 .02 .03 .03 .03 .03 .03 .03 .02 I 19.20 DISCHG .02 .02 .02 .03 .03 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .D2 .02 .02 .02 .02 .OR 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 1.13 WATERSHED INCHES, .75 CFS-HRS, .06 ACRE-FEET; BASEFLOW = .00 CFS EXECUTIVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 3 RECORD 10 i 1 TR20 XEQ 01-04-95 15.02 EAST E S PASTURE ESTATES PROPOSED CONDITION JOB I PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 31 EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO XSECTION 12 RECORD ID STARTING TIME = .00 RAIN DEPTH = 7.00 RAIN DURATION= 1.00 RAIN TABLE NO.= 9 ANT. HOIST. CORD= 2 ALTERNATE NO.= i STORM NO.= 4 MAIN TIME INCREMENT = .08 HOURS OPERATION RUNOFF CROSS SECTION 1 OUTPUT HYDROGRAPH= 1 AREA= .00 $O HI INPUT RUNOFF CURVE= 63. TIME OF CONCENTRATION= .16 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0213 HOURS ** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .01 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .01 (RUNOFF) 12.24 .47 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCIIG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 10.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .02 .02 11.20 DISCHG .02 .02 .03 .03 .03 .05 .07 .08 .15 .27 12.00 DISCHG .34 .39 .43 .47 .42 .26 .19 .16 .12 .10 12.80 DISCHG .10 .09 .08 .08 .07 O7 .07 .06 .06 .06 13.60 DISCHG .06 .05 .05 .05 .05 .05 .05 .05 .05 .04 14.40 DISCHG .04 :04 04 .04 .04 .04 .04 .04 .04 .04 15.20 DISCHG 04 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 16.80 DISCHG .03 .02 .02 .02 .02 .02 .02 .02 .02 .02 17.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 18.40 DISCHG .01 .01 .01 .02 .02 .02 .02 .02 .02 .01 19.20 DISCIIG .01 .01 .01 .02 .02 .01 .01 .01 .01 .01 20.00 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 20.80 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 21.60 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 22.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 23.20 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 2.88 WATERSHED INCHES, .57 CFS-HRS, .05 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .00 SR MI INPUT RUNOFF CURVE= 70. TIME OF CONCENTRATION= .54 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0720 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.41 2.22 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = :08 HOURS DRAINAGE AREA = .00 SO.MI. 8.80 DISCHG .00 .01 .01 .01 .01 .01 .02 .02 .02 .02 TR20 XED 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION 30B 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 32 9.60 DISCHG .03 .03 .03 .04 .04 .04 .05 .05 .05 .06 10.40 DISCHG .06 .07 .07 .08 .09 .09 .10 .11 .12 .13 11.20 DISCHG .14 .15 .17 .18 .20 .23 .27 .33 .42 .59 12.00 DISCHG .86 1.18 1.53 1.86 2.11 2.22 2.16 1.97 1.72 1.45 12.80 DISCHG 1.22 1.03 .88 .76 .67 .60 .54 .49 .46 .43 13.60 DISCHG .40 .38 .36 .34 .32 .31 .30 .29 .28 .28 14.40 DISCHG .27 .27 .26 .25 .24 .24 .23 .22 .22 .22 15.20 DISCHG .21 .21 .21 .20 .20 .19 .19 .19 .19 .19 16.00 DISCHG .18 .18 .18 .17 .17 .17 .17 .16 .16 .16 16.80 DISCHG .15 .15 .15 .14 .13 .12 .11 .11 .11 .11 17.60 DISCHG .10 .10 .10 .10 .10 .10 .10 .10 .10 .09 18.40 DISCHG .09 .09 .08 .08 .08 .09 .09 .09 .09 .09 19.20 DISCHG .09 .08 .08 .08 .08 .08 .08 .08 .08 .08 20.00 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 G7 .07 20.80 DISCHG .07 .07 .07 .07 .07 .07 .07 .07 .07 .07 21.60 DISCHG .07 .06 .06 .06 .06 .06 .07 .07 .07 .07 22.40 DISCHG .07 .06 .06 .06 .06 .06 .06 .06 .06 .06 23.20 DISCHG .06 .06 .06 .06 .06 .06 .06 .06 .06 .06 RUNOFF VOLUME ABOVE BASEFLOW = 3.59 WATERSHED INCHES, 3.59 CFS-HRS, .30 ACRE-FEET; BASEFLOW _ .00 CFS OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 69. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENTu .0440 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.31 3.61 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SO.MI. 8.80 DISCHG .00 .01 .01 .01 .02 .02 .02 .02 .03 .03 9.60 DISCHG .04 .04 .05 .05 .06 .06 .06 .07 .08 .09 10.40 DISCHG .09 .10 .11 .12 .13 .14 .15 .17 .18 .20 11.20 DISCHG .22 .24 .26 .29 .33 .38 .48 .59 .82 1.34 12.00 DISCHG 2.01 2.62 3.08 3.44 3.60 3.29 2.66 2.07 1.64 1.31 12.80 DISCHG 1.08 .93 .81 .73 .67 .62 .58 .55 .53 .50 13.60 DISCHG .49 .46 .44 .42 .41 .40 .39 .38 .37 .37 14.40 DISCHG .36 .35 .34 .33 .32 .31 .30 .30 .29 .29 15.20 DISCHG .29 .28 .28 .27 .26 .26 .26 .26 .26 .25 16.00 DISCHG .25 .24 .24 .24 .23 .23 .22 .21 .21 .21 16.80 DISCHG .21 .20 .18 .16 .15 .15 .15 .15 .14 .14 17.60 DISCIIG .13 .13 .14 .14 .14 .14 .14 .13 .13 .12 18.40 DISCHG .12 .11 .11 .12 .12 .12 .12 .13 .13 .12 19.20 DISCHG .12 .11 .11 .11 .12 .12 .11 .11 .10 .10 20.00 DISCHG .10 .10 .10 .10 .11 .10 .10 .09 .09 .10 20.80 DISCHG .10 .10 .10 .09 .09 .10 .10 .10 .10 .09 21.60 DISCHG .09 .08 .08 .08 .09 .10 .10 .10 .09 .09 22.40 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .08 .08 23.20 DISCHG .08 .08 .08 .08 .08 .08 .08 .08 .08 .07 l 1 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE [11 STORM DISTRIBUTION 24 HOUR DURATION PAGE 33 I i RUNOFF VOLUME ABOVE BASE:FLOW = 3.50 WATERSHED INCHES, 4.94 CFS-HRS, .41 ACRE-FEET; BASEFLOW _ .00 CFS i OPERATION ADDHYD CROSS SECTION 4 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 PEAK TIME(NRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.33 5.72 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 8.80 DISCHG .00 .01 .02 .02 .03 .03 .04 .04 .05 .06 9.60 DISCHG .06 .07 .08 .09 .09 .10 .11 .12 .13 .14 10.40 DISCHG .16 .17 .18 .20 .21 .23 .25 .27 .30 .33 11.20 DISCHG .36 .39 .43 .47 .53 .61 .75 .92 1.24 1.93 12.00 DISCHG 2.87 3.80 4.61 5.30 5.71 5.51 4.82 4.04 3.35 2.76 12.80 DISCHG 2.30 1.95 1.69 1.49 1.34 1.22 1.12 1.05 .98 .93 13.60 DISCHG .89 .84 .80 .76 .73 .71 .69 .67 .66 .64 14.40 DISCHG .63 .62 .60 .58 .56 .54 .53 .52 .51 .51 15.20 DISCHG .50 .49 .48 .47 .46 .45 .45 .45 .45 .44 16.00 DISCHG .43 .42 .42 .41 .41 .40 .39 .38 .37 .37 16.80 DISCHG .37 .35 .33 .29 .27 .27 .26 .26 .25 .24 17.60 DISCHG .24 .24 .24 .24 .24 .24 .24 .23 .22 .21 18.40 DISCHG .21 .20 .20 .20 .20 .21 .21 .21 .21 .21 19.20 DISCHG .20 .19 .19 .19 .20 .20 .20 .19 .18 .18 20.00 DISCHG .17 .17 .17 .18 .18 .18 .17 .16 .16 .17 20.80 DISCHG .17 .17 .17 .16 .16 .16 .17 .17 .17 .16 21.60 DISCHG .15 .15 .15 .15 .15 .16 .17 .17 .16 .16 22.40 DISCHG .15 .15 .14 .14 .14 .14 .14 .14 .14 .14 23.20 DISCHG .14 .14 .14 .14 .14 .14 .14 .14 .14 .13 i RUNOFF VOLUME ABOVE BASEFLOW = 3.54 WATERSHED INCHES, 8.53 CFS-HRS, .70 ACRE-FEET; SASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 5 OUTPUT HYDROGRAPH= 5 AREA= .00 SQ M1 INPUT RUNOFF CURVE= 64. TIME OF CONCENTRATION= 11 HOURS INTERNAL HYDROGRAPH TIME INCREMENT .0147 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .02 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 23.68 .02 (RUNOFF) 12.24 .84 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.HI. 9.60 DISCHG .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .02 .03 .03 .03 .04 11.20 DISCHG .04 .04 .06 .06 .07 .11 .13 .14 .37 .56 12.00 DISCHG .65 .72 .78 .84 .62 .33 .28 .24 .18 .17 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORH DISTRIBUTION 24 HOUR DURATION PAGE 34 12.80 DISCHG .16 .14 .13 .13 .12 .11 .11 .10 JO .10 13.60 DISCHG .09 .09 .09 .08 .08 .08 .08 .08 .08 .08 14.40 DISCHG .07 .07 .07 .06 .06 .06 .06 .06 .06 .06 15.20 DISCHG .06 .06 .05 .05 .05 .06 .06 .06 .05 .05 16.00 DISCHG .05 .05 .05 .05 .05 .04 .04 .05 .05 .05 16.80 DISCHG .04 .03 .03 .03 .03 .03 .03 .03 .03 .03 17.60 DISCHG .03 .03 .03 .03 .03 .03 .03 .02 .02 .02 WAD DISCHG .02 .02 .03 .03 .03 .03 .03 .03 .03 .02 19.20 DISCHG .02 .02 .03 .03 .03 .02 .02 .02 .02 .02 20.00 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 20.80 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 21.60 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 22.40 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .02 .02 23.20 DISCHG .02 .02 .02 .02 .02 .02 .02 .02 .01 .01 RUNOFF VOLUME ABOVE BASEFLOW = 2.99 WATERSHED INCHES, .99 CFS-HRS, .08 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 4,5 OUTPUT HYDROGRAPH= 3 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.30 6.35 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.M1. 8.80 DISCHG .00 .01 .02 .02 .03 .03 .04 .04 .05 .06 9.60 DISCHG .06 .07 .08 .09 .10 .11 .12 .13 .14 .16 10.40 DISCHG .17 .18 .20 .22 .23 .25 .28 .30 .33 .36 11.20 DISCHG .40 .43 .48 .54 .60 .72 .88 1.07 1.62 2.49 12.00 DISCHG 3.52 4.53 5.40 6.14 6.33 5.84 5.11 4.28 3.53 2.93 12.80 DISCHG 2.46 2.09 1.82 1.62 1.46 1.33 1.23 1.15 1.09 1.03 13.60 DISCHG .98 .93 .88 .84 .81 .79 .76 .75 .73 .72 14.40 DISCHG .70 .69 .67 .65 .63 .61 .59 .58 .58 .57 15.20 DISCHG .56 .55 .54 .53 .51 .51 .50 .50 .50 .49 16.00 DISCHG .48 .47 .47 .46 .45 .44 .43 .42 .42 .42 16.80 DISCHG .41 .38 .35 .32 .31 .30 .30 .29 .28 .27 17.60 DISCHG .27 .27 .27 .27 .27 .27 .27 .26 .25 .24 18.40 DISCHG .23 .22 .22 .23 .23 .24 .24 .24 .24 .23 19.20 DISCHG .22 .21 .21 .22 .22 .22 .22 .21 .20 .20 20.00 DISCHG .19 .19 .20 .20 .20 .19 .19 .18 .18 .19 20.80 DISCHG .20 .19 .18 .18 .18 .19 .19 .19 .19 .18 21.60 DISCHG .17 .17 .16 .17 .18 .19 .19 .19 .18 .17 22.40 DISCHG .17 .16 .16 .16 .16 .16 .16 .16 .16 .16 23.20 DISCHG .16 .16 .16 .16 .16 .16 .16 .16 .15 .14 RUNOFF VOLUME ABOVE BASEFLOW = 3.47 WATERSHED INCHES, 9.52 CFS-HRS, .79 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RESVOR STRUCTURE 1 1 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 35 INPUT HYDROGRAPH= 3 OUTPUT HYDROGRAPH= 2 SURFACE ELEVATION= 186.25 j WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .78 CFS. PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 14.00 .78 190.83 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 10.40 DISCHG .01 .02 .03 .04 .05 .06 .07 .08 .10 .11 10.40 ELEV 187.51 187.53 187.56 187.58 187.60 187.62 187.65 187.67 187.70 187.73 11.20 DISCHG .13 .14 .16 .18 .20 .23 .24 .25 .27 .29 11.20 ELEV 187.76 187.80 187.83 187.87 187.92 187.97 188.02 188.06 188.12 188.22 12.00 DISCHG .32 .37 .43 .49 .56 .63 .69 .71 .72 .73 12.00 ELEV 188.38 188.59 188.85 189.15 189.47 189.79 190.04 190.21 190.34 190.45 12.80 DISCHG .74 .75 .76 .76 .77 .77 .77 .77 .77 .78 12.80 ELEV 190.53 190.59 190.64 190.68 190.71 190.74 190.76 190.77 190.79 190.80 13.60 DISCHG .78 .78 .78 .78 .78 .78 .78 .78 .78 .78 13.60 ELEV 190.81 190.82 190.82 190.83 190.83 190.83 190.83 190.83 190.83 190.82 14.40 DISCHG .78 .78 .78 .78 .78 .78 .77 .77 .77 .77 14.40 ELEV 190.82 190.82 190.81 190.81 190.80 190.80 190.79 190.78 190.77 190.77 15.20 DISCHG .77 .77 .77 .77 .77 .77 .76 .76 .76 .76 15.20 ELEV 190.76 190.75 190.74 190.73 190.72 190.71 190.70 190.69 190.68 190.67 16.00 DISCHG .76 .76 .76 .75 .75 .75 .75 .75 .75 .74 16.00 ELEV 190.65 190.64 190:63 190.62 190.61 190.59 190.58 190.57 190.55 190.54 16.80 DISCHG .74 .74 .74 .74 .74 .73 .73 .73 .73 .72 16.80 ELEV 190.53 190.51 190.50 190.48 190.46 190.45 190.43 190.41 190.39 190.37 17.60 DISCHG 72 .72 .72 .72 .71 .71 .71 .71 .70 .70 17.60 ELEV 190.35 190.34 190.32 190.30 190.28 190.26 190.24 190.22 190.21 190.19 18.40 DISCHG .70 .70 .70 .69 .69 .69 .69 .68 .68 .68 18.40 ELEV 190.17 190.15 190.13 190.11 190.09 190.07 190.05 190.03 190.02 190.00 19.20 DISCHG .67 .67 .66 .66 .65 .65 .64 .64 .63 .62 19.20 ELEV 189.97 189.95 189.92 189.89 189.87 189.85 189.82 189.80 189.77 189.75 20.00 DISCHG .62 .61 .61 .60 .60 .59 .59 .58 .58 .57 20.00 ELEV 189.72 189.70 189.68 189.65 189.63 189.61 189.59 189.56 189.54 189.52 20.80 DISCHG .57 .56 .56 .55 .55 .55 .54 .54 .53 .53 20.80 ELEV 189.50 189.47 189.45 189.43 189.41 189.39 189.37 189.35 189.33 189.31 21.60 DISCHG .52 .52 .52 .51 .51 .50 .50 .49 .49 .49 21.60 ELEV 189.29 189.27 189.25 189.23 189.21 189.19 189.18 189.16 189.14 189.12 22.40 DISCHG .48 .48 .48 .47 .47 .46 .46 .46 .45 .45 22.40 ELEV 189.10 189.09 189.07 189.05 189.03 189.02 189.00 188.98 188.96 188.95 23.20 DISCHG .44 .44 .44 .43 .43 .43 .42 .42 .42 .41 23.20 ELEV 188.93 188.91 188.90 188.88 188.87 188.85 188.84 188.82 188.81 188.79 RUNOFF VOLUME ABOVE BASEFLOW = 2.91 WATERSHED INCHES, 7.98 CFS-HRS, .66 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYOROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 83. TIME OF CONCENTRATION= .19 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0253 HOURS TR20 XEO 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 36 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.22 1.66 (RUNOFF) TIHE(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 5.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 6.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 7.20 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 8.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .04 .04 8.80 DISCHG .04 .04 .05 .05 .05 .05 .05 .05 .05 .06 9.60 DISCHG .06 .06 .06 .07 .07 .07 .07 .08 .08 .09 10.40 DISCHG .09 .10 .10 .11 .11 .12 .13 .14 .14 .15 11.20 DISCHG .16 .17 .19 .21 .23 .28 .37 .41 .67 1.14 12.00 DISCHG 1.40 1.53 1.61 1.65 1.52 1.02 .70 .56 .43 .35 12.80 DISCHG .32 .28 .26 .25 .23 .21 .21 .20 .19 .18 13.60 DISCHG .17 .16 .16 .15 .15 .14 .14 .14 .14 .14 14.40 DISCHG .13 .13 .13 .12 .11 .11 .11 .11 .11 .11 15.20 DISCHG .10 .10 .10 .10 .09 .09 .10 .10 .10 .09 16.00 DISCHG .09 .09 .09 .09 .09 .08 .08 G8 .08 .08 16.80 DISCHG .08 .06 .05 .05 .05 .06 .06 .05 .05 .05 17.60 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .04 .04 18.40 DISCHG .04 .04 .04 .04 .05 .05 .05 .05 .05 .04 19.20 DISCHG .04 .04 .04 .04 .05 .04 .04 .04 .04 .04 20.00 DISCHG .04 .04 .04 .04 .04 .03 .03 .03 .04 .04 20.80 DISCHG .04 .04 .03 .03 .03 .04 .04 .04 .03 .03 21.60 DISCHG .03 .03 .03 .03 .04 .04 .04 .03 .03 .03 22.40, DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .02 RUNOFF VOLUME ABOVE BASEFLOW = 5.01 WATERSHED INCHES, 2.22 CFS-HRS, .18 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 8 INPUT HYDROGRAPHS= 2,3 OUTPUT HYDROGRAPH= 4 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.25 2.15 (NULL) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 S©.MI. 5.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 6.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 7.20 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 8.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .04 .04 8.80 DISCHG .04 .04 .05 .05 .05 .05 .05 .05 .05 .06 9.60 DISCHG .06 .06 .06 .07 .07 .07 .07 .08 .08 .09 10.40 DISCHG .10 .11 .13 .14 .16 .17 .20 .22 .24 .26 11.20 DISCHG .29 .31 .35 .39 .43 .51 .61 .67 .94 1.43 12.00 DISCHG 1.73 1.90 2.03 2.15 2.08 1.65 1.38 1.26 1.15 1.08 12.80 DISCHG 1.06 1.03 1.01 1.01 .99 .98 .98 .97 .96 .96 1 O CONDITION JOB TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 37 13.60 DISCHG .95 .94 .94 .93 .93 .92 .92 .92 .92 .92 14.40 DISCHG .91 .91 .90 .89 .89 .89 .88 .88 .88 .88 15.20 DISCIIG .88 .87 .87 .86 .86 .86 .86 .86 .86 .85 16.00 DISCHG .85 .84 B4 .84 .84 .83 .83 .82 .83 .83 i 16.80 DISCHG .82 .81 .79 .79 .79 .79 .79 .78 .78 .77 17.60 DISCHG .77 .77 .77 .77 T7 .76 .76 .75 .75 .74 18.40 DISCHG .74 .74 .74 .74 T4 .73 .73 .73 .73 .72 19.20 DISCHG .71 .70 .70 .70 .70 .69 .68 .67 .67 .66 20.00 DISCHG .65 .65 .65 .64 .64 .63 .62 .61 .61 .61 20.80 DISCHG .61 .60 .59 .59 .58 .58 .58 .57 .56 .56 21.60 DISCHG .55 .55 .54 .54 .54 .54 .54 .53 .52 .52 22.40 DISCHG .51 .51 .50 .50 .50 .49 .49 .49 .48 .48 23.20 DISCHG .47 .47 .47 .46 .46 .46 .45 .45 .44 .44 RUNOFF VOLUME ABOVE BASEFLOW = 3.20 WATERSHED INCHES, 10.20 CFS-HRS, .84 ACRE-FEET; DASEFLON = .00 CFS OPERATION RESVOR STRUCTURE 2 INPUT HYDROGRAPH= 4 OUTPUT HYDROGRAPH= 3 SURFACE ELEVATION= 184.50 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.26 2.14 184.53 TIME(HRS) FIRST HYDROGRAPH POINT W .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA .00 SQ.MI. 6.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 6.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 7.20 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 7.20 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 i 8.00 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .04 8.00 ELEV 164.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 8.80 DISCHG .04 .04 .04 .05 .05 .05 .05 .05 .05 .D6 8.80 ELEV 164.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 9.60 DISCHG .06 .06 .06 .07 .07 .07 .07 .08 .08 .09 9.60 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 10.40 DISCHG .10 .11 .12 .14 .16 .17 .19 .22 .24 .26 10.40 ELEV 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 184.50 11.20 DISCHG .29 .31 .34 .39 .42 .50 .60 .66 .89 1.36 11.20 ELEV 184.50 184.50 184.50 184.51 184.51 184.51 184.51 184.51 184.51 184.52 12.00 DISCHG 1.71 1.88 2.02 2.13 2.10 1.72 1.39 1.28 1.16 1.09 12.00 ELEV 184.52 184.53 184.53 184.53 184.53 184.52 184.52 184.52 164.52 184.51 12.80 DISCHG 1.06 1.04 1.01 1.01 1.00 .98 .98 .97 .96 .96 12.80 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 13.60 DISCHG .95 .94 .94 .93 .93 .92 .92 .92 .92 .92 13.60 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 14.40 DISCIIG .91 .91 .90 .90 .89 .89 .88 .88 .88 .88 14.40 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 15.20 DISCHG .88 .87 .87 .86 .86 .86 .86 .86 .86 .85 15.20 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 16.00 DISCHG .85 .84 .84 .84 .84 .83 .83 .82 .82 .83 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 38 16.00 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 16.80 DISCIIG .82 .81 .79 .79 .79 .79 .79 .78 .78 .77 16.80 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 17.60 DISCHG .77 .77 .77 .77 .77 .76 .76 .75 .75 .74 17.60 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 18.40 DISCHG .74 .74 .74 .74 .74 .73 .73 .73 .73 .72 18.40 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 19.20 DISCHG .71 .70 .70 .70 .70 .69 .68 .67 .67 .66 19.20 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 20.00 DISCHG .66 .65 .65 .64 .64 .63 .62 .62 .61 .61 20.00 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 20.80 DISCHG .61 .60 .59 .59 .58 .58 .58 .57 .57 .56 20.80 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 21.60 DISCHG .55 .55 .54 .54 .54 .54 .54 .53 .52 .52 71.60 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 22.40 DISCHG .51 .51 .50 .50 .50 .49 .49 .49 .48 .48 22.40 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 23.20 DISCHG .47 .47 .47 .46 .46 .46 .45 .45 .44 .44 23.20 ELEV 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 184.51 RUNOFF VOLUME ABOVE BASEFLOW = 3.20 VATERSHED INCHES, 10.20 CFS-HRS, .84 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 9 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .17 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0227 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.23 1.99 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.ME. 8.00 DISCHG .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 8.80 DISCHG .02 .02 .02 .02 .02 .02 .03 .03 .03 .03 9.60 DISCHG .04 .04 .04 .04 .05 .05 .05 .06 .06 .07 10.40 DISCHG .07 .07 .08 .08 .09 .10 .11 .12 .12 .14 11.20 DISCHG .15 .15 .18 .20 .22 .28 .37 .42 .75 1.30 12.00 DISCHG 1.60 I.T7 1.89 1.99 1.79 1.12 .79 .66 .50 .42 12.80 DISCHG .39 .35 .32 .31 .28 .27 .26 .25 .24 .23 13.60 DISCHG .22 .20 .20 .19 .19 .18 .18 .18 .18 .17 14.40 DISCHG .17 .16 .16 .15 .14 .14 .14 .14 .14 .14 15.20 DISCHG .14 .13 .13 .12 .12 .12 .13 .13 .12 .12 16.00 DISCHG .11 .11 .11 .11 .11 .10 .10 .10 .10 .10 16.80 DISCHG .10 .08 .07 .06 .07 .07 .07 .07 .06 .06 17.60 DISCHG .06 .07 .07 .07 .07 .07 .06 .06 .05 .05 18.40 DISCHG .05 .05 .05 .06 .06 .06 .06 .06 .06 .05 19.20 DISCHG .05 .05 .05 .06 .06 .06 .05 .05 .05 .05 20.00 DISCHG .05 .05 .05 .05 .05 .04 .04 .04 .05 .05 20.80 DISCHG .05 .05 .04 .04 .05 .05 .05 .05 .04 .04 21.60 DISCHG .04 .04 .04 .04 .05 .05 .05 .04 .04 .04 ,I TR20 XEQ 01-04-95 15.02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 39 22.40 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .04 .04 23.20 DISCHG .04 .04 .04 .04 .04 .04 .04 .04 .03 .03 RUNOFF VOLUME ABOVE BASEFLOW = 3.92 WATERSHED INCHES, 2.52 CFS-HRS, .21 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 10 INPUT HYDROGRAPHS= 4,3 OUTPUT HYDROGRAPII= 2 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.24 4.12 (NULL) 1 TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .01 SQ.MI. 6.40 DISCHG .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 7.20 DISCHG .01 .01 .01 .01 .02 .02 .02 .02 .02 .02 8.00 DISCHG .03 .03 .03 .03 .04 .04 .04 .04 .05 .05 8.80 DISCHG .06 .06 .07 .07 .07 .07 .07 .08 .08 .09 9.60 DISCHG .09 .10 .11 .11 .11 .12 .12 .14 .15 .15 10.40 DISCHG .17 .19 .20 .23 .25 .27 .30 .33 .36 .39 11.20 DISCHG .43 .46 .52 .59 .64 .78 .97 1.08 1.64 2.66 12.00 DISCHG 3.30 3.65 3.91 4.12 3.90 2.84 2.18 1.94 1.67 1.51 12.80 DISCHG 1.45 1.38 1.33 1.32 1.28 1.25 1.24 1.22 1.20 1.19 13.60 DISCHG 1.17 1.15 1.13 1.13 1.11 1.11 1.10 1.10 1.09 1.09 14.40 DISCHG 1.08 1.07 1.06 1.05 1.03 1.03 1.03 1.02 1.02 1.02 15.20 DISCHG 1.01 1.01 1.00 .99 .98 .98 .99 .99 .98 .97 16.00 DISCHG .96 .96 .96 .95 .95 .94 .93 .92 .93 .93 16.80 DISCHG .92 .89 .86 .85 .86 .86 .86 .85 .84 .83 17.60 DISCHG .83 .84 .84 .84 .83 .83 .82 .81 .80 .80 18.40 DISCHG .79 .79 .79 .79 .80 .80 .79 .79 .79 .78 19.20 DISCHG .76 .75 .75 .76 .76 .75 .73 .72 .71 .71 20.00 DISCHG .70 .70 .70 .70 .69 .67 .66 .66 .66 .67 20.80 DISCHG .66 .65 .63 .63 .63 .64 .63 .62 .61 .60 21.60 DISCHG .59 .59 .58 .59 .59 .59 .59 .57 .56 .56 22.40 DISCHG .55 .55 .54 .54 .54 .53 .53 .52 .52 .52 23.20 DISCHG .51 .51 .51 .50 .50 .50 .49 .49 .48 .46 RUNOFF VOLUME ABOVE BASEFLOW = 3.32 WATERSHED INCHES, 12.72 CFS-HRS, 1.05 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 11 OUTPUT HYDROGRAPH= 3 AREA= .00 SQ MI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .38 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0507 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.34 5.89 (RUNOFF) TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .02 10.40 DISCHG .03 .04 .05 .06 .08 .09 .11 .13 .15 .17 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 PASS 4 REV PC 09/83(.2) TYPE ]I[ STORM DISTRIBUTION 24 HOUR DURATION PAGE 40 11.20 DISCHG .20 .23 .26 .30 .36 .43 .54 .70 1.00 1.64 12.00 DISCHG 2.58 3.61 4.56 5.34 5.86 5.73 4.99 4.07 3.28 2.67 12.80 DISCHG 2.22 1.88 1.64 1.46 1.32 1.22 1.13 1.07 1.01 .97 13.60 DISCHG .93 .89 .85 .81 .78 .76 .74 .73 .71 .70 14.40 DISCHG .69 .68 .66 .64 .62 .60 .58 .57 .56 .56 15.20 DISCHG .55 .55 .54 .52 .51 .50 .49 .50 .50 .49 16.00 DISCHG .48 .47 .46 .46 .45 .44 .43 .42 .41 .41 16.80 DISCHG .41 .40 .36 .32 .30 .29 .29 .29 .28 .27 17.60 DISCHG .26 .26 .27 .27 .27 .27 .27 .26 .25 .24 18.40 DISCHG .23 .22 .22 .22 .23 .24 .24 .24 .24 .24 19.20 DISCHG .23 .22 .21 .21 .22 .23 .22 .21 .20 .20 20.00 DISCHG .19 .19 .20 .20 .21 .20 .19 .18 .18 .19 20.80 DISCHG .20 .20 .19 .18 .18 .18 .19 .20 .19 .18 21.60 DISCHG .17 .17 .16 .16 .17 .19 .20 .20 .19 .18 22.40 DISCHG .17 .16 .16 .16 .16 .16 .16 .16 .16 .16 23.20 DISCHG .16 .16 .16 .16 .16 .16 .16 .16 .16 .15 RUNOFF VOLUME ABOVE BASEFLOW = 2.68 WATERSHED INCHES, 8.47 CFS-HRS, .70 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 12 OUTPUT HYDROGRAPH= 4 AREA= .00 SQ HI INPUT RUNOFF CURVE= 61. TIME OF CONCENTRATION= .12 HOURS INTERNAL HYDROGRAPH TINE INCREMENT= .0160 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATIDN(FEET) 12.22 1.51 (RUNOFF) TIME(HRS) FIRST HYDROGRAPR POINT = .00 HOURS TIME INCREMENT = .08 HOURS DRAINAGE AREA = .00 SQ.MI. 9.60 DISCHG .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 10.40 DISCHG .01 .01 .02 .02 .02 .03 .03 .04 .04 .05 11.20 DISCHG .D6 .06 .08 .09 .10 .16 .20 .23 .58 .92 12.00 DISCHG 1.11 1.26 1.39 1.50 1.18 .64 .53 .46 .34 .31 12.80 DISCHG .30 .26 .25 .24 .22 .21 .21 .19 .19 .19 13.60 DISCHG .17 .16 .16 .15 .15 .15 .15 .15 .15 .14 14.40 DISCHG .14 .13 .13 .12 .12 .12 .12 .12 .12 .11 15.20 DISCHG .11 .11 .10 .10 .10 .10 Al .11 .10 .10 16.00 DISCHG .09 .09 .09 .09 .09 .08 .08 .08 .09 .09 16.80 DISCHG .08 .06 .05 .05 .06 .06 .06 .06 .05 .05 17.60 DISCHG .06 .06 .06 .06 .06 .06 .05 .05 .05 .05 18.40 DISCHG .05 .05 .05 .05 .05 .05 .05 .05 .05 .04 19.20 DISCHG .04 .04 .05 .05 .05 .04 .04 .04 .04 .04 20.00 DISCHG .04 .04 .05 .05 .04 .03 .03 .04 .04 .05 20.80 DISCHG .04 .04 .03 .03 .04 .05 .05 .04 .03 .03 21.60 DISCHG .03 .03 .03 .04 .05 .05 .04 .03 .03 .03 22.40 DISCHG .03 .03 .03 .03 .03 .03 .03 .03 .03 .03 23.20 DISCHG 03 .03 .03 .03 .03 .03 .03 .03 .03 .02 RUNOFF VOLUME ABOVE BASEFLOW = 2.69 WATERSHED INCHES, 1.78 CFS-HRS, .15 ACRE-FEET; BASF-FLOW = .00 CFS i TR20 XEO 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB i PASS 5 REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 41 EXECUTIVE CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 4 RECORD ID EXECUTIVE CONTROL OPERATION ENDJOB RECORD ID TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 SUMMARY REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 42 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME -- --- RUNOFF -------------------------------------- ID OPERATION AREA # CORD INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 1 XSECTION 1 RUNOFF .00 9 2 .08 .0 2.60 24.00 .17 --- 12.32 .03 113.2 XSECTION 2 RUNOFF .00 9 2 .08 .0 2.60 24.00 .50 - 12.48 .26 167.4 XSECTION 3 RUNOFF .00 9 2 .08 .0 2.60 24.00 .46 -- 12.40 .41 185.8 XSECTION 4 ADDHYD .OD 9 2 .08 .0 2.60 24.00 .48 --- 12.40 .65 174.4 XSECTION 5 RUNOFF .00 9 2 .08 .0 2.60 24.00 .23 --- 12.24 .07 140.0 XSECTION 6 ADDHYD .00 9 2 .08 .0 2.60 24.00 .45 --- 12.40 .69 161.7 STRUCTURE I RESVOR .00 9 2 ..08 .0 2.60 24.00 .39 187.92 13.28? .20? 47.3 XSECTION 7 RUNOFF 00 9 2 .08 .0 2.60 24.00 1.12 --- 12.24 .40 577.7 XSECTION 8 ADDHYD 00 9 2 .08 .0 2.60 24.00 .50 --- 12.32 .40 80.8 STRUCTURE 2 RESVOR .00 9 2 .08 .0 2.60 24.00 .50 184.51 12.32 .4D 81.2 XSECTION 9 RUNOFF .00 9 2 .08 .0 2.60 24.00 .62 --- 12.24 .31 313.6 XSECTION 10 ADDHYD .01 9 2 .08 .0 2.60 24.00 .52 --- 12.24 .71 118.9 XSECTION 11 RUNOFF .00 9 2 .08 .0 2.60 24.00 .22 --- 12.48 .27 54.7 XSECTION 12 RUNOFF .00 9 2 .G8 .O 2.60 24.00 .22 12.32 .08 79.9 ALTERNATE 1 STORM 2 188 XSECTION 1 RUNOFF .00 9 2 .08 .0 3.10 24.00 .35 --- 12.32 .07 2 . XSECTION 2 RUNOFF .00 9 2 .08 .0 3.10 24.00 .76 12.48 .43 277.1 XSECTION 3 RUNOFF .00 9 2 .08 .0 3.10 24.00 .72 --- 12.32 .69 314.4 XSECTION 4 ADOHYD .00 9 2 .08 .0 3.10 24.00 .74 --- 12.40 1.08 290.2 XSECTION 5 RUNOFF .00 9 2 .08 .0 3.10 24.00 .47 --- 12.24 .14 265.3 XSECTION 6 ADDHYD .00 9 2 .08 .0 3.10 24.00 .70 --- 12.35 1.18 276.9 STRUCTURE 1 RESVOR .00 9 2 .08 .0 3.10 24.00 .64 188.16 13.44? .28? 64.9 XSECTION 7 RUNOFF .00 9 2 .08 .0 3.10 24.00 1.52 --- 12.24 .53 775.3 XSECTION 8 ADDHYD .00 9 2 .08 .0 3.10 24.00 .77 --- 12.32 .63 127.3 STRUCTURE 2 RESVOR .00 9 2 .08 .0 3.10 24.00 .77 184.51 12.32 .63 127.7 XSECTION 9 RUNOFF .00 9 2 .08 .0 3.10 24.00 .91 --- 12.24 .47 474.4 XSECTION 10 ADDHYD .01 9 2 .08 .0 3.10 24.00 .79 --- 12.32 1.08 181.7 XSECTION 11 RUNOFF .00 9 2 .08 .0 3.10 24.00 .40 --- 12.40 .65 132.3 XSECTION 12 RUNOFF .00 9 2 .08 .0 3.10 24.00 .40 12.24 .19 188.6 ALTERNATE 1 STORM 3 XSECTION 1 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.25 --- 12.24 .20 654.7 XSECTION 2 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.73 --- 12.40 1.04 675.4 1 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 SUMMARY REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 43 SUMMARY TABLE 1 SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOST T114E ----- RUNOFF -------------------------------------- [D OPERATION AREA it CORD INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (IIR) (HR) (IN) (HR) (IN) (FT) (HR) (CPS) (CSM) ALTERNATE 1 STORM 3 XSECTION 3 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.66 --- 12.32 1.70 778.1 XSECTION 4 ADDHYD .00 9 2 .08 .0 4.60 24.00 1.69 --- 12.35 2.69 720.8 XSECTION 5 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.32 --- 12.24 .38 728.9 XSECTION 6 ADDHYD .00 9 2 .08 .0 4.60 24.00 1.64 --- 12.32 2.96 695.6 STRUCTURE 1 RESVOR .00 9 2 .08 .0 4.60 24.00 1.54 189.11 13.68? .48? 114.0 XSECTION 7 RUNOFF .00 9 2 .08 .0 4.60 24.00 2.80 --- 12.24 .96 1394.7 XSECTION 8 ADDHYD .00 9 2 .08 .0 4.60 24.00 1.71 --- 12.24 1.25 252.5 STRUCTURE 2 RESVOR .00 9 2 .08 .0 4.60 24.00 1.71 184.52 12.24 1.24 250.4 XSECTION 9 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.96 --- 12.24 1.02 1023.3 XSECTION 10 ADDHYD .01 9 2 .08 .0 4.60 24.00 1.75 --- 12.25 2.26 380.1 XSECTION 11 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.13 --- 12.37 2.33 475.8 XSECTION 12 RUNOFF .00 9 2 .08 .0 4.60 24.00 1.13 --- 12.24 .63 613.0 ALTERNATE 1 STORM 4 i XSECTION 1 RUNOFF .00 9 2 .08 .0 7.00 24.00 2.88 --- 12.24 .47 1519.2 XSECTION 2 RUNOFF .00 9 2 .08 .0 7.00 24.00 3.59 - - 12.41 2.22 1437.6 i XSECTION 3 RUNOFF .00 9 2 .08 .0 7.00 24.00 3.50 - 12.31 3.61 1647.0 XSECTION 4 ADDHYD .00 9 2 .08 .0 7.00 24.00 3.54 --- 12.33 5.72 1531.1 XSECTION 5 RUNOFF .00 9 2 .08 .0 7.00 24.00 2.99 12.24 .84 1621.9 XSECT[ON 6 ADDHYD .00 9 2 .08 .0 7.00 24.00 3.47 --- 12.30 6.35 1492.5 STRUCTURE 1 RESVOR .00 9 2 .08 .0 7.00 24.00 2.91 190.83 14.00? .78? 183.3 XSECTION 7 RUNOFF .00 9 2 .08 .0 7.00 24.00 5.01 --- 12.22 1.66 2414.1 XSECTION 8 ADDHYD .00 9 2 .08 .0 7.00 24.00 3.20 --- 12.25 2.15 435.0 STRUCTURE 2 RESVOR .00 9 2 .08 .0 7.00 24.00 3.20 184.53 12.26 2.14 432.9 XSECTION 9 RUNOFF .00 9 2 .08 .0 7.00 24.00 3.92 --- 12.23 1.99 2000.4 XSECTION 10 ADDHYD .01 9 2 .08 .0 7.00 24.00 3.32 --- 12.24 4.12 694.0 XSECTION 1t RUNOFF .00 9 2 .08 .0 7.00 24.00 2.68 --- 12.34 5.89 1203.7 XSECTION 12 RUNOFF .00 9 2 .08 .0 7.00 24.00 2.69 --- 12.22 1.51 1473.9 TR20 XEQ 01-04-95 15:02 EAST PASTURE ESTATES PROPOSED CONDITION JOB 1 SUMMARY REV PC 09/83(.2) TYPE III STORM DISTRIBUTION 24 HOUR DURATION PAGE 44 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (SQ MI) 1 2 3 4 STRUCTURE 2 .00 ALTERNATE 1 .40 .63 1.24 2.14 STRUCTURE 1 .00 ALTERNATE 1 .20 .28 .48 .78 XSECTION 1 .00 ALTERNATE 1 .03 .07 .20 .47 XSECTION 2 .00 ALTERNATE 1 .26 .43 1.04 2.22 XSECTION 3 .00 ALTERNATE 1 .41 .69 1.70 3.61 XSECTION 4 .00 ALTERNATE 1 .65 1.08 2.69 5.72 XSECTION 5 .00 ALTERNATE 1 .07 .14 .38 .84 XSECTION 6 .00 ALTERNATE 1 .69 1.18 2.96 6.35 XSECTION 7 .00 ALTERNATE 1 .40 .53 .96 1.66 XSECTION 8 .00 ALTERNATE 1 .40 .63 1.25 2.15 XSECTION 9 .00 ALTERNATE 1 .31 .47 1.02 1.99 XSECTION 10 .01 ALTERNATE 1 .71 1.08 2.26 4.12 XSECTION 11 .00 ALTERNATE 1 .27 .65 2.33 5.89 XSECTION 12 .00 ALTERNATE 1 .08 .19 .63 1.51 i SOILS INFORMATION EAST PASTURE CIRCLE NORTH ANDOVER, MASSACHUSETTS f AYES ENGAIEERI1G. IA/6 SOIL TESTING H1A .sr�ET NFORIWATIOA/ SNEET lY,4iYEFTE�,O, AM SS 01884 T EL• (6TT� 2�6:2800 � ,YME SlS 7EST RESMrS 0"I ARE FOR 1NFUR.lG4770N,4L JO8 LOCARopt! - PORPOSES` ONLY AND DO NOr CUAR44WI- IMTA VGA . - ,U OOV�r�_ SUBSURFACE say4cE D,CSPQS•�L SWEV GY7uw 8E ............�--- _ - DESlcNE17 AT 7711E s7x Jmal cvNR7R"s TO ALL CUEiVT INFO. A-PLIC40LC 85E 4771 R�cUL.4AONS _ d1/SC 1NFO c� Rc�.MRK.5` —-_ _ ___ __ ____ ____ �l-ao �--__--- ____-___--.�__________________ PRESENT AT ST �� . ————————————————————————————— HFALW ACEA -_L�1 __-_�-�__°-_- -_._.__-.--.---_____.�.�___------_-_- HEI E�t�ALOYEE-__ ------------------_--___---- --_- OMERS: 1-c SITE SKETCH ®ORSOMA77ON JEST HOLE LOc n a 2 yN��� s✓� � �2 qti� LWtXAly N.clt7�LbNN �/C YT 'Ci � R�P2/A LZ�1'/ZQ' alk- y � 5q {, r aearow ,ctrFx n�rFrr (s !mil,r3�•3 EL�V J IMP- PERC IZEST Mr ac OW cr cur f+nr a rW,wrBWA4 �a :, LIO /S1P 4 1t 1Z: 3 ,SM„�rSOIL & SU&S01L 6-aESYCN RA , C--Cawse s1=s1Lr cW-cWO 14 Y.6S ENG/NFEf�/NG, 1AIC, S01L TESTING FGYGA 0I680 /NFO t MA TI N SHEET EET IEL (6-f7) 2,-6:2800 '- r� (6T7) 246--T596 n I � 1•YEA7NEl�-_C���" _��_OAS: f7�Utr� G_L�/ NOTE IE7"Rj2S7/L7S SMORN I(RE FOR /NFOR.{G4TT NW ✓OB LOCAr/ON. I-Mp shy ONLY"O LSO NOT ca(R4Agr: Imr.4• Ce SUQSUR,cACE SF M'C lJ,CSPLLS4L SYS7Dr COULD BE oESrcN6v A 1N/S SITE ids1w colvfoR"s TO ,4[L CL/E�VT INFO_ _�_ _u IIPPL/G46LENCN-7NREc4/l.4n0A6: - - -____.......__-__�-___ --- ---- �cI/Sr 17 1NFRc�[ARKS`,--_--------------- _ - - - - - -- - -----.--.-------------------_--- � �a%� _---------------___---- PRESSNT A2' SITE 197 icy Ak-ID ------------------------------ HF4LTH .4GENT_ f1 ,�_�L � -__ - ____- _-- -__-- Ha CAtlzOYFE____-���� oMERs_p,Pi� .�_ ?cX�---_-.-__ .S/7¢ ®E SKETCH �4 �3 OBSEROA770N 7ESr HOLE LOG Pr e,5m0 10 ! 33 I ��3 1 7," r,4 ,4 /O: S0 -� z: 1 4 0 -- I7 I7- i�Z ow<^v "wow mom Jed •� n �Z u z�r �rrp t Su�j3dtL� zec tc470r Dora( d n elm i z Izo 91 pc rEsrr row-of*cur 11w cr cur 1 : 6 xva p; 3 S rz" r � tuff,av,�r A (a�ixJ r r r 1 y 2J- 1 i v, LEGFJ�D 7,c-s=7vpsv/L svasaa F RAZE GR-CRA a RF--REt71SV1 6" 1 t' .cr=.clmiU,�r M=salvo tG=LvGE �JWW D�LCN �-CLWRSE S7=,S/Lr GW=GROUND �Q fV1 �}5 TT=1]LL lYrflR 1 A YES ENGIN2 TR/NG INC. S0/1- TESTING 10 ' STREET I NFORIVA T/ON SHEET f�AIrEFr�, ,u.Ass oraao T,L• (617) 2,-6-2800 ' FAX (617) 246-7596 l��EATNEf ' V f d `�(� S DATE/no lr. N07E REST RESULTS' SNOIYY ARE FOR /NFORU47701V Q JOB LOCATION:__ //,V_&PC s PURPLLS'ES' ONLY AND Do Nor cuxk4N7FF 7mrA SUQSURFACF SOfX6'E OISPr-'7,4L SY57F C041LO ©E ---- ----�-F-���= � 4aV C' OES•ICNED Ar MIS SIT£ NON/CI CONR7R,US TO ALL CLIFIvT INFO.- VCR AJ APPUC49GC HCA47H RECUL.4PON.S --- -- INFO ROIARX.S.'____ _____-_ _-- _ __ - ---- __ �_ IA -coo --------- ------------------------------ PR,ESEiVT AT SITE ___ _- --- ____ _- HF4LW ACFN7 -,�Gj1 cf c- /'C*�► --- -_ HEr EUPLOYFE__-- c�i f'- - _ -- - ------------ ---_ -------____- DINERS. _ �Z� -- a��-------- SITE SKETCH ®08SERVA7701V JEST HOLE LOG ®,fir ELEv- F/OJ/ �� ct, l� . N d/n ®Z2 EE Ay 7'0 P- �sea z�'120 Ir ' C/a r. r I/ � - J ® PERC 7EST � ( -Xl j Q 2( Jl J El�Y ix or ar air r,�sty �or atr Ez wsm fw ova � �, Vlq (Dstm �rNJ rz' 3 7' T- LECOW 7&SWOPSOIL � SUasok F--RNE GR-GR4 ,a RF REEUS Z c---,O RSE S7=sl4r CW-CROUNO ism nuE DESIGN M 27-7714 fY E? r" 6'Irt7FJ7t�.[L AIA YES EMC NEERIAIG INC. SOIL TESTING 60-T S4LEARaD, mss' T /NFORMA TION SHED IY�47fEFIEZD, X-f.4SS. 07880 TEL- (61 7> 2�6-2800 FAX (617� 2-Y'6--7596 WS MEfl- ('�� 70 S _D,47r- JOB LOCATION. NOAE 7EST RES'UL7S- Sh'01W ARE FOR /NFOM4477ON.iC PURPOYES' OAV AND DO NOT CU.4R.d lac- 7MT A —— — SUQSURF�SCE SE3YftCE O/SPYLS4L 5)ST1 ! GYJUCD ©E ——--————-- ——- -- �-- DESICNEV A7- THIS SITE IfHI H GONFORk'S TO AU CLIENT INFO. ^ APPlJC WBLE HE40N REMIAPON,T _ WISC. INIcD a- RDMRKS `— ——— —— ---------- --- -------^^^- ------_ Al- 6 - -- -- ------------------------------ PRESENT AT SrE ---------------------. -------_ NF-IF A6EN7:_� C JO-r r - HE7 lc-UFLOYEE _� ----------------------------- 07HCRS.-_ 2/C�r2_�/ --------- S/TE SKETCH ®OBSERVA7r7ON 7FST HOLE LOG z" 7-o y s'w1 Sefc� cn�arav ,rum oorrY /�/�11 e� ` f 3Z caMAV iurrx DOHN �. ®IJ ELEV .1 PERC 7E.S7" �.3�2 Y r�crcur nwartuY fW AWDW-44 frw AWERV 4 a �D�rH] � r 91 9" r 7- 7-. LEGEND 7&s-7bPSOc & sueson 6 6" 6'� �:41Q7/U.f! Sv4-. O �G=ILDCE L O" c--casE r cw--cf�ourvo �r cPsra� n�f ESYCN RA 27—=A L 1 WE? .sr'-d uvr�XY,tL IM YES El GIA EEf�I1�G, IIVC. SOIL TESTING 60 S4� SrRS- Or880 f INFoR�,�TION SHEET YAKEf7� d-L4.SS. JFL.• �61,7 2�6-2800617J 2�6-�596 5 IyEAWER. _- M E msr Restll-rs SHOW AfRE FOR /NfOR.0 MOM4 ./08 .LOC,4r/ON- `__ /'1_ /J¢S_ - plyMo SE.s' OYLr"0 DO Nor CUARA4WE Imr A _ SMSURFACE SOME D/SPOS 4( SYSrEt! GVULD BE f OESJCM6D Ar MIS S/TE ff ICH CVAIc?RVS rO AU CLIENT INFO' S AP1?ZJC-WLE HEAQIN REGUL4T70NS --- U"- __ __ -__-__ acI/SG INFO �- ROGaRK�_...._..._.___ �_---------_...,.�.---------- ------------------------------ PRESENT AT STE Z --.�.�...._-----------------_----------- NEALTN .4CEN7 _ � --, 4%� -- -_.,.-___--,.,__________________,-___ HL7 Ef{�PLOYEE__---- --- -- LL S/TE SKETCH ®OBSERVAnoN TEST HOLE LOG F7- EEY lee ,61 ®,�2 �z z�' 7� t s� ��« G sr l7-1YCJGYeI /r p f m PERC TEs7' �' -1l�/� /� �. -2( )l 1 nv� a cur „ rrr c,�cur a,� 1 ---- Ir S r r 7- °O'D r�s�rr�Psnr� suasan F--ANE' GR�CRA rt�1 RF-REFVSV- 0- -- 6- 6- �3 s" �!(�{fDJ/U,{t Sfr�aND LG=LF�E -�a�zSE sr=.5/Lr cW CR UN �r.�sm nue /CN 24 Tl=rIGLIW 1'--.6—/N7FX l fA YES EVGIA -ERIA/G. LAIC. SO/Z TEST/AIG KI NEZO,! s SS'- NFOf IWAT/OAI SHE-T tyar{�r�, ,cuss 01880 7EL•• (6r7) 2-if6-2900 '- rAX.- (6r 7 246 T596 fyF4Ih�ER. D N07L 72ES"T RESULTS SNORW MC FOR 1NR7R,(G477ONQ ✓OS ,LOC MOM__ � y/ PURPYsSEs, ONLY"0 DO NOT ca(R467W 7M,gT:A - SURSURFXCE SEIi'.4CE D1nP W SMD,( COVID 9E -.-_-.....-_.._ _.-. /V CJ c_ L�r.CIQdJC�f� _ DEs1cNEt7 gar Tt1is-97F > Jrc/1 GnNPoRcls TD ,4LL CLJENT INFO_ ,4PPLJCWLE A'SV W RECUL4MAIN �(I/SG` JNF77 R�G4Rit'� --.__..--_-_- __---__---- PRESENT A2- S. T -----_.�__- ____-- HF4LTht .4GFNT- �el—al - - _. ._..._______--__--_--- --_ _---- 07h'El�S. �� �/�_�---____ SITE Sf(ETCH ®OOSERVAWN 7FST HO!_E too z� � ®,�1 ELEY •,. J '" 1 , c�ccvn jrur��wr�ry /�Jd Ii P� A T� y 3119 rs4xlc a rue rvravvu X)7A&(,- /o s s� r� ,►f� JLII r r ' LEGEND TckS=7t?P.A7/L season M�41 F fINE CRCRr Va Rlr SWS4L 6" 6` + '• h �flQ7/Ud/ M=S4ND L�LaI CC RA �-CURSE =77/1 GW--CROUD a� r _y, t �•�s�?�'.,r,� i r - .:�.ri. ',4''. -'' s .;'.17 / .d ki I�t�.•{% a i.`-a' /A�J� rL.'.s'l./♦..r :.: H..E:..:•: ',60.3'�:S�LEtif':STREET i'`. : �- t ,,. :• ... .; E�. ,axEfr ,'.;cress: ar88o /l1IrCOR/1�.4 F.4.Y.•. (, r.�J 2¢6-7596 - :IfPWE4'Pl�'Il SUnr� _ LL4M _ NO7. 7EST RMUN'SHOW-ARE foR IN7VRW4TlON& ✓OS ,ZOC,4ndN..' _ Q-�•t� � 7L - PURPaS•f�'.oivzrA4N0`OD Nor GUr4Rf'r�71` r'A -/20 /7 IJ Lq 0 u t!f( T --- S`U9SCIRF.QGE�.S'�f'4CE�ISf�C4L:�Y5.7�1 GY3llC.l�:BE. ......_..,_ _.,.. APPL�WICAWM`RFGUlA17ONZ --_------ ---�---�- �S!/SG:INFt7. � 14�7�lriRK:S:� """�-..�'- ------___,�- _- _ ,� �___ _ �.� PRESENT .4T SITE _- _. - -- __---- ---- HF4G"IH '4GEM:---��_ a ✓r----- .-•-. - --------------------- -- H``7':EMPLOYEE.•--- a.YQ'L�. -- ------ ------ - - --- ------ ®OBSS?VAT10N TEST HOLE LOG r f I ' 1 t c rESr e,#r.( Jl &Z2( Jl ELFV nor£w al amszo TJ�E . ME,OF DW EI4psev W PREWA . y,��. foR �uAW ,9 q. LF r r .. n Mu S SAWS tour sAiv . Sl,L. SILTY LAur S.L,-sAivr.zaw SI.AC.'L.}SILTY LY.(Y.tC3W .St7 71 ': Ir:S,.L.�.F7A SIMY LGL(f! C r s'-s-'qua FS/CN 2a 7� I .. s.K snac x�nw