Loading...
HomeMy WebLinkAboutConstruction Notes - Consultant Review - 46 WHITE BIRCH LANE 9/24/2024 North Andover Health Department Community and Economic Development Division ONSITE WASTEWATER SYSTEM CONSTRUCTION NOTES LOCATION INFORMATION ADDRESS: 46 White Birch Lane MAP: 061.0 LOT: 94 INSTALLER: Peter Breen — mulch770C-yahoo.com 978-687-7774 DESIGNER:Vladimir Nemchenok/ Bill Dufresne (978) 502-6206 (978)475-3555 x-20 PLAN DATE: 12.27.23 BOH APPROVAL DATE ON PLAN: 02.19.2024 INSPECTIONS TANK INSPECTION: 6 -7- 2-y DATE OF BED BOTTOM INSPECTION: 7 3•;tV DATE OF FINAL CONSTRUCTION INSPECTION: '7. 3•�Y DATE OF FINAL GRADE INSPECTION:6/11/24 D. Ottenheimer SITE CONDITIONS ❑ Contractor reports any changes to design plan ® Existing septic tank properly abandoned, if present ❑ Internal plumbing all to one building sewer ® Topography not appreciably altered Comments: SEPTIC TANK ❑ Building sewer in continuous grade, on compacted firm base ❑ Cleanouts per plan ❑ Bottom of tank hole has 6" stone base ® Tank size and loading per plan ® Monolithic tank construction ® If monolithic, water tightness of tank has been achieved by visual testing ❑ If 2-piece, water tightness of tank has been achieved by water/ vacuum test (circle one) M Inlet tee installed, centered under access port M Outlet tee installed, centered under access port M Effluent filter installed (circle one) ❑ If effluent filter, riser to finished grade over filter ❑ Riser with cover to within 6" of finish grade installed over one access port ❑ Manhole and riser minimum inch diameter M Pipe penetrations appear watertight using rubber boots Comments: 6/11/24 Existing building sewer re-used. Contractor to install manhole to grade over effluent filter. D. Ottenheimer DISTRIBUTION-BOX ❑ Installed on stable stone base M H-20 D-Box ® Baffle wall ® Hydraulic cement around inlet & outlets M Even distribution observed ® Schedule 40 PVC Pipe Comments: SOIL ABSORPTION SYSTEM (General) ❑ Bottom of SAS excavated down to specified soil layer, as provided on plan M Size of SAS excavated as per plan M Sand installed, if specified on plan M Sand displays few fines when handled ❑ 40 Mil HDPE barrier installed, if specified on design plan ® Laterals installed and ends capped or connected to header ❑ Retaining wall material, location and height if specified on plan Comments: DOCUMENTS NEEDED Certification of Installation Form submitted by designer and signed and dated by designer and installer As-Built Plan by designer BM = 164.40 HR = 1.20 HI = 165.60 SYSTEM ELEVATIONS ROD AS-BLT INVERT DESIGN INVERT ELEVATION ELEV ELEV Building Sewer OUT Septic Tank IN 4.00 161.27 161.25 Septic Tank OUT 4.27 161 .00 161.00 Distribution Box IN 4.40 160.87 160.45 Distribution Box OUT 4.50 100.77 160.28 Lateral 1 BEGINNING 5.09 160.18 160.20 Lateral 1 END 5.32 159.95 160.00 Lateral 2 BEGINNING 5.10 160.17 160.20 Lateral 2 END 5.33 159.94 160.00 Lateral 3 BEGINNING 5.10 160.17 160.20 Lateral 3 END 5.33 159.94 160.00