HomeMy WebLinkAbout2005-07-22 Monitoring Reports DEF SUB iAE RECEIVED
Atlantic Engineering&Survey Consultants,Inc, o B.Paulson,P,l.S.President
97 Tenney Street • Georgetown,MA 01833 NORTH aNUuv( George J.Zaenbouras,RE.
978-3b2-7870 • 978-362-9940(fax) • atiandc84@cs.com
PLANNING DEPARTMENT
Town of North Andover
Conservation Commission
1600 Osgood Street
North Andover,MA 01845
Attn: Painela Merrill
Town of North Andover
Planning Department
1600 Osgood Street
North Andover,MA 01845
Attn:Lincoln Daley
H& S Realty Trust
12 Kick Road
Billerica,MA 01821
Atha: Bruce Hughe
Environmental Monitor Report
This report is submitted to the Conservation Commission,the Planning Department and the Site Owner to
meet the requirements of the Decisions listed below.
Site Inspection Date: May 5, 2006
Property Owner:
H& S Realty Trust
Bruce Hughe
Affected Premises:
Assessor's Map 103,Parcel 20
9 Winter Street,North Andover
Decisions Requiring Reporting
Conservation Order of Conditions: 242-1300(recorded bk. 9919,pg. 251)
Conservation Order of Conditions: 242-1309 (recorded bk. 9874,pg. 254)
Definitive Subdivision-approved 5/17/05 (recorded bk. 9874,pg.240)
Watershed Special Permit(Dwelling)-approved 5/17/05 (recorded bk. 9874,pg. 235)
Watershed Special Permit(Roadway)-approved 5/17/05 (recorded bk. 9874,pg. 249)
On the date shown above the staff of Atlantic Engineering performed an inspection of the site per the
requirements of the above listed decisions. The following information is a summary of what was found at
the site. Any concerns or recommendations to the owner and/or the Conservation.Commission/Planning
Department are italicized following the item.
General
1. OoC Condition 41 -The required DEP signs exist,as required,at the site.
Page I of 2
2. OoC Condition 45 -The wetlands line as approved was cliecked and remains visible.
3. OoC Condition 46 -The limit of work is clearly identified on the ground by the staked
haybales/siltation fence. This limit is in good condition.
The haybale/siltation fence was located by Atlantic to check its location relative to the
approved location. It was fouled that the actual location encroaches into the limit of the 75'
conservation zone. I have attached a sketch that shows the existing and proposed locations.
Since the area has already been disturbed up to the actual line it is ]ny reconinnendation that
the line be maintained as is and that the area between the existing and proposed litres be
returned to its original condition ul,hen it is time for the haybales to be removed. The owner
has been informed of this situation.
4. OoC Condition 47-The required extra haybales or on site as required.
5. OoC Condition 50 -No rainfall of 1 in or greater occurred during the week of this report.
6. OoC Condition S l -The required"no disturbance"markers/signs have not be placed as required by
this condition.
The site owner has been informed that this item needs to be complied with.
7. OoC Condition 60 -The proposed foundation location was staked on the ground prior to site
excavation to insure installation in the correct location. Tine foundation location was re-staked after
the initial excavation for the proposed footing locations. The footing are approximately half
complete as of this date.
8. OoC Condition 61 -The foundation has not been completed as of the date of this inspection,
9. OoC Condition 63 -The required crushed stone entrance exists as required by this condition.
10. OoC Condition 64 -The erosion control devices were inspected and found to be in good condition.
There was not siltation that required removing or cleaning.
11. OoC Condition 65 -No known de-watering has been done and there is no evidence of any
sedimatation resulting fiom de-watering.
12. OoC Condition 66 -No fill has been brought onto the site as of this inspection.
13. OoC Condition 69 -No finish grading has been done.
14. OoC Condition 71 -No stockpiling of soil or other materials has been observed within 25 feet of any
resource area.
Miscellaneous Comments
L The water line has been installed and backfilled. This was done prior to our engagement.
2. The sediment 7 oil separator has been installed. It is not active. No outfall pipe has been installed.
3. The roadway is under construction and is still a dirt access road.
4. Several digital pictures have been taken of the site to document the progression of the construction.
These can be made available to you should you have any concerns regarding the above inspection
comments.
The next anticipated inspection date will be May 11,Please feel frre to contact me should `have any
questions. --
oaP son,President,P.L.S.
I:1win2006fileslWinterSt-NorthAndover\EnvirotunentalMonitorReport-05-05-06.wpd
Page 2 of 2
9¢Sg, i THIS IS AN INSTRUMENT PLOT PLAN
SHOWING THE LOCATIONS OF EXISTING PLAN OF LAND
AND PROPOSED STRUCTURES FOR
OBTAINING A BUILDING PERMIT. IN
A2B �79 'i/ THE BUILDING SETBACK DISTANCEC
75 FOOT �
��Q N. ANDO VER, MA
CONSERVATION � = SHOWN ARE NOT TO BE USED BY THE
ZONE i ' V FENCES, SHCLIENT TO RUBS, LANDSCAPINABLISH LINES G, ETC...
`�`�` A 7Z,AN7IC ENGINEERING &
a25 T SURVEY CONSUL,TANTS, INC
EASIING
1!
LHJNE ALES i "� rs��j. ,' 97 TENNEY SIREET— GE014CTEMW, MA 01833
�� I , ;• 75 FOOT
} �CONSERVATION
A24 PROPOSED ; i f ZONE
OA TEE• JUNE 2, 2006
14AYBALE
LINE
� ,�•.,�� SCALE 1" = 40 FT.
JOB NO, A0604-05
NEW j• 25 FOOT `
s FOUNDATION NO DISTURB
A22 A
AB
A5 7, •��_
O �x�
���►
e
A21 t g A4 �.
A1O ON TIME BASIS OF MY KNOWLEDGE, ,
A20 INFORMATION AND BELIEF, I CERTIFY
THAT THE INDICATED STRUCTURES
ARE LOCATED AS SHOWN, AND THAT �� �`,
rn THE SETBACK DISTANCES SHOWN 's' \%
A19 MAP 103 LOT 120 A11 HEREON WERE THOSE RECORDED AT
12.90 ACzf Al2 THE SITE. ;
OHN
C?
rn
A13
A1S .�
A17 A14
Atlantic Engineering&Survey Consultants,Inc. Jolui B.Paulson,P.L.S.President
97 Tenney Street - Georgetown,MA 01833 George J.Zambouras,RE,
978-352-7870 - 978-352-9940(fax) attaritic84@cs.com
Town of North Andover
Conservation Commission
1600 Osgood Street
North Andover, MA 01845
Attn: Parnela Merrill �� t , l t1 s.. j
Town of North Andover
Planning Department
1600 Osgood Street
North Andover, MA 01845
Attn: Lincoln Daley
H& S Realty Trust
12 Kirk Road
Billerica, MA 01821
Attn: Bruce Hughe
Environmental Monitor Report
This report is submitted to the Conservation Commission, the Planning Department and the Site Owner to
meet the requirements of the Decisions listed below.
Site Inspection Date: June 27, 2006
Property Owner:
H &S Realty Trust
Bruce Hughe
Affected Premiso...s--,
Assessor's 6-s'sor's Map 103,') arccl 20
9 Winter Street,Nortth Andover
Decisions Requiring Reporting:
Conservation Order of Conditions: 242-1300 (recorded bk. 9919, pg. 25 1)
Conservation Order of Conditions: 242-1309 (recorded bk. 9874, pg. 254)
Definitive Subdivision - approved 5/17/05 (recorded bk. 9874, pg. 240)
Watershed Special Permit(Dwelling)-approved 5/17/05 (recorded bk, 9874, pg. 235)
Watershed Special Permit(Roadway) - approved 5/17/05 (recorded bk. 9874, pg. 249)
On the date shown above the staff of Atlantic Engineering performed an inspection of the site per the
requirements of the above listed decisions. The following information is a summary of what was found at
the site. Any concerns or recommendations to the owner and/or the Conservation Commission/Planning
Department are italicized following the item.
Page I of 2
i
General
I. OoC Condition 41 -Tile required DEP signs exist, as required, at the site.
2. OoC Condition 45 - The wetlands line as approved was checked and remains visible.
3. OoC Condition 46 -The limit of work is clearly identified on the ground by the staked
haybales/siltation fence. This limit is in good.condition.
4. OoC Condition 47 -The required extra haybales or on site as required.
5. OoC Condition 50 -No significant rainfall events have occurred since the last report.
6. OoC Condition 51 - The required "no disturbance"markers/signs exist and are clearly visible.
7. OoC Condition 60 -No comment on this item.
8. OoC Condition 62 -The foundation decking has been completed and the house framing is being
worked on..
9. OoC Condition 63 -The required crushed stone entrance exists as required by this condition.
10. OoC Condition 64 -The erosion control devices were inspected and found to be in good condition
with the following exceptions.
A few areas of the cloth silt felOng are beginning to sag and will be fired.
11. OoC Condition 66 -No fill has been brought onto the site as of this inspection.
12. OoC Condition 69 -No finish grading has been done.
13. OoC Condition 71 -No stockpiling of soil or other materials has been observed within 25 feet of any
resource area.
14. OoC Condition 74 - Some lunch and coffee break debris has been noted around the site and beyond
the limit of proposed work,
The owner has been instructed to clean this tip.
Miscellaneous Comments
l. The roadway is under construction and is still a dirt access road.
2. Some digital pictures have been taken of the site to document the progression of the construction.
These can be made available to you should you have any concerns regarding the above inspection
comments,
The next anticipated inspection date will be July 6, 2006. Please feel free to contact me sliotijd-you have
any questions.
fohn B. Paulson, President, P.L.S.
I:1win2006files1WinterSt-NorthAndoverlE►ivironnientalMonitorReport-06-27-06.wpd
Page 2 of 2