Loading...
HomeMy WebLinkAbout1995-08-15 Department Review DEF SUB poRTH a4 BOARD OF HEALTH i a 120 MAIN STREET TEL. 682-6483 C,�Us NORTH ANDOVER, MASS. 01845 Ext23 3 M E M O R A N D U M } ( d 1 E. DATE: January 30, 1995 ` �: i' TO: Planning Board FROM: Sandra Starr, Health JiAtr,�or RE: Evergreen Estates Definitive Subdivision I have reviewed the definitive subdivision for Evergreen Estates dated December 28, 1994 and have determined the following: Those lots which have sufficient testing, (ie, two acceptable deep holes and two passing percolation tests per lot) are lots 1, 2, 19, and 14 . Lot 16 would also have adequate testing if the lot line between 16 and 15 were moved. There has been a great deal of soils testing on this site. The low number of acceptable lots is due primarily to a huge amount of large rocks and boulders which renders the areas unsuitable for septic systems. In addition, some of the test pits located on this definitive plan are unlabelled, so it is impossible to determine what the soils information is for those pits. tkORTH O� �= y` 0 61� BOARD OF HEALTH 120 MAIN STREET TEL. 682.6483 �4ssacsHus�t�y NORTH ANDOVER, MASS. 01845 Ext23 M E M O R A N D U M DATE: July 16, 1995 TO: Planning Board _ FROM: Sandra Starr, - 1 dm' istrator RE: Evergreen Estates Soil Vests There has been a large amount of additional soils testing out at Evergreen Estates off Salem Street . Based on the criteria of passing percolation tests and four feet of parent material observed in the deep holes, the following lots appear to be acceptable for septic system installation: Lots 1, 2, 3, 4, 5, 7, 8, 10, 11, 14, 15, 16, 17, 18, 19, 20, 22 . 1n addition, Lots 12 and 21 look okay so far; they need an additional passing percolation test . Lots 6 and 13 have no passing percolation tests at this point, and Lot 9 has no soil tests at all . There is still the concert: with the large amount of rock on the site which may interfere with the amount of parent material available for leaching . Because of this concern, the Board of Health must stipulate that prior to our signoff on any Form U for any individual lot in this subdivision, the leaching area for that lot must be completely excavated to insure that there is the requisite four feet of parent material present throughout the entire location proposed for the leaching area. cc: Board of Health Phil. Christiansen Kenneth Mahoney, Director, Planning & Comm. Dev. Michael Howard, Conser. Admin. Town of North Andover OoRrH i OTTICEOI ?�y'Y4 oL I COMMUNITY DEVELOPMENT AND SERVICES 4 � V 146 Main Street L }gin 0"# North Andover}Massachusetts 01845 9t�A�Y¢oKPppt4�� WIL,L.IAM J, SCOTF �SsAcK05�� l Director F i 1 MEMORANDUM i DATE: July 30, 1996 TO: Kathleen Colwell, Town Planne' FROM: Sandra Starr, Heal 1 1 s� Cc� RE: Lot Status at Evergreen Estates As you are aware, I met with personnel from Christiansen and Sergi Engineering on July 26"`to discuss specific lots at Evergreen Estates relative to the proposed septic systems. The following conclusions were reached: • Lots 3A, 7, 8, 10, 11, and 15 can be signed off by Health at any time, • The leaching area on lots 4, 5, 6, 14, 16A, 18, 19, and 20 must be excavated prior to Form U signoff from the Board of Health, • Further testing is required on lots 1, 2, 12, 13 and 21. • Revised plans are to be submitted for lots 17 and 22, When these plans have been approved, both of these lots can receive their Norm U signoffs from Health. I will be happy to discuss at any time any questions you may have about this process. BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 IIEAI;rH 688-9540 PLANNING 688-9535 Town of North Andover NaR�M of 2TLEp 61�0 i OFFICE OF �� y4 0 COMMUNITY DEVELOPMENT AND SERVICES m 146 Maim Street °aarin r0',t5 North,Andover, Massachusetts 01845 RSSAc>aus�� (508) 688-9533 i i Memorandum Date: 09/09/96 To: Kathleen Bradley Colwell,Town Planner From: Sandra Starr,, h I A4ministrator RE: Status of Evergreen Estates As a result of further plan approvals and the excavation of two of the lots at Evergreen Estates, the Form Us for the following lots have been signed and approved by the Board of Health. I believe that the Planning Board's condition #4b of the Definitive Plan Approval dated January 17, 1995 has been net for these lots. Lots 3A, 7, 8, 10, 11, 14, 15A, 16A, 17 and 99. Additional soil testing had been scheduled for the week ending September 140, for Lots 1A, 2A, 12, 13 and 21. The leaching areas for Lots 4,5, 6, 18, 19 and 20 have not yet been excavated. Cc: Christiansen & Sergi W. Scott File WARD OI<APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEAIA'H 688-9540 PLANNING 688-9535 Julia Parrino D.Robed Nicetta Michael Howes Sandra st"r KadL ow Bradley Colwell Town of North Andover 01,70CHOFOast eo Id4aa�L COMMUNITY DEVELOPMENT AND SERVICES 146 Mani Street * ro North Andover Massachusetts 01845 �se°AAiiOµ+r¢` WILLIAM J. SCOTI' SSacNUSEii Direclor If i1 } I1 gg MEMORANDUM TO: Kathleen Bradley Colwell, Town Planner Planning Board FROM. Sandra Star 'At m trator RE: Evergreen Estates Conditions DATE: October 7, 1996 Because of the logistics involved in opening septic bed bottoms and the phased-in building development new bylaw, the Board of Health would like to request a modification of Planning Board condition 4B for Evergreen Estates. In essence, this change should offer the same protection to all parties as the current one and it is more easily managed. The requested change is as follows; There shall be a note recorded on the deed for each pertinent lot, i.e. Lots 4, 5, 18, 19, & 20, that the septic system for each individual lot shall be installed, inspected and approved by the Board of Health in accordance with all state and local regulations before construction of the primary building is begun. Construction includes the pouring of foundation walls. This statement shall be recorded on the deed for each lot and a copy filed with the Board of Health and the Planning Board before Form"U" signoff. Hopefully this change will simplify the process in dealing with the remaining lots of this subdivision. Please contact me with any questions or concerns. cc: Board of Health File BOARD OF APPEALS 688-9541 BUILDING 688-9545 CONst;RVA'HON 688-9530 HEALTH 688-9540 PLANNING 688.9535 A Memorandum DATE: October 30, 1997 TO: Bob Nicetta, Ken Surrette FROM: Sandra Starr, Health RE: Evergreen Estates CC. Bill Scott, Susan Ford, Kathleen Colwell, Mike Howard, Phil Christiansen, Al Couliiard Due to the problems recently encountered on multiple lots on Evergreen Estates, the Board of Health at their meeting on October 29, 1997 voted unanimously to require bottom of bed inspections OT full septic system installations on each lot in this subdivision before any construction, including foundations, is begun on that specific lot. The majority of lots already have Form U approvals from the Board of Health so it AU be up to the Building Department to route all requests for construction approvals at Evergreen Estates to the Health Department for proper action on the septic system issues. I suggest that once a bed bottom has been inspected and approved(or a septic system fully installed), the attached form will be sent to the Building office. I hope this procedure will meet with your approval, If you have any questions or comments or issues, ploase call me so they can be addressed, -lY i The ( ) bottom of bed, { ) septic system located- has been inspected and approved on by Board of Health personnel, and the Health Department has no objection to a construction permit being issued for this lot. Inspector Date 1 �1 Town of North Andover `' H6RTk OI�TICE OF 3`2 Qy�s to , QL 6.aY0 COMMUNITY DEVELOPMENT AND SERVICES 30 School Street i ,`,' North Andover,Massachusetts 01845 �QA�giiFO j'E ; �'' 1i E 9SSACHUSE� WILI,IAM J, SCO7 , ;, Director , October 1, 1998 Jim Rand,Engineering 384 Osgood Street North Andover,MA 01845 Dear Jim: i I had occasion to be out at Evergreen Estates for an inspection today and noted that there are no guard rails or any other type of safety barrier over the culvert that lies underneath the road into the subdivision. The depth of the drop off is roughly 10 to 15 feet. Since there are children of school age now living in the subdivision, this lack of a barrier appears to be a dangerous safety hazard. As I understand it,issues of this type lie within the scope of DPW at this stage in a subdivision's development. I am,therefore,sending you this letter in the hopes that you will respond in your usual efficient manner and remedy the problem. Please feet free to call me if you have any questions. Sincerely, Sandra Starr,R.S, Health Administrator Cc: W. Scott,Dir. CD&S KBC, Town Planner BOARD OIL APPEALS 688-9541 BUILDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 { \r.(z1 �,y'fr��,�tt� f r I a l��•R4\i�.'i`�ry:e".�ti\6y` --yy yr '"al;!'•e@ 1L�rtix. r[,i.`' 1! lx „FvA��-L..1!R 3 ...l��� .�,a—�a�.!�.1�.•..l..t Ls:,�7;]..tti SJRy�`y§.1�.�1x wti S{t {l �j py ) 'r l " "," 120 Main Street, 01845 KAREN H.P. NELSON Town O �508} 682-6483 DiY"`°' NORTH ANDOVER BUILDING ACH DIVISION OF CONSERVATION HEALTH PLANNING & COMMUNITY DEVELOPMENT PLANNING I January 27, 1995 i iE i • I Mr. John Chessia, P.E. Coler & Colantonio, Inc. 101 Accord Park Drive, Suite 1 Norwell, MA 02061-1685 Re: Evergreen Estates Dear Mr. Chessia: Enclosed herewith is a set of additional plans DefinitiveSuodi ision Plan "Ever teen Estates" to assist you in drafting yourproposal aid subdivision. Should you require further information or assistance, do not hesitate to contact this office. Very truly yours, Michael D. Howard Natural Resource/Land Use Planner /dmd Encl. Town of North Andover of NORTH 1N OFMCE Or �= yt`S 0 4 COMMUNITY DEVELOPMENT AND SERVICES 146 Main Street " North Andover, Massachusetts 01845 *�►�` ' }.�..i. SSACH 50 May 6, 1996 m Ay Mr. Al Couillard DECK Essex Inc. Lowell, MA 01852 RE: Wetland Replication - Evergreen Estates Subdivision (DEP #242-743). Dear Mr. Couillard: As you are aware, approximately 10,000 square feet of wetland replication is required for the above referenced subdivision filing. Work specific to this area has not been carried out as of May 6, 1996. 1 offer the following comments: • The Massachusetts Wetland Protection Act Regulations and the North Andover Wetland Regulations each respectively require that"in-kind" replication be provided when a resource area is scheduled for alteration. The area, as approved by the North Andover Conservation Commission (NACC) and depicted on the approved plans referenced in the Order of Conditions, appears to be designed primarily as a detention/retention area versus a Bordering Vegetated Wetland (BVW). Please provide an "interim As-Built" depicting existing grades and total square footage of the area in question. In addition, please submit a cross-section verifying that"in-kind" grades are being satisified; • Dependent upon the findings of the"Interim As-Built', please initiate the planting schedule as approved by this Department, Schedule accordingly with Mr. Steve D'Urso and myself so that proper supervision and monitoring can be provided during construction. Please forward the above referenced plan to this Department no later than Wednesday, May 15, 1996, Your prompt consideration of this matter is appreciated. Thanking you in advance. Sincerely, Michael D. Howard Conservation Administrator BOARD OF APPEALS 688.9541 1 UILDINO 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 Y 1 CC: DEP-NERD NACC Kathleen Colwell,Town Planner Steve D'Urso,Wetland Biologist Leah Basbanes,Environmental Monitor Phil Christiansen,Christiansen&Sergi 1 i Town of North Andover f gORTi{ p -�10 ,.I O+ + CEOT' 3? b41 'eopL COMMUNITY DEVELOPMENT AND SERVICES h • ' 146 Main Street + ,^ North Andover, Massachusetts 01845 ,'" WfLLIAM J. SCaTT �SSACKuS���y Director i April 23, 1997 To: Michael D. Howard - Conservation Administrator From: Richelle Martin - Conservation Associate Re: Evergreen Estates Cc: NACC, Sandra Starr, File l determined what lots are currently being worked on in relation to the Conservation Department, and issuances of Order of Conditions and Requests of Determination of Applicability. My findings areas follows: [{•4` ,.[0 Y:i'i+:.v`i;)[.ir0%T27:,[.. f..:' } •.... :.}I v,}:i5::[4r::::.G::..:�:.. .};..._.. }4.QySr::4'{ri:Y'.+}i.:{:.0::i...iti.4::. :v.\:.::,vu-.. {.,:i'[t.:Cy}:-.,2o.a $ {➢;.FQ.GxGi:[:::3b�.v}co:.i•.a.: �: {:•fc o.:c.:{{.a3'.., a {;a}r..4.[v>a,Q..+S},''dtitz,:.i ..,?. # ...2 ,o �.,.J,, �.}::=}: . ':r t: Y �.[._,-Q.:s.. . ...'[;t:} : .S.; .:t x. YS.c.,.};�t:;:on..o c[,oa.:r-.•: c.�. :.[£3{.8: h:Sl �$.. ( .nS,,u.}v,rb]e:3';S'::f.•^+:::.q :.',•;L :t't#.:�' ::;.,.,.:0....3.,,.. .r.,. {.{s.,..y:,. [[ ....: i.LrifQn�4.0.'1N.41[r � .$ ,7.:...+4,...i.i•ri{r.. ,}'v� , '��{.r.0.\.[.[{. .},4,..,#.,:,r;.v?�:].,.:i.riY:4S3::v�[.$1a4n:. 1 work has not begun DEP # 242-846 for detention pond future home will require a permit 2 work has not begun Permit Re aired-Riverfront Act 3 work has not begun No Permit Required 4 work has not begun Permit Required 5 work has not begun DEP # 242-836 6 foundation constructed No Permit Required 7 house constructed No Permit Required 8 work'has not begun Permit Required 9 work has not begun Permit Required 10 work has not be un Permit Required 11 work has not begun Permit Required 12 work has not begun DEP # 242-850 13 work has not begun Permit Required 14 house constructed DEP # 242-799 15 house constructed No Permit Required 16 house constructed No Permit Required 17 work has not begun Negative Determination-RDA 18 excavation taking DEP # 242-835 lace 19 work has not begun DEP # 242-851 20 work has not begun Permit Required 21 work has not be un Permit Required 22 work has not begun Permit Required-Vernal Pool, Riverfront Act BOARD OF APPEALS 688-9541 BUMDING 688-9545 CONSERVATION 688-9530 HEALTH 688-9540 PLANNING 688-9535 SERGis INC, p W'. 1.') )p, North Andove.1 lee -arirlu fin- thn Eve) .14 PGC,, r,v