HomeMy WebLinkAbout1976-03-17 Decision DEF SUB 1
MUM MH
TOWN OF NORTH ANDOVER
MASSACHUSETTSn ; x
Y► APIAMM
March 17, 1976
John J. Lyons, Town Clerk
Town Office Building
North Andover, Massachusetts
Dear Sir:
The following petition was heard at a meeting of the Planning Board on Tuesday
evening, February 17, 1976 at 7:30 P,Mo in the Town Office Meeting Room. The
following members were present and voting: William Chepulis, Chairman; Pritz
Ostherr, Vioe-Chairman; Paul R. Lamprey and John J. Monteiro. Thee to the absence
of William N. Salemme, Clerk, the hearing was tape recorded in order that Mr.
Salemme may vote on the matter. ,
Frank C. Celinas, representing SCOTT PROPERTIES, INC, petitioned for a subdivision
of a parcel of land containing approximately 14 acres situated off Boston St. ,
subdivided into 12 lots and to be known as "Willow Ridge Estates".
Mr. Gelinas presented plans to the Board and stated that all lots are 1 acre each
with 150 foot frontage. He indicated that the proximity of the Andover line to
Willow Ridge Road is about 600 ft. There is no municipal water in the location,
Ann Howes, Marbleridge Rd., Sharon Knepper, 440 Boston St, , and Connie Bernal 429
Marbleridge Rd. voiced concern about the large catchment area and the drainage.
At a meeting held on March 15, 1976, biro Ostherr made a motion to APPROVE the sub-
division subject to the conditions and requirements of the Town Depts. Mr, Lamprey
seconded the motion and all five members voted unanimously in favor. The conditions
are as follows:
1. That the record owners of the subject land forthwith execute and record a "covenant
running with the land", or otherwise provide security for the oonstruction oR ways and
the installation of municipal services within said subdivision, all as provided by
G.L. C, 4.1 , S. 81-U.
2. That all such construction and installations shall in all respects conform to the
governing rules and regulations of this Board,
3. That fare protection improvements be constructed in accordance with the standards
of the Board of Fire Engineers.
F
Willow Ridge Estates cont. March 17, 1976
4. That roadway and surface drainage be constructed in accordance with the standards
of the Highway Surveyor.
5. That no lot may be built upon until a subsurface sewage disposal system permit be
granted by the Board of Health.
6. That the turnaround drainage be piped approximately 75 feet in a northerly
direction to a natural, drainage Swale.
7. That sloped granite curbing run from the catch basins at station 0+85 to station
7+00.
8. That a surface water drain be shown entering at the 0+85 catch basin; entry to
provide relief from surface water in the Swale on lot 5 (not a part of the subdivision).
9. That catch basin swales and curbing be constructed to catoh the street surface
water..
10. That gravel under base extend 18" beyond-the pavement on each side.
Very truly yours,
PLANNING
ANNING BOARD
William Chepulis,
Chairman
gb