Loading...
HomeMy WebLinkAbout2020-12-15 Department Review SPR I 11/5/2020 Town of North Andover Mail-1270 Turnpike Street-Site Plan Review Modification NOR`�h AND OVER Jean Enright<jenright@northandoverma.gov> 1 { 1270 Turnpike Street - Site Plan Review Modification 1 Tim Willett <twillett@northandoverma.gov> Thu, Nov 5, 2020 at 6:50 AM To: Jean Enright<jenright@northandoverma.gov> Hi Jean, I have no concerns with associated with the proposed plan. (Quoted text hidden) https://mail.google.com/inail/utO?ik=7c2effB2B5&view=pt&search=all&permmsgid=msg-f%3Al 682520989988060321&slmpl=msg-f%3A168252098998... 11i i 1113/2020 Town of North Andover Mail-1270 Turnpike Street-Site Plan Review Modification 0� 30VE Jean Enright jenright@northandoverma,gov> Ma�saChus 1270 Turnpike Street - Site Plan Review Modification Brian LaGrasse<blagrasse@northandeverma.gov> Tue, Nov 3, 2020 at 3:51 PM To: Jean Enright<jenright@northandoverma.gov> Cc: Tim Willett<twillett@northandoverma.gov>, John Borgesi <jborgesl@northandoverma.gov>, Amy Maxner <amaxner@northandoverma.gov>, Daniel Lanen <dlanen@napd.us>, Mike Beirne <mbeirne@northandoverma.gov>, Paul Hutchins <phutchins@northandoverma.gov>, William McCarthy<Wmccarthy@northandoverma.gov>, Jim Stanford <jstanford@northandoverma.gov>, Glen Alt<galt@northan dove rma.gov> I have no issues or concerns with this proposal On Tue, Nov 3, 2020 at 7:54 AM Jean Enright<jenright@northandoverma.gov>wrote: [Quoted text hidden] Brian J. LaGrasse, CENT Director of Public Health Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9540 Fax 978,688.8476 Email blagrasse@northandoverma.gov Web www.northandoverma.gov https:llmail.google.com/mail/u/0?ik=7c2eff6265&view=pt&search=all&permmsgid=msg-f%3Ai 682373792344034044&slmpl=msg-f%3Al68237379234... 111 11/3/2020 Town of North Andover Mail-1270 Turnpike Street-Site Plan Review Modification No VER. M � Jean Enright<jenright@northandoverma.gov> 1270 Turnpike Street - Site Plan Review Modification Mike Beirne<mbeirne@northandoverma.gov> Tue, Nov 3, 2020 at 1:27 PM To:Jean Enright<jenright@northandoverma.gov>,William McCarthy <wmccarthy@northandoverma.gov> Ft]submits the following: 1.Access to fire protection equipment on the exterior of the building is maintained. 36"minimum clearance around fire protection features as well as a clear, unobstructed path to FD connections is required to be maintained per 527 CMR. 2. Hydrants in the general vicinity of the location remain unobstructed by any work related to the proposed project. 3. Fire lanes and access roadways remain unchanged, open and unobstructed. [Quoted text hidden] Lt Michael Beirne North Andover FD 795 Chickering Rd. North Andover Ma. 01845 978-688-9590 https:llmail.g oogle.comlm ail/u10?lk=7c2eff6265&view=pt&search=a li&permmsgld=msg-f°/a3A1682364776739697944&simpimmsg-f%3Al 6823647 7673... 111 `1 i 111512020 Town of North Andover Mail-1270 Turnpike Street-Site Plan Review Modification Massachusetts f Jean Enright<jenright@northandoverma.gov> 1270 Turnpike Street - Site Plan Review Modification Daniel Lanen <dlanen@napd.us> Thu, Nov 5, 2020 at 11:46 AM To: Jean Enright<jen rig ht@north andoverma.gov> 1 The Police Department has no issues if adequate parking is supplied and entry/exit sightlines are maintained. 1 i Dan [Quoted text hidden] 1 Lt. Daniel P. Lanen North Andover Police Department Operations Division Commander E-mail: dlanen@napd.us Phone: 978-242-1542 i i https://ma 1I.google.coin/mail/u!0?i k=7c2eff6265&view=pt&search=all&perm msgid=msg-f%3Al 682539653927256566&si mpl=msg-f%3A1682 53965392... 111 12/5/2020 Town of North Andover Mail-1270 Turnpike Street-Site Plan Review Modification T ` 1+�as; ttlu Jean Enright<jenright@northandoverma.gov> 1270 Turnpike Street - Site Plan Review Modification E John Borgesi <jborgesi@northandoverma.gov> Fri, Dee 4, 2020 at 11:35 AM To: Jean Enright<jonright@northandoverma.gov> I Jean, i I have completed my review of the proposed modifications at the 1270 Turnpike Street property. Based on the updated plans submitted, all of my comments from my original email dated October 20, 2020 have been adequately addressed. In addition I reviewed the drainage memo and proposed upgrades to the drainage system and these also appear to adequately address the proposed increase in impervious area, therefore I have no further comments. Thank you. -John John J. Borgesi, P.E. Assistant Director/Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 x.44021 Fax: 978.688.9573 From:Jean Enright<jenright@northandoverma.gov> Sent:Tuesday, November 3, 2020 7:54 AM To:Tim Willett<twil lett@ north andove rma.g ov>;John Borgesi<jborgesl@northandoverma.gov>; Brian I-aGrasse <blagrasse@northandoverma.gov>; Amy Maxner<amaxner@northandoverma.gov>; Daniel Lanen <dlanen@napd.us>; Mike Beirne<mbeirne@northandoverma.gov>; Paul Hutchins <phutchins@northandoverma.gov> Cc:William McCarthy<Wmccarthy@northandoverma.gov>; Jim Stanford<jstanford@northandoverma.gov>; Glen Alt<galt@northandoverma.gov> Subject: 1270 Turnpike Street-Site Plan Review Modification i https://mail.google.com/mait/u/0?ik=7c2eff6265&v€ew=pt&search=al l&permmsgid=msg-f%3A1885166178204329210&s imp hm sg-f%3A 168516617820... 1/2 12/512020 Town of North Andover Mail-1270 Turnpike Street-Site Plan Review Modification Hollo, (Quoted text hidden] I i https:Hmal 1.google.com/mall/u107ik=7o2eff6265&view=pt&search=all&permmsgid=msg-f%3Al 685166178204329210&si mpl=msg-f%3A168516617820... 212 11/5/2020 Town of North Andover Mail-RE: 1270 Turnpike Street E i NoRT1 �`O�QVE Ma �ils Jean Enright<jenright@northandoverma.gov> ssach�s RE; 1270 Turnpike Street 4 messages Jahn Borges! <j borges!@north andoverma.gov> Tue, Oct 27, 2020 at 11:35 AM To: "Deborah L. Colbert" <dcolbert@hancockassociates.com> Cc: Tim Willett <twillett@northandoverma.gov>, Glen Alt<galt@northandoverma.gov>, David Sampson <dsampson@rabican.com>, Steve Aldrich <saidrich@rabican.com>, Steve Aldrich <Steve@arborstaffing.com>, "James J. Polakiewicz" <jpoiakiewicz@hancockassociates.com>, Jean Enright<jenright@northandoverma.gov> Deb, I have reviewed your comments with Glen Alt the Water-Sewer Superintendent and based on the care required for the pump station we cannot reconsider our original comments. We offer the following response to your comments: i 1. As we indicated the need to be able to get both the propane refill truck but more importantly a sewer pump truck and sometimes 2 pump trucks both in the area behind and along the western side of the pump station Is critical to its operation. At times there are 2 pump trucks located behind and on the side of the station that are there for a minimum of half a day for regular maintenance and could be longer(hours) if it is an emergency. It is for this reason we cannot support the 3 proposed parking spaces in the back of the pump station. 2. With regards to the 2 proposed parallel spots located on the western side of the pump station and the proposed aisle width,when we have 2 sewer pump trucks on site they use the aisle on this side of the building and if it is reduced to 12' this is insufficient for the truck and the workers to be able to work around the truck and fence as necessary, Therefore we propose maintaining the aisle width of 15 feet and reduce the grass Island width from 6 to 3 feet This will still allow for a 3 foot grass area between the 2 parking areas,the addition of the 2 new parallel parking spots, and still maintain a 15 foot aisle width. Thank you. i -John John J.Borgesi,P.E. Assistant Director/Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 x.44021 Fax: 978,688,9573 https:/Imalt.google.com/mail/u/0?lk=7r,2eff6265&view=pt&sea rch=all&permth id=th read-f%3Al681719730511473135&simpl=msg-f°/a 3AI68171973051... 1/4 111512020 Town of North Andover Mail-RE: 1270 Turnpike Street From: Deborah L. Colbert<dcolbert@hancockassociates.com> Sent. Monday, October 26, 2020 10:43 AM To: John Borges! <jborgesi@northandoverma.gov> Cc: 'twiliett@northandoverrna.gov'<twillett@noithandoverma.gov>; 'galt@northandoverma,gov' <galt@northandoverma.gov>; David Sampson <dsampson@rablcan,corn>; Steve Aldrich <saldrich@rablcan.com>; Steve Aldrich <Steve@arborstaffing.com>; James J. Polakiewicz <jpolakiewicz@hancockassociates.corn> Subject; FW: 1270 Turnpike Street John, Please reconsider some of your requests for eliminating possibly five (5)proposed parking spaces. Currently, there is NOT enough parking for this commercial office space, 1. Is it necessary to remove the three parking spaces on the northeasterly side of the PS? Can your trucks park in the aisle to pump out or fill the propane tanks? How much time does this require? 2. The current driveway width on the southerly side of the pump station is 10'. We are proposing to widen it to 12' and yes,the step will be designed to appropriate steps standards. 3. The current drive width on the northern side of the pump station is currently 15'; however, standard one way traffic aisle width is 12'. We ask that you reconsider your request to provide a 15' aisle width. We would like to be able to provide a landscape aisle, two parallel parking spaces, and an aisle width of 12'. Thank you for your prompt response to these requests. Stay Safe, Stay Healthy, Stay b' Apart! Deb Colbert, P.E. Senior Project Manager HANCOCK ASSOCIATES Surveyors I Engineers I Scientists Licensed in MA,NH,CT and RI Established 1978 185 Centre Street, Danvers, MA 01923 P(978)777-3050,F(978)774-7816, C(978)989-4978 dcolbert@hancockassociates.com www.hancockassociates.com https:/Imail.google.com/mail/u/0?ik=7c2eff6265&view=pt&search=all&permthid=thread-f%3Al681719730511473135&simpl=msg-f%3A16817197305l... 2/4 I 11/5/2020 Town of North Andover Mail-RE: 1270 Turnpike Street > Jean Enright jenright@northandoverma.gov> Mon, Nov 2, 2020 at 3:02 PM To: John Borgesi <jb o rgesi @northan dove rma.gov> John, Following up on your email below, The aisle width to the east of the pump station is 12'kl-. There are no proposed changes to that aisle width. Do you deem that sufficient? Jean [Quoted text hidden] i Sincerely, .Jean Enright Planning Director Town of North Andover 120 Main Street North Andover, MA 01845 Phone 978.688.9533 Fax 978.688.9542 Email jen rig ht@north an dove rma.gov Web: www.NorthAndoverMA.gov cid:image001.jpg@010EOF52.F=68A5980 John Borgesi <jborgesl@northandoverma.gov> Tue, Nov 3, 2020 at 1:46 PM To: Jean Enright<jenright@northandoverma.gov> Jean, 12' aisle width on east side is sufficient—no Issues with east side. Thanks. John J. Borgesi, P.B. Assistant Director/Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 x.44021 h ttps:llma li,googie,com/mall/u10?lk=7c2eff6265&view=pt&search=al I&permthid=thread-f%3A1681719730511473135&si mpl=m sg-€%3A168171973051... 314 11/5/2020 Town of North Andover Mail-RE:1270 Turnpike Street Fax: 978,688.9573 [Quoted text hidden] Jean Enright<jenright@northandoverma.gov> Tue, Nov 3, 2020 at 2:14 PM To: John Borgesi <jborgesi@northandoverma.gov> Thank you [Quoted text hidden] Sincerely, Jean Enright [Quoted text hidden] cid:image001.jpg@010EOF52.F68A5980 https:llmall.google.comlmall/u/0?ik=7c2eff6265&vlew=pt&search=atl&permtiiid=thread-f%3Al68l7l9730511473135&simpl=m sg-f%3A168171973051... 414 10/20/2020 Town of North Andover Mail-1270 Turnpike Street NO Jean )Enrig htJ en @ ht northandoverma.gov> 1270 Turnpike Street John Borgesl4Jborgesi@northandoverma.gov> Tue, Oct 20, 2020 at 3:58 PM To:Jean Enright<Jenright@north an doverma.gov> Cc:Tim Willett <twiilett@northandoverma.gov>, Glen Alt{gait@northandoverma.gov> i Jean, Glen and I met to go over the proposed plan. We do have some concerns and offer the following comments which please share with the Applicant: 1. The proposed 3 parking spaces located to the northerly portion need to be removed as this space is necessary for when we need to pump out the pump station or have the propane tanks refilled, 2. The proposed concrete step located on the easterly side of the wood shed is proposed to be saw cut to Increase the travel width. The remaining concrete step needs to meet the requirements for the proper width of a step for access Into the wood shed. This should be confirmed. 3. The travel lane on the westerly side of the building Is currently 15 feet. This travel width needs to be maintained for access of both the propane fill up truck and the sewer pumper truck, If the existing width plus the proposed two parallel parking spots can be maintained we do not have an issue with these 2 proposed parallel spots. We have no concerns with the 7 proposed parking spots located on the southerly portion of the site, Please let us know if you have any questions on any of these comments. Thank you, -John John J. Borges], P.E. Assistant Director/Town Engineer Department of Public Works Town of North Andover 384 Osgood Street North Andover, MA 01845 Phone: 978.685.0950 x.44021 httns.-//mall.a000tn.rnm/mailhr/O?ik=7n2eff69fiS&VIRw=ntRaaarr.}i=;ill Lnprmm4riirl=mcn.fa/"lA9RR1In2l)AA9IMAMA6Rc1mrJ=inen..fo/AA4AA44WACIA94 119