Loading...
HomeMy WebLinkAbout2017 Driveway Permit Application Lot 2-3 TOWN OF NORTH VER - DIVISION OF PUBLICWORKS Permit to Connect a Driveway to the Town Right-of-Way Permit to be Issued at each building permit signed This Permit only approves connection to the Town bight-of-Way and not the overall driveway design. Approval from Conservation or other Town Boards may be required. The pavement elevation of all driveway entrances must be at least 4 Inches below the edge of the existing roadway's pavement at a distance of 6 feet from that edge of pavement Into the roadway shoulder, 3 Please legibly fill out the following Information completely (blue or black Ink) J ,- Date of Application; � Owner: Address. 2 t .3 `>�.� 121` Phone;, `1I I .— - - _.._ >-�- V Are Town trees Involved Y / Compliance with MGL Chapter 87 required Y / N Are Town Boards involved? Y,)/ N If yes, which Board(s) (' <N-fseq.v- -hor-r - dr"-)j rf-I vi Building Permit? Y / N Copy of Permit attached? Y / N Approved plan attached? Y / N Proposed plans submitted? Y / N Driveway information New Existing New driveway sq ft Expansions ft Existing s ft q g q Can you show the location of water service shut off Y / N or /`AY NfA due to Well is in use Storm water runoff flows to the street right-of-way? Y 1 C �- r` i f'° fit` �� °r°t �' ` . Work to be done in right-of-way? / N If yes, describe Runoff mitigation (1.e, Infiltration, grass areas, change grades, etc) provided? / N If yes, describe Contractor Information: Name; �.. v �k,t y pc V�_ 'e � - Address: , - �...�...�.. Phone(s); `l -1 V This portion to be filled out by the town r,6Kr*KM TO Orel vfttb bv_,oZ CCVN Approved by: Date: �� 'ZS �? Final Inspection Date: Completed by: 1 TOWN OF NORTH ANDOVER - DIVISION OF PUBLIC Permit to Connect a Driveway to the Town Right-of-Way Permit to be issued at each building Permit signed This Permit only approves connection to the Town Right-of-Way and not the overall driveway design. Approval from Conservation or other Town Boards may be required. The pavement elevation of all driveway entrances must be at least 4 inches below the edge of the existing roadways pavement at a distance of 6 feet from that edge of pavement into the roadway shoulder. Please legibly fill out the following information completely (blue or black Ink) Date of Application: I /f l u Owner; Address: 1 V i a «rv� S+. Phone: Are Town trees involved Y / N Compliance with MGI. Chapter 87 required Y / N Are Town Boards involved?�Y?/ N If yes, which Board(s) Building Permit? Y / N Copy of Permit attached? Y / N Approved plan attached? Y / N Proposed plans submitted? Y / N Driveway information New L Existing New driveway sq ft Expansion sq ft Existing sq ft Can you show the location of water service shut off Y / N or N/A due to Well is in use Storm water runoff flows to the street right-of-way? Y / k) 6 (14r "; $ } Worst to be done in right-of-way? �1 N If yes, describe Runoff mitigation (l.e. infiltration, grass areas, change grados, etc) provided? Y? 1 N If yes, describe Contractor Information: Name: r_ ,�,;; �,� � .t fe. This portion to be filled out by the town 1-" V4V0'M - Arzvv b5: � Approved by: VhE\ Date: id z� t7 Final Inspection Date: \_/ \j V(C mpleted by: