Loading...
HomeMy WebLinkAbout1975 Salem Street Stormwater Summary 1975 Salem Street Stormwater Summary I Area Storm (yr) 2 10 25 100 Flow rate cfs Pre A-1 .09 .61 1.20 2.77 Post 7L .07 .42 .79 1.89 Pre A-2 .20 1.29 2.57 5.94 Post prop ne .20 1.04 1.91 5.13 Pre A-3 .03 .25 .49 1.14 Post prop se .01 .10 .20 .47 Pre A-4 .13 .91 1.8 4.15 Post prop nw .01 .77 1.46 3.25 Pre A-5 .03 .19 .38 .88 Post P-5 A6 .28 .49 1.03 Drainage flows to all offsite areas are less than existing flows. Areas A-5 and P-5 drain internally and the increase in flow can be accommodated by the size of the depression. Area Storm (yr) 2 10 25 100 Volume acre feet Pre A-1 0.015 0.056 0.098 0.210 Post 7L 0.011 0.036 0.061 0.15 Pre A-2 0.037 0.138 0.242 0.519 Post prop lie 0.031 0.103 0.174 0.405 Pre A-3 0.006 0.021 0.037 0.079 Post prop se 0.002 0.009 0.016 0.036 Pre A-4 0.023 0.085 0.149 0.32 Post prop nw 0.021 0.072 0.123 0.257 Pre A-5 0.004 0.017 0.029 0.063 Post P-5 0.007 0.021 0.035 0.071 Drainage volumes to all offsite areas are less than existing volumes. Areas A-5 and P-5 drain internally and the increase in volume of 348 cubic feet can be accommodated by the size of the depression into which it drains.