HomeMy WebLinkAbout1990-03-28 Conservation Commission Minutes Draft Minutes of NACC Meeting of March 28 1990
• PRESENT Paul Tariot Bill Sousa
Alison Brewster Carl Schoene
Bob Mansour Richard Doucette, Administrator
MINUTES
None approved
HAWKINS LANE (#242-388)
ENFORCEMENT ORDER
The Enforcement Order previously issued was discussed A new
construction sequence was submitted The elevation of the
replication area was taken and may be slightly above the approved
plan (although it is very wet) Bill Sousa motioned to lift the
Enforcement Order, Bob Mansour seconded, motion carried
LOT 17 JERAD PLACE (4242-506)
MODIFICATION
Predevelopment hydrologic calculations show that the area in
question is not an isolated land sub]ect to flooding (less than
an acre-foot) Bill Sousa motioned to accept the modification to
the Order of Condition, Bob Mansour seconded motion carried
LOT 19 JERAD PLACE
DETERMINATION
• The Positive Determination voted previously was never sent out
It will be issued as voted
JERAD PHASE I (#242-331)
COMPLIANCE
Bill Sousa motioned to grant a certificate of compliance on Jerad
Phase I Carl Schoene seconded motion carried
LOT 9 JERAD PLACE (#242-423)
COMPLIANCE
Bill Sousa motioned to grant a partial Certificate of Compliance
on Lot 9 Jerad Place Alison Brewster seconded motion carried
EDGEWOOD (#242-511)
MODIFICATION
Pro]ect changes were presented to the Commission showing some
parking now being located under the courtyard area instead of
under residential units The NACC requested a letter from an
Engineer regarding storm runoff
LOT 4A BOXFORD STREET (#242-418)
MODIFICATION
A rip rap wall is now on the property and was not shown on the
approved plan The new owner of the property would like to keep
the wall and stabilize it Bill Sousa motioned to accept the
change as a modification to the original Order of Conditions
• Carl Schoene seconded motion carried
f
CAMPBELL FOREST
DETERMINATION
Dave Jordan of Andover Consultants and Nora Miller of Wetlands
Preservation Inc discussed the wetland flagging The NACC will
conduct a site visit to discuss hydrologic connections The
Administrator will meet with WPI in the field to discuss
flagging
LOT 1 COVENTRY ESTATES
DETERMINATION
This filing was withdrawn
701 FOREST STREET
DETERMINATION
Ken Daher and Hugh Dunkley spoke regarding the Determination
The Administrator discovered a large mound of construction debris
ad]acent to the wetland while reviewing the flagging Some of
the fill may be in the wetland An enforcement order will be
issued No further action on the Determination is anticipated
until the completion of the Enforcement Order
LOT 25A EQUESTPIAN DRIVE
A Certificate of Compliance was discussed No vote taken
LOTS 26 & 27 GF.ANVILLE LANE (#242-22)
CERTIFICATE OF COMPLIANCE
Carl Schoene motioned to grant the partial Compliance on the
above lots Bill Sousa seconded motion carried
BAYFIELD COMPANY (#242-523)
DECISION
Bill Sousa motioned to issue the decision on 2070 Turnpike Bob
Mansour seconded motion carried
MOTION TO ADJOURN 9 45 P M
VVAr
Paul L Tariot Chairman