Loading...
HomeMy WebLinkAbout1990-03-28 Conservation Commission Minutes Draft Minutes of NACC Meeting of March 28 1990 • PRESENT Paul Tariot Bill Sousa Alison Brewster Carl Schoene Bob Mansour Richard Doucette, Administrator MINUTES None approved HAWKINS LANE (#242-388) ENFORCEMENT ORDER The Enforcement Order previously issued was discussed A new construction sequence was submitted The elevation of the replication area was taken and may be slightly above the approved plan (although it is very wet) Bill Sousa motioned to lift the Enforcement Order, Bob Mansour seconded, motion carried LOT 17 JERAD PLACE (4242-506) MODIFICATION Predevelopment hydrologic calculations show that the area in question is not an isolated land sub]ect to flooding (less than an acre-foot) Bill Sousa motioned to accept the modification to the Order of Condition, Bob Mansour seconded motion carried LOT 19 JERAD PLACE DETERMINATION • The Positive Determination voted previously was never sent out It will be issued as voted JERAD PHASE I (#242-331) COMPLIANCE Bill Sousa motioned to grant a certificate of compliance on Jerad Phase I Carl Schoene seconded motion carried LOT 9 JERAD PLACE (#242-423) COMPLIANCE Bill Sousa motioned to grant a partial Certificate of Compliance on Lot 9 Jerad Place Alison Brewster seconded motion carried EDGEWOOD (#242-511) MODIFICATION Pro]ect changes were presented to the Commission showing some parking now being located under the courtyard area instead of under residential units The NACC requested a letter from an Engineer regarding storm runoff LOT 4A BOXFORD STREET (#242-418) MODIFICATION A rip rap wall is now on the property and was not shown on the approved plan The new owner of the property would like to keep the wall and stabilize it Bill Sousa motioned to accept the change as a modification to the original Order of Conditions • Carl Schoene seconded motion carried f CAMPBELL FOREST DETERMINATION Dave Jordan of Andover Consultants and Nora Miller of Wetlands Preservation Inc discussed the wetland flagging The NACC will conduct a site visit to discuss hydrologic connections The Administrator will meet with WPI in the field to discuss flagging LOT 1 COVENTRY ESTATES DETERMINATION This filing was withdrawn 701 FOREST STREET DETERMINATION Ken Daher and Hugh Dunkley spoke regarding the Determination The Administrator discovered a large mound of construction debris ad]acent to the wetland while reviewing the flagging Some of the fill may be in the wetland An enforcement order will be issued No further action on the Determination is anticipated until the completion of the Enforcement Order LOT 25A EQUESTPIAN DRIVE A Certificate of Compliance was discussed No vote taken LOTS 26 & 27 GF.ANVILLE LANE (#242-22) CERTIFICATE OF COMPLIANCE Carl Schoene motioned to grant the partial Compliance on the above lots Bill Sousa seconded motion carried BAYFIELD COMPANY (#242-523) DECISION Bill Sousa motioned to issue the decision on 2070 Turnpike Bob Mansour seconded motion carried MOTION TO ADJOURN 9 45 P M VVAr Paul L Tariot Chairman