HomeMy WebLinkAbout1990-07-25 Conservation Commission Minutes Mts of 7 25 90 NACC Mtg
• Present Paul Tariot Chair Alison Brewster Vice-chair
Don Stanley Richard Doucette Admin
Carl Schoene
JERAD PLACE II (#242-461)
PARTIAL BOND RELEASE
Robert Janusz the owner attended the meeting A letter of July
23 1990 was read regarding removal of Lot 14 from #242-461 (a
typo) and remote Sugarcane Lane from this request (It will be
built later) A Modification was requested to reword Condition
#51
Plans and letter from Tom Neve (7/25/90 were reviewed
Questions regarding changes in flood storage and wetlands
filling A Brewster motion to grant a Partial bond release of
$20 000 a balance of $10 000 remains C Schoene seconded
motion granted
LOTS 3 & 8 IRONWOOD ROAD (ORCHARD PATH) (#242-324)
DETERMINATIONS
Work is more -han two-hundred feet from the from the resource
area C Schoene motioned to grant a Negative Determination and
close the public hearing on Lots 3 & 8 Ironwood Road D Stanley
seconded motion carried Joe Cushing presented a number of
• plans concerning the subdivision A discussion was held
concerning the overlapping Orders on Orchard Path The NACC
reviewed the as builts and various lots
LOTS 25 & 28 GREAT POND ROAD (#242-532 & 533)
CONTINUED PUBL=C HEARING
Joe Cushing represented the owner Fred Horne attended the
meeting This involves two houses with some grading within 100
feet of a wetland There was a question as to the date of the
plan the revision date being June 20 1990 C Schoene motioned
to close the public hearing and issue an Order of Conditions
within twenty-one days A Brewster seconded motion carried
LOT 1 DALE STREET 242-451
DISCUSSION
Joe Cushing amended meeting A question was asked does the
sewer pump station location and grading conform to the Notice of
Intent') Detention Pond/Drainage Line An As-Built has been done
for the detention basin There has been no certification as to
whether this basin was constructed as approved and whether it
functions as approved
BOAT RAMP
The Commissior was given an update on the status of the Boat
Ramp following the Army Corps letter to the NACC
WATERSHED COMMITTEE
r"
The Town Manager will be appointing representatives of all
appropriate town boards and departments to sit on a standing
committee to address watershed protection issues
ITEMS BEFORE OTHER TOWN BOARDS
A watershed variance has been requested for a lot on Great Pond
Road This will be before the ZBA in August
AIRPORT (#242-491)
CERTIFICATE OF COMPLIANCE
A site visit will be made The applicant has requested a
Certificate of Compliance
HAROLD PARKER STATE FOREST
A forest cutting plan has been submitted The Administrator will
review and comment if necessary
LOT 7 NORTH CROSS (#242-488)
A site visit will take place
The applicant has requested a Certificate of Compliance for this
pro3 ect
LOT E BERRY STREET
DECISION
A letter from Christiansen Engineering needs to be redrafted to
ask for a reopening of public hearing
LOT A FOSTER STREET (#242-531)
DECISION
Foundation drains require moving the house back (away from the
septic system) Speak with Debbie and Robert Nicetta
A Brewster motioned to accept the following minutes March 3
1990 (Saturdal) and July 11 1990 (Wednesday) D Stanley
seconded, motion carried
Meeting ad3ourned at 11 00 P M
Paul L Tariot