HomeMy WebLinkAbout71 Peach Tree Lane - NACC #342 Small Project Approval - Permits #NACC #342 - 71 PEACH TREE LANE 2/26/2025 CONSERVATION DEPARTMENT
Community & Economic Development Division
Pat Byrne.
Deck-It March 3, 2025
1092 Main Street
Bolton,MA 01740
71 Peach. Tree Laney North Andover
Small Project Permit
In-Kind Deck Replacement
Conservation Conditions of Approval,NACC #342
Pursuant to section 4.4.2 (B) of the North Andover Wetlands Protection Regulations,Pat Byrne of
Deck-It, applicant, filed on behalf of the owners L71lal and Indira Kini, for a Small Project Permit for
work proposed at 71 Peach Tree Lane, North Andover. Work involves in-kind deck replacement at
12'x14'with the installation of new helical pile footings within 100-Foot Buffer Zone to Bordering
Vegetated Wetland (BVW). The deck is and will remain approximately 55 feet from the BVW, thus
outside the 50-Foot No Build Zone.
During the Februarys 26, 2025 public mceting, the North.Andover Conservation Commission voted.
unanimously to approve this as a Shull Pro`ect Catogoiryi "13"art-kilid irplacelmnl of Iary idly ex slitig clerks,
iUai-dless of side. The project is approved only as it relates to the Conservation Commission and any
and (if applicable) all other approvals should be obtained by the applicant/homeowner. The
applicant is responsible for determining property boundaries. All work shall conform to the
following:
RECORD DOCUMENTS: Small Project Filing Including:
Application Checklist& Project Narrative,
Measurements to wetland,
Plan View of deck with details and dimensions
The following conditions are hereby Ynandated:
CONDITIONS:
1. Prior to the start of construction the applicant shall ensure that the site contractor has reviewed
the small project pernvt and is aware of the wetland resource area and the linvts of the proposed
work.
Deck It/Pat Byrne
Small Project Approval at 71 Peach Tree Lane,NACC#342
1larch 3,2025
Page 1 of 2
2. Prior to construction, erosion controls in the form of 8" straw wattle to be installed and staked
at the limit of the 50' No Build Zone.
3.
4. A pre-construction site inspection shall be scheduled with the Conservation Department and the
contractor to review erosion control installation and project scope,
5. A post construction site inspection shall be scheduled with the Conservation Department to
verify compliance and approve removal of erosion control.
6. This Dermit shall expire one year from the date of issuance.
re advised that NO other work on the propeM
is allowed under this permit. The NACC has jurisdiction all of the wetlands and associated 100-Foot
Duffer zones and 200 Riverfront Area to the Shawsheen River on site and any work that involves V,round
disturbance or changing the current conditions in these areas will require l?cri-nitting with the NACC.This
includes,but are not litnited to,liouseadditiom,pools,patios, decks, sheds, feqce&-arden beds,landscal)iri g
and I)ridg)4e installation tree or vegetation cutting/pinning.These activities shall be held to the current
standards under the Bylaw and NVPA.**,
Should you have any questions, or need additional information please do not hesitate to
contact the Conservation Department through ernailing atnaNtIe @n9.r.t1ban,,doYer1n-a.,gQv or
glaiiggyiii C(e,— ad!QYcxm&g9 nottim v or by phone at (978)-688-9530.
Respectfully,
NORTH ANDOVER CONSERVATION DEPARTMENT
Alexyss Langevin
Conservation Field Inspector & Planner
Deck It/Pat Byrne
Small Project Approval at 71 Peacli'rrce Lane,NACC #342
ANIarch 3,2025
Page 2 of 2