Loading...
HomeMy WebLinkAbout314 Salem Street - NACC #343 Small Project Approval - Permits #NACC #343 - 314 SALEM STREET 2/26/2025 CONSERVATION DEPARTMENT Community & Economic Development Division IXIarch 3, 2025 Jonathan Saurman—Saurman Construction 6 Scenic View Drive Pelham,NH 03076 314 Salem Street;North Andover Construction of Front Farmers Porch Conservation Conditions; of Approval,NACC#343 Pursuant to section 4.4.2 of the North Andover Wetlands Protection Regulations,Jonathan Saurman of Saurman Construction,applicant, filed on behalf of the owner David Pickles,for.a.Small Project Permit application for work proposed at 314 Salem Street,North Andover.Work involves construction of a front farmers porch at 6'x 30' (180 s.f.)tivithin 100-hoot Buffer Zone to Bordering Vegetated Wetland (BV\X'o.All work will be accomplished manually and materials stored in the driveway. The new porch will be located 90 feet from the BVW at its closest point. During the February 26,2025 public weeting,,the North Andover Conservation Commission (NACC) voted unanimousl to a 7ptove this as a Small Project Cate ofmirait.,yul iiaip6ct,cis determined by the North 1lndoi)er C"onsewration Cmywission.The project is approved only as it relates to the Conservation Commission and an at nci Cif applicable) all other approvals should be obtained by the applicant horneowner.The applicant is responsible for determininga�to�e�rty_boundaries.All work shall conform to the following: RECORD DOCUMENTS: Small.Project Filing Including: o Application Checklist&Project Narrative, • Plan of Land in North Andover,MA prepared by PFS Lan.cl. '..... Surveying Inc. dated September 16,2024 The following conditions are hereby mandated: CONDITIONS: 1. Prior to the start of construction the applicant shall ensure that the site contractor has reviewed the small project permit and is aware of the wetland resource area and the limits of the proposed work. 2. Prior to construction, erosion controls in the form of 8" silt sock (mulch filled not straw) to be installed and staked between the work and wetland as determined in the field by Conservation Department staff. At least 50 feet of sock shall be installed to fully envelope the work site. 3. 4. A pre-construction site inspection shall be scheduled with the Conservation Department and the contractor to review erosion control installation and project scope. 5. A post construction site inspection shall be scheduled with the Conservation Department to verify compliance and approve removal of erosion control. 6. This pertnit shall expire one year from the date of issuance. Jonathan Saurman—Saurrtnan Construction Small Projcct Approval at 314 Salem Street,NACC#343 March 3,2025 Page 1 of 2 **The applicant,homeowner and their contractors are advised that NO other work on the mopegy is allowed under this perinit. The NACC has jj1dadiction overall of the wetlands and associated 100-Foot buffer zones and 200 Riverftont Area to the Stiawslicen River on site and any work that involves ground disturbance or changing the current condittotxs in these areas will require permitting with the NA(;C;.This includes, but are �fcnccs and bridge installation, tree or vegetatio 'retit statidards under the ByA-aw-atid WPA.** Should you have any questions, or need additional information please do not hesitate to contact the Conservation Department through emailing gin_axq er 'IQ tha na x ndQyc�tt -tgoy or Aqlgqggvi1 t�)northandovermAgpy or by phone at (978)-688-9530. Respectfully, NORTH ANDOVER CONSERVATION DEPARTMENT ................. Alexyss Langevin Conservation Field Inspector & Planner Jonathan Sawman-Saurman Construction Small Project ApInovalat 314 Salem Street,NACC #343 March 3,2025 Page 2 of 2