Loading...
HomeMy WebLinkAbout1992 Department Review NAFD 3 NORTH ANDOVER FIRE DEPARTMENT CENTRAL FIRE HEADQUARTERS �;ae.:fFa 124 fain Street North Andover, Mass, 01845 Chief or Dpp�f�f�eRr �it�i;. '( 6 ) 666" 1 To: Chris Huntress, Town Planner From: Fare Chief Dolan RE: The Greenery - Parking Lot Date: August 27 , 1992 The fire department supports the proposed construction of the parking lot as shown in the plan submitted by Kaminski. & Assoc. This parking area will alleviate the traffic congestion on Park Street, which at times, has impeded fire department access. This change is needed. The discussion at the TRC concerning the upgrade of the fire water main connection from the existing six (6) inch water main into the building to the twelve (12) inch main would improve fire suppression capabilities. If that change is made the fire department recommends that a Vnew fire hydrant, also off that twelve (12) inch main, be installed at the service entrance to the Greenery. A specific location would be given at the time of installation. If the existing Ramsden residence is to be moved or razed please notify this office for the necessary permits required. The department does not desire to utilize this residence for any type of training. William V. Dolan Fire Chief cc, Lt. Ken Long The Greenery ''SMOKE DETECTORS SAVE. LVES"