HomeMy WebLinkAbout1992 Department Review NAFD 3
NORTH ANDOVER FIRE DEPARTMENT
CENTRAL FIRE HEADQUARTERS
�;ae.:fFa 124 fain Street
North Andover, Mass, 01845
Chief or Dpp�f�f�eRr �it�i;. '( 6 ) 666" 1
To: Chris Huntress, Town Planner
From: Fare Chief Dolan
RE: The Greenery - Parking Lot
Date: August 27 , 1992
The fire department supports the proposed construction of the
parking lot as shown in the plan submitted by Kaminski. & Assoc.
This parking area will alleviate the traffic congestion on Park
Street, which at times, has impeded fire department access. This
change is needed.
The discussion at the TRC concerning the upgrade of the fire
water main connection from the existing six (6) inch water main
into the building to the twelve (12) inch main would improve fire
suppression capabilities.
If that change is made the fire department recommends that a
Vnew fire hydrant, also off that twelve (12) inch main, be
installed at the service entrance to the Greenery. A specific
location would be given at the time of installation.
If the existing Ramsden residence is to be moved or razed
please notify this office for the necessary permits required.
The department does not desire to utilize this residence for any
type of training.
William V. Dolan
Fire Chief
cc, Lt. Ken Long
The Greenery
''SMOKE DETECTORS SAVE. LVES"