HomeMy WebLinkAbout1985-04-05 Application for Approval of Definitive Plan DEF SUB APPLICATION FOR APPROVAL OF DEWINITIVE PLAN
December 28 f 19 84
To the Planning Board of the Town of *orth Andover:
The undersigned, being the applicant as- defined under Chapter 41, Section
81—L, for approval, of a proposed anbdivision shown on. a plw,. entitled • a
Florence Estates
by r• Merrimack -Engineering Services dated , November. 1984
-- rY�I��Yl1.l�llll111.1 Y�
being Land bounded as follows: North by Rea Street and Averka East b
Crowe and Arsenault , South by Mandry•and West by Mandry
hereby submits said plan as 4 DEFINITIVE plan in accordance with the Rules and
Regulations of the North AndaYer P1amini'Board• and makes application to the
Board for approval of said plan.
....•.s::`<.1°p it t{M{ +;.Sr✓.ell:{:l+liV!+yY.i;: .:4.:r+*drhA�i•J:v,7.'Gr'r.NtY'!h�JPk�'YrwV'Hi-:r✓l c•11...r`!:{ �,Qyrr y.aL+i-I. '!i f:*...r F,"•' .. 'a
Title References North Essex Deeds, Book , 946 Page 888 or
erti_t :,_icateof,rsvlww Title No. Re*; • ion Book page ; or..aw.z..,.„
?W�',t#ft1h�M4VWNN.P'.SMtr.Mfv, r: ay, i+c:r..r'r'rla Ir trahpµ' {�I'a*�!�!�i'vH.:::'�!��:�,..�,� .�!7ST+r•,t'�
Said plan has(x) has not( ) evolved from a preliminary plan submitted to
the Board of Planning 19 84 and approved (with modifications) (x)
.I�_
disapproved ( oa Octoter , 19 84
The undersigned hereby applies for the approval of said DEFINITIVE plan
by the Board, and in furtherance thereof hereby agrees to abide by the Board's
Rules and Regulations. The undersigned hereby further covenants and agrees
with the Town of North Andover, upon approval of said DEFINITIVE plan by the
Board:
1. To install utilities in accordance with the rules and regulations of the
Planning Board, the Public Works Department, the Highway Surveyor, the
Board of Health, and all general as well as zoning by—laws of said Town,
as are applicable to the installation of utilities within the limits of
ways and streets;
2. To complete and construct the streets or ways and other improvements shorn
thereon in accordance with Sections Iv and V of the Rules and Regulations
of the Planning Board and the approved DEFINITIVE plan, profiles and cross
sections of the same. Said plan, profiles, cross sections and construction
specifications are specifically, by reference, incorporated herein and made
a part of this application. This application and the covenants and agree—
ments herein shall be binding upon all heirs, executors, administrators,
successors, grantees of the whole or part of said land, and assigns of the
undersigned; and
3. To complete the aforesaid installations and construction within two (2)
years from the date hereof.
Received by Town Clerk:
Dates S gnature of A plicant
P.O. Box 177
Time:
Pinehurst , MA
Signature: Address
Notice to APPLICANT/TOWN CLMK and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled:
By$ dated • 19
e * eeee
The North Andover Planning Board has voted to APPROVE said plan, subject to the
following conditions
1. That the record owners of the subject land forthwith execute and record
a "covenant running with the land", or otherwise provide security for the con-
struction of ways and the installation of municipal services within said sub-
division, all as provided by G.L. c. 41, S. 81-U.
2. That all such construction and installations shall in all respects
conform to the governing rules and regulations of this Board.
3. That, as required by the North Andover Board of Health in its report to
this Board: no building or other structure shall be built or placed upon Lots
=`t ed ehoim on 'said Plan `wi bout 'the .pr`ior
consent of said Board of Health.
}rb�IT'.]M'W'M.:h' pMCi..y(xrAN..^-yK naR.,,;�,r .._ae.._ti., N, .. ., i l�' •q'..T:.i'►.fh.l'. :'/"iiC-.r.'N.-.•♦ "..r.. "-`••1-. >r•..-.. .bt*r..,. .r,._s ,• r!•�. x., %.k"i:.
4. Other conditions: F
In the event that no appeal shall have been taken from said approval within
twenty days from this date, the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
The North Andover Planning Board has DISAPPROVED said plan, for the following
reasons:
NORTH ANDOVER PLANNIM BOARD
Date: By:
ABUTTERS LIST
FOR
F'LORENCE ESTATES
Town Map Town Lot
Veronica Mandry
21.9 Summer Street
North Andover, MA 38 38
Joseph J. & Faye L. Averka
383 Abbott Street
North Andover, MA 38 37
Frank E. & Barbara R. Fay
1.63 Summer Street
North Andover, MA 38 54
Nellie Arsenault
171. Summer Street
North Andover, MA 38 39
Allen A. & Dorothy M. Lowell
1.33 Summer Street
North Andover, MA 38 40
Adrian F. & Linda J. Crowe
495 Rea Street
North Andover, MA 38 93
Ernest & Antonietta Romano
64 Greene Street
North Andover, MA 38 62
MERRIMACK ENGINEERING SERVICES, INC. • 66 PARK STREET • ANDOVER, MASSACHUSETTS 01810
ABUTTERS LIST
FOR
FLORENCE ESTATES
Town Map Town Lot
Veronica Mandry
219 Summer Street 38
North Andover, MA 38
Joseph J. & Faye L. Averka
383 Abbott Street 37
North Andover, MA 38
Frank E. & Barbara R. Fay
163 Summer Street
North Andover, MA 38 5�+
Nellie Arsenault
171 Summer Street
North Andover, MA 38 39
Allen A. & Dorothy M. Lowell
133 Summer Street 4o
North Andover, MA 38
Adrian F. & Linda J. Crowe
495 Rea Street e
North Andover, NIA 38 93
Ernest & Antonietta Romano
64 Greene Street
North Andover, MA 38 ��
MFRRIMA( h FNC;INFERIN(� SERVK t", INC • 66 PARK SIRW • ANOOVEk MASSAk.HUSEl iti 0 810
ENVIRONMENTAL IMPACT STATEMENT
FOR
FLORENCE ESTATES
IN
NORTH ANDOVER, MA
DECEMBER, 1984
MERRIMACK ENGINEERING SERVICES, INC. • 66 PARK STREET • ANDOVER, MASSACHUSETTS 01810
PHYSICAL ENVINONMENT
The existing site is wooded with gently rolling knolls which slope from.
Summer Street to Mosquito Brook. Ground cover consists of heavy vegetated
growth with scattered brush throughout the site. The site has no defined
trails or paths, nor does it serve as a link between open spaces.
The project consists of a 770 + foot roadway and the construction of 5 lots
which would serve single family dwellings . This land use is conducive
to this area of North Andover ;o it would blend into the existing
surroundings. The project will also contribute to upgrading Rea Street
to bring it up to existing Town Standards .
SURFACE WATER AND SOILS
The project has no standinfy water (.in site , but is adjacent to Mosquito Eroor_,
The northern tip of our site meets with the brook at Rea Street.
No wetland was observed on our rite , howevE:•r, adjacent to our site Mosquito
Brook has a large wetland surrounding it upstream of Rea Street , but it
was not found to encroach our site. A Notice of Intent will be filed for
the site to address all erosion and sedimentation control. measures.
During analysis, the Flood Insurance Rate Hap (VIRIi) for the Town of North
Andover indicated that part of the 100 year flood plain was on our site.
Subsequent calculations revealed that the 100 year storm did cause flooding
up to Elevation 166, which doe,. encroach our site on the Westerly side. 7hi2
flood line is shown on sheet 2 of ' of "Subdivision Plan of Land of Florence
Estates"in North Andover, KA, drawn for EC.) Inc. , dated November, 198h .
Existing site drainage consist,; of an east to west over land flow f.com Summer
Street to Mosquito Brook. The :,uhseliuent roadway and lot grading w'i..11 try to
retain as much of this natural drainage pattern as possible. Two sets of
catch basins will be provided, one set will be at the intersection of the
proposed South Cross Road and Rea Street . 'Phis will channel the surface
runoff through subsurface drain Lines to the urstream end of Mosquito
Brook where it would flow naturally.
The second set of catch basins will collect the upper portion of the nroposed
cul-de-sac and channel it through ,treet drain lines between lot '� and ?.
Rip-rap will be provided at the outfall of the system so as to control
erosion.
Also, site grading will be done .so as to be conducive to the natural flow of
storm drainage runoff, and all grading will be loamed and seeded after
construction.
Any increase, due to road and douse construction , could be handled by the
wetland area adjacent to Mosquito Brook which has a surface area of 80+
acres. See enclosed "Pre-and Post-Development Drainage Analysis" for design
Sewage will be handled by on lot subsurface disposal systems if underground pro. o-.:-
sewer lines are not approved by the Town at the time of scheduled construction
of these houses.
MERRIMACX ENGINEERING SERVICE`, IN( • 66 PAR,, STREET 0 ANDOVER MASSACHUSWS 01810
At this time, various developers of land in the Salem Street area art,
working on preliminary plans for a comprehensive sewer system that would
service parts of Salem Street , Abbott Street , Rea Street , and Bradford
Street. When plans are worked out between all of the concerned parties ,
Florence Estates will be booked up to public sewer. flans are beinp, lookeFi
at for a common pumping station near Mosquito Brook, in the vicinity of
the proposed Francis Estates.
As of now, subsurface disposal systems are proposed. All subsurface
disposal systems will be 41 above the seasonal high water table , therefore
causing no adverse effect on subsurface coater.
All Local and State Regulations will be adhered to during construction of the
disposal systems..
T014N SERVICES
The proposed site will generate 2 cars/lot for a total of 1(-j cars . ;:aci
car will generate about 8 trips/car/day maximum, therefore , resulting in
80 trips per day, which would be serviced by the upgraded flea Street .
Cars could egress onto either Summer Street or the proposed road for
Francis Estates which would provide acces', to Abbott Street.
Offstreet parking will be provided at eaci, i rl the form
. of a driveway.
Overall circulation will be improved becau:>e of the upgrading of ilea
Street, and police and fire protection will be improved.
Approximately 1,500 feet of road will be uti l.t , and subserluentl;r ,
maintained by the DPW.
Also, water service will be extended down t'rom Summer Street to service
the 5 house lots.
The project will add approximately 10-15 ri,ildren to the educational system.
GENERAL IMPACT
This project is conducive to its surroundiLng:, being that this area of Towll
is single family residences throughout , and it would bring more aesthetici^m
to the area,
MERRIMACX ENGINEERING SERYKA , 3M • 66 PARK `-IREET • ANDOVER MASSAi Hu5UI1 61810
FLORENCE ESTATES
TEST PIT INFORMATION
CONDUCTED BY TOM MURPHY
Test Pit #i1A 0" - 36" top & subsoil
36" -- 120" clay/till
water observed @ 3'-6'T
Test Pit 1B 0" - 36" top & subsoil
3611 - 120" clay/till
water observed @ 3'-6"
Test Pit 2A 0" - 18" top & subsoil
18" - 8411 sand/gravel
water observed @ 5'-6"
Test Pit 2B 0" - 18" top & subsoil
18" - 84" sand/gravel
water observed @ V-6"
Test Pit 3A 0" - 18" top & subsoil
1811 - 66" gravel
66" - 120" fine sand
water observed @ 41-6"
Test Pit 3B 0" - 18" top & subsoil
18" - 66" gravel
66" - 120" fine sand
water observed @ 5'-611