Loading...
HomeMy WebLinkAbout2015-03-17 Decision - Watershed Special Permit DEF SUB 1 t a waer" r.e: Town of North Andover ��"D Z�15 MAR�� pM Ids Office of the Planning Department p " Community Development and Services Division DfIN OF !A . , a ?�Gt70 Osgood Street DRYER M ItCUS�T�S North Andover,Massachusetts 01845 NOTICE OF DECISION-Watershed Special Permits Is to eaft that twenty(20)days thave elapsed Isom date of doah*M,OM Any appeal shall he filed vrtdtoutoE within(20)days after the T ' a date of filing this notice in the office of the Town Clerk. Date: March 17,2015 Public Hearings: March 3,2015;March 17, 20I5. Date of Decision:March 17,2015 Petition of; Marc E Rudick 1046 Great Pond Road D0a! 1 x 4 r r 83 04s--.28.-20 16 2 a 04 North Andover,MA 01845 EsseK Napth Land Court Resistrs Premises Affected: 1046 Great Pond Road Assessors Map 103 Lot 27 North Andover,MA 01845 The above petition for a Watershed Special Permit is in accordance to the requirements of the North Andover Zoning Bylaw,Sections 4.136 and 10.31 and MGL C40A,Sec 9. This petition is to allow construction of a new stormwater management system designed to capture and treat stormwater originating from Great Pond Road.The stormwater work is within the Non-Disturbance Zone and Nan-Discharge Zone of the Watershed Protection District.The application was submitted by applicant Marc B. Rudick, the owner of the property, with plans dated February 5, 2015 and an associated Construction Detail for"Rudick Place"Subdivision drawing SK 1 dated February 26,2015. After a public hearing givers on the above dates,and upon a motion by L.Rudnickl, seconded by L. McSherry, the Planning Board APPROVES the Watershed Special permit, as amended and with conditions.A vote of 5.0 was made in favor/apposition of the application, b4ol LAND COURT, BOSTON, The land PlanninkBoard herefn tIoseN d will be shown on John Simons,Chairman our appraved4plan to t Ilow as Michael Colanteni Q ep Dave Kellogg uN 2016 LoraMrSherry Ly nne ynne Rudnloki Ptan�� Loll (EXAMINED AS DESCRIPTION*OL A'f'li' r T.C. PONTBRIAND Alm Cow *W CHIEF ENGINEER i U '1'q"Clerk 4, t 1046 Great Pond Road Rudick Place Watershed Special Permit i The Planning Board herein APPROVES the application for a Watershed Special Permit so as to allow construction of a now stormwater management system designed to capture and treat stormwater originating from Great Pond Road.The stormwater work is within the Non- Disturrbance Zone and Non-Discharge Zone of the Watershed Protection District.The application was filed with the planning Board on February 5,2015,The public hearing on the above referenced application was opened on March 3,2015 and immediately continued to March 17,2015 without testimony taken,and closed on March 17,2015.The site is located at 1046 Great fond Road,Map 103, Lot 27 in the Residential 1 (R-1)Zoning District. This Special Permit was requested by Marc B.Rudick, 1046 Great Pond Road,North Andover,MA 01845. The application was filed with the Planning Board on February 5,2015. The applicant submitted a complete application,which was noticed which was noticed and reviewed in accordance with Sections 4.136 and 10,31 of the Town of North Andover Zoning f Bylaw and MGL C.40A,Sec.9. In accordance with 4.136 the Planning Board makes the finding that the intent of the Bylaw,as well as its specific criteria, is met, This decision specifically stated by the Planning Board makes the following FINDINGS OF FACT: = 1) That as a result ofthe proposed construction in conjunction with other uses nearby,there will not be any significant degradation of the quality or quantity of water in or entering Lake Cochichewick. 2) There is no reasonable alternative location outside the General, Non-Disturbance, and the Non- Discharge Zones for any discharge,structure or activity. 3) The Applicant has responded to comments from the Planning Board and independent stormwater technical reviewer and provided revised drainage plans that address on-site stormwater management. 4) The project includes a nominal amount of construction activity, there will be no roadway construction,and there will be an improvement to the treatment of the water entering the lake, l 5) The construction has been reviewed by Town Staff and the Town's consulting engineer, Lisa Eggleston, and with the application of the erosion control measures and implementation of the drainage and stormwater management designs, the consultant concluded that there will not be significant degradation to the quality or quantity of water in or entering Lake Cochichewick,The site drainage system and stormwater management design are designed in accordance with the Town Bylaw requirements and Best Engineering and Management Practices. The plan has been reviewed and approved by the outside consulting engineer, Lisa Eggleston, as evidenced by an email dated March 17,201S. 6) )A addition, in accordance with Section 10,31 of the North Andover Zoning Bylaw, the ,Planning Board makes the following ADDITIONAL FINDINGS OF FACT-. a. The specific site is an appropriate location for the,proposed use as all feasible storm water and erosion controls have been placed on the site; Y b. The use will not adversely affect the neighborhood as the lot is located in a Residential 1 i{ Zoning District; i c. There will be no nuisance or serious hazard to vehicles or pedestrians; l 2 .f 1 � ` 1046 Great Pond Road Radick Place Watershed Special Permit d, Adequate and appropriate facilities are provided for the proper operation of the proposed use, e, The Planning Board also makes a specific finding that the use is in harmony with the general purpose and intent of the North.Andover Zoning Bylaw, 7) The project design has been reviewed and approved by the Division of Public Works. See Interoffice Memorandum prepared by Gene Willis dated February 26,2015. i t 8) The topography of the site will not be altered substantially, t 9) As conditioned,the site is an appropriate location for the project use and proposed structures. 10)The Planning Board also makes a specific finding that the use is in harmony with the general purpose and intent of the North Andover Zoning Bylaw and will not adversely affect the neighborhood given that the Project proposes the elimination of one house which reduces density on the Locus, and the stormwater facilities to be constructed on the Locus as a part of the Project will improve water quality within the Lake Watershed. Finally, the Planning Board finds that this project generally complies with the Town of North Andover Zoning Bylaw requirements as listed in Section 4.136, but requires conditions in order to be fuW in compliance. The Planning Board hereby grants an approval to the Applicant provided the following conditions are met; Upon reaching the above findings, the Planning Board approves this Special Permit based upon the following SPBCIAL CONDITIONS: 1) Permit Definitions: a) The "Locus" refers to the approximately 6.3-acre parcel of land fronting Great Pond Road at 1046 Great Pond Road as shown on Assessor's Map 103,Lot 27 as shown on the Plans. i b) The"Plans"refer to the plans named"Special Permit Plan for Rudick Place in North Andover, MA -M Proposed Drainage Modification Plan," dated March 12, 2015 i (revised to March 14,2015),Sheets 14,prepared by Christianson&Sergi Inc„ i c) The "Project" refers to allow construction of a now stormwater management system designed to capture and treat stormwater originating from Great Pond Road. The stormwater work is within the Non-Disturbance Zone and Non-Discharge Zone of the Watershed Protection District. d) The "Applicant" refers to Marc Rudick, the applicant for the Definitive Subdivision } Plan. i e) The"Project Owner"refers to the person or entity holding the fee interest to the title to the Locus,which can include but is not limited to the Applicant,developer,and/or owner, 3 � I 1 1 f I 1046 Great Pond Road Rudick Place Watershed Special Permit 2) Fertilizers utilized for landscaping and lawn care shall be slow release, low-nitrogen types (< 5%). Pesticides and herbicides shall not be used within 100 feet of a wetland resource Area.The use of coal tar-based pavement sealants Is prohibited. These restrictions will be noted in a recordable deed restriction or covenant covering the entire Locus 3) The Town Planner shall approve any changes made to these plans not deemed substantial. Any changes deemed substantial by the Town Planner would require a Public Hearing and modification to the Special Permit by the Planning Hoard. Any change that relocates,eliminates,reduces size or capacity of or adds any catch basin,drainage pipe or bioinfiltration area,or any other changes to :+ the drainage system (as shown on the Plans)shall be deemed to be substantial. This Watershed Special Permit may only be used In conjunction with the Definitive Subdivision Plan for these same premises approved March 17,2015. 4) In consultation with the Town Planner,the Applicant shall designate an independent construction i monitor as stated. in Condition 13 of the Definitive Subdivision Plan Decision dated March 17, 2015, 5) The area depicted as an area of vegetation removal on Lots 36 and 37, which had been recently cleared, shall be promptly re-vegetated and the soils stabilized. Vegetation shall be comprised of native species to minimize the need for watering and fertilizer application,and any fertilizer used in the re-establishment of vegetation shall be slow-release and low in phosphorus. 6) Prior to issuance of site work or a building permit: a. A performance guarantee bond of five thousand dollars($5,000.00)made out to the Town of North Andover must be posted to insure that the construction,erosion control,measures,and performance of any other condition contained herein will take place in accordance with the plans and the conditions of this deolsion and to ensure that the as-built plans will be submitted. b. The applicant shall ant a non-exclusive 25'-wide easement to the Town of North Pp !� Andover which provides the Town with the right, but not the obligation, to maintain, repair, replace, and access to and egress from, the existing catch basin on the westerly y side of Great Pond Road at#1046,the existing drain pipe leaving said catch basin, and the existing manhole structure said pipe flows to(said manhole Is currently located in the front yard of#1046 Great Pond Road and shown as DMH#1 on the Plans). c. Three (3) copies of the signed, recorded plans and Decision :rust be delivered to the s Planning Department. d. All erosion control measures as shown on the plan must be to place and reviewed by the Town Planner.Weekly inspections of all erosion control measures will be completed by the designated independent Environmental Monitor and incorporated into the weekly reports as part of Special Condition(13)of the approved March 17,2015 Definitive Subdivision Plan, 7) Prior to release of the Performance Bond; 'E i 4 i E I ' ' I i s 1046 Great Pond Road:Rudick Place Watershed Special Permit a. The applicant shall submit an as-built plan stamped by a Registered Professional Engineer in Massachusetts that shows all construction, including storm water mitigation structures and other pertinent site features. This as-built plan shall be submitted to the Town Planner for approval. The applicant trust submit a certification from the design engineer that the site � was constructed as shown on the approved plan. b. The Planning Board must by a majority vote make a finding that the site is in conformance with the approved plan. S) Prior to the Issuance of a Certificate of Compliance The applicant shall incorporate the following conditions as a deed restriction covering the entire Locus and a copy of the recorded deed restriction shall be submitted to the Town Planner and included in the file. i. Fertilizers arc limited to those which are either organic or slow�release nitrogen and phosphorous-free. ii. The use of coal w-based pavement sealants is prohibited. Ill. Conditions 7 and 8 of the Notice of Decision Definitive Subdivision Plan Rudick Place shall be deemed to be for the benefit of and enforceable by the Town of North Andover 9) General Conditions a. In no instance shall the applicant's proposed construction be allowed to further impact the site other than as proposed on the plans referenced in Special Condition 491 b. The applicant must comply with the conditions set forth in the Definitive Subdivision Plan Decision approved on March 17,2015. c, No open burning shall be done except as is permitted during burning season under the Fire Department regulations. d. The Contractor shall contact Dig Safe at least 72 hours prior to commencing excavation. o. The provisions of this conditional approval shall apply to and be binding upon the applicant, its employees and all successors and assigns In interest or control. f. Should the project Owner transfer ownership of the entire Locus prior to completion and submission of the final as-bunts,the buyer shall meet with the Planning Board to provide an update on the status of the project. g. This Special Permit approval shall be deemed to have lapsed March 17, 2017 (two years from the date of issuance)exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commenced within said two-year i period. Substantial use or construction will be determined by a mgjority vote of the planning Hoard. 3 h. no applicant is hereby notified that should the applicant disagree with this decision, the j applicant has the right under MGL Chapter 40A Section 17, to appeal this decision within twenty days after the date this decision has been filed with the Town Clerk. � S i . i ' 1046 Great Pond Read Rudick Place Watershed Special permit L This decision must be filed with the North Essex Registry District of the band Court.The following Information is included as part of this decision: i Plans Titled: Special Permit flan for"Rudick Place" North Andover,MA 01845 Prepared for: Mare E.Rudick 1046 Great Pond Road North.Andover,MA 01845 � i Prepares!by: Christiansen&Sergi Inc. 160 Summer Street Haverhill,MA 01830 Seale: 1"=40' Date. March 12,2015,Revised March 14,2015 t Shoots: 14 E Co., Director of Public Works Conservation Administrator Applicant Engineer s File , i . 6 t c r i R E i i ACCEPTANCE BY TOWN OF NORTH ANDOVER BOARD OF SELECTMEN The Town of North Andover, Massachuse acting by and through its Board of Selectmen,accepts the foregoing conveyance to sai wn. i aey .Watson, Chair eColog os ' e onald Stewart Richard Vaillancourt COMMONWEALTH OF MASSACHUSETTS ESSEX, SS On this D day of y,2016, before me, the undersigned notary public, personally appeared Tracy M. Watson, Phil DeCologero, Rosemary Smedile, Donald Stewart and Richard Vaillancourt, each proved to me through satisfactory evidence of identification,which was a Massachusetts Driver's License, to be the person whose name is signed on the preceding or attached document, and acknowledged to me that she/he each signed it voluntarily for its stated purpose, acting in her/his capacity as a Selectman for the Town of North Andover. Notary ubIi My Commissio(/x xres: LAURIE A. 8 RZI.AF Notary Public caMMaNwFauMTHiE+of w►seaarrs My Commission Expires October 2. 2020 J00092127,2) t 4 now Lu 0 9 sk ` fill �� I J J 1 Krr;9 �3f1�3' is s,r1 � r.r •�w�Y �[ ���rf •�� rfff • � r } '� s� .� ` -'-_W__ _S•�ti`_�=s=�:#'�{ Ins ry'` ~ r ; ANN fig wffim \\\\\`\`\�\�\ \ \�\ \\�\\\\\ r a GMTR �Iffi1l3Q � D*flo . 1 �E7tlsf Lilht AEL=IMIS ' Iw.e-x 172A4 INV.E3- 17Q82 INV EL i71 i8 .f3.._ 'l IL Y3DFE 44 do mm a lasm WA STOP FC70J AND WAS NV. r lM ,�r,A. p INV.EL tBi 39 1Z WRINMI NETOA 38PiH 1 FT ST0Nr=Th8EWRWFMlr4 LE EL-1 UV 77 too Q DA1 iJ�f EJLY m Fo si n .Jb6 0000 r ,o 4 3i0U PROFILE scut _ TPL4v 4 PROPOSED RUDIC1iPf.ACE' DRAINAGE ,ua MODIFICATION PRORLE CSCf"s D s 'A"a __ .... i { � IIIUhIIIIlddlldrllf_ �� ', 04 Jill d � --. mill s DOC. �rc�yC�{pC�.fL�.4ti1� GW3 i r Town of North Andover • Off ice of the Planning Department ''''' Community Development Division 120 Main North Andover, Street , Massachusetts 01845 WATERSHED SPECIAL PERMIT—EXTENSI6N Date of Decision: December 6, 2016 Petition of: Marc E. Rudick 1046 Great Pond Road North Andover,MA 01845 Premises Affected: 1046 Great Pond Road,North Andover,MA 01845 Assessor's Map 103,Parcel 27 PROJECT HISTORY On March 17,2015 the Planning Board approved a Watershed Special Permit to allow construction of a new stormwater management system designed to capture and treat stormwaler originating from Great Pond Road, The Stormwater work is within the Non-Disturbance and Non-Discharge Zone of the Watershed Protection District. A Special Condition on the Decision, 9(g) states, "This Special Permit approval shall be deemed to have lapsed March 17,2017(two years fionn the date of issuance) exclusive of the time required to pursue or await determination of any appeals, unless substantial use or construction has commence within said two- year period. Substantial use or construction will be determined by a majority vote of the Planning Board." Under Section 10.31.3 of the North Andover Zoning Bylaw the Special Permit Granting Authority, at its discretion,may extend the Special Permit for an additional one (1)year period. FINDINGS On December 6, 2016 the Applicant requested an extension of the Special Permit due to contractor issues, financial constraints and the upcoEning winter season. DECISION After discussion at the December 6, 2016 Planning Board meeting, and upon a motion by Lynne Rudnicki, seconded by David Kellogg, the Planning Board voted to approve a six(6) month extension for the Watershed Special Permit for 1046 Great Pond Road. Should the applicant need an additional six(6) month extension he must come back to the Board with another extension request. r an Enright,Pl nning Director On behalf of North Andover Planning Board John Simons Lynne Rudnicki David Kellogg Lora McSherry Peter Boynton