HomeMy WebLinkAbout1990-03-02 Decision Definitive Subdivision Extension I61ce to APPLICANP/TOWN CLERK and Certification of Action of Planning Board
,n Definitive Subdivision Plan entitled:
DEFINITIVE SUBDIVISION PLAN OF NORTH ANDOVER BUSINESS PARK EXTENSION
By; THOMAS E. NEVE ASSOCIATES, INC- (TOPS F Idbf)W DECP-MBER 1, t 19 a9
The North Andover Planning Board has voted to APPROVE said plan, subject to the
following conditions:
1. That the record owners of the subject land forthwith execute and record
a "covenant running with the land", or otherwise provide security for the con-
struction of ways and the installation of municipal services within said sub-
division, all as provided by G.L. c. 41t S. 81-U.
2. That all such construction and installations shall in all reapects
conform to the governing rules and regulations of this Board.
3. That, as required by the North Andover Board of Health in its report to
this Board, no building or other structure shall be built or placed upon Lots
No. as shown on said Plan without the prior
consent of said Board of Health. �
4. Other conditions:
SEE ATTACHED
In the event that no appeal shall have been taken from said approval within
twenty days from this date, the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
a o er 1 �APO�, s p t ore o f
re
low
NORTH ANDOVER PLANNIM BOMLD
94 .
Datet March 2 199 By: r„r, � Jr- -- Chairman
l
r
NORTH ANDOVER BUSINESS PARK EXTENSION
DEFINITIVE SUBDIVISION, CONDITIONAL APPROVAL
1. There shall be no driveways placed where stone bound
monuments and/or catch basins are to be set. It shall be the
developers responsibility to assure the proper placement of
the driveways regardless of whether individual lots are
sold. The Planning Board shall require any driveway to be
moved at the owners expense if such driveway is at a
catch basin or stone bound position. Certification by a
Registered Professional Engineer will be required prior to
the issuance of a certificate of occupancy.
2 . All drainage facilities including detention basins, shall be
constructed and erosion controlled prior to any lot release.
3 . An as--built plan and profile shall be submitted for review
and approval prior to the final release of DPW bond money.
An interim as-built, certified by the design engineer,
verifying that all utilities have been installed in
accordance with the plans and profile shall be submitted
prior to the application of the binder coat of pavement. In
addition, all required inspection and testing of water,
sewer, and drainage facilities shall be completed prior to
binder course paving. To insure compliance with this
condition, a bond in the amount of $10, 000 shall be posted
prior to the release of any lots within this subdivision.
4 . Any changes on the plans required by the North Andover
Conservation Commission may be subject to Modification under
Chapter 41 by the Planning Board.
5 . All Planning Board Order of Conditions are to be placed upon
the recorded Definitive Plan, ( Cover Sheet ) prior to
endorsement and filing with the Registry of Deeds .
b. Throughout all lands, tree cutting shall be kept to a
minimum in order to minimize erosion and preserve the
natural features of the site. Prior to construction, each
lot shall apply to the Planning Board for Site Plan Review
as required by Section 8 . 3 of the North Andover Zoning
Bylaw. The owner, or representatives thereof, may not
petition the Building Inspector for a permit to build prior
to receiving Site Plan approval from the Planning Board.
Accordingly, the developer of each individual lot, in
conjunction with a registered arborist, shall submit a
tree cutting and reforestation plan consistent with the
provisions of Section 5 . 8 of the North Andover Zoning Bylaws
( The plan is for areas of substantial cutting and filling }
to be reviewed by the Planning Staff prior to the applicant
receiving a permit to build on any lot within the
subdivision. This Plan shall explicitly include specific
trees to be retained. Also, the developer shall inform the
Town Planner when any tree cutting is to occur in order that
the Planner may determine the need to be to be present.
7 . Prior to final release of any bond being held, street trees
may be added as reasonably required by the Town Planner.
8 . The contractor shall contact Dig Safe at least 72 hours
prior to commencing any excavation.
9 . Gas, Telephone, Cable and Electric utilities shall be
installed as specified by the respective utility companies.
10 . All catch basins shall be protected with hay bales to
prevent siltation into the drain lines during road
construction.
11. No open burning shall be done except as is permitted during
burning season under the Fire Department regulations .
12 . No underground fuel storage shall be installed except as may
be required by Town Regulations.
13 . Permanent street numbers will be posted on dwellings prior
to occupancy.
14 . All buildings shall have commercial fire sprinklers
installed prior to the issuance of the Certificate of
Occupancy, per order NAFD.
15. Prior to a Certificate of Occupancy being issued for any
lot, that lot shall have received all necessary permits and
approvals from the North Andover Board of Health.
16 . All drainage and sewage facilities shall be approved by the
North Andover Division of Public Works prior to the Planning
Board endorsing the record plans.
17 . Asa part of this conditional approval the owner/applicant
has agreed to the following:
a. Bayfield Co. , and/or any subsequent owner, ( "the owner")
shall set up an entity which will manage the design and
installation of the traffic light at the intersection of
Route 114 and Mill Street.
b. The owner shall get the light designed by an engineering
firm qualified to do the work and approved by the Town.
C. An Industrial Revenue Bond, or other means of
assessment, shall be written to cover the cost of the
engineering, the installation of the lights, any
roadwork, and associated other fees for issuance of the
bond or assessment.
d. The owner shall manage the construction of the lights .
h b I
e. The owner shall contact all business users of the lights
that are directly affected and enlist them to pay their
fair share.
f. If the lights are not installed at the time of
completion of the first building in the subdivision, the
owner shall pay for a traffic officer each business day
during such time period as directed by the safety
offices of the North Andover Police Department.
g. In the event that enough funds are not collected, a
betterment action would be undertaken for Town Meeting
approval to cover the costs.
18 . Bonds, in an amount to be determined by the Planning Board,
shall be posted to ensure construction and/or completion of
sewers, roadways, site screening and other pertinent public
amenities. These bonds shall be in the form of a Tri-Party
Agreement, Pass Book or buildable lots.
19 . This subdivision shall conform to the Subdivision Rules and
Regulations of the North Andover Planning Board.
20. The provisions of this settlement shall apply to and be
binding upon the applicant, it' s employees and all
successors and assigns in interest or control .
CC: Director of Public Works
Board of Public Works
Highway Surveyor
Building Inspector
Conservation Commission
Board of Health
Assessors
Police Chief
Fire Chief
Applicant
Engineer
Tile