HomeMy WebLinkAboutPackage Steel perspective drawing (05-21-24) - Plans - 1101 TURNPIKE STREET 9/9/2024 DRAWING TABLE OF CONTENTS DRAWING RELEASE HISTORY
DRAWING DESCRIPTION DRAWING ID(S). INITIAL TOTAL N LATEST
COVER SHEET COVR-1 DRAWING TYPECS) DRAWING DRAWING REVISION
DATE SHEETS. DESCRIPTION. DATE'
ANCHOR BOLT PLAN &DETAILS ABLT—I
ANCHOR BOLT REACTIONS AND NOTES ABLT-2 ANCHOR BOLT LAYOUT, REACTIONS, AND NOTES 03/28/24 3 RELEASED FOR CONSTRUCTION 03/28/24
GENERAL NOTES ABLT-3 PRELIMINARY FRAMING AND SHEETING DRAWINGS 04/10/24 8 FOR PERMIT ONLY — NOT FOR CONSTRUCTION 04/10/24
ROOF FRAMING &SHEETING ROOF—I FINAL FRAMING AND SHEETING DRAWINGS 05/21/24 8 RELEASED FOR CONSTRUCTION 05/21/24
SIDEWALL FRAMING &SHEETING SWFS-1 THRU SWFS-3
ENDWALL FRAMING &SHEETING EWFS-1 NOTE' TOTAL IF OF DRAWING SHEETS DOES NOT INCLUDE COVER SHEET (THIS DRAWING)
FRAME X—SECTION FRXS—I
FRAMING DETAILS DTLS—I
SHEETING DETAILS DTLS-2
NATI❑NAL GRID BARN
1101 TURNPIKE STREET
NORTH AND❑VER, MA 01845
I ePPENT
�.- tnE andoveSTna o�easN Ccs, EIII 5,2>r2aY ev elA p'rvc nt cU PACKAGE STEEL -' re�
212UU