HomeMy WebLinkAbout1991-11-29 Application for Approval of Definitive Plan Notice to APPLICANT/TOWN CLERK and Certification of Action of Planning Board
on Definitive Subdivision Plan entitled:
By; Merrimack Engineering , dated. October 10, t lg 91
The North`Andover Planning Board ;has '.voted to:APPROVE said plant subject to the
following conditions:
1. That the record owners of the subject land forthwith execute and record
a "covenant running With the land"# or otherwise provide security for the con-
struction of ways and the installation of municipal: services within said eub-
divisiont all as provided by G.L. ;:o.'''41s S. ',81-U.
2. That all such construction`and installations shall in all respects
conform ,to the governing rules and ,regulations of this. Board.
3. Thatt as required by the-North Andover Board of, Health in its report to
this Boardq no building or other structure shall berbuilt or placed upon Lots
No. as shown on,said. Plan,without the prior
consent of said Board of Health.
4. Other conditions:
�J
In the event that no appeal shall have been taken from said approval Within
twenty days from this dater the North Andover Planning Board will forthwith
thereafter endorse its formal approval upon said plan.
The North Andover Planning Board has DISAPPROVED said plant for the following
reasons:
NORTH�VEL1rj-1 ,Date: November 21, 1991 By: erna, Jr. , C�iairman
FpAil °
P nr If
�1 �{Op
APPLICAT ION FOR AP ROVAt OF DEFINITIVE PLAN ` t
33 ��
119
To the Planning Board of: the Town of North ,Andover:
" The undersigned# being the applicant, as"defined u. n0er Chapter 419 Section
al—Lo for approval ooff�a proposed subdivision shown':on a;p1an.,entitled .
4 L/ys a.y�1aN
by /�/G�2/r� �/� G�v�,.-G� � '.dated' /D
being land bounded as follows: �,e4 %�y N ,�c�%` a/�a� ` ., L- i
,� �� iu a nai.r.r.r�n w rri r�i rt
C�c,C.,,.G �1�, Gril�� 8 �.5'rl�•o1J .STXCz- v G' /K/ �
/ ✓/ Ci S�Z-Cie
hereby submits said plaw'as a'DEFINITIVE plan in accordance with the Rules and
Regulations 'of the North-Andover Planning Board'..and-makes .application to the
Board for approval of said. plan.
Title Reference: North Essex Deeds, Book �� Page 2„s� or
Certificate of Title No. . , .Registration Book t page ; or
Other:.
Said plan has( } has not(G11"evolved from a preliminary plan submitted to
. the Board of 19 and approved (with modifications) { )
disapproved ( on t 19
The undersigned hereby applies for the approval of said DEFINITIVE plan
by the Board* and in furtherance thereof hereby- agrees to abide by the Boardts
Rules and Regulations. The undersigned hereby further covenants and agrees
with the Town of North Andover# upon approval of. said DEFINITIVE plan by the
Board:.
1. To install utilities in accordance with the rules and regulations of the
Planning Board, the Public Works Departmentt the Highway Surveyor, the
Board of Healtht and all general as well as zoning by—laws of said Towns
as are applicable to the installation of utilities within the limits of
ways and streets;
2. To complete and construct the streets or ways and other improvements shown
thereon in accordance with Sections Iv and V of`the Rules and Regulations
of the Planning Board and the approved DEFINITIVE plant profiles and cross
sections of the same. Said plant profilest cross sections and construction
specifications are specificallyt by'referencet incorporated herein and made
a part of this application. This application and the covenants and agree—
. ments herein shall,be binding upon all heirs# executors# administrators#
suocessorst grantees of the whole or .part of said land, and assigns of the
undersigned; and
3. To complete the aforesaid installations and construction within two (2)
years from the date hereof.
Received by Town Clerk: 7�.W�
Date: Signat4rarlof Applicant
Time:
v -a C-ey
Signature:
Address
yy i
1 )
PHILLIPS COMMON REALTY TRUST
DEFINITIVE SUBDIVISION
CONDITIONAL APPROVAL.
(1) There shall be no driveways placed where stone bound
monuments and/or catch basins are to be set. It shall be the
developers responsibility to assure the proper placement of
the driveways regardless of whether individual lots are
sold. The Planning Board shall require any driveway to be
moved at the owners expense if such driveway is at a catch
basin or stone bound position. Certification to the
Department of Public Works by a Certified Professional
Engineer shall be required prior to the issuance of a
certificate of occupancy.
(2) All drainage facilities including detention basins, sh 11 be
constructed and erosion controlled prior to any lot re ease.
(3) An as-built plan and profile shall be submitted for review
and approval. A certified interim as-built verifying that
all utilities have been installed in accordance with the
plans and profile shall be submitted prior to the
application of the binder coat of pavement. In addition, all
; required inspection and testing of water, sewer, and
drainage facilities shall be completed prior to bander
course paving.
(4) All Planning Board order of conditions are to be placed upon
the recorded Definitive Plan, ( Cover Sheet ) prior to
indorsement and filing with the Registry of Deeds.
(5) All lots shall have received all necessary permits and
pprovals from the North Andover Board of Health and
Conservation Commission.
(6) All catch basins shall be protected with hay bales to
prevent siltation into the drain lines during road
construction.
�(7) o open burning shall be done except as is permitted during
�� burning season under the Fire Department regulations.
t
(8) o .underground fuel storage shall be installed except as may
ie :required by Town Regulations.
9) Lot numbers shall be posted prior to any lot receiving a
p rmit to build
( ,) Permanent house numbers will be posted on dwellings prior to
occupancy.
All lots shall have residential fire sprinklers installed
prior to the issuance of the Certificate of occupancy, per
order NAFD.
(' 2) . Prior to..construction, a stop sign shall be placed at the
intersection of Massachusetts Avenue and the proposed
access road. Per order N.A.P.D.
O0and
he applicant shall construct a sidewalk along the frontage f Massachusetts Avenue to the intersection of Mass. Ave.
.Chickering Road. Reference plan entitled Special Permit
nd Definitive Subdivision Plan, Phillips Common, North
Andover, Mass. , Owner and Developer: Phillips Common RealtX
Trust. Prepared By: Merrimack Engineering Services, Dated:
10/10/91, revised 11/18/91. Sheet 3 of 6. Further reference
memorandum from Town Manager, James P. Gordon, Dated
1/5/91, included in the file and considered as part of this
ecision. ''.
-Q4E) The Board considers this roadway to meet the definition of a
Minor Street as found in the Rules and Regulations Governin
the Subdivision of Land, Revised 1989 . The applicant will be
required to conform to all specifications for Minor Roadway
�donstruction.
( ) Prior to any lots being released, Bonds shall be posted to
ensure construction and/or completion of roadways and other
pertinent public amenities. These bonds shall be in an
amount as determined by the Planning Board and shall be in
the form of a Tri-Party Agreement, or Pass Book.
( 6) This Definitive Subdivision approval is based upon a Special
Permit granted in accordance with sections 8 . 5, 10. 3 and
10. 31 of the North Andover Zoning Bylaw, dated 11/21/91. The
Special Permit and Definitive Subdivision approvals are both
based upon the following plans:
Plans entitled: Special Permit and Definitive Subdivision
Plan. PHILLIPS COMMON North Andover, MASS.
Dated: October 10, 1991, Final Revision 11/18/91
Scale: 1" = 401
Sheets: one through Six, (1-6)
Prepared By: Merrimack Engineering Services
66 Park Street
Andover, Massachusetts 01810
Plans entitled: Phillips Common, Site Plan
Dated: October 23, 1991, Final Revision 11/19/91
Scale: 1" = 401 , (one sheet)
Prepared By: Woodman Associates
20 Inn Street
Newburyport, MA 01950
Booklet: Phillips Common
Prepared by: Woodman Associates
20 Inn Street
Newburyport, MA 01950
included: Site Plan, Entry Plan, Typical Lot Landscape
Plan, Roadway Perspective.
Floor ,Plans: Home A, 1920 sq.ft.
Home B, 1998 sq.ft.
Home C. 1918 sq. ft.
Home D, 1940 sq.ft.
Booklet: Environmental Impact Summary
Erosion Control Summary
Project Schedule
Drainage Analysis
Prepared By: Merrimack Engineering Services
66 Park Street
Andover, Massachusetts 01810
Dated: October 11, 1991
Any changes to the above referenced Special Permit or the
record plans may be subject to Modification under Chapter 41
of the Massachusetts General Laws.
cc: Director of Public Works
Board of Public works
Highway Surveyor
Building Inspector
Board of Health
Assessors
Conservation Commission
Police Chief
Fire Chief
Applicant
Engineer
Fade