Loading...
HomeMy WebLinkAbout1991-11-29 Environmental Impact & Drainage Study DEF SUB PRD g i ENVIRONMENTAL. IMPACT SUMMARY EROSION CONTROL PLAN PROJECT SCHEDULE DRAINAGE ANALYSIS FOR, PHILLIPS COMMON PREPARED; FOR PHILLIPS COMMON' REALTY TRUST P.O BOX' 6700, 'NORTH. ANDOVER; MASSACHUSETTS 01845, OCTOBER 1991 MERRIMACK ENGINEERIPJG SERVICES, Inc. 66 Park Street Andover, Massachusetts 01810 planners 0 engineers 0 surveyors PHILLIPS COMMON NORTH ANDOVER MASSACHUSETTS CONSTRUCTION SCHEDULE Construction of this development will be driven by the response of sales within the project. However, the following is antici- pated , given the market analysis at this time : Grubbing clearing , layout, initial excavation December , 1991 Utility construction January , April , 1992 Roadway pavement ( binder) April , 1992 * Model construction 1 Unit February , 1992 * House construction 6 Units March , 1992 * House construction 7 Units June , 1992 * House construction 7 Units September , 1992 * House construction 5 Units March , 1993 Final roadway construction May , 1993 * Miscellaneous roadway construction to occur during this period. MERRIMACK ENGINEERING SERVICES. INC. - 66 PARK STREET 6 ANDOVER, MASSACHUSETTS 01810 EROSION CONTROL PLAN Although there are no wetlands located on or adjacent to the premises , erosion control techniques will still be applied to this project. The project construction methodology calls for limited tree clearing on the site , clearing and grubbing of the existing surface cover , and the installation of utilities during the time that the roadway is brought to subgrade . Associated with the utility construction , is the installation of two detention ponds on the site . As part of the erosion control program for the site , each deten- tion pond will be constructed initially at the time the roadway is being brought to subgrade . Excess soil material will be stockpiled in the center of the site , in the vicinity of a landscaping berm , proposed to be constructed in the center loop of the development. Outlets to the ponds will not be constructed until after the drainage system is installed in the street and is operational on site . In the meantime , each of these detention ponds , located in relatively low points of the site , will act as sedimentation collection traps , collecting runoff from the site , and allowing sediment contained within the runoff, to be deposited within the pond . It is anticipated that prior to installation of the drain- age outlets , each of the ponds will be cleaned and reexcavated to the subgrade of the pond , the drainage outlets then installed , and the entire pond area loamed and seeded . Landscaping will then be installed in the proper season in and adjacent to the pond , per the drawings of the architect. In addition to the above , each of the catch basins within the drainage system will be equiped with sumps , which will allow for sediment collection , prior to the sediment being carried by storm water runoff and discharged into the detention ponds . Haybales will be placed around the top of the catch basins in order to filter soil from the runoff water before it even enters the catch basin . After the roadway is completed , and during intervals of construction , on an as needed basis , the catch basin sumps will be cleaned so as to function properly . Where necessary , erosion control siltation fencing will be placed in selected ares on the site . Especially located around soil stockpile areas , the siltation fencing will prevent large amounts of sediment flow into the existing wooded areas which are to remain in place around the project perimeter. It is not anticipated that berms , dikes , or other similar con- struction techniques will need to be utilized on this site since the site is relatively gently sloping , and does not have any steep hillside areas that are on or adjacent to it. 1 MERRIMACK ENGINEERING SERVICES, INC. ® 66 PARK STREET ® ANDOVER, MASSACHUSETTS 01810 However, when necessary , areas will be sodded to prevent erosion , and in areas where trees are not provided to be planted , or mulch landscaping beds are not proposed to be installed , disturbed areas will be loamed and seeded as soon as possible after instal - lation of foundations , so as to minimize soil runoff from the site . When necessary , these loamed and seeded areas will be mulched with hay, to provide additional protective matting , and to promote the growth of grass on these finish graded areas . 2 MERRIMACK ENGINEERING SERVICES, INC. ® 66 PARK STREET ® ANDOVER, MASSACHUSETTS 01810 STATEMENT OF ENVIRONMENTAL IMPACT PHILLIPS COMMON NORTH ANDOVER , MASSACHUSETTS In accordance with the requirements of the Town of North Andover Subdivision Control Regulations , this Statement of Environmental Impact has been prepared for the project: A. TOPOGRAPHY AND EXISTING SITE FEATURES The site consists of approximately 16 . 67 acres of land at the intersection of Chickering Road and Massachusetts Avenue adjacent to Osgood Street in the Town of North Andover ( Essex County ) Massachusetts . Located on the site is a historic house , commonly refered to as The Manse , and an outbuilding ( garage ) ® The land slopes from the rear of the Manse , about 200 feet from Osgood Street, down toward Chickering Road . The general slope of the land is slight to moderate , with the slope of the land ranging between two and four percent slopes . The site is wooded and open field . Some stone walls exist in areas along the perimeter property lines of the site ; there are no internal stone walls on the property . The woods consists primarily of hardwood trees , with some mixed evergreens in various areas of the site . Except for the remnants of an old garden located in the vicinity of the Manse , there are no other substantial outstanding botanical or other features on the site . There are no wetlands or specialty wildlife habitat areas on site . Testing undertaken on the site in 1987 and 1991 indicates that the water table varies throughout the premises , from a depth of ten feet up to a depth of three feet in some areas of the site . The soils are relatively pervious and more adeptly described in the Storm Drainage Analysis , which is attached hereto ® B . PROPOSED DEVELOPMENT-PHYSICAL ENVIRONMENT The scope of work proposed for this development includes the construction of approximately 1 , 600 lineal feet of roadway , entering the site from Massachusetts Avenue , and traversing the site in a general cloverleaf loop fashion , closing upon itself, in order to service 26 single family homes . The 26 single family homes would be constructed each upon their own lot, and each would be serviced with municipal sanitary sewer and water which would be constructed within the proposed roadway . A storm drainage line will be con- structed within the roadway to collect surface drainage runoff from the roadway and each of these homes ® 1 MERRIMACK ENGINEERING SERVICES, INC. - 66 PARK STREET - ANDOVER, MASSACHUSETTS 01810 Proposed under the PRD Requirements of the Town of North Andover Zoning By-Law , this development was designed after a conventional subdivision plan was initially prepared for the site . Recognizing that the site is currently zoned R-3 , which permits the construction of single family homes on lots 25 ,000 square feet in size , each with 125 feet of frontage , the conventional plan depicted the possibility of 26 lots subdivided from this site . Under the PRD By-Law, each lot within this proposed PRD will contain at least 100 of frontage and 12 , 500 square feet of land area . Each of the homes within the development would be setback at least 20 feet from the roadway right-of-way , and 20 feet from the rear property line , or side property line , of each lot. The PRD By-Law also permits some homes to be constructed to zero feet from the side lot line , as long as the adjacent home is constructed at least 20 feet from the adjoining lot line . In this development, all requirements of the Zoning By-Law relative to PRD are met, as relating to frontage and area as well as setback . The PRD By-Law also requires that at least 35 percent of the entire tract area be set aside as open space . The total of 42 . 92 percent of this site is proposed to be set aside as open space . This set aside also includes the area adjacent to the existing Manse ( shown on the plan as Lot Y ) . Substracting out the lot area associated with the Manse ( Lot Y ) , 36 . 73 percent of the entire site will be set aside as open space . The Manse which is existing on Lot Y is proposed to remain and will be sold along with the land area on Lot Y , so as to permit the owner and occupant, to preserve the historic value of this Manse . Covenants will be placed on the land and building , which require the future owner to rehabilitate structure , and to restore it to is natural historic condi- tion . In addition , certain improvements to the grounds adjacent to the Manse on Lot Y , will also be made by the future owner. These covenants which significantly restrict activity and modification to the building and land on Lot Y will be prepared and submitted to the Town and the Historical Society for review, and subsequently will be made a part of the future deed of conveyance of Lot Y. The 26 new homes to be constructed within the development are depicted upon plans prepared by Woodman Associates , Architects , of Newburyport Massachusetts . Four different styles of homes will be constructed on the site , each in varied locations throughout the development. Each of these home styles and the finish grades of the houses are depicted upon the architectural and engineering site plans . Each of the homes will have attached garages , and will have three or four bedrooms ® As part of the site design , attention was given to the historical nature and value of the site ® As such , a sight 2 MERRIMACK ENGINEERING SERVICES, INC. 0 66 PARK STREET - ANDOVER, MASSACHUSETTS 01810 corridor behind the Manse was layed out , and respected with this design , so that no homes are built directly behind the existing Manse . In addition , careful consideration was given to maintaining as much of the existing vegetated wood- land buffer as possible , thereby utilizing the existing perimeter landscaping as a natural landscaping amenity for the project. Additional landscaping as depicted on the architects plans will be constructed and installed as part of this development. Additional landscaping amenities include the creation of privacy berms in the center lots of the project . Stone walls and multiple tree plantings will also be installed in this center loop area . In order to provide extensive visual character within the development, the outside perimeter of the roadway will be heavily landscaped , and a fence constructed along the property line of the roadway ® In addition to providing significant visual identity , this fence will provide a continuous connection from the development out to Massachusetts Avenue ® Significant landscaping at the gateway to the project on Massachusetts Avenue will occur. The sanitary sewer which will service each house in the development, will be connected to the existing Massachusetts Avenue Sanitary Sewer System. This proposed interconnection is shown on the Engineering Site Plans and Plan and Profiles for the roadway improvements . Off site mitigation of infiltration at the rate of 2 : 1 will be provided for this project. The water service within the development will be from a connection to the existing municipal service on Massachusetts Avenue , run through the development, and be interconnected or looped to the existing municipal service main on Osgood Street. Hydrants have been provided at 1 ,000+ foot intervals , so as to maximize fire protection on the site . Sprinklers will be provided in each house , as an additional means of fire protection . As indicated previously , a storm drainage system has been designed and layed out to adequately collect surface runoff from the site prior to its ultimate discharge into the existing storm drainage system on Massachusetts Avenue and Chickering Road . These are both locations where surface drainage runoff from the site currently flows . Catch basins with sumps will collect the water , and sediment contained within the surface water during and after construction is complete , will be collected in these sumps . The stormwater will then be piped to one of two detention ponds ® The first detention pond , located at the entrance to the site , adjacent to Massachusetts Avenue , will collect much of the surface water runoff which currently runs to 3 MERRIMACK ENGINEERING SERVICES, INC. ® 66 PARK STREET • ANDOVER, MASSACHUSETTS 01810 Massachusetts Avenue as well as Chickering Road . At that point, it will enter the detention basin , and ultimately outlet through a pipe which would be interconnected to the existing Massachusetts Avenue drainage system. The rate of flow out of the detention area and into the Massachusetts Avenue system will be controled by the size of the pipe and outlet configuration . Drainage flow into the Chickering Road area detention pond , will be through overland surface flow and direct piping . Because of the reduced area of flow to this pond , no outlet has been proposed . Much of the drainage entering this pond will be recharged into the existing ground water table , or be stored , in such a fashion that only a small amount of drainage will be allowed to be discharged overland from the pond , entering the woods adjacent to the pond and Chickering Road , and ultimately flowing , after it reaches a small berm which exists along Chickering Road , to the storm drainage system which exists along this roadway . The storm water collection system within the roadway has been designed to accommodate a 24 hour 10 year storm, while the detention pond themselves , have been designed to accom- modate a 24 hour 100 year storm. Drainage system design and detention ponds respectively , have been designed in accor- dance with Town of North Andover Requirements for the Subdivision Land, as well as the Requirements of the USDA Soil Conservation Service . A zero percent increase in the peak rate of runoff for the 100 year storm has been designed for this site . References are made to the drainage computa- tions attached hereto for a further discussion as to the storm drainage design . At this time , it is anticipated that each of the homes in the development will be serviced with underground gas service , to be provided within the site by the Bay State Gas Company . Underground telephone , electric , and cable TV service will be provided to each home . Designed as a village concept , it is anticipated that this development will have no negative visual or other impacts upon the adjacent land uses . It will complement the exist- ing residential uses located to the north and east as well as south portion of this site . Further , it is not antici- pated that any negative impact on the existing sanitary sewer, drainage or water system in this area , will result from implementation of this development. C . SURFACE WATER, AND SOILS CONDITIONS Since there are no wetlands , ponds or streams on or adjacent to the premises , and a selfcontained storm drainage system is proposed , it is anticipated that no negative impacts to 4 MERRIMACK ENGINEERING SERVICES, INC. - 66 PARK STREET - ANDOVER, MASSACHUSETTS 01810 any of the mentioned resources will occur from implementa- tion of this development . Since the cut and fill conditions of the site are extremely limited , no extensive erosion is anticipated to occur . However , consideration has been given to erosion during construction and after completion of the development , and the reader is refered to the erosion control plan attached hereto for further discussion relative to this item. Regarding the subsurface soil conditions on the site , no special footings or foundations are required for the homes to be constructed on the site . The drainage report attached hereto , further discusses the USDA and other soil conditions found on the site . It should be noted that the North Andover Building Depart- ment requires foundation drains around the perimeter of the houses , and a layout has been prepared for this drainage system , which will allow interconnection of footing drains to the storm drainage system which will be constructed within the roadway . Given the installation of subsurface footing drains , no special subsurface drainage or collection is anticipated to be required at this time . However, as construction conditions dictate , specialized waterproofing and backfill of foundations may be provided by the home builder as part of this development. D. SUBSURFACE CONDITIONS No percolation tests have been undertake for this project, as municipal sanitary sewer will be provided to all of the homes within the development. E. TOWN SERVICES Previous discussions within the report have indicated the methodology for interconnection of services from this development into existing municipal services . Given the construction of 26 homes , each with four bedrooms , a maximum of 11 ,440 gallons per day of water demand may occur. In addition , an equal amount of sewerage flow may result from this development. It appears that the existing systems adjacent to the site , at the point of interconnec- tion , have adequate capacity to service and handle the flows projected from this development, with the implementation of offsite infiltration mitigation . It is estimated that approximately 208 vehicle trips per day will be generated at the time of full construction of this development . Approximately 30 trips per hour at the peak hour may occur into or out of this site . MERRIMACK ENGINEERING SERVICES. INC, ® 66 PARK STREET ® ANDOVER, MASSACHUSETTS 01810 Massachusetts Avenue has adequate capacity to accommodate the traffic from this development. Further , studies for previous developments of a similar nature , but higher den- sity ( 40 units and 55 units respectively ) at this site indicated that no negative impact to the traffic systems at the intersection of Massachusetts Avenue or Chickering Road would result from implementation of those developments . Since significantly fewer units are proposed for the Phillips Common Development it is further anticipated that no negative impacts upon the traffic circulation system in the project area will result® It is anticipated that many of the home owners within this development will be existing Town of North Andover residents who rent or live with others within the community ® As such , the impact upon the educational facilities will be limited by target marketing to this group . However , marketing will occur outside of the project area , and residents outside of this area may be attracted to reside in this development. Based on averages for other projects of this type , it is anticipated that between 15 and 39 children may reside within this development. F. GENERAL FISCAL IMPACT TO THE TOWN As stated previously , no negative impacts are expected from this development in terms of water quality , flood control , erosion , or significant demand upon public services such as police or fire . Fiscal demands upon the system will be limited to providing services of public safety and education as are currently being provided within the community . The development will generate significant revenue in terms of property taxes to the Town , and because of the minimization of the roadway and utilities within the development through the PRD concept, the reduction in the cost of maintenance of the roadway , as compared to that which would be experienced under a conventional development, will occur. 6 MERRIMACK ENGINEERING SERVICES, INC. - 66 PARK STREET - ANDOVER, MASSACHUSETTS 01810 Drainage Analysis Phillips Chickering Road and Massachusetts Avenue on North Andover, Massachusetts Prepared for Phillips on Realty Trust P.O. x North 6700 vMassachusetts October 1991 4 fr s �; ♦ r F ,`a,r,;.asF.7''^ o r �,. ^'A,�!y t7.�'i` ` r'r ��r7 v r6s .> r� T u � 3rfJ`E� ,?��''a j�,/��,r ��� ,�l,oar, ✓,j���� Project : Phillips Common - North Andover, Massachusetts October ED 9=91 Table of Contents 3 Site Locus 4 Street Drainage Design 11 Pre and Post Development Methodology 13 Summary 14 Pre Development Analysis 20 Post Development Analysis OF I ERT C. z DALEY CIVIL No.31650 o Date b�ertC. Page No. 2 Merrimack Engineering Services, Inc. * 66Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1"8 [—Project : Phillips Common - North Andover, Massachusetts October 14, 1991 United States Geological Survey South Groveland quadrangle Site locus at 1" = 2,083' (1 : 25,000) 0 1000 2000 4000 bo 1 150 4729 hig n < 21 Seh' so o 234 2 2 w, W ' Cep \ m r l ��L o � No 1�n over o Cen r i r 25 33) �. a d �' 7ri8 'A Ld LL ewoga� O Franklin' � ••�.., � �• �r I - '�.� r n VV � 94 1ia74 ; .. Ht� z \ Ljj39 �w.� e� o o' V�� 2, ?14 f l lute imack — Q�F61ege �J DSO 238Ot 'gaa � �»� SUM Earo� 0�11 ��,!�' i<< Page No. 3 Merrimack Engineering Services, Inc. °66 Park Street-Andover, Massachusetts 01810"Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 1, 1991 Street Draminage Desmign Page No. 4 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 F—project : Phillips Common - North Andover, Massachusetts October 14, 19911 Plan of street drainage contributory areas scale : 1 200' 0 100 200 400 7 Page No. 5 Merrimack Engineering Services, Inc. 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 I Project �­Phillips Common - North Andover, Massachusetts October Techniques and parameters: o Peak flows were calculated using the Rational Method( Q=CiA o All street drainage was designed for the 2 and 10 year storm events. o The selected cover type coefficients are; C=0.90 for any impervious area. C=0.30 for any area to loaned and reseeded(disturbed). C=0.20 for any area to remain in a natural state(undisturbed). o All street drainage pipe to be reinforced concrete with a minimum diameter of 12 inches. o Manning's coefficient of friction for all pipe is assumed to be equal to 0.013. o The minimum pipe slope is 0.5% o The minimum pipe flow velocity is 2.5 feet per second. o The maximum pipe flow velocity is 10.0 feet per second. The maximum flow velocity exiting a headwall or flared end section is 6.0 feet per second. o The minimum cover over all pipe is to be 3 feet except for class V RCP for which the minimum cover will be 2.5 feet. o Catch basins are to be located on both sides of the roadway on continuous grades at intervals of not more than 300 feet or 400 feet from a high point in the roadway. Catch basins shall be located at all sags in the roadway and near the upstream comers of intersecting roadways unless the intersection is at the top of a vertical curve. Page No. 6 Merrimack Engineering Services, Inc. ' 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 Project :. Phillips Common - North Andover, Massachusetts October 14, 1991 From structure CB103+94,RT CB203+94,LT DMH103+84 C83@16+75,LT DMH2@1+80 To structure DMH1 @3+84 DMFIi 03+84 DMH2@1+80 DMH2@1+80 DMH3@1+35 Area(acres) 1.545 0.465 1.363 %Impervious 23.5 41.9 23.3 %disturbed 56.2 58.1 76.7 %natural 20.3 - - Weighted C 0.42 0.55 - 0.44 - Sum of CAs 0.65 0.26 0.90 0.60 1.50 Hydraulic length(it) 480 390 380 - Average slope(%) 1.0 1.0 - 1.4 - Tc(minutes) 27 20 27 22 27 Pipe size(inches) 12 12 12 12 15 Pipe slope(ft/ft) 1.4 2.6 0.93 1.0 1.0 2 year Intensity(in/hr) 1.6 1.9 1.6 1.8 1.6 Q=CIA(cis) 1.0 0.5 1.4 1.1 2.4 Flow velocity(fps) 3.9 4.1 3.7 3.6 4.4 Flow depth(inches) 4.4 2.6 5.9 4.8 6.7 10 year Intensity(in/hr) 2.5 3.0 2.5 2.8 2.5 Q=CIA(cfs) 1.6 0.8 2.3 1.7 3.8 Flow velocity(fps) 4.5 4.7 4.1 4.0 4.9 Flow depth(inches) 5.7 3.3 8.1 6.1 9.2 From structure CB4@1+50,RT CB54f16+75,RT DMH3@1+35 DMN4,90+90 CB6@11+50,RT To structure DMH3@1+35 DMF1361+35 DMH4@0+90 FES1@0+75,LT DMH5@11+60 Area(acres) 0.977 0.290 0.942 •impervious 34.3 51.7 32.6 •disturbed 65.7 48.3 - - 53.3 %natural - - 14.1 Weighted C 0.51 0.61 - - 0.48 Sum of CAs 0.50 0.18 2.18 2.18 0.45 Hydraulic length(it) 320 160 - - 480 Average slope(%) 1.3 1.0 - - 1.0 Tc(minutes) 18 10min 27 27 24 Pipe size(inches) 12 12 15 15 12 Pipe slope(ft/ft) 0.5 1.0 1.0 1.0 t,6 2 year Intensity(in/hr) 2.0 2.6 1.6 1.6 1.7 Q=CiA(c!s) 1.0 0.5 Flow velocity(fps) 2.7 2.9 4.8 4.8 4.6 Flow depth(inches) 5.8 3.4 8.6 8.6 3.4 10 year Intensity(in/hr) 3A 4.2 2.5 2.5 2.7 Q=CiA(cis) 1.6 0.8 5.5 6.5 1.2 Flow velocity(fps) 3.0 3.4 5.2 5.2 5.1 Flow depth(inches) 7.8 4.2 12,0 12,0 4.0 Merrimack Engineering Services, Inc. " 66 Park Street-Andover, Massachusetts 01810'Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 1TI-1-991-1 From structure CB7@11+50,LT DIVIH5611+60 DIVII-166112+00 DMH7012+50 CB8013+37,RT To structure DMH5@11+60 DMH6012+00 DMH7012+50 DIVII-18@113+25 DIVII-18613+25 Area(acres) 0.399 0.494 •Impervious 35.3 56.9 •disturbed 64.7 43.1 •natural - Weighted C 0.51 - - - 0.64 Sum of CAs 0.20 0.66 0.66 0.66 0.32 Hydraulic length(it) 350 - - 200 Average slope(%) 1.0 - - - 1.0 Tc(minutes) 20 24 24 24 11 Pipe size(inches) 12 is is is 12 Pipe slope(ft/ft) ') C7- 1.0 1.0 1.0 2.2 2 year Intensity(In/hr) 1.9 1.7 1.7 1.7 2.5 Q--CIA(cfe) 0.4 1.1 1.1 1.1 0.8 Flow velocity(fps) 2.7 3.5 3.5 3.5 4.4 Flow depth(inches) 3.0 4.5 4.5 4.5 3.4 10 year Intensity(In/hr) 3.0 2.7 2.7 2.7 4.0 Q=CIA(cis) 0.6 1.8 1.8 1.8 1.3 Flow velocity(fps) 3.0 4.1 4.1 41 5.0 Flow depth(inches) 3.6 6.0 6.0 6.0 4.3 From structure CB9@13+37,LT DMH8@13+25 To structure DMH8@13+25 FES2@13+00,RT Area(acres) 1.568 •impervious 20.5 •disturbed 79.5 •natural - Weighted C 0.42 - Sum of CAs 0.66 1.63 Hydraulic length(it) 380 - Average slope(%) 2.0 - Te(minutes) 21 24 Pipe size(inches) 12 is Pipe slope(ft/ft) 1.0 1.0 2 year Intensity(In/hr) 1.8 1.7 Q=CiA(cfs) 1.2 2.8 Flow velocity(fps) 3.7 4.7 Flow depth(inches) 5.3 7.6 10 year Intensity(in/hr) 2.9 2.7 Q=CiA(cfe) 1.9 4.4 Flow velocity(fps) 4.1 5.0 Flow depth(inches) 7.0 10.0 Page No. 8 Merrimack Engineering Services, Inc. 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Design charts for Rational Method: 10. o �.o 5.0 4.0 INN 3.0 a � 1.0 Q t C 0.e es C 0.3 ®.2 D 1 0.1 W 03 CIA 0.3 07 1 2 3 4 5 6 T 0 9 0 is 20 30 40 so 6010 Durafion of Storm in'Hours Fla. 4. Intensity of precipitation at Boston,Mass.,for various durations and frequencies. (Sherman,Frequency and Intlimlil of Excessive Rainfalls at SOstan, Mass., Trans. Am. Sole. Civic Engrs.,sod. 95, P• 956, 1931.) Figure showing relation of IiEQ z z travel time to overland distance, w average overland slope,and coefficient(C)-for use in the ael EC Rational Method. wwJ W � Source: z44HP VA cc 7o Wright-McLaughlin Engineenngs"Airport Drainage", Federal Aviation Administration Washington,DC 1965 a Page No. 9 Merrimack Engineering Services,Inc."66 Park Street-Andover,Massachusetts 01810*Tel.(508)475-3555 Fax.(508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 11 1 991 20 40 30 FEET 30 ra W Ild pill Iay ° I FL.D ,b /0 20 DEptN DF °rye Ao _ NG�NpL o\y e 7- 6- 5- -/O 'B - -•g0 - - - - 1- u• 7 -- 4 e C G 20 -o4 7 •19 y � I F � - 3 6o- 5 �¢ o+���lG'� 2 4 ,3 405 o (� O 3 A a5 i 'o CURV£ oJ FI@\@ -----� AL a ~2 .0 it oo 0 C ov 01B Q@� /.0 2 y' 0/ N` .7 .s 40 B.o0 4 -4 �h .4 .B ®G.0010 o b SC® .6 .5 0 .300'1 / o o� Cn 4'p000p9 .0002 ,OOaS `J .05 OG .09 0./ .2 .9 .5 .G /D 2 9 5 6 9 8 10 20 DISCHARGE - 0-CFS n-.015 0.,3 0.4 0.5 0.6 0.8 /.O n=.012 2 3 4 5 6 7 B /0 20 30 y .03 .04 .05.06 .OB 0.1 .2 .3 .4 .5 .6.7' a' /.0 2 3 4 5 6 7 B /0 n-.024 20 40 E y 3o W•�N pipE °�E °� ° i •moo 20 p1M DF FAD o /0 20 NDRMA� DE a\y 0 s 8 7 h O/0 -c 6 0 9 0�s 5 /0 C B -.90 -- - - - - - 4 B G ,20 i'.l 'o y FQQt 7 5 I 4 •0g - F,F' 2 4 1 3 0 05 oci�@� CRInCA Q3 p9' Io4s �'@� CURVE C -4 015 oo? rVQ d - 3 e 5 r\ .B N o0 0 o�4 c 15" I O t^� .6 /0.003 `J 9 009 o o c 9 .5 /.O 00/- •oo g I o .4 .8 G .p006 'o c� .0p050004 0005 0002 000i5 i o� .Ll pc 08 CZ .Z .5 G .7.8 10 4 5 G 7 E /0 _ 20 90 DISCHARGE - 0- CFS 1`1 - .015 a .OB O./ 0.2 0.3 0.4 0.50.6 O.B /.On_042. 2 3 4 5 6 7 8 /O 20 30 40 y .04 .05.06 .OB 0.l .2 .3 .4 .3 .6.7.B /.O 2 3 4 5 6 T B /O 20 n-.024 Page No. 10 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810°Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 1K, 19=91 Pre and Post Development Methodology Page No. 11 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 1 , 1991 Technique; The analyses were performed using the methods outlined in the Soil Conser- vation Service Technical Release 55 (TR55). The analyses were performed for the 10 and 100 year storm events with 24 hour rainfalls of 4.5 and 6.5 inches respec- tively. Soil data: The site is composed of two soil Hydrologic Percent See the SCS soil plan on the types, listed at right, as defined by the SO1I type Group coverage next sheet. Soil Conservation Service in its report PaB-Paxton c 63.4 titled"Soil Survey of Essex County, WrA-Woodbridge c 36.6 Massachusetts Northern Part". g Site watershed description: See the overall watershed The site consists of an old hayfield or pasture surrounded by a predominately plans on sheets 15 and 21. pine forest. The site is located at the top of a gently sloping hill in such a way that no appreciable runoff enters the property from any outside watersheds.Thus to simplify analysis it was decided to clip all the subarea boundaries at the site property line. Pre development analysis -The site was defined as four subareas. Subareas PRE and PRE2 are small in area and runoff as sheet flow toward design points 1 and 2 respectively which are along Osgood Street. Subarea PRE3 is the largest subarea containing 75% of the entire site. Runoff from subarea PRE3 travels as sheet and shallow concentrated flows toward design point 3 at the intersection of Massachusetts Avenue and Chickering Road. Runoff from subarea PRE4 collects on the site in two small depressions behind the existing house on Osgood Street. Since no runoff from Subarea PRE4 leaves the site it was not included in the analyses. Post Development analysis -The site was defined as seven subareas. What was subarea PRE3 has been divided into subareas POND 1,POND2, POST and POST2. Subareas POND and POND2 contain the most heavily developed areas of the site and runoff to proposed detention ponds 1 and 2 respectively. Subareas POST1 and POST2 consist mostly of the buffer areas along the site perimeter and runoff to design points 3 and 4 respectively. Subarea POST3 is identical to subarea PRE 1. Except for the additon of a walkway subarea POST4 is identical to subarea PRE2. Except for the loss of some area due to the proposed site grading, subarea POSTS is identical to subarea PRE4, and just as subarea PRE4 was not included in the analysis subarea POSTS is not as well. Note that the total areas within the pre and post development analyses do not match, since subarea POND2 collects part of PRE4 (an area that was ignored in the pre development analysis). Two ponds were added to the analysis to mitigate the increased runoff due to the addition of impervious area. Proposed pond 1 is a retention pond, it is intended to store much of the incoming runoff.When pond 1 overtops any incoming runoff will flow out of the pond to design point 3. Proposed pond 2 is a detention pond, it was designed with a 12"RCP outlet connected to the Massachusetts Avenue drainage system. Page No. 12 Merrimack Engineering Services, Inc. ` 66 Park Street -Andover, Massachusetts 01810`Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Conclusions: Listed at right are the results of the Pre Post pre and post development analyses at Development Development each of the design points. At each design Design point 1 _ point there is either no change or a 10 year storm 1.0 1.0 100 year storm 2.0 2.0 decrease in runoff rate after development. Design point 2 The total rate of runoff from the entire 10 year storm 1.0 1.0 site shows a 3.1 cfs decrease for the 10 100 year storm 3.0 3.0 year storm event and a 4.5 cfs decrease Design point 3 for the 100 year storm event. 10 year storm 9.0 2.0 During the 10 year storm the peak 100 year storm 19.0 10.2 rate of overtopping runoff from and 1 is Design point 4 pp g runo p 10 year storm n.a. 0.0 1.0 cfs. The peak rate of flow through the too year storm 1.0 12"RCP outlet of pond 2 is 3.9 cfs. Total During the 100 year storm the peak 10year y astorm s o m 11.0 19 b rate of overtopping runoff from pond 1 is 6.2 cfs. The peak rate of flow through the 12"RCP outlet of pond 2 is 5.4 cfs. Soil Conservation Service Soil Survey - Essex County Northern Part sheet no. 30 of 42. Soils map at 1" = 1 ,320' (1'° = 1/4 mile) 0 500 1000 2000 _ �y 'k•tia,M'� /qt pai ."\� �'(�, ti rt '1y 1� t''i� 3... m a ..w� a.;,{ �Pac I ' LL 31 c': PbDUD "WEB Ill WrA tt r Pa8 4, St8 W h 1 W9" A c � St \+1 1;:.� by t T�'�, c 1. \ t _ 9• r c.� WsB d� er P f, w WW` M R18, WEB r UD 9 i'W58` w a h; ,;' ' �C Wg u°� Page No. 13 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusefts October 14 Pre Development Analysis Page No. 14 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 --------------- Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Pre Development Subarea Plan. scale : 1" = 200' 0 100 200 400 ,.,- DESIGN POINT 1 \ IR4 3. o — a �1 7. zi DI-SIGN POINt- 5' Page No. 15 Merrimack Engineering Services, Inc. ' 66 Park Street -Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Subarea PRE1 PaB-Paxton C 100 Cover description Acreage Percentage of subarea Curve Number Lawn-good condition 0.140 13.0 74 Woods-good condition 0.960 87.0 70 1.100 100 70.52 use 71 Sheet flow 280 0.018 light woods 70.8647 Time of concentration=0.864 hr to design point 1. Subarea PRE2 PaB-Paxton C 100 Cover description Acreage Percentage of subarea Curve Number Existing house 0.050 2.5 98 Lawn-good condition 0.170 1 9.5 74 Meadow-Continuous grass 0.600 33.0 71 Woods-good condition 1.010 55.0 70 1 1.830 100 71.41 use 71 Sheet flow 300 0.017 light woods 0.935 Time of concentration=0.935 hr to design point 2. Page No. 16 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 1 [Project Phillips Common - North Andover, Massachusetts October 14, 1991 Subarea PRE3 PaB-Paxton C 100 WrA-Woodbridge Cover description Acreage Percentage of subarea Curve Number Lawn-good condition 0280 2.2 74 Meadow-Continuous grass 5.900 46.8 71 Woods-good condition 6.430 1 51.0 1 70 12.610 100 70.56 use 71 Sheet flow 300 0.018 light woods 0.913 Shallow concentrated flow 360 0.025 unpaved 0.039 Shallow concentrated flow 320 0.006 unpaved 0.071 Time of concentration=1.023 hr to design point 3. Subarea PRE4 - not included in analysis. Page No. 17 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 1 Project : Phillips Common - North Andover, Massachusetts October 1 , 1991 TR-SS TABULAR DISCHARGE METHOD VERSION 1.11 Project Phillips Common User: SAS Date: 10-10-91 County Essex State: MA Checked: Date: Subtitle: Pre Development Total watershed area: 0.005 sq mi Rainfall type: III Frequency: 10 years Subareas PRE1 PRE2 PRE3 Area(sq mi) 0.00 0.00 0.02 Rainfall(in) 4.S 4.S 4.5 curve number 71 71 71 Runoff(in) 1.75 1.7S 1.75 Tc (hrs) 0.86* 0.93* 1.02* (Used) 0.75 1.00 1.00 TimeToOutlet 0.00 0.00 0.00 Ia/P 0.18 0.18 0.18 Time Total Subarea Contribution to Total Flow (cfs) (hr) Flow PRE1 PRE2 PRE3 11.0 0 0 0 0 11.3 0 0 0 0 11.6 0 0 0 0 11.9 1 0 0 1 12.0 1 0 0 1 12.1 1 0 0 1 12.2 1 0 0 1 12.3 2 0 0 2 12.4 2 0 0 2 12.5 6 iP iP 4 12.6 7 1 1 5 12.7 9 1 1 7 12.8 10 1 1 8 13.0 11P 1 1 9P 13.2 11 1 1 9 13.4 9 1 1 7 13.6 7 0 1 6 13.8 6 0 1 5 14.0 5 0 1 4 14.3 3 0 0 3 14.6 2 0 0 2 15.0 2 0 0 2 15.5 2 0 0 2 16.0 1 0 0 1 16.S 1 0 0 1 17.0 1 0 0 1 17.5 1 0 0 1 18.0 1 0 0 1 19.0 1 0 0 1 20.0 1 0 0 1 22.0 0 0 0 0 26.0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-SS system routines Page No. 18 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 TR-SS TABULAR DISCHARGE METHOD VERSION 1.11 Project : Phillips Common User: JAS Date: 10-10-91 County Essex State: MA Checked: Date: Subtitle: Pre Development Total watershed area: 0.005 sq mi Rainfall type: III Frequency: 100 years Subareas PRE1 PRE2 PRE3 Area(sq mi) 0.00 0.00 0.02 Rainfall(in) 6.5 6.5 6.5 Curve number 71 71 71 Runoff(in) 3.31 3.31 3.31 Tc (hrs) 0.86* 0.93* 1.02* (Used) 0.75 1.00 1.00 TimeToOutlet 0.00 0.00 0.00 Ia/P 0.13 0.13 0.13 Time Total Subarea Contribution to Total Flow (cfs) (hr) Flow PRE1 PRE2 PRE3 11.0 1 0 0 1 11.3 1 0 0 1 11.6 1 0 0 1 11.9 2 0 0 2 12.0 2 0 0 2 12.1 2 0 0 2 12.2 3 0 0 3 12.3 6 1 1 4 12.4 8 1 1 6 12.5 10 1 1 8 12.6 15 2P 2 11 12.7 18 2 2 14 12.8 21 2 2 17 13.0 24P 2 3P 19P 13.2 21 1 3 17 13.4 17 1 2 14 13.6 14 1 2 11 13.8 10 1 1 8 14.0 8 0 1 7 14.3 6 0 1 5 14.6 5 0 1 4 15.0 S 0 1 4 15.5 3 0 0 3 16.0 2 0 0 2 16.5 2 0 0 2 17.0 2 0 0 2 17.5 2 0 0 2 18.0 1 0 0 1 19.0 1 0 0 1 20.0 1 0 0 1 22.0 1 0 0 1 26.0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-SS system routines Page No. 19 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Post Development Analysis Page No. 20 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)4 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Post Development Subarea Plan. scale : 1" = 200' MEMO= DESIGN POINT 1 0 100 200 400 DESIGN POINT 2 —QOO9S0 \ �---�J �.— ° \ i \ \ , t a i 1 TA it zi� o \ <Y a e fO, `p DE SIGN POINT ZIA Page No. 21 Merrimack Engineering Services, Inc. °66 Park Street -Andover, Massachusetts 01810°Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 19=91 Subarea POND1 PaB-Paxton C 100 WrA-Woodbridge Cover description Acreage Percentage of subarea Curve Number Prop.roadway and sidewalk 0.437 11.4 98 Prop.houses and drives 0.660 17.2 98 Exist.lawn-good condition 0.055 1.4 74 Prop.lawn-good condition 2.359 61.5 74 Woods-good condition 1 0.328 8.5 1 70 3.839 100 80.52 use 81 Sheet flow 300 0.019 lawn 0,894 Shallow concentrated flow 85 0.019 unpaved - 0.011 Pipe flow 140 0.039 3.89 0.010 I Time of concentration=0.915 hr to proposed detention pond 1. Subarea POND2 PaB-Paxton C 100 WrA-Woodbridge Cover description Acreage Percentage of subarea Curve Number Prop.roadway and sidewalk 0.596 11.8 98 Prop.houses and drives 0.804 15.9 98 Exist.lawn-good condition 0.248 4.9 74 Prop.lawn-good condition 3.094 61.2 74 Woods-good condition 1 0.314 6.2 70 5.056 100 80.40 use 80 Sheet flow 300 0.015 lawn - 0.982 Gutter and pipe flow 240 0.010 2.02 0.033 Time of concentration=1.015 hr to proposed detention pond 2. Page No. 22 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1 481 Project : Phillips Common - North Andover, Massachusetts October 14, -1-9-9-11 Subarea POST1 PaB-Paxton C 100 WrA-Woodbridge Cover description Acreage Percentage of subarea Curve Number Prop.houses and drives 0.132 4.0 98 Prop.lawn-good condition 0.395 11.9 74 Woods-good condition 2.783 1 84.1 70 3.310 100 71.60 use 72 Sheet flow 300 0.013 light woods 1.040 Shallow concentrated flow 685 0.015 unpaved 0.096 Time of concentration=1.136 hr to design point 3. Subarea POST2 PaB-Paxton C 100 WrA-Woodbridge Cover description Acreage Percentage of subarea Curve Number Meadow-Continuous 0.147 30.0 71 Woods-good condition 1 0.343 70,0 70 0.490 100 70.30 use 70 300 0.008 light woods 1.263 Sheet w7con7centrated 7flw 80 0.008 unpaved 0.015 '171me of concentration=1.278 hr to design point 4. Page No. 23 Merrimack Engineering Services, Inc. *66 Park Street -Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusefts October 1±1-1-99--1i Subarea POSTS identical to PRE1 PaB-Paxton C 100 Cover description Acreage Percentage of subarea Curve Number Lawn-good condition 0,140 13.0 74 Woods-good condition 0.960 87.0 70 Y- 1.100 100 70.52 use 71 Sheet flow 280 0.018 light!woods 0.864 Time of concentration=0.864 hr to design point 1. Subarea POST4 PaB-Paxton C 100 Cover description Acreage Percentage of subarea 7. Curve 7Number Exist.house and prop.walk 0.06 3.5 98 Exist.lawn-good condition 0.17 10.2 74 Meadow-Continuous grass 0.60 35.3 71 Woods-good condition 0.88 1 51.0 1 70 1.71 100 71.7 use 72 Sheet flow 300 0.017 light woods 0.935 Time of concentration=0.935 hr to design point 2. Subarea POST5 - not included in the analysis. Page No. 24 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 TR-55 TABULAR DISCHARGE METHOD VERSION 1.11 Project Phillips Common User: JAS Date: 10-23-91 County : Essex State: MA Checked: Date: Subtitle: Post Development Total watershed area: 0.024 sq mi Rainfall type: III Frequency: 10 years Subareas POND1 POND2 POST1 POST2 POST3 POST4 Area(sq mi) 0.01 0.01 0.01 0.00 0.00 0.00 Rainfall(in) 4.5 4.5 4.5 4.5 4.S 4.S Curve number 81 80 72 70 71 71 Runoff(in) 2.S5 2.46 1.82 1.67 1.75 1.75 Tc (hrs) 0.91* 1.02* 1.14* 1.28* 0.86* 0.93* (Used) 1.00 1.00 1.25 1.25 0.75 1.00 TimeTooutlet 0.00 0.00 0.00 0.00 0.00 0.00 Ia/P 0.10 0.11 0.17 0.19 0.18 0.18 Time Total Subarea Contribution to Total Flow (cfs) (hr) Flow POND1 POND2 POST1 POST2 POST3 POST4 11.0 0 0 0 0 OP 0 0 11.3 0 0 0 0 0 0 0 11.6 0 0 0 0 0 0 0 11.9 1 0 1 0 0 0 0 12.0 2 1 1 0 0 0 0 12.1 2 1 1 0 0 0 0 12.2 2 1 1 0 0 0 0 12.3 2 1 1 0 0 0 0 12.4 4 1 2 1 0 0 0 12.5 8 2 3 1 0 1P 1P 12.6 9 3 3 1 0 1 1 12.7 10 3 4 1 0 1 1 12.8 13 4 5 2P 0 1 1 13.0 15P 5P 6P 2 0 1 1 13.2 13 4 5 2 0 1 1 13.4 11 3 4 2 0 1 1 13.6 9 3 3 2 0 0 1 13.8 7 2 3 1 0 0 1 14.0 6 2 2 1 0 0 1 14.3 4 1 2 1 0 0 0 14.6 3 1 1 1 0 0 0 15.0 3 1 1 1 0 0 0 15.5 3 1 1 1 0 0 0 16.0 2 1 1 0 0 0 0 16.5 1 0 1 0 0 0 0 17.0 1 0 1 0 0 0 0 17.5 0 0 0 0 0 0 0 18.0 0 0 0 0 0 0 0 19.0 0 0 0 0 0 0 0 20.0 0 0 0 0 0 0 0 22.0 0 0 0 0 0 0 0 26.0 0 0 0 0 0 0 0 P - Peak Flow * - value(s) provided from TR-S5 system routines Page No. 25 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810`Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 TR-55 TABULAR DISCHARGE METHOD VERSION 1.11 Project Phillpis Common User: JAS Date: 10-21-91 County Essex State: MA Checked: Date: Subtitle: Post Development Total watershed area: 0.024 sq mi Rainfall type: III Frequency: 100 years Subareas POND1 POND2 POST1 POST2 POST3 POST4 Area(sq mi) 0.01 0.01 0.01 0.00 0.00 0.00 Rainfall(in) 6.5 6.5 6.5 6.5 6.5 6.5 Curve number 81 80 72 70 71 71 Runoff(in) 4.34 4.24 3.41 3.21 3.31 3.31 TC (hrs) 0.91* 1.02* 1.14* 1.28* 0.86* 0.93* (Used) 1.00 1.00 1.25 1.25 0.75 1.00 TimeToOutlet 0.00 0.00 0.00 0.00 0.00 0.00 Ia/P 0.07 0.08 0.12 0.13 0.13 0.13 (Used) 0.10 0.10 0.12 0.13 0.13 0.13 Time Total Subarea Contribution to Total Flow (cfs) (hr) Flow POND1 POND2 POST1 POST2 POST3 POST4 11.0 1 0 1 0 0 0 0 11.3 1 0 1 0 0 0 0 11.6 2 1 1 0 0 0 0 11.9 2 1 1 0 0 0 0 12.0 3 1 1 1 0 0 0 12.1 3 1 1 1 0 0 0 12.2 4 1 2 1 0 0 0 12.3 7 2 2 1 0 1 1 12.4 9 3 3 1 0 1 1 12.5 13 4 5 2 0 1 1 12.6 17 5 6 2 0 2P 2 12.7 21 6 8 3 0 2 2 12'.8 24 7 9 4 0 2 2 13.0 28P 8P lop 4 iP 2 3P 13.2 25 7 9 5P 1 1 2 13.4 21 6 7 4 1 1 2 13.6 15 4 5 3 0 1 2 13.8 12 3 4 3 0 1 1 14.0 9 3 3 2 0 0 1 14.3 8 2 3 2 0 0 1 14.6 6 2 2 1 0 0 1 15.0 4 1 2 1 0 0 0 15.5 3 1 1 1 0 0 0 16.0 3 1 1 1 0 0 0 16.5 3 1 1 1 0 0 0 17.0 3 1 1 1 0 0 0 L7.5 2 1 1 0 0 0 0 L8.0 2 1 1 0 0 0 0 L9.0 1 0 1 0 0 0 0 ?0.0 0 0 0 0 0 0 0 ?2.0 0 0 0 0 0 0 0 ?6.0 0 0 0 0 0 0 0 ? - Peak Flow * - values) provided from TR-55 system routines Page No. 26 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810`Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Proposed detention pond 1 description: Level Elevation Area Level storage Cumulative storage (sq.ft) (ac.ft) (ac.ft) 5 192.0 7,493 0.079 0.564 4 191.5 6,252 0.194 0.485 3 190.0 5,013 0.186 0.291 2 188.0 3,093 0.105 0.105 1 186.0 1,493 0 0 Pond controls; o 10 If, I inch diameter outlet pipe(to model infiltration). n=0.015, s=0.010 ft/ft, inv.out= 186.0 o 178 degree"V" notched weir, inv.out= 191.5 Proposed detention pond 2 description: Level Elevation Area Level storage Cumulative storage (sq.ft) (ac.ft) (ac.ft) 4 196.5 7,963 0.082 0.435 3 196.0 6,240 0.231 0.353 2 194.0 3,840 0.122 0.122 1 192.0 1,467 0 0 Pond controls; o 10 If, I inch diameter outlet pipe(to model infiltration). n=0.015, s=0.010 ft/ft, inv.out= 192.0 o 115 If, 12 inch diameter RCP, n=0.015, s=0.0074 ft/ft, inv.out= 192.0 well rounded entrance(FES). o 178 degree"V" notched weir, inv.out= 197.0 Page No. 27 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (508)475-1448 1 Project : Phillips Common - North Andover, Massachusetts OctoberiLl -199--1j Proposed retention pond 1 - 10 year storm flow data: Time Inflow Outflow Elevation Storage (hr) (cfs) (cfs) (ac.ft) 11.0 0.0 0.0 186.1 0.00 11.2 0.0 0.0 186.1 0.00 11.4 0.0 0.0 186.1 0.00 11.6 0.0 0.0 186.1 0.00 11.8 0.0 0.0 186.1 0.00 12.0 1.0 0.0 186.1 0.01 12.2 1.0 0.0 186.4 0.03 12.4 1.0 0.0 186.8 0.05 12.6 3.0 0.0 187.4 0.09 12.8 4.0 0.0 188.2 0.14 13.0 5.0 P 0.0 189.0 0.22 13.2 4.0 0.0 189.8 0.29 13.4 3.0 0.0 190.3 0.35 13.6 3.0 0.0 190.7 0.40 13.8 2.0 0.0 191.0 0.43 14.0 2.0 0.0 191.2 0.46 14.2 1.3 0.0 191.4 0.49 14.4 1.0 0.0 191.6 P 0.50 P 14.6 1.0 1.0 P 191.6 0.50 14.8 1.0 1.0 191.6 0.50 15.0 1.0 1.0 191.6 0.50 15.2 1.0 1.0 191.6 0.50 15.4 1.0 1.0 191.6 0.50 15.6 1.0 1.0 191.6 0.50 15.8 1.0 1.0 191.6 0.50 16.0 1.0 1.0 191.6 0.50 P -indicates peak value. Page No. 28 Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Proposed detention pond 2 - 10 year storm flow data: Time Inflow Outflow Elevation Storage (hr) (cfs) (cfs) (ac.ft) 11.0 0.0 0.0 192.1 0.00 11.2 0.0 0.0 192.1 0.00 11.4 0.0 0.0 192.1 0.00 11.6 0.0 0.0 192.1 0.00 11.8 0.7 0.1 192.1 0.01 12.0 1.0 0.4 192.3 0.02 12.2 1.0 0.7 192.4 0.03 12.4 2.0 0.9 192.6 0.04 12.6 3.0 1.6 193.0 0.07 12.8 5.0 2.6 193.5 0.10 13.0 6.0 P 3.6 194.1 0.14 13.2 5.0 3.8 194.4 P 0.17 P 13.4 4.0 3.9 P 194.4 0.17 13.6 3.0 3.8 194.4 0.16 13.8 3.0 3.8 194.3 0.15 14.0 2.0 3.6 194.1 0.13 14.2 2.0 3.1 193.8 0.11 14.4 1.7 2.7 193.5 0.09 14.6 1.0 2.1 193.2 0.07 14.8 1.0 1.7 193.0 0.06 15.0 1.0 1.4 192.9 0.05 15.2 1.0 1.3 192.8 0.05 15.4 1.0 1.2 192.7 0.04 15.6 1.0 1.1 192.7 0.04 15.8 1.0 1.1 192.6 0.04 16.0 1.0 1.0 192.6 0.04 P -indicates peak value. Page No. 29 Merrimack Engineering Services, Inc.* 66 Park Street-Andover, Massachusetts 01810*Tel. (508)475-3555 Fax. (50 E)4:75=-1�8 Project : Phillips Common - North Andover, Massachusetts October 1K,19=91 Proposed retention pond 1 - 100 year storm flow data: Time Inflow Outflow Elevation Storage (hr) (cfs) (Cfs) (ac.ft) 11.0 0.0 0.0 186.1 0.00 11.2 0.0 0.0 186.1 0.00 11.4 0.3 0.0 186.1 0.01 11.6 1.0 0.0 186.3 0.02 11.8 1.0 0.0 186.7 0.04 12.0 1.0 0.0 187.1 0.05 12.2 1.0 0.0 187.5 0.07 12.4 3.0 0.0 188.1 0.11 12.6 5.0 0.0 188.9 0.19 12.8 7.0 0.0 190.0 0.29 13.0 8.0 P 0.0 190.9 0.42 13.2 7.0 3.9 191.6 0.50 13.4 6.0 6.2 P 191.7 P 0.51 P 13.6 4.0 4.4 191.6 0.50 13.8 3.0 3.2 191.6 0.49 14.0 3.0 3.0 191.6 0.49 14.2 2.3 2.5 191.6 0.49 14.4 2.0 2.0 191.6 0.49 14.6 2.0 2.0 191.6 0.49 14.8 1.5 1.6 191.6 0.49 15.0 1.0 1.1 191.6 0.49 15.2 1.0 1.0 191.6 0.49 15.4 1.0 1.0 191.6 0.49 15.6 1.0 1.0 191.6 0.49 15.8 1.0 1.0 191.6 0.49 16.0 1.0 1.0 191.6 0.49 P -indicates peak value. Page No. 30 Merrimack Engineering Services, Inc. *66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-148 [-Project-: Phillips Common - North Andover, Massachusetts October 14, 9=91 Proposed detention pond 2 - 100 year storm flow data: Time Inflow Outflow Elevation Storage (hr) (cfs) (cfs) (ac.ft) 11.0 1.0 0.7 192.4 0.02 11.2 1.0 0.8 192.5 0.03 11.4 1.0 0.9 192.6 0.03 11.6 1.0 1.0 192.6 0.03 11.8 1.0 1.0 192.6 0.03 12.0 1.0 1.0 192.6 0.03 12.2 2.0 1.1 192.7 0.04 12.4 3.0 1.7 193.0 0.05 12.6 6.0 3.2 193.9 0.10 12.8 9.0 4.0 194.6 0.18 13.0 10.0 P 4.6 195.4 0.26 13.2 9.0 5.1 196.1 0.33 13.4 7.0 5.3 196.3 0.37 13.6 5.0 5.4 P 196.4 P 0.37 P 13.8 4.0 5.3 196.3 0.36 14.0 3.0 5.2 196.2 0.32 14.2 3.0 5.0 195.9 0.29 14.4 2.7 4.8 195.6 0.26 14.6 2.0 4.5 195.3 0.22 14.8 2.0 4.2 194.9 0.18 15.0 2.0 4.0 194.6 0.15 15.2 1.6 3.7 194.3 0.11 15.4 1.2 3.2 193.8 0.08 15.6 1.0 2.2 193.3 0.06 15.8 1.0 1.6 193.0 0.04 16.0 1.0 1.3 192.8 0.04 P -indicates peak value. Page No. 31 Merrimack Engineering Services, Inc. * 66 Park Street -Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Post development - 10 year storm runoff summary: Time Pond 2 Design Design Design Design Total (hr) outflow point 1 point 2 point 3 point 4 flow(cfs) 11.0 0.0 0.0 0.0 0.0 0.0 P 0.0 11.2 0.0 0.0 0.0 0.0 0.0 0.0 11.4 0.0 0.0 0.0 0.0 0.0 0.0 11.6 0.0 0.0 0.0 0.0 0.0 0.0 11.8 0.1 0.0 0.0 0.0 0.0 0.1 12.0 0.4 0.0 0.0 0.0 0.0 0.4 12.2 0.7 0.0 0.0 0.0 0.0 0.7 12.4 0.9 0.0 0.0 1.0 0.0 1.9 12.6 1.6 1.0 P 1.0 P 1.0 0.0 4.6 12.8 2.6 1.0 1.0 2.0 P 0.0 6.6 13.0 3.6 1.0 1.0 2.0 0.0 7.6 13.2 3.8 1.0 1.0 2.0 0.0 7.8 13.4 3.9 P 1.0 1.0 2.0 0.0 7.9 P 13.6 3.8 0.0 1.0 2.0 0.0 6.8 13.8 3.8 0.0 1.0 1.0 0.0 5.8 14.0 3.6 0.0 1.0 1.0 0.0 5.6 14.2 3.1 0.0 0.3 1.0 0.0 4.4 14.4 2.7 0.0 0.0 1.0 0.0 3.7 14.6 2.1 0.0 0.0 2.0 0.0 4.1 14.8 1.7 0.0 0.0 2.0 0.0 3.7 15.0 1.4 0.0 0.0 2.0 0.0 3.4 15.2 1.3 0.0 0.0 2.0 0.0 3.3 15.4 1.2 0.0 0.0 2.0 0.0 3.2 15.6 1.1 0.0 0.0 1.8 0.0 2.9 15.8 1.1 0.0 0.0 1.4 0.0 2.5 16.0 1.0 0.0 0.0 1.0 0.0 2.0 P -indicates peak value. Page No. 32 Merrimack Engineering Services, Inc. 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (508)475-1448 ['Project : Phillips Common - North Andover, Massachusetts October 14, 1991 Post development - 100 year storm runoff summary: Time Pond 2 Design Design Design Design Total (hr) outflow point 1 point 2 point 3 point 4 flow(cfs) 11.0 0.7 0.0 0.0 0.0 0.0 0.7 11.2 0.8 0.0 0.0 0.0 0.0 0.8 11.4 0.9 0.0 0.0 0.0 0.0 0.9 11.6 1.0 0.0 0.0 0.0 0.0 1.0 11.8 1.0 0.0 0.0 0.0 0.0 1.0 12.0 1.0 0.0 0.0 1.0 0.0 2.0 12.2 1.1 0.0 0.0 1.0 0.0 2.1 12.4 1.7 1.0 1.0 1.0 0.0 4.7 12.6 3.2 2.0 P 2.0 2.0 0.0 9.2 12.8 4.0 2.0 2.0 4.0 0.0 12.0 13.0 4.6 2.0 3.0 P 4.0 1.0 P 14.6 13.2 5.1 1.0 2.0 8.9 1.0 18.0 13.4 5.3 1.0 2.0 10.2 P 1.0 19.5 P 13.6 5.4 P 1.0 2.0 7.4 0.0 15.8 13.8 5.3 1.0 1.0 6.2 0.0 13.5 14.0 5.2 0.0 1.0 5.0 0.0 11.2 14.2 5.0 0.0 1.0 4.5 0.0 10.5 14.4 4.8 0.0 1.0 3.7 0.0 9.5 14.6 4.5 0.0 1.0 3.0 0.0 8.5 14.8 4.2 0.0 0.5 2.6 0.0 7.3 15.0 4.0 0.0 0.0 2.1 0.0 6.1 15.2 3.7 0.0 0.0 2.0 0.0 5.7 15.4 3.2 0.0 0.0 2.0 0.0 5.2 15.6 2.2 0.0 0.0 2.0 0.0 4.2 15.8 1.6 0.0 0.0 2.0 0.0 3.6 16.0 1.3 0.0 0.0 2.0 0.0 3.3 P -indicates peak flow. Page No. 33 f Merrimack Engineering Services, Inc. * 66 Park Street-Andover, Massachusetts 01810 Tel. (508)475-3555 Fax. (50