Loading...
HomeMy WebLinkAbout2000-06-30 Correspondence Drainage i Town of North Andover o� ho tlrrr�ti Office of the Planning Department Community Development and Services Division 27 Charles Street North Andover, Mass adiusetts 01845 4Ssncsaus�t KrtlrylUcKeima Telephone(978)688-9535 Plalwh?g Director Fax(978)688-9542 I December 27, 2002 VIA FAX AND MAIL Dan Koravos, P.E. DK Engineering Associates 87 Indian Rock Road--Suite 7 Windham,NH 03087-1656 RE: Chatham Crossing—Drainage Modification Dear Dan: Attached please find copies of Tim Willett's and VHB's review of your Drainage Modification Plan dated November 11, 2002. The Town approves construction in accordance with the plans noted above with the following conditions: • Drainage easements shall be secured prior to construction • A drain manhole shall be installed on lot 10 at the intersection of the perforated and non- perforated pipelines • Cleanouts shall be placed at the ends of the proposed 6"perforated pipelines Please be aware that all drainage structures constructed shall be privately owned and maintained. Thank you, Kathy Me enna Planning Director attachments cc: Sandy Brown Bobbie Demeris BOARD OF APPEALS 688-9541 BUILDING 688-95R4.5 CONS rRVATION 688-9530 lIEALTII 688.9540 PL4\n4fN0 688-9535 12/17/02 TUE 12:19 FAX 978 698 9573 NORTH ANDOVER DPW �j001 TOWN OF NORTH ANDOVER DIVISION OF PUBLIC WORKS 384 OSCOOD STREET : NORTH ANDOVER,MASSACHUSETFS 01845 2909 J,WU LIAM I3MURCIAK,I3MCTOR,P.E. Timothy J. Willett oa qrH Telephone(978)685-0950 Water Superintendent tit b�;. _,*:•o� Fax(978) 688-9.573 December 17,2002 Ms.Kathleen McKenna Town Planner 27 Charles Street North Andover, MA 01845 �sl� _.. Chatham Crossing-- Drainage Modification Re ew Dear Ms, McKenna` The Division of Public Works has reviewed the proposed plait entitled"Drainage Modification Plan', dated November 22,2002 by DK Engineering Associates. We offer the following comments. 1. The appropriate drainage easements should be secured prior to any work. I A drain manhole should be installed on lot 10 at the intersection of the perforated and non- perforated pipelines, 3. Cleanouts at the ends of the proposed 6"perforated pipelines are recommended. 4, All drain lines shall be privately owned and maintained. Very truly yours, Timothy J illett Water& Sewer Superintendent CC; Bill Hmurciak E I Transportation RECEIVED I V Land Development Environmental Services DEC b 2002 NO RTFI rarlDOvr--R B Imagination innovation I energy Creating results for our clients and benefiBLAN[t}WQjADVAR'I-MENT December 9,2002 V-anv .Se IHangen B2^tdstUI nC --— Ref: 06716.08 Kathy McKenna,Planning Director Community Development&Services Division Town of North Andover 27 Charles Street North Andov r,.M4 01845 Re: (/Chatham Cros h4-Drainage Modification Review ] firth Andover,MA c Dear Kathy, Vanasse Hangen Brustlin,Inc. (VHB)has received your letter dated December 2,2002 and the attached Drainage Modification Plan prepared by DK engineering Associates,dated 11/22/02. As requested by your office,VHB investigated the feasibility of the proposed solution to remedy the Stormwater pending issue in the rear of lots 9 and 10 of the Chatham Crossing subdivision. VHB offers the following comments: • VHB recommends that the applicant secure all necessary drainage easements for the 6"subdrain as set forth in section 6.14.11 of the Subdivision Rules and Regulations. • VHB recommends that the applicant place a drainage structure at the'Tee' intersection of the subdrain between Lots 9 and 10. • VHB also recommends that the subdrain design be reviewed by the Town of North Andover the Department of Public Works,as the proposed pipe size(6")falls 'below the minimum pipe size of 12"as set forth in Appendix Il of the Subdivision Rules and Regulations, VHB agrees that DK Engineering's solution should alleviate the pending problem in the rear of lots 9 and 10. if you have any questions or concerns,please call at your convenience. Very truly yours, VANASSE HANGEN BRUSTLIN,INC. Erik Swanson Senior Project Engineer-Highway&Municipal Engineering 101 Walnut Street Post Office Box 9151 Watertown, Massachusetts 02471-9151 Cc:Tim McIntosh,VHB 617.924.1770 s FAX 617.924.2286 \\mawatr\te\0671608\docs\letters\let-McKenna-120902.doc email: infoOvhb.com www.vhb,ca'm Town of North Andover Office of the Planning Department l Community Development and Services Division 27 Charles Street North Andover,Massachusetts 01845 Telephone 978 688-9535 Kathy McKenna Planning Director Fax (978)688-9542 i December 2,2002 Tim MacIntosh VfIB,Inc. 101 Walnut Street Watertown,MA 0247 1-9 1 5 1 RE.- Chatham Crossing Dear Tim: Enclosed is a copy of a Drainage Modification Plan for Lots 9& 10 of Chatham Crossing. The applicant met with one of the abutting property owners and has come up with the attached proposed solution to the ponding in the back of lots 9& 10. According to the plan it appears that the developer proposes to regrade the area between the lots and add a perforated 6"pipe. Please provide your professional opinion on the legitimacy of this solution. This item is scheduled for a Planning Board hearing on December 3,2002. If you have any questions,please do not hesitate to call. /4�athy McKenn Town Planner attachment i 'allo ges 6K Engineering Associates VOL 87 Indian Rock Road Letter of Windham, NH 03087-1656 Phone (603) 898-8516 • Fax (603) 898-8497 e-Mail: dan@dkengineering.net Transmittal To: Job Number: 0237 Date: 11/26/02 Town of North Andover Attention: Ms. Kathy McKenna Planning Department 27 Charles Street North Andover, MA RE: Chatham Circle We are sending you the following items: Item Date Copies Description 1 11/22/02 8 Drainage Modification Plan Comments: From: Daniel Koravos, P.E. The attached is being submitted as requested. Please give me a call if you have any questions. Page No. 1 of 1 Pages SimhK Engineering Associates Vow 87 Indian Rock Road —Suite 7 { Windham, NH 03087-1656 Letter 01 Phone (603) 898-8516 • Fax(603) 898-8497 e-Mail: dan@dkengineering.net Transmittal To: Job Number: 0237 Date: 10/15/02 North Andover Planning Department Attention: Ms. Kathy McKenna 27 Charles Street North Andover, MA RE: Chatham Circle We are sending you the following items: Item Date Copies Description 1 nla 1 Mass Highway Permit#4-2000-0282 2 Varies 1 Certified Plot Plans (Lots 1, 4, 7, 8, 9, 10, 11, 12, 13 3 Varies 1 Proposed Plot Plans (Lots 1, 8,9,10,11,12,13) Comments: Please let me know if you need additional information. a From: Daniel Koravos, P.E. DK Engineering Associates Page No. pf Pages 87 Indian Rock Road - Suite 7 Letter of Windham, NH 03087-1656 Phone (603) 898-8516 • Fax(603) 898-8497 e-Mail: dan@dkengineering.net Transmittal To: Job Number: 0237 Date: 10/08/02 Town of North Andover Attention: Ms. Kathy McKenna Office of the Planning Department Community Development and Services Division 27 Charles Street North Andover, MA 01845 i RE: Chatham Crossing We are sending you the following items: Item Date Copies Description 1 10/07/02 4 "Partial As-Built" for Chatham Circle prepared by Dana f. Perkins, Inc. 2 10/08/02 4 Letter from Daniel Koravos to Kathy McKenna 3 n/a 4 Exhibits "A" "B" and "C" 1 1 Comments: For your review III RECE P! r,..: 00T 0 8 2002 NORTH ANI.)Qktr°+=t From: Daniel Koravos, P.F. /� RNAs221.6b �' IfIV.w2t1.15 Exhibit "A" r � Exhibit AL W*221.a7 IIW.(MMip21&27 KKK w 217.97 1 11111 217.97 ol� Nk r�+Mr:au217-77 uw WACK AC M 4 l� ` � LO PAIM No Ww . o AV ` > LOT or f ion &W it in M,0219.01 PACMJ 12, W.111►4 56 � Poo �r r tr l( n4.a7w-. WA _ F"'^ MIS LOr It Ir W. 225A OWN Z. iP11-A. 4 vi I" AWN Rt 7r M -P v X Y" Go � 7\ WIM M � � m Y* .3NCZ ltl;:,-CbL Sam.0 t Wdl '� ittlrC }Qf 3xtr3 �910.1 { jai* 39iYd '� at+ NOW .1 Aar AM rr' I j r Acw- WL IL 44 � r LU _ _ _ ' i° I WAN RA.YY40W + LTA' lS ` It ; � " 4 � .ram mr, 2 Pit 4w 2'• { 1 go i►f 9AG1t tit � RED VrtM yea � d� WATM F rr OF t sG+ Z �V � fRJE� C A A/)' 3 C P ,/ IA VSON—f'R, N�C1lr W L. C� Jul 00 04 03i38p DK Engineering nssooiates (603) 898-0497 P. 1 DK ENGINEE,RING ASSOCIATES2 INC. PhOLM (603)898 8516 87 tfidian Rock Road Fmv:(60)998-8497 P.0,Dox 4260 WimIllam,NJ 1 03087-4200 Lily 8, 2004 Town of North Andover 27 Ch,,irles Sucet North Andover,MA Attn: Msjulic Parrino, Planning Dii-occol' RE: Ch'.AhAgn CtONSilIg E)e-,jv'Ms. PICASk: St;h(;dLll(; ChAth,1111 CI-Os$ing .1,; p L11scUssirxi item on your next available 1genda. Mr, Don Borenstein will represent the applicant to diicw-,; rqcdremenu for the completion of the I -,jpprCdjte yao m.,sisti-ince nij J11j;, 1111titCt ',111d ShOUld YOU FKWC 11fly (JUCNtioms ()j- concerm, plulzie do IM besitatc to LOXILad:IMCL. DK ENC.FNrU?.RjNc Assocmm3s,INC. Daniel Koravos, 11.1-4. President cc: Mr. Don Baremwin I Page No. 1 of 1 Pages DK Engineering Associates, Inc. 87 Indian Rock Road Windham, NH 03087-1656 Letter of Phone (603) 898-8516 • Fax (603) 898-8497 e-Mail: dan@dkengineering.net Transmittal To: Job Number: 0237 Date; 08/13/03 Town of North Andover Attention: Mr. Justin Woods, F RI 27 Charles Street North Andover, MA 01845 AUG 1 4 Pow RE: Chatham Crossing PLANNING DEPARTMENT We are sending you the following items: Item Date Copies Description 1 11/22/02 2 Drainage Modification Plan revised 08/08/03 Comments: From: Daniel Koravos, P.E. This plan shows the proposed locations of the area drains to be installed on the Brown's property. Please note that the locations are approximate. The cleanout at the end of the drain line will be removed and a grate installed. As you know the drain was extended from the original design at the requrest of the Browns and no as-build survey was preformed. Also, the second grate is to placed at the low point off the grass area. The exact location should be identified in the field during the installation. If you require any further information, please contact me. II ~ DK ENGINEERING ASSOCIATES , INC . I July 24, 2003 Town of North Andover 27 Charles Street North Andover, MA 01845 Attn: Mr.Justin Woods,Town Planner RE: Chatham Crossing Detention Basin ' 2 ,3 Dear Justin, The accompanying report entitled "Supplemental Drainage Calculations for Detention Basin Modification" is the complete design and construction package for die detention basin at Chatham Crossing. This is an alternate to the approved underground concrete vault detention basin. As discussed with Mr. Jack Sullivan and yourself, the detention basin as approved will require special maintenance and trained personnel to perform this maintenance. The detention basin proposed is a conventional above ground basin requiring a minimal amount of maintenance. I discussed this change with Mile Formichella, District Permits Engineer at Mass Highway. I was told that the change would not affect the permit as long as the flow in the pipe to the State culvert did not increase from the original design. As requested, a copy of this letter and the report is also being fotwarded to Mt. Timothy B. McIntosh, P.E, at Vanasse Hangen Btustlin, Inc. for review. Should you have any questions or concerns, please contact me. Sincerely, DK ENGINEERING ASSOCIATES,INC. Daniel Koravos, P.E. I Enclosures(1) cc: Aft.Timothy B.McIntosh,P.E.,-\THB 87 INDIAN ROCK ROAD • WINDHAM, NH - 03087-1656 PHONE: (603) 898-8516 • FAX: (603) 898--8497 E-MAIL: DAN r@It DKENGINLERING.NEI` I 1 Page No. 1 of 1 Pages DK Engineering Associates Sim 87 Indian Rock Road Letter of Windham, NH 03087-1656 Phone (603) 898-8516 • Fax(603) 898-8497 e-Mail: dan@dkengineering.net Transmittal To: Job Number: 0237 Date: 06/26/03 Town of North Andover Attention: Justin Woods Planning Department RE: Chatham Crossing We are sending you the following items: Item Date Copies Description 1 nla 1 Drainage calculations for the detention basin modifications. Comments: From: Daniel Koravos, P.E. This is the information I gave to Jack Sullivan for his review. Please let me know if you have any questions. IE I Page No. 1 of 1 Pages DK Engineering Associates j 87 Indian Rack Road Letter o 1 Windham, NH03087-1656 Phone (603) 898-8516 • Fax (603) 898-8497 e-Mail: Nan@dkengineering.net Transmittal To: Job dumber: 0237 Date: 04/24/03 Town of North Andover Attention: Mr. Justin Wood Planning Department 27 Charles Street North Andover, MA RE: Chatham Crossing We are sending you the following items: Item Date Copies Description 1 11/22/02 3 Drainage Modification Plan Comments: From: Daniel Koravos, P.E. I was contacted by Mrs. Joanne Brown, an abutter to the project, and she indicated that you did not have a copy of this plan so I decided to send copies for your file. Please let me know if you need any other information or clarification an this matter. LAW OFFICE OF MARK B. JOHNSON 12 Chestnut Street Andover,Massachusetts 01810-3706 (978)475-4488 Telecopier: (978)475-6703 Paralegals MARK B. JOHNS€7N (NIA,NH,DC) KA'rHRYN Ni.MORIN L1NDA A, O'CONNELL (MA,NH,RI) JEAN A.SHEEHAN DONALD F. BORENSTEIN MA,ME � ) LIANNECRfS'I•ALDI MICHAEL G.FURLONG (MA) September 23, 2002 Via Facsimile: (978) 688-9542 Aitd Fh-st Class Mail Ms. Kathy McKenna Town Planner Town of North Andover 27 Charles Street North Andover.',MA 01845 Re: Ray Von Realty Trust- Chatham Crossin Dear Kathy: As you know, this matter was continued by the Planning Board at their last meeting to October 1, 2002. It is Illy understanding that the Board will be expecting a discussion with the project engineer concerning compliance of the work completed to date with the approved plan and, drainage concerns raised by abutters. I am informed that the engineering work necessary to have a meaningful discussion on these issues will not be completed by the Board's October 1, 2002 meeting. Accordingly, it is requested that all issues related to this project, including the developer's request for lot releases, be continued to the Board's following meeting, which I believe is scheduled for October 15, 2002. Would you please confirm to me whether this matter will be continued as requested and, whether any appearance on behalf of the property o vmi r will be necessary at the October 1, 2002 meeting. Thank you very much for your anticipated cooperation in this regard, Very truly yours, LAW OFFICE OF E g MARK B. JOHNS EC Donald F. Borenstein NO H ANL RT Ft DFB—klb PLAN INC,Dr--PA PC: Ray Von Realty Trust I F;1New-DocslRay Von Realty Trus02-624 Chatham Crossingkmekonna-lir 9-23-02,doc 1 I' a� J !7 q i. i g r.l f�r � 0 I v I (1 ;N, \\\)))\\ CY IV z \ ii1 tV v a V ��,✓,I � ..® tom) � f �') t 1)�I'• f3�I ' 3h V \ I 1 b 999 ) N F�:,) F 1 F• , �� f oA. Q Y w•to ax z1a \\I I �� Z p o � I 1 D � 4 : s(0M7 M t O U co N f o' I (+I z Ou CHATHAM CROSSING North.Andover, Massachusetts LEGEND Drainage Modification Flan PREPARED FOR PROPOSED PERFORATED DRAIN PIPE Cormier Andover Consinrctioct Co(poraUon n n PROPOSED SOLID DRAIN PIPE And Ogle over, over,h1]lfassuclrusetts PROPOSED CONTOURS ASSESSORS MAP 11 LOT# _ _____ __________ ORIGINAL CONTOURS DKEAgmeerirlgAssociates SCALL:i�an� EXISTING SPOT ELEVATION DATE:i l/12lQ2 87 h dims Rock Road Suire 7 nit.BY;DK swim iViodh:ml,N11 03087-16S6 ;OE NOs 0237 VW Tel(603),498.3516 Fsr(601)S98-F497 siiFFr;1�(i t I Division of Public Woft Phone 978-68M950 384 Osgood Street Fax 978-688-9573 n � r� . _� North Andover, MA 01845q � Memo I I Ta: Heidi Griffin,Town Planner From; James Rand, Jr., Director Of Engineering 0Q J.Willies��Hmur ciak, PE, Director of D ;Tirmn IAdiilett Staff Engineer, Dana F. Perkins, Inn, &Ray Cormier Date: August 7, 2001 Re:Chatham Crossing-Subsurface Detention In regards to the subsurface detention area looted in the Chatham Crossing I have reviewed the following documents: 1. Letter from Douglas E, Lees, PE, dated 7/25/01 2. "Drainage Revision Plan Chatham Crossing, North Andover, MA" Scale 1"=40", dated July 25,2001. 3 "Hydrological Analysis" Chatham Crossing prepared by Dana Perkins, Inc and dated July 24, 2001. After my review of the data submitted, I am in agreement with Dana F. Perkins, Inc. and support the changes as proposed. As they show,;the drainage easement must be retained. Hov►+ever, the area of the easement could be substantially reduced if the applicant so desires. If you have any questions please contact me. CJMEMOS HEIDIG 2001/CHATHAM CROSSING DRAINAGE REVISION Pages 1 TOWN WAY STATE HIGHWAY 18" RCP L=20' S=0.005 DMH RIM=221.16 — EXTEND 15" RCP 18" INV.�W)= 215.29 L=66' S=0.013 180 OUT)=215.10 AND 0 VER STREET IU WAIN -E ISTIPfG E0(2E OF P&PAENT w EXISfING C WAIER LINTF W SMH RI)1=221,86 EXISTING 6' GAS UN E IW,=211.15 8" PY(' S N- ER F.Xls-rfNG YCIGIF OF PAVUENT 18- RCA. [Atc SBYFR NM=221.07 IW.(0IJT)=218.27 PROP. DMH RIM=222.50 15" INV.�IN)=2116.91 L 18" INV. OUT)=215.39 RIM=220,98 IWOUT)=218,36 Q4 > DMH Ji RIM=221.27 CL LOTZ GMA 121: 11W N=217,97 I NV V:'JIN =217.97 124 INV. IN =217.97 > 15' INV. IN =217,91 ro �. I zq 15* JW- OUT)=217.77 W Uj LOT /3 �DRAINAGE EASEMENT LO DQUGLA 6 Q. LEES Lp LOT')� 10 5T DRAINAGE REVISION DANA F. PERKINS, inc. Consu,fling Engincers &Land Surveyors .......... . .............. PLAN ................. 1215 MAIN STREET # UNIT III Te TEWKSBURY, HASSACHUSETIS 01076 CHATHAM CROSSING PREPARED FOR: ... ...... ......... RAY CORMIER ArO)?Tff AiVDO VER, HA 59 CHANDLER CIRCLE ........... ................ ANDOVER, MASSACHUSETTS .. ....... ........ .... 1"=40DULY 25, 2001 J08 NO.51165—D COPYRIGHT 0 2.001 BY DANA F. PERKINS,JAC. ( A F �`4z-° '��i=°_,�. z-- s -4i;4 .:, � tiY v : x t ?� }, r Fx { 1« u ,f r,� r 5 r...•':t.,= ^r�� s:�,r`� �I-;;�; ,��� ��" -}., � � ' cr"� � :,r i r'���s�i� ,s � '•P.y�'7 v, ;'. i -k-. ,s �s ,. 4r.. �(r.^ .. �"_dr'.S �,� r6 � r -I1 .i_.g YY'�S 'w..3 p,.i :=b`i K"" ,+'3 p t is t�- ,.c ��? ,�E'#7 ., 5 �. r � ,�1 xzi'bS�.`:-P65 - '� .1; <;:.: 'k dam' •°"`: `a-c -_�i-.uJ •P 'u�t�. ' k- rR, , '• -i .y,.xr, , rrug,_.D, r �'�"• F$`..- 3'� ;'.� , ., a$ -t - 'h .,; 5^x r f'. ,� ' i fr n�; -r ys'� t N. t If-.:.f� k f 0 _ ya T f,. r : •' . e� � }NF�F:k��t'.gk'.k,.,�s,.r'�•r,� 4d���i �����5�� ._.e.,t� .. `�,`" _ .4^ y� i5`ff I1 fR� } I t4 y j4.y �:r4 rs s { t_;- ; �`• f k t'? 7 i.ti i0. r' .rSKi.: x-.s '»��i'� !}7 S �� .1,"yz,� - ' p f F f J �F-r•- � � k Z to}�titlirf��ngfnk4rs'&li�nd Sa�rseyor.� July 25,2001 Mr. James Rand,Jr. Director of Engineering Division of Public Works 384 Osgood Street North Andover, MA 01845 Re: Subsurface Detention Chatham Crossing Dear Mr. Rand: Enclosed please find a Hydrological Analysis and Drainage Revision Plan for the Chatham Crossing Subdivision, The Hydrological Analysis was prepared to compare the pre- development and post-development peak runoff rates to the existing drop inlet catch basin and 3 0" RCP culvert in Andover Street. The calculations enclosed show a decrease in the peak runoff rates due to other development in this part of town.Due to this decrease in runoff,we are proposing to connect the drainage system from Nantucket Drive directly to this 30" RCP foregoing the installation of the underground stormwater detention facility shown on the definitive plans. The area of the drainage easement would remain as part of Lot#3. Thank you for your time in reviewing this matter and please feel free to call with any questions or comments. Very truly yours, DANA F. PERKINS, inc. f� Douglas E. Lees, P.E. DEL:ck i Corporate Offices.,121 S Main Street•Unit 111•Tewksbury,MA 01876-Phone:(978)858-0680•Fax:(978)640-0237 125 Main Street•Reading,MA 01867 Email:danaperkins@worldnet.att.net i ow � � F EItkins, Inc. Corl�ullr`itg$�tglit sees&Laud Surveyors V July 25, 2001 Mr. ,fames Rand, Jr. Director of Engineering Division of Public Works 384 Osgood Street North Andover, MA 01845 Re: Subsurface Detention Chatham Crossing Dear Mr. Rand: Enclosed please find a Hydrological Analysis and Drainage Revision Plan for the Chatham Crossing Subdivision. The Hydrological Analysis was prepared to compare the pre- development and post-development peak runoff rates to the existing drop inlet catch basin and 30" RCP culvert in Andover Street. The calculations enclosed show a decrease in the peak runoff rates due to other development in this part of town.Due to this decrease in runoff,we are proposing to connect the drainage system from Nantucket Drive directly to this 30" RCP foregoing the installation of the underground stormwater detention facility shown on the definitive plans. The area of the drainage easement would remain as part of Lot#3. Thank you for your time in reviewing this matter and please feel free to call with any questions or comments. Very truly yours, DANA F. PERKINS, inc. Douglas E. Lees, P.E. DEL:ck Corporate Off cgs.1215 Main Street•Unit 111-Tewksbury,MA 01876•Phone:(978)850-0680•Pax:(978)640-0237 125 Main Street•Reading,MA 01867 Email:danaperkins(Mworidnet.att.net Tow WAY STATE IIIGIIW,4,v 18" RCP L=20' S=0.005 H RIMDM=221.16 EXTEND 15" RCP 18* IW.(IN)= 215.29 L=66' S=0.013 18" INV.(OUT)-215.10 EXISAG-BITUMINOUS WkK AND 0 VER STREET D D ID —7 MENT W MSFIN,G 6' W&H UNE ENTINc 6' GAS LINE RIM=221.86 INV,=21 I M F"/C SEIVER EXISTING EDGI. OF PAVEWNT S 18" RCP 8" PVC SEWER I r > B IM=221.07 IW-(0IJT)=218.27 PROP. DMH -A RIM=222.50 15" INV.(IN)=216.91 �.` o 18 INV,(OUT)=215.39 6 INV.(OUT)=218-36 i322- F77 44 DmH RIM=221.27 M 12 N 12: 1IVN1:1 1111 =21 1W I. LOT Q4 N =217.97 12: IW-(JN =217.97 �2 15 W IN =217.91 INK 15- 1W. OUT)=217.77 /07 RRAINA60'f EASEMENTEASEMENT92 Lo —�M4$. DOUGL LEES % LOT '1# 3 ca > 0. T DANA F. PERKINS, !no. PRAXWE REVISION N j .............. Consulthig Engineers &Land Surveyors Id .......... ................. 1215 MAIN STREET a UNIT III ........... . .... PLAN YEWSBURY, MASSAMSETTS 01676 CHATHAM CROSSING TPREPAREO FOR: ................ ........... RAY CORMIER . .............. NORTH AjVDOVER, AfA 59 CHANDLER CIRCLE ANDOVER, MASSACHUSETTS ATE: JULY 25, fl T 0 2001 BY DANA SHEET I OF I WP7ypj, 14T' it i 1 ! i THIRU & MARY ANN T. I SADAGOPAN \ I � .211 \ I Z N/F Lot 10 GUY P. & MICHELE M. \ RIENDEAU i I � \ N (M � \ (236.88 \ 235.0 (234.65) (234.73) I n J tom 234. 34 5 I U 233.0 233.5 2 ,0 U S=3,49. 235,0 232 Q \ EDGE OF LANDSCAPING 232.1 I N/F (231.60) (232.67, (234.73) I HOWARD & JOANNE v \ I BROWN EXIST, FISH PONE} E lot 9 I I ° I o_ 231.60 11 I � I EXIST. SHED N/F I WILLIAM L. & 'w OF i I ELIZABETH M. MORIN �.� t3AN16A. CHATHAM CROSSING KORAVOS' North Andover, Massachusetts pNo.3-1, Drainage Modification Plan PRIEPAREDFOR Cormier Andover Construction Corporation LEGEND n C^[D 03tc Elm Squore G v G I `� Af Andover,A4ussachusetts ASSESSORS MAP N LOT# --- -- -m- EXISTING CONTOURS � DKE11g111eci-Mg Associates SCALE:I=30' (235.56) EXISTING SPOT ELEVATION BATE:un2102 235.5 PROPOSED STOT ELEVATION 871ndian Rock Road—Surtc7 MBY:BK SWALE FLOW LINE WindLam,NH03087-1656 3013NO,:0237 IM Tel f60])999-8514T—Fay(603)898-S497 SHEET:I of I G 6o �ON�0 1 1 2 I N SCALE: 20' \ j r `o. \ \ NN rn LOT 2 tx i X w LOT 3 Landscaping Legend Prop. Variegated Tatarian Dogwood 44' (15) Prop. Pinus Strabus 5'-6' (9) ' CRATHAM CROSSING North Andover,Massachusetts Detention Basin Design Plan Existing Mature Trees ' PFWPA"u FOIL Cormier Andover Construction Corp, 59 Chandler Circle Andover,Massachusetts ASS13SSORS MAP 9 LOT 11 1DK Engineering ssoclates sdATE:O&S/13/cAl.u: " 1�'in ,! 13103 / 871ndian Rock Road-'"I DR.BY:DK Windham,NH 030874656 JOB NO.:0277 Tel(603)898-8516—Far(603)898-8497 811HBT:i or k Exhibit ;r t 4 . . . OF tlhK►} � 6 ' NINON w . . . YIN it JOL '�- Aft � i � g 4 � � �x§ mom J/# f FILM .8 J�MYI VIL 91 j S ti � I 'b 1 lotOL �- al r , At Exhibit rr ri i QI 221.66 ` kiv.•211.15 Exhibit "'A L o� i E ;Z r ri b 221.07 � a— w NC x�, lu �# 1 �kW2221-217.47,t)"J K �► l^ 26 W, P .217,07 ' of �,f rJn4 a C NV217.01 .Otll)+217.77 +1 1 AIM Im" wdmw a r WXK La NIG UNpFR to � ""`'• A I ilkrc'k f�. �• , PAT , N/F � >lk/ 1DTor !2 fey sw rW 2�2279$0 4w ,. NIr k1VS.=Y1A1 B�C� s PAM lliM1�226 j 16' #N-(OVr')-22#.07.,e�' 0 pAiM PAAMDMH R N=229.411 �s ON ;x Of W.78 owtor, �� ��• 1 1Y kiV 225,76 � � / A rAW5, .1 F. �