Town of North Andover o� ho tlrrr�ti
Office of the Planning Department
Community Development and Services Division
27 Charles Street
North Andover, Mass adiusetts 01845 4Ssncsaus�t
KrtlrylUcKeima Telephone(978)688-9535
Plalwh?g Director Fax(978)688-9542
I
December 27, 2002
VIA FAX AND MAIL
Dan Koravos, P.E.
DK Engineering Associates
87 Indian Rock Road--Suite 7
Windham,NH 03087-1656
RE: Chatham Crossing—Drainage Modification
Dear Dan:
Attached please find copies of Tim Willett's and VHB's review of your Drainage Modification
Plan dated November 11, 2002.
The Town approves construction in accordance with the plans noted above with the following
conditions:
• Drainage easements shall be secured prior to construction
• A drain manhole shall be installed on lot 10 at the intersection of the perforated and non-
perforated pipelines
• Cleanouts shall be placed at the ends of the proposed 6"perforated pipelines
Please be aware that all drainage structures constructed shall be privately owned and maintained.
Thank you,
Kathy Me enna
Planning Director
attachments
cc: Sandy Brown
Bobbie Demeris
BOARD OF APPEALS 688-9541 BUILDING 688-95R4.5 CONS rRVATION 688-9530 lIEALTII 688.9540 PL4\n4fN0 688-9535
12/17/02 TUE 12:19 FAX 978 698 9573 NORTH ANDOVER DPW �j001
TOWN OF NORTH ANDOVER
DIVISION OF PUBLIC WORKS
384 OSCOOD STREET :
NORTH ANDOVER,MASSACHUSETFS 01845 2909
J,WU LIAM I3MURCIAK,I3MCTOR,P.E.
Timothy J. Willett oa qrH Telephone(978)685-0950
Water Superintendent tit b�;. _,*:•o� Fax(978) 688-9.573
December 17,2002
Ms.Kathleen McKenna
Town Planner
27 Charles Street
North Andover, MA 01845 �sl�
_..
Chatham Crossing--
Drainage Modification Re ew
Dear Ms, McKenna`
The Division of Public Works has reviewed the proposed plait entitled"Drainage Modification Plan',
dated November 22,2002 by DK Engineering Associates. We offer the following comments.
1. The appropriate drainage easements should be secured prior to any work.
I A drain manhole should be installed on lot 10 at the intersection of the perforated and non-
perforated pipelines,
3. Cleanouts at the ends of the proposed 6"perforated pipelines are recommended.
4, All drain lines shall be privately owned and maintained.
Very truly yours,
Timothy J illett
Water& Sewer Superintendent
CC; Bill Hmurciak
E
I
Transportation RECEIVED
I V
Land Development
Environmental
Services DEC b 2002
NO RTFI rarlDOvr--R
B Imagination innovation I energy Creating results for our clients and benefiBLAN[t}WQjADVAR'I-MENT
December 9,2002 V-anv .Se IHangen B2^tdstUI nC --—
Ref: 06716.08
Kathy McKenna,Planning Director
Community Development&Services Division
Town of North Andover
27 Charles Street
North Andov r,.M4 01845
Re: (/Chatham Cros h4-Drainage Modification Review ]
firth Andover,MA
c
Dear Kathy,
Vanasse Hangen Brustlin,Inc. (VHB)has received your letter dated December 2,2002 and
the attached Drainage Modification Plan prepared by DK engineering Associates,dated
11/22/02. As requested by your office,VHB investigated the feasibility of the proposed
solution to remedy the Stormwater pending issue in the rear of lots 9 and 10 of the
Chatham Crossing subdivision.
VHB offers the following comments:
• VHB recommends that the applicant secure all necessary drainage easements for
the 6"subdrain as set forth in section 6.14.11 of the Subdivision Rules and
Regulations.
• VHB recommends that the applicant place a drainage structure at the'Tee'
intersection of the subdrain between Lots 9 and 10.
• VHB also recommends that the subdrain design be reviewed by the Town of North
Andover the Department of Public Works,as the proposed pipe size(6")falls
'below the minimum pipe size of 12"as set forth in Appendix Il of the Subdivision
Rules and Regulations,
VHB agrees that DK Engineering's solution should alleviate the pending problem in the
rear of lots 9 and 10. if you have any questions or concerns,please call at your convenience.
Very truly yours,
VANASSE HANGEN BRUSTLIN,INC.
Erik Swanson
Senior Project Engineer-Highway&Municipal Engineering
101 Walnut Street
Post Office Box 9151
Watertown, Massachusetts 02471-9151
Cc:Tim McIntosh,VHB 617.924.1770 s FAX 617.924.2286
\\mawatr\te\0671608\docs\letters\let-McKenna-120902.doc email: infoOvhb.com
www.vhb,ca'm
Town of North Andover
Office of the Planning Department l
Community Development and Services Division
27 Charles Street
North Andover,Massachusetts 01845
Telephone 978 688-9535
Kathy McKenna Planning Director Fax (978)688-9542
i
December 2,2002
Tim MacIntosh
VfIB,Inc.
101 Walnut Street
Watertown,MA 0247 1-9 1 5 1
RE.- Chatham Crossing
Dear Tim:
Enclosed is a copy of a Drainage Modification Plan for Lots 9& 10 of Chatham Crossing. The applicant met with
one of the abutting property owners and has come up with the attached proposed solution to the ponding in the
back of lots 9& 10.
According to the plan it appears that the developer proposes to regrade the area between the lots and add a
perforated 6"pipe.
Please provide your professional opinion on the legitimacy of this solution.
This item is scheduled for a Planning Board hearing on December 3,2002.
If you have any questions,please do not hesitate to call.
/4�athy McKenn
Town Planner
attachment
i
'allo ges
6K Engineering Associates
VOL
87 Indian Rock Road Letter of
Windham, NH 03087-1656
Phone (603) 898-8516 • Fax (603) 898-8497
e-Mail: dan@dkengineering.net Transmittal
To: Job Number: 0237 Date: 11/26/02
Town of North Andover Attention: Ms. Kathy McKenna
Planning Department
27 Charles Street
North Andover, MA
RE: Chatham Circle
We are sending you the following items:
Item Date Copies Description
1 11/22/02 8 Drainage Modification Plan
Comments: From: Daniel Koravos, P.E.
The attached is being submitted as requested. Please give me a call if you have any questions.
Page No. 1 of 1 Pages
SimhK Engineering Associates
Vow
87 Indian Rock Road —Suite 7 {
Windham, NH 03087-1656 Letter 01
Phone (603) 898-8516 • Fax(603) 898-8497
e-Mail: dan@dkengineering.net Transmittal
To: Job Number: 0237 Date: 10/15/02
North Andover Planning Department Attention: Ms. Kathy McKenna
27 Charles Street
North Andover, MA
RE: Chatham Circle
We are sending you the following items:
Item Date Copies Description
1 nla 1 Mass Highway Permit#4-2000-0282
2 Varies 1 Certified Plot Plans (Lots 1, 4, 7, 8, 9, 10, 11, 12, 13
3 Varies 1 Proposed Plot Plans (Lots 1, 8,9,10,11,12,13)
Comments:
Please let me know if you need additional information.
a
From: Daniel Koravos, P.E.
DK Engineering Associates Page No. pf Pages
87 Indian Rock Road - Suite 7 Letter of
Windham, NH 03087-1656
Phone (603) 898-8516 • Fax(603) 898-8497
e-Mail: dan@dkengineering.net Transmittal
To: Job Number: 0237 Date: 10/08/02
Town of North Andover Attention: Ms. Kathy McKenna
Office of the Planning Department
Community Development and Services Division
27 Charles Street
North Andover, MA 01845
i
RE: Chatham Crossing
We are sending you the following items:
Item Date Copies Description
1 10/07/02 4 "Partial As-Built" for Chatham Circle prepared by
Dana f. Perkins, Inc.
2 10/08/02 4 Letter from Daniel Koravos to Kathy McKenna
3 n/a 4 Exhibits "A" "B" and "C"
1
1
Comments:
For your review
III
RECE
P! r,..:
00T 0 8 2002
NORTH ANI.)Qktr°+=t
From: Daniel Koravos, P.F.
/� RNAs221.6b �'
IfIV.w2t1.15 Exhibit "A"
r
� Exhibit
AL
W*221.a7
IIW.(MMip21&27
KKK
w 217.97
1 11111 217.97 ol�
Nk
r�+Mr:au217-77 uw
WACK
AC
M 4 l� ` � LO
PAIM
No Ww
.
o
AV
` > LOT or
f
ion &W it in
M,0219.01 PACMJ
12, W.111►4 56 � Poo �r r
tr l( n4.a7w-. WA _ F"'^
MIS LOr It
Ir W. 225A OWN
Z.
iP11-A. 4 vi I"
AWN
Rt
7r M -P v X
Y" Go � 7\ WIM M
� � m Y*
.3NCZ ltl;:,-CbL Sam.0 t Wdl
'� ittlrC }Qf 3xtr3 �910.1 {
jai* 39iYd '�
at+
NOW .1
Aar
AM
rr' I j
r
Acw-
WL
IL
44
� r
LU
_ _ _ ' i°
I
WAN
RA.YY40W + LTA' lS ` It
;
� "
4
� .ram
mr,
2 Pit
4w 2'• {
1
go
i►f 9AG1t
tit
� RED VrtM
yea �
d� WATM F rr OF t sG+ Z
�V �
fRJE� C A A/)' 3
C P ,/ IA VSON—f'R, N�C1lr W L.
C�
Jul 00 04 03i38p DK Engineering nssooiates (603) 898-0497 P. 1
DK ENGINEE,RING ASSOCIATES2 INC.
PhOLM (603)898 8516
87 tfidian Rock Road Fmv:(60)998-8497
P.0,Dox 4260
WimIllam,NJ 1 03087-4200
Lily 8, 2004
Town of North Andover
27 Ch,,irles Sucet
North Andover,MA
Attn: Msjulic Parrino, Planning Dii-occol'
RE: Ch'.AhAgn CtONSilIg
E)e-,jv'Ms.
PICASk: St;h(;dLll(; ChAth,1111 CI-Os$ing .1,; p L11scUssirxi item on your next available 1genda. Mr,
Don Borenstein will represent the applicant to diicw-,; rqcdremenu for the completion of the
I -,jpprCdjte yao m.,sisti-ince nij J11j;, 1111titCt ',111d ShOUld YOU FKWC 11fly (JUCNtioms ()j- concerm,
plulzie do IM besitatc to LOXILad:IMCL.
DK ENC.FNrU?.RjNc Assocmm3s,INC.
Daniel Koravos, 11.1-4.
President
cc: Mr. Don Baremwin
I
Page No. 1 of 1 Pages
DK Engineering Associates, Inc.
87 Indian Rock Road
Windham, NH 03087-1656 Letter of
Phone (603) 898-8516 • Fax (603) 898-8497
e-Mail: dan@dkengineering.net Transmittal
To: Job Number: 0237 Date; 08/13/03
Town of North Andover Attention: Mr. Justin Woods, F RI
27 Charles Street
North Andover, MA 01845
AUG 1 4 Pow
RE: Chatham Crossing
PLANNING DEPARTMENT
We are sending you the following items:
Item Date Copies Description
1 11/22/02 2 Drainage Modification Plan revised 08/08/03
Comments: From: Daniel Koravos, P.E.
This plan shows the proposed locations of the area drains to be installed on the
Brown's property. Please note that the locations are approximate. The cleanout
at the end of the drain line will be removed and a grate installed. As you know
the drain was extended from the original design at the requrest of the Browns
and no as-build survey was preformed. Also, the second grate is to placed at the
low point off the grass area. The exact location should be identified in the field
during the installation.
If you require any further information, please contact me.
II
~ DK ENGINEERING ASSOCIATES , INC .
I
July 24, 2003
Town of North Andover
27 Charles Street
North Andover, MA 01845
Attn: Mr.Justin Woods,Town Planner
RE: Chatham Crossing Detention Basin ' 2 ,3
Dear Justin,
The accompanying report entitled "Supplemental Drainage Calculations for Detention
Basin Modification" is the complete design and construction package for die detention basin
at Chatham Crossing. This is an alternate to the approved underground concrete vault
detention basin.
As discussed with Mr. Jack Sullivan and yourself, the detention basin as approved will
require special maintenance and trained personnel to perform this maintenance. The
detention basin proposed is a conventional above ground basin requiring a minimal amount
of maintenance.
I discussed this change with Mile Formichella, District Permits Engineer at Mass
Highway. I was told that the change would not affect the permit as long as the flow in the
pipe to the State culvert did not increase from the original design.
As requested, a copy of this letter and the report is also being fotwarded to Mt. Timothy
B. McIntosh, P.E, at Vanasse Hangen Btustlin, Inc. for review.
Should you have any questions or concerns, please contact me.
Sincerely,
DK ENGINEERING ASSOCIATES,INC.
Daniel Koravos, P.E.
I
Enclosures(1)
cc: Aft.Timothy B.McIntosh,P.E.,-\THB
87 INDIAN ROCK ROAD • WINDHAM, NH - 03087-1656
PHONE: (603) 898-8516 • FAX: (603) 898--8497
E-MAIL: DAN r@It DKENGINLERING.NEI`
I
1
Page No. 1 of 1 Pages
DK Engineering Associates
Sim
87 Indian Rock Road Letter of
Windham, NH 03087-1656
Phone (603) 898-8516 • Fax(603) 898-8497
e-Mail: dan@dkengineering.net Transmittal
To: Job Number: 0237 Date: 06/26/03
Town of North Andover Attention: Justin Woods
Planning Department
RE: Chatham Crossing
We are sending you the following items:
Item Date Copies Description
1 nla 1 Drainage calculations for the detention basin
modifications.
Comments: From: Daniel Koravos, P.E.
This is the information I gave to Jack Sullivan for his review. Please let me know if you have any
questions.
IE
I
Page No. 1 of 1 Pages
DK Engineering Associates j
87 Indian Rack Road Letter o 1 Windham, NH03087-1656
Phone (603) 898-8516 • Fax (603) 898-8497
e-Mail: Nan@dkengineering.net Transmittal
To: Job dumber: 0237 Date: 04/24/03
Town of North Andover Attention: Mr. Justin Wood
Planning Department
27 Charles Street
North Andover, MA
RE: Chatham Crossing
We are sending you the following items:
Item Date Copies Description
1 11/22/02 3 Drainage Modification Plan
Comments: From: Daniel Koravos, P.E.
I was contacted by Mrs. Joanne Brown, an abutter to the project, and she indicated that you did
not have a copy of this plan so I decided to send copies for your file.
Please let me know if you need any other information or clarification an this matter.
LAW OFFICE OF
MARK B. JOHNSON
12 Chestnut Street
Andover,Massachusetts 01810-3706
(978)475-4488
Telecopier: (978)475-6703
Paralegals
MARK B. JOHNS€7N (NIA,NH,DC) KA'rHRYN Ni.MORIN
L1NDA A, O'CONNELL (MA,NH,RI) JEAN A.SHEEHAN
DONALD F. BORENSTEIN MA,ME
� ) LIANNECRfS'I•ALDI
MICHAEL G.FURLONG (MA)
September 23, 2002
Via Facsimile: (978) 688-9542
Aitd Fh-st Class Mail
Ms. Kathy McKenna
Town Planner
Town of North Andover
27 Charles Street
North Andover.',MA 01845
Re: Ray Von Realty Trust- Chatham Crossin
Dear Kathy:
As you know, this matter was continued by the Planning Board at their last meeting to
October 1, 2002. It is Illy understanding that the Board will be expecting a discussion with the
project engineer concerning compliance of the work completed to date with the approved plan
and, drainage concerns raised by abutters. I am informed that the engineering work necessary to
have a meaningful discussion on these issues will not be completed by the Board's October 1,
2002 meeting. Accordingly, it is requested that all issues related to this project, including the
developer's request for lot releases, be continued to the Board's following meeting, which I
believe is scheduled for October 15, 2002.
Would you please confirm to me whether this matter will be continued as requested and,
whether any appearance on behalf of the property o vmi r will be necessary at the October 1, 2002
meeting.
Thank you very much for your anticipated cooperation in this regard,
Very truly yours,
LAW OFFICE OF E g
MARK B. JOHNS EC
Donald F. Borenstein NO H ANL RT Ft
DFB—klb PLAN INC,Dr--PA
PC: Ray Von Realty Trust
I
F;1New-DocslRay Von Realty Trus02-624 Chatham Crossingkmekonna-lir 9-23-02,doc
1 I'
a� J !7 q
i.
i g r.l
f�r �
0 I
v
I (1 ;N,
\\\)))\\ CY
IV z
\ ii1 tV
v a
V ��,✓,I � ..® tom) � f
�') t 1)�I'• f3�I '
3h V \ I 1 b 999
) N
F�:,)
F 1 F• , �� f
oA.
Q
Y
w•to
ax
z1a \\I I �� Z p
o � I 1 D �
4 :
s(0M7 M t O
U co N f o' I (+I
z
Ou
CHATHAM CROSSING
North.Andover, Massachusetts
LEGEND Drainage Modification Flan
PREPARED FOR
PROPOSED PERFORATED DRAIN PIPE Cormier Andover Consinrctioct Co(poraUon
n n PROPOSED SOLID DRAIN PIPE And Ogle over,
over,h1]lfassuclrusetts
PROPOSED CONTOURS ASSESSORS MAP 11 LOT#
_ _____ __________ ORIGINAL CONTOURS DKEAgmeerirlgAssociates SCALL:i�an�
EXISTING SPOT ELEVATION
DATE:i l/12lQ2
87 h dims Rock Road Suire 7 nit.BY;DK
swim iViodh:ml,N11 03087-16S6 ;OE NOs 0237
VW Tel(603),498.3516 Fsr(601)S98-F497 siiFFr;1�(i
t I
Division of Public Woft Phone 978-68M950
384 Osgood Street Fax 978-688-9573 n � r� . _�
North Andover, MA 01845q �
Memo
I
I
Ta: Heidi Griffin,Town Planner
From; James Rand, Jr., Director Of Engineering
0Q J.Willies��Hmur ciak, PE, Director of D ;Tirmn IAdiilett Staff Engineer, Dana F. Perkins, Inn,
&Ray Cormier
Date: August 7, 2001
Re:Chatham Crossing-Subsurface Detention
In regards to the subsurface detention area looted in the Chatham Crossing I have reviewed the
following documents:
1. Letter from Douglas E, Lees, PE, dated 7/25/01
2. "Drainage Revision Plan Chatham Crossing, North Andover, MA" Scale 1"=40", dated July
25,2001.
3 "Hydrological Analysis" Chatham Crossing prepared by Dana Perkins, Inc and dated July 24,
2001.
After my review of the data submitted, I am in agreement with Dana F. Perkins, Inc. and support the
changes as proposed. As they show,;the drainage easement must be retained. Hov►+ever, the area of
the easement could be substantially reduced if the applicant so desires. If you have any questions
please contact me.
CJMEMOS HEIDIG 2001/CHATHAM CROSSING DRAINAGE REVISION
Pages 1
TOWN WAY
STATE
HIGHWAY 18" RCP
L=20' S=0.005
DMH
RIM=221.16 — EXTEND 15" RCP
18" INV.�W)= 215.29 L=66' S=0.013
180 OUT)=215.10
AND 0 VER STREET
IU WAIN
-E ISTIPfG E0(2E OF P&PAENT
w
EXISfING C WAIER LINTF
W
SMH
RI)1=221,86
EXISTING 6' GAS UN E IW,=211.15
8" PY(' S N- ER F.Xls-rfNG YCIGIF OF PAVUENT
18- RCA.
[Atc SBYFR
NM=221.07
IW.(0IJT)=218.27
PROP. DMH
RIM=222.50
15" INV.�IN)=2116.91
L
18" INV. OUT)=215.39 RIM=220,98
IWOUT)=218,36
Q4 >
DMH
Ji RIM=221.27
CL LOTZ GMA
121: 11W N=217,97 I NV V:'JIN =217.97
124 INV. IN =217.97 >
15' INV. IN =217,91 ro
�. I
zq 15* JW- OUT)=217.77
W
Uj
LOT /3
�DRAINAGE EASEMENT LO
DQUGLA 6
Q. LEES Lp
LOT')�
10
5T
DRAINAGE REVISION DANA F. PERKINS, inc.
Consu,fling Engincers &Land Surveyors
.......... . ..............
PLAN
.................
1215 MAIN STREET # UNIT III
Te TEWKSBURY, HASSACHUSETIS 01076
CHATHAM CROSSING PREPARED FOR:
... ......
.........
RAY CORMIER
ArO)?Tff AiVDO VER, HA 59 CHANDLER CIRCLE ...........
................
ANDOVER, MASSACHUSETTS
.. .......
........ ....
1"=40DULY 25, 2001 J08 NO.51165—D COPYRIGHT 0 2.001 BY DANA F. PERKINS,JAC.
( A
F �`4z-° '��i=°_,�. z-- s -4i;4 .:, � tiY v : x t ?� }, r Fx { 1« u ,f r,� r 5 r...•':t.,=
^r�� s:�,r`� �I-;;�; ,��� ��" -}., � � ' cr"� � :,r i r'���s�i� ,s � '•P.y�'7 v, ;'. i -k-. ,s �s ,.
4r.. �(r.^ .. �"_dr'.S �,� r6 � r -I1 .i_.g YY'�S
'w..3 p,.i :=b`i K"" ,+'3 p t is t�- ,.c ��? ,�E'#7 ., 5 �. r � ,�1
xzi'bS�.`:-P65 - '� .1; <;:.: 'k dam'
•°"`: `a-c -_�i-.uJ •P 'u�t�. ' k-
rR, , '• -i .y,.xr, , rrug,_.D, r �'�"• F$`..- 3'� ;'.� , ., a$ -t - 'h .,; 5^x r f'. ,� ' i fr n�; -r ys'� t
N.
t If-.:.f� k f 0 _ ya T f,. r : •' .
e� � }NF�F:k��t'.gk'.k,.,�s,.r'�•r,� 4d���i �����5�� ._.e.,t� .. `�,`" _
.4^ y�
i5`ff I1 fR� } I t4 y j4.y �:r4 rs s { t_;- ; �`• f k
t'? 7 i.ti i0. r' .rSKi.: x-.s '»��i'� !}7 S �� .1,"yz,�
-
'
p f F f J �F-r•- � � k
Z
to}�titlirf��ngfnk4rs'&li�nd Sa�rseyor.�
July 25,2001
Mr. James Rand,Jr.
Director of Engineering
Division of Public Works
384 Osgood Street
North Andover, MA 01845
Re: Subsurface Detention
Chatham Crossing
Dear Mr. Rand:
Enclosed please find a Hydrological Analysis and Drainage Revision Plan for the Chatham
Crossing Subdivision, The Hydrological Analysis was prepared to compare the pre-
development and post-development peak runoff rates to the existing drop inlet catch basin
and 3 0" RCP culvert in Andover Street.
The calculations enclosed show a decrease in the peak runoff rates due to other development
in this part of town.Due to this decrease in runoff,we are proposing to connect the drainage
system from Nantucket Drive directly to this 30" RCP foregoing the installation of the
underground stormwater detention facility shown on the definitive plans. The area of the
drainage easement would remain as part of Lot#3.
Thank you for your time in reviewing this matter and please feel free to call with any
questions or comments.
Very truly yours,
DANA F. PERKINS, inc.
f�
Douglas E. Lees, P.E.
DEL:ck
i
Corporate Offices.,121 S Main Street•Unit 111•Tewksbury,MA 01876-Phone:(978)858-0680•Fax:(978)640-0237
125 Main Street•Reading,MA 01867
Email:danaperkins@worldnet.att.net
i
ow
� � F EItkins, Inc.
Corl�ullr`itg$�tglit sees&Laud Surveyors
V
July 25, 2001
Mr. ,fames Rand, Jr.
Director of Engineering
Division of Public Works
384 Osgood Street
North Andover, MA 01845
Re: Subsurface Detention
Chatham Crossing
Dear Mr. Rand:
Enclosed please find a Hydrological Analysis and Drainage Revision Plan for the Chatham
Crossing Subdivision. The Hydrological Analysis was prepared to compare the pre-
development and post-development peak runoff rates to the existing drop inlet catch basin
and 30" RCP culvert in Andover Street.
The calculations enclosed show a decrease in the peak runoff rates due to other development
in this part of town.Due to this decrease in runoff,we are proposing to connect the drainage
system from Nantucket Drive directly to this 30" RCP foregoing the installation of the
underground stormwater detention facility shown on the definitive plans. The area of the
drainage easement would remain as part of Lot#3.
Thank you for your time in reviewing this matter and please feel free to call with any
questions or comments.
Very truly yours,
DANA F. PERKINS, inc.
Douglas E. Lees, P.E.
DEL:ck
Corporate Off cgs.1215 Main Street•Unit 111-Tewksbury,MA 01876•Phone:(978)850-0680•Pax:(978)640-0237
125 Main Street•Reading,MA 01867
Email:danaperkins(Mworidnet.att.net
Tow WAY
STATE
IIIGIIW,4,v 18" RCP
L=20' S=0.005
H
RIMDM=221.16 EXTEND 15" RCP
18* IW.(IN)= 215.29 L=66' S=0.013
18" INV.(OUT)-215.10
EXISAG-BITUMINOUS WkK AND 0 VER STREET
D D ID —7
MENT
W MSFIN,G 6' W&H UNE
ENTINc 6' GAS LINE RIM=221.86
INV,=21 I M
F"/C SEIVER EXISTING EDGI. OF PAVEWNT
S
18" RCP 8" PVC SEWER
I r >
B
IM=221.07
IW-(0IJT)=218.27
PROP. DMH -A
RIM=222.50
15" INV.(IN)=216.91
�.` o 18 INV,(OUT)=215.39
6 INV.(OUT)=218-36
i322-
F77
44 DmH
RIM=221.27
M
12 N 12: 1IVN1:1 1111 =21 1W
I. LOT
Q4 N =217.97
12: IW-(JN =217.97 �2
15 W IN =217.91
INK 15- 1W. OUT)=217.77
/07
RRAINA60'f EASEMENTEASEMENT92 Lo —�M4$.
DOUGL
LEES %
LOT '1# 3 ca
>
0.
T
DANA F. PERKINS, !no.
PRAXWE REVISION N j
..............
Consulthig Engineers &Land Surveyors
Id .......... .................
1215 MAIN STREET a UNIT III
........... . ....
PLAN YEWSBURY, MASSAMSETTS 01676
CHATHAM CROSSING TPREPAREO FOR: ................ ...........
RAY CORMIER
. ..............
NORTH AjVDOVER, AfA 59 CHANDLER CIRCLE
ANDOVER, MASSACHUSETTS
ATE: JULY 25, fl T 0 2001 BY DANA SHEET I OF I WP7ypj,
14T'
it
i
1 !
i
THIRU & MARY ANN T. I
SADAGOPAN
\ I �
.211
\ I Z N/F
Lot 10 GUY P. & MICHELE M.
\ RIENDEAU i
I �
\ N
(M
� \ (236.88
\ 235.0
(234.65) (234.73) I n
J tom 234.
34 5 I U
233.0 233.5 2 ,0
U S=3,49. 235,0
232
Q \ EDGE OF LANDSCAPING
232.1 I N/F
(231.60) (232.67, (234.73) I HOWARD & JOANNE
v \ I BROWN
EXIST, FISH PONE}
E
lot 9 I
I
° I o_
231.60 11
I
� I
EXIST. SHED N/F
I WILLIAM L. &
'w OF i I ELIZABETH M. MORIN
�.� t3AN16A.
CHATHAM CROSSING
KORAVOS' North Andover, Massachusetts
pNo.3-1, Drainage Modification Plan
PRIEPAREDFOR
Cormier Andover Construction Corporation
LEGEND
n C^[D 03tc Elm Squore
G v G I `� Af Andover,A4ussachusetts
ASSESSORS MAP N LOT#
--- -- -m- EXISTING CONTOURS � DKE11g111eci-Mg Associates SCALE:I=30'
(235.56) EXISTING SPOT ELEVATION BATE:un2102
235.5 PROPOSED STOT ELEVATION 871ndian Rock Road—Surtc7 MBY:BK
SWALE FLOW LINE WindLam,NH03087-1656 3013NO,:0237
IM Tel f60])999-8514T—Fay(603)898-S497 SHEET:I of I
G 6o
�ON�0 1
1
2
I
N
SCALE:
20'
\ j
r
`o.
\ \ NN rn
LOT 2
tx
i
X
w LOT 3
Landscaping Legend
Prop. Variegated Tatarian Dogwood 44' (15)
Prop. Pinus Strabus 5'-6' (9) ' CRATHAM CROSSING
North Andover,Massachusetts
Detention Basin Design Plan
Existing Mature Trees ' PFWPA"u FOIL
Cormier Andover Construction Corp,
59 Chandler Circle
Andover,Massachusetts
ASS13SSORS MAP 9 LOT 11
1DK Engineering ssoclates sdATE:O&S/13/cAl.u: "
1�'in ,! 13103
/ 871ndian Rock Road-'"I
DR.BY:DK
Windham,NH 030874656 JOB NO.:0277
Tel(603)898-8516—Far(603)898-8497 811HBT:i or k
Exhibit ;r
t
4
. . . OF tlhK►} �
6 ' NINON
w . . . YIN
it
JOL
'�-
Aft �
i
� g
4 � �
�x§
mom
J/#
f FILM .8 J�MYI
VIL
91
j S ti
� I
'b 1
lotOL
�-
al
r ,
At
Exhibit rr ri
i
QI 221.66 `
kiv.•211.15 Exhibit "'A
L
o�
i
E
;Z r ri
b 221.07
� a— w NC x�,
lu
�# 1 �kW2221-217.47,t)"J K �►
l^ 26
W, P .217,07 ' of �,f rJn4 a C
NV217.01
.Otll)+217.77
+1 1 AIM Im"
wdmw
a r
WXK
La
NIG UNpFR
to � ""`'•
A
I
ilkrc'k
f�. �• , PAT , N/F �
>lk/ 1DTor !2 fey
sw rW
2�2279$0 4w ,. NIr
k1VS.=Y1A1 B�C� s
PAM
lliM1�226
j 16'
#N-(OVr')-22#.07.,e�'
0
pAiM PAAMDMH
R N=229.411 �s ON
;x Of W.78 owtor, �� ��•
1 1Y kiV 225,76 � � / A rAW5, .1 F. �